This document is Addendum No. 4 to the bid documents for the Utley Creek Water Reclamation Facility (UCWRF) Lab & Operators Building project, issued by the Town of Holly Springs, North Carolina, and engineered by Hazen and Sawyer. The addendum provides clarifications and updates to the original bid documents, addressing contractor questions about project timelines, phasing, and specific technical specifications. The project is Phase 1 of the UCWRF Expansion, with the Lab and Operations Building as the primary focus. Phase 2, covering Treatment Facility Upgrades, is anticipated to bid in late fall 2025 and begin construction in early spring 2026, with potential overlap during the last nine months of the Phase 1 project.
The addendum includes detailed technical modifications to electrical panel schedules, HVAC control sequences, door schedules, and signage details. The Town's construction budget for Phase 1 is between $13 million and $15 million. Key updates include changes to power transfer protocols during generator operation, modifications to air handling unit controls, updates to lab equipment schedules, and notes about relocating existing equipment. The document provides specific guidance for bidders on substitution requests, contract time adjustments, and required documentation, emphasizing the critical nature of on-time delivery for the overall UCWRF Expansion Project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 4 TO BID DOCUMENTS
Date: June 18, 2025 Project: Utley Creek WRF - Lab & Operators Building Owner: Town of Holly Springs Engineer: Hazen and Sawyer
To All Bidders:
Contractors submitting Proposals for the above-named Project shall take note of the following changes, additions, deletions, clarifications, etc., in the Bid Documents, which shall become part of and have precedence over anything contrarily shown or described in the Bid Documents, and all such shall be taken into consideration and be included in the Contractor’s Bid Proposal.
All other general items, conditions, drawings, and specifications shall remain the same.
Please acknowledge the receipt of Addendum No. 4 with the Bid Form.
Refer to the Attached Sheets.
The return receipt requested with the communication will be deemed evidence that the bidder has received this Addendum and has followed the instructions outlined herein.
Please sign, date, clearly print company name, and email this sheet back to Hazen and Sawyer at tohs_ucwrf_labopsbldg@hazenandsaywer.com.
Company Name
Acknowledgement of Receipt
Date
Michelle A. Mayes, P.E.
HAZEN AND SAWYER
Addendum No. 4
Utley Creek WRF - Lab & Operators Building Project
GENERAL:
Response to Bidder Questions:
1. Please clarify the meaning of Time for Performance?
a. Response: Time of Performance refers to the number of days stated in Section
00500 - Agreement to achieve intermediate milestones, or Substantial Completion and complete the Work so that it is ready for final payment as evidenced by
Engineer’s written recommendation of final payment.
2. Will other projects and/or phases begin on the same construction Site as this project?
a. Response: The Lab and Operations Building project is Phase 1 of the UCWRF
Expansion project. The Treatment Facility Upgrades are Phase 2 and is anticipated to bid in late fall 2025. Construction for Phase 2 is expected to start in early spring
2026. The scope of work for Phase 2 will focus on areas to the south and east of the
Lab and Operations building. Construction for the two phases of work may overlap during the last nine months of the Lab and Operations Building project.
3. Can additional time be added to this scope of work?
a. Response: The Lab and Operations Building (Phase 1) is critical path for the overall
UCWRF Expansion Project. On time delivery of Phase 1 is important to the overall success of the project. Refer to Section 00500 – Agreement Article 10 paragraph
10.05 and Article 12 paragraphs 12.02 and 12.03 for requirements related to adjustment to the Contract Time.
4. Can mulch be done and left on site?
a. Response: Section 31 10 00 – Clearing, Grubbing, and Site Preparation, paragraph
2.04 states all debris from the clearing and grubbing work shall be disposed of by the Contractor as part of the work.
5. In Spec section 12.03 it states Extensions granted to the contract times shall reflect the actual delay likely to be caused to the date of Substantial Completion, if a delay occurs during the 270 days of the Grading, Duck Bank & Temp Roads scope will days be days to this time line or will all extensions be added to Sub. Completion?
a. Response: Section 00500 – Agreement, Article 12 paragraphs 12.02 and 12.03 state
Contract Times, including intermediate milestones, may be adjusted by Change
Order or by Written Amendment. Additional time may be added to the intermediate milestone and Substantial Completion if it is determined that the delay of the intermediate milestone will cause a delay to Substantial Completion.
6. Please clarify project budget discussed at pre-bid meeting. Is the $13M-$15M allocated for
Phase 1 only?
a. Response: The Town’s construction budget for the UCWRF - Lab and Operations
Building Project (Phase 1) is between $13M and $15M.
7. Can any products be added to the specifications?
a. Equals and substitutions will be reviewed in accordance with specification section
00700 paragraph 6.05. Substitutes and "Or Equals". Products of equal or superior quality will be considered.
SPECIFICATIONS:
SECTION 23 09 02 – HVAC AUTOMATIC TEMPERATURE CONTROLS
Page 23 09 02 – 31 (Air Handler for VAV Boxes) Add the following:
17. Upon receiving a discrete signal from the Building Electrical Automatic Transfer Switch (ATS) indicating a loss in primary power and transfer to generator power the Building Management System shall signal the Packaged Rooftop unit AHU0800-1 (AHU-800-2 to stay operational) to override operational mode and shutdown fan, cooling, heating and ventilation operation. All VAV boxes served by the Packaged Rooftop unit shall also cease any control and reheat functions. The Packaged Rooftop Unit controls circuit shall remain active.
Upon receiving a discrete signal from the Building Electrical Automatic Transfer Switch (ATS) indicating a return of primary power the Building Management System shall signal the Packaged Rooftop unit AHU-800-1 to return to operational mode and activate fan, cooling, heating and ventilation operation. All VAV boxes served by the Packaged Rooftop unit shall also return to normal control and reheat functions.
Page 23 09 02 – 32 (VAV Box) Add the following:
13. Upon receiving a discrete signal from the Building Electrical Automatic generator power the Building Management System shall signal the Packaged Rooftop unit AHU0800-1 (AHU-800-2 to stay operational) to override operational mode and shutdown fan, cooling, heating and ventilation operation. All VAV boxes served by the Packaged Rooftop unit shall also cease any control and reheat functions.
Upon receiving a discrete signal from the Building Electrical Automatic Transfer Switch (ATS) indicating a return of primary power the Building Management System shall signal the Packaged Rooftop unit AHU-800-1 to return to operational mode and activate fan, cooling, heating and ventilation operation. All VAV boxes served by the Packaged Rooftop unit shall also return to normal control and reheat functions.
Page 23 09 02 – 34 (Air Handler - Laboratory) Add the following:
12. Upon receiving a discrete signal from the Building Electrical Automatic generator power the Building Management System shall signal the Packaged Rooftop unit AHU0800-3 (AHU-800-2 to stay operational) to override operational mode and shutdown fan, cooling, heating and ventilation operation. The Packaged Rooftop Unit controls circuit shall remain active.
Upon receiving a discrete signal from the Building Electrical Automatic Transfer Switch (ATS) indicating a return of primary power the Building Management System shall signal the Packaged Rooftop unit AHU-800-3 to return to operational mode and activate fan, cooling, heating and ventilation operation.
DRAWINGS:
A002 Signage Detail H: Revise ‘LAB’ ENTRANCE to ‘OPERATIONS’
ENTRANCE.
A002 Signage Detail H, Add the following Note:
“COORDINATE 911 SIGNAGE LOCATION WITH AUTHORITY HAVING
JURISDICTION DURING CONSTRUCTION.”
A005 Replace Door Schedule with table provided in Attachment #1.
A819 Add the following Note:
“3. LAB DISHWASHERS AND INCUBATOR ARE INCLUDED IN LAB
ALLOWANCE.”
Replace EQ-5 and EQ-6 in the Lab Equipment Schedule as follows:
EQ-5 DISHWASHER Thermo Scientific 51029321
EQ-6
Existing Full
Height Incubator ThermoFisher ---
A820 Add the following Note:
“3. LAB DISHWASHERS AND INCUBATOR ARE INCLUDED IN LAB
ALLOWANCE”
Replace EQ-5 and EQ-6 in the Lab Equipment Schedule as follows:
EQ-5 DISHWASHER Thermo Scientific 51029321
EQ-6
Existing Full
Height Incubator ThermoFisher ---
A824 Enlarged Breakroom Plan, add the following note:
“NOTE: EXISTING AED AND FIRST AID KIT TO BE RELOCATED BY THE
TOWN TO NEW BREAKROOM.”
A828 Add the following Note:
“1. EXISTING LAB STOOLS AND CHAIRS TO BE RELOCATED BY THE
TOWN TO NEW LAB.”
E003 Reference Attachment #2 for handhole tags on sheet E003.
E805 The following note shall be added to sheet E805:
“11. EMERGENCY LIGHTING CIRCUITS SHALL BE INSTALLED IN
SEPARATE DEDICATED CONDUITS FROM NORMAL LIGHTING AND
RECEPTACLE CIRCUITS.”
E806 The following note shall be added to sheet E806:
“11. EMERGENCY LIGHTING CIRCUITS SHALL BE INSTALLED IN
SEPARATE DEDICATED CONDUITS FROM NORMAL LIGHTING AND
RECEPTACLE CIRCUITS.”
E809 Reference Attachment #3 for sheet E809: Addition of Temporary Heavy
Duty Disconnect Switch. The temporary disconnect switch shall be installed immediately adjacent to the temporary utility transformer to establish the point of common coupling upstream of HH-001.
E810 Reference updates to Panel Schedules on Sheet E810 in Attachment #4.
E811 Reference updates to Panel Schedule for LP-UPS on sheet E811 in
Attachment #5.
ATTACHMENTS:
Attachment #1: A005- Revised Door Schedule Attachment #2: E003- Handhole tags Attachment #3: E809- Addition of Temporary Heavy Duty Disconnect Switch Attachment #4: E810- Updated Panel Schedules Attachment #5: E811- Updated Panel Schedule LP-UPS
D A
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
C T
R A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
DOOR LEGEND DOOR SCHEDULE NOTES:
AL
HM
IG
MF
ALUMINUM
HOLLOW METAL
INSULATING GLAZING
MANUFACTURER
PT
SF
PAINT
STOREFRONT
1. PROVIDE BLINDS IN SIDELITE OF FRAME F-2.
2. GLASS SHALL BE SAFETY TYPE IN DOORS, SIDELITES, AND STOREFRONT.
3. SEE SHEET A007 FOR STOREFRONT ELEVATIONS.
4. THRESHOLDS TO BE CENTERED BELOW INTERIOR DOORS.
5. COORDINATE SECURITY DEVICES AND WIRING WITH SECURITY INSTALLER, SEE A 002.
6. PAINT FRAME OF WOOD DOOR. WOOD DOORS SHALL HAVE FACTORY FINISH.
7. COORDINATE FIRE ALARM WIRING WITH STOREFRONT SYSTEM
8. ALL GLAZING ADJACENT TO DOORS SHALL BE TEMPERED SAFETY GLASS
9. PAINT FRAME OF BIFOLD DOORS. DOORS SHALL HAVE A FACTORY FINISH. HARDWARE
PER BIFOLD DOOR MANUFACTURER
DOOR SCHEDULE
NO.
FRAME DOOR DOOR DETAILS
FIRE
RATING
GLAZING
FINISH
SECURITY
WIRING
HARDWARE
THRESHOLD REMARKSTYPE MATL TYPE MATL
ACTIVE
WIDTH
INACTIVE
WIDTH HEIGHT THICKNESS HEAD JAMB SILL TYPE SIZE NO NOTE
801 SF-6 AL FG&FG AL 6' - 0" 7' - 8" SF-6/A007 SF-6/A007 SF-6/A007 IG 24"x70" PT 1 PANIC -- SEE SHEET A009
802 F-1 HM FG&FG WD 3' - 0" 3' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" PT 7 -- -- NOTE 6
803A F-1 HM BF WD 5' - 6" 7' - 0" 1 3/4" 4/A006 4/A006 4/A006 -- -- MFR MFR -- -- NOTE 9, HARDWARE PER DOOR MFR
803B F-1 HM BF WD 5' - 6" 7' - 0" 1 3/4" 4/A006 4/A006 4/A006 -- -- MFR MFR -- -- NOTE 9, HARDWARE PER DOOR MFR
804 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" MFR 8 -- -- NOTE 6
805 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" MFR 8 -- -- NOTE 6
806 F-1 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 IG 24"x70" PT 8 -- AL NOTE 6
807 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" MFR 8 -- -- NOTE 6
808 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" MFR 8 -- -- NOTE 6
810 SF-10 AL FG AL 3' - 0" 7' - 10" SF-10/A007 SF-10/A007 SF-10/A007 IG 24"x70" PT YES 2 -- -- SEE SHEET A009
811 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A008 2/A008 2/A008 -- 24"x70" MFR 3 -- -- NOTE 6
811A SF-1 AL FG AL 3' - 0" 7' - 8" SF-1/A007 SF-1/A007 SF-1/A007 24"x70" PT YES 2 -- -- SEE SHEET A009
812 F-1 HM F&F HM 3' - 0" 3' - 0" 7' - 10" 1 3/4" 1/A006 1/A006 1/A006 -- -- PT 10 -- AL
813 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 4 -- -- NOTE 6
814 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" MFR 3 -- -- NOTE 6
814A SF-3 AL FG AL 3' - 0" 7' - 10" SF-3/A007 SF-3/A007 SF-3/A007 IG 24"x70" PT YES 2 -- SEE SHEET A009
815 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 4 -- -- NOTE 6
816 F-1 HM -- -- 0' - 0" 0' - 0" 5/A006 5/A006 5/A006 -- -- PT - -- AL CASED OPENING
817 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- PT 8 -- -- NOTE 6
818 F-3 AL FG AL 3' - 0" 0' - 0" 7' - 2" 1 3/4" 3/A006 3/A006 3/A006 -- 24"x70" MFR 8 -- --
818A SF-10 AL FG AL 3' - 0" 7' - 10" SF-10/A007 SF-10/A007 SF-10/A007 IG 24"x70" PT YES 9 PANIC SEE SHEET A009
819 SF-5 AL FG&FG AL 6' - 4" 7' - 10" SF-5/A007 SF-5/A007 SF-5/A007 IG 24"x70" MFR YES 1 PANIC SEE SHEET A009
819A F-1 AL FG&FG AL 3' - 0" 3' - 0" 7' - 2" 1 3/4" 3/A006 3/A006 3/A006 -- -- MFR 6 -- --
821 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 4 -- -- NOTE 6
822 F-3 HM FG WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- 24"x70" MFR 8 -- -- NOTE 6
822A F-1 HM BF WD 4' - 6" 7' - 0" 1 3/4" 4/A006 4/A006 4/A006 -- MFR MFR MFR -- NOTE 9, HARDWARE PER DOOR MFR
823 SF-1 AL FG AL 3' - 0" 7' - 8" SF-1/A007 SF-1/A007 SF-1/A007 IG 24"x70" PT YES 2 -- AL SEE SHEET A009
824 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 4 -- -- NOTE 6
825 F-1 HM F HM 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- PT 4 -- --
825A SF-10 AL FG AL 3' - 0" 7' - 10" SF-10/A007 SF-10/A007 SF-10/A007 IG 24"x70" MFR YES 9 PANIC SEE SHEET A009
826 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 4 -- -- NOTE 6
827 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 5 -- -- NOTE 6
828 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 5 -- -- NOTE 6
829 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 6 -- -- NOTE 6
830 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 6 -- -- NOTE 6
831 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 5 -- -- NOTE 6
832 F-1 HM F WD 3' - 0" 0' - 0" 7' - 2" 1 3/4" 2/A006 2/A006 2/A006 -- -- MFR 5 -- -- NOTE 6
4 1
5/
/2
D W
A
7-
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
DATE
BYATTACHMENT NO.
CONTRACT
NUMBER
REFER TO CONTRACT
DRAWING NUMBER
SHEET OF
HAZEN JOB
NUMBERTOWN OF HOLLY SPRINGS
HOLLY SPRINGS, NORTH CAROLINA
UTLEY CREEK WRF
LAB AND OPERATORS BUILDING
31407-006
ADDENDUM NO.
XXXX
EVSE-R EVSE-R
X X
B-3
B-22
LAB &
OPERATORS
BUILDING
[800]
CO
U G
E U
G E
U G
E
U G
E
EVC-1 & EVC-2 ON COMMON PEDESTAL
16" X 16" POLYMER FLUSH MOUNTED BOX
FOR FUTURE GATE POWER, ACCESS
CONTROLS, CAMERA (TYP. OF 3)
NEMA 3R 304 SST JB
MOUNTED ON 304 SST
UNISTRUT RACK,
18" ABOVE GRADE
HH-001: 3'X3' FLUSH
MOUNTED QUAZITE
BOX
HH-002:
DATE
BYATTACHMENT NO.
CONTRACT
NUMBER
REFER TO CONTRACT
DRAWING NUMBER
SHEET OF
HAZEN JOB
NUMBERTOWN OF HOLLY SPRINGS
HOLLY SPRINGS, NORTH CAROLINA
UTLEY CREEK WRF
LAB AND OPERATORS BUILDING
31407-006
ADDENDUM NO.
XXXX
EVSE-R EVSE-R
X X
B-3
B-22
LAB &
OPERATORS
BUILDING
[800]
CO
U G
E U
G E
U G
E
U G
E
EVC-1 & EVC-2 ON COMMON PEDESTAL
16" X 16" POLYMER FLUSH MOUNTED BOX
FOR FUTURE GATE POWER, ACCESS
CONTROLS, CAMERA (TYP. OF 3)
NEMA 3R 304 SST JB
MOUNTED ON 304 SST
UNISTRUT RACK,
18" ABOVE GRADE
HH-001: 3'X3' FLUSH
MOUNTED QUAZITE
BOX
HH-002:
TEMPORARY UTILITY X
500 kVA 23.8kV-480V 3P/3W
PADMOUNT TRANS
DUKE ENERGY
P-800-004
P-800-000 P-800-001 P-800-002
P-800-005
C-800-001 C-800-000
ECB-800-N
600AF
600AP
600AT
LSIG
N.C.
600A 480V
3P 3W
TEMPORARY
NEMA 3R
HEAVY DUTY
RATED
DISCONNECT
SWITCH
HH-001
2 SETS 3-350KCMIL,
#2GND, 3"C
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
7-
480V, 3P, 3W (WYE) PP-800-2 TYPE: NEMA 1
400A BUS MAIN LUGS ONLY MOUNT: SURFACE
35kA (MINIMUM)
MODS DESCRIPTION CONDUIT &
WIRE TRIP POLE CKT
No.
VOLT-AMPERES VOLT-AMPERES CKT
No. POLE TRIP CONDUIT &
WIRE DESCRIPTION MODS
A B C A B C
LFD VAV-800-13 C 20 2
1 1,000 1,500 2
20 B
TEPID WATER HEATER
(WH-800-1) -3 1,000 1,500 4 3
LFD VAV-800-14 C 20 2
5 1,000 1,500 6 7 1,000 8,000 8
50 E WATER HEATER (WH-800-2) -
LFD VAV-800-15 C 20 2
9 1,250 8,000 10 3 11 1,250 8,000 12
- SPARE - 20 2
13 - 1,666 14
20 B BOD FUME HOOD NO.1 -15 - 1,666 16 3
- SPARE - 1 17 - 1,666 18
- SPARE - 20
19 - 1,666 20
20 B BOD FUME HOOD NO.2 -3 21 - 1,666 22 3
23 - 1,666 24
- SPARE - 20
25 - - 26
20 - SPARE -3 27 - - 28 3
29 - - 30
- SPARE - 20
31 - - 32
20 - SPARE -3 33 - - 34 3
35 - - 36
- SPARE - 20
37 - - 38
20 - SPARE -3 39 - - 40 3
41 - - 42
MODIFICATION (MODS) LEGEND: TOTAL 2,000 2,250 2,250 12,832 12,832 12,832 TOTAL CONDUIT & WIRE (WHERE NOTED ABOVE) GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA) PHASE TOTAL (VA) TOTAL LOAD (VA) A: 3#2, #8GND, 1-1/2"C EPD - EQUIPMENT PROTECTION DEVICE (30mA GFCI) 14,832 15,082 15,082 44,996 B: 3#12, #12GND, 3/4"C VIA DISCONNECT
LOD - LOCK-ON DEVICE PHASE TOTAL (A) TOTAL LOAD (A) C: 2#12, #12GND, 3/4"C
LFD - LOCK-OFF DEVICE 31 31 31 54 D: 3#3/0, #6GND, 2"C
ETU - ELECTRONIC TRIP UNIT E: 3#6, #10GND, 1"C VIA DISCONNECT
480V, 3P, 3W (WYE) PP-800-1 TYPE: NEMA 1
400A BUS MAIN BREAKER W/ ETU (LSIG) MOUNT: SURFACE
35kA (MINIMUM) 400AF/400AP/400AT, 3P
MODS DESCRIPTION CONDUIT &
WIRE TRIP POLE CKT
No.
VOLT-AMPERES VOLT-AMPERES CKT
No. POLE TRIP CONDUIT &
WIRE DESCRIPTION MODS
A B C A B C
- ROOFTOP AC UNIT - AHU-800-1 A 100
1 16,350 28,923 2
175 D TX-LP-800 -3 3 16,350 28,254 4 3
5 16,350 24,141 6
- ROOFTOP AC UNIT - AHU-800-2 A 100
7 9,145 - 8
3 60 E SPD -3 9 9,145 - 10
11 9,145 - 12
- ROOFTOP AC UNIT - AHU-800-3 A 100
13 14,965 3,250 14
2 20 C VAV-800-7 LFD
3 15 14,965 3,250 16
17 14,965 1,750 18
2 20 C VAV-800-8 LFD
LFD VAV-800-1 C 20 2
19 1,000 1,750 20 21 1,000 2,000 22
2 20 C VAV-800-9 LFD
LFD VAV-800-2 C 20 2
23 1,000 2,000 24 25 1,000 1,750 26
2 20 C VAV-800-10 LFD
LFD VAV-800-3 C 20 2
27 1,250 1,750 28 29 1,250 500 30
2 20 C VAV-800-11 LFD
LFD VAV-800-4 C 20 2
31 1,000 500 32 33 1,000 750 34
2 20 C VAV-800-12 LFD
LFD VAV-800-5 C 20 2
35 1,000 750 36 37 1,000 - 38
3 175 - SPARE -
LFD VAV-800-6 C 20 2
39 1,750 - 40 41 1,750 - 42
14,832
SUB - 6#3/0, #4GND SUBFEED LUGS -15,082 3
15,082
MODIFICATION (MODS) LEGEND: TOTAL 44,460 45,460 45,460 51,005 51,086 44,223 TOTAL NOTES/ACCESSORIES:
GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA) PHASE TOTAL (VA) TOTAL LOAD (VA) 200kA SPD EPD - EQUIPMENT PROTECTION DEVICE (30mA GFCI) 95,465 96,546 89,683 281,694 EXTERNALLY MOUNTED LOD - LOCK-ON DEVICE PHASE TOTAL (A) TOTAL LOAD (A) CONDUIT & WIRE (WHERE NOTED ABOVE)
LFD - LOCK-OFF DEVICE 199 201 187 339 A: 3#2, #8GND, 1-1/2"C
ETU - ELECTRONIC TRIP UNIT B: 2#12, #12GND, 3/4"C VIA DISCONNECT
C: 2#12, #12GND, 3/4"C
D: 3#3/0, #6GND, 2"C
E: 3#6, #10GND, 1"C
208/120V, 3P, 4W LP-800-1 TYPE: NEMA 1
400A BUS MAIN BREAKER MOUNT: SURFACE
22kA (MINIMUM) 400AF/400AT, 3P
MODS DESCRIPTION CONDUIT &
WIRE TRIP POLE CKT
No.
VOLT-AMPERES VOLT-AMPERES CKT
No. POLE TRIP CONDUIT &
WIRE DESCRIPTION MODS
A B C A B C
- ENTRY / ADMIN AREA REC A 20 1 1 540 - 2
3 60 3#6, 1#10GND,
1"C
SPD -- ENTRY / ADMIN AREA REC A 20 1 3 540 - 4
- CONF RM REC A 20 1 5 1,800 - 6
- CONF RM COUNTER REC A 20 1 7 1,440 500 8 1 20 A FACP-800 / CELLULAR DIALER LOD
- OFF 904 / 905 REC A 20 1 9 1,260 381 10
2 20 A INV-800 -
- OFF 906 REC A 20 1 11 720 381 12
- OFFICE 907 / 908 REC A 20 1 13 1,260 560 14 1 20 A BOLLARD LIGHTS, CART PATH -
GFCI COVERED PATIO REC A 20 1 15 1,800 1,750 16
2 20 A ACC-800-1 -
GFCI AHU REC A 20 1 17 540 1,750 18
GFCI UTILITY ROOM REC A 20 1 19 720 1,750 20
2 20 A ACC-800-2 -
- BOLLARD LIGHTS, FRONT A 20 1 21 1,085 1,750 22
- BOLLARD LIGHTS, REAR A 20 1 23 455 1,750 24
2 20 A ACC-800-3 -
- EF-800-1 A 20 1 25 950 1,750 26
- EF-800-2 A 20 1 27 950 1,875 28
1 20 A EUH-800-1
- EF-800-3 A 20 1 29 950 1,875 30 -
- EF-800-4 A 20 1 31 950 313 32
1 20 A EUH-800-2
- EF-800-5 A 20 1 33 950 313 34 -
- EF-800-6 A 20 1 35 950 950 36 1 20 A EUH-800-3 -
- IRRIGATION PEDESTAL A 20 1 37 300 950 38 1 20 A EUH-800-4 -
- BMS PANEL A 20 1 39 300 - 40 1 20 - SPARE -
- SPARE - - 1 41 - - 42 1 20 - SPARE -
- SPACE - - 1 43 - - 44 1 - - SPACE -
- SPACE - - 1 45 - - 46 1 - - SPACE -
- SPACE - - 1 47 - - 48 1 - - SPACE -
- SPACE - - 1 49 - - 50 1 - - SPACE -
- SPACE - - 1 51 - - 52 1 - - SPACE -
- SPACE - - 1 53 - - 54 1 - - SPACE -
16,940
SUB 6#3/0, #4GND SUBFEED TO LP-800-2 -15,300 3
12,020
MODIFICATION (MODS) LEGEND: TOTAL 6,160 6,885 5,415 22,763 21,369 18,726 TOTAL NOTES/ACCESSORIES:
GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA) PHASE TOTAL (VA) TOTAL LOAD (VA) 100kA SPD EPD - EQUIPMENT PROTECTION DEVICE (30mA GFCI) 28,923 28,254 24,141 81,318 EXTERNALLY MOUNTED LOD - LOCK-ON DEVICE PHASE TOTAL (A) TOTAL LOAD (A) LTG/RECP CIRCUITS (WHERE NOTED ABOVE):
LFD - LOCK-OFF DEVICE 241 235 201 226 A: 2#12, #12GND, 3/4"C
ETU - ELECTRONIC TRIP UNIT B: 3#12, #12GND, 3/4"C
C: 2#10, #10GND, 3/4"C
208/120V, 3P, 4W LP-800-2 TYPE: NEMA 1
400A BUS MAIN LUGS ONLY MOUNT: SURFACE
22kA (MINIMUM) 400AF/400AT, 3P
MODS DESCRIPTION CONDUIT &
WIRE TRIP POLE CKT
No.
VOLT-AMPERES VOLT-AMPERES CKT
No. POLE TRIP CONDUIT &
WIRE DESCRIPTION MODS
A B C A B C
- BREAK RM REF A 20 1 1 360 1,800 2 1 20 A BOD COUNTER TP REC GFCI
- BREAK RM DW A 20 1 3 1,200 1,800 4 1 20 A BOD COUNTER TP REC GFCI
- BREAK RM RANGE 2#6,#10GND,
3/4"C 50 2
5 2,000 1,620 6 1 20 A BOD COUNTER TP REC GFCI
7 2,000 1,440 8 1 20 A BOD COUNTER TP REC GFCI
- BREAK RM ICE MAKER A 20 1 9 1,200 1,200 10 1 20 A BOD ICE MAKER -
GFCI BREAK RM COUNTER TP REC A 20 1 11 1,080 360 12 1 20 A DROP OFF REC -
GFCI BREAK RM COUNTER TP REC A 20 1 13 360 1,440 14 1 20 A SUPER OFF & CHEM STOR REC -
- BREAK RM GP REC A 20 1 15 540 1,080 16 1 20 A LAB STAFF & RECORDS REC -
- WASHING MACHINE A 20 1 17 1,200 540 18 1 20 A SCADA/CNTRL GP REC -
- DRYER C 30 2
19 2,500 720 20 1 20 A PROC. CTRL REC GFCI
21 2,500 540 22 1 20 A MEN LOCK RM REC GFCI
- JANITOR CLOSET REC A 20 1 23 540 540 24 1 20 A WOMEN LOCK RM REC GFCI
- HALLWAY REC A 20 1 25 720 360 26 1 20 A UNISEX RR REC GFCI
- HALLWAY REC A 20 1 27 540 500 28 1 20 A WATER COOLER GFCI
GFCI GLASSWARE REC A 20 1 29 720 900 30 1 20 A HALLWAY COPY REC -
- GLASSWARE DW A 20 1 31 1,200 360 32 1 20 A WORKSTATIONS REC -
GFCI BOD LIGHTING A 20 1 33 360 360 34 1 20 A WORKSTATIONS REC -
GFCI OUTDOOR LIGHTING A 20 1 35 360 360 36 1 20 A WORKSTATIONS REC -
- BOD DW A 20 1 37 1,200 2,480 38
1 40 3#8, #10GND,
3/4"C LP-UPS SERVER ROOM UPS -- BOD INC A 20 1 39 1,500 1,980 40
- SPARE A 20 1 41 - 1,800 42
- SPACE - - 1 43 - - 44 1 - - SPACE -
- SPACE - - 1 45 - - 46 1 - - SPACE -
- SPACE - - 1 47 - - 48 1 - - SPACE -
- SPACE - - 1 49 - - 50 1 - - SPACE -
- SPACE - - 1 51 - - 52 1 - - SPACE -
- SPACE - - 1 53 - - 54 1 - - SPACE -
MODIFICATION (MODS) LEGEND: TOTAL 8,340 7,840 5,900 8,600 7,460 6,120 TOTAL NOTES/ACCESSORIES:
GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA) PHASE TOTAL (VA) TOTAL LOAD (VA) EPD - EQUIPMENT PROTECTION DEVICE (30mA GFCI) 16,940 15,300 12,020 44,260 LOD - LOCK-ON DEVICE PHASE TOTAL (A) TOTAL LOAD (A) LTG/RECP CIRCUITS (WHERE NOTED ABOVE):
LFD - LOCK-OFF DEVICE 141 128 100 123 A: 2#12, #12GND, 3/4"C
ETU - ELECTRONIC TRIP UNIT B: 3#12, #12GND, 3/4"C
C: 2#10, #10GND, 3/4"C
T E
B Y
A T
T A
C H
M E
N T
N O
C
O N
T R
A C
T N
U M
B E
R
A D
D E
N D
U M
N O
H
A Z
E N
J O
B N
U M
B E
R R
E F
E R
T O
C O
N T
R A
A
W
IN
G N
U M
B E
R
S H
E E
T O
F
X
/2
/2
:3
:3
P
M
C U s e rs
\M S w in s k y \O n e D ri v e
H a z e n a n d
S a w y e r\
D o c u m e n ts \3
-0
-7
-T D
B -M
E C
H m s w in s k y .r v t
2/26/2020 1:31:31 PM
TO
W
N O
F H
O
LL
Y
SP
R
IN
G S
H O
LL
Y
SP
R
IN
G
S, N
O R
TH
C
AR
O
LI
N
A
U
TL
EY
C
R
EE
K W
R F
LA
B
O
PE
R
AT
O
R S
BU
IL
D
IN
G
7-
208/120V, 3P, 4W LP-UPS TYPE: NEMA 1
100A BUS MAIN BREAKER MOUNT: SURFACE
10kA (MINIMUM) 100AF/60AT, 3P
MODS DESCRIPTION CONDUIT &
WIRE TRIP POLE CKT
No.
VOLT-AMPERES VOLT-AMPERES CKT
No. POLE TRIP CONDUIT &
WIRE DESCRIPTION MODS
A B C A B C
- SERVER RACK REC A 20 1 1 1,080 360 2 1 20 A CONTROL RM DESKTOP REC -
- SERVER RACK REC A 20 1 3 1,080 360 4 1 20 A CONTROL RM DESKTOP REC -
- SERVER RACK REC A 20 1 5 1,080 360 6 1 20 A CONTROL RM DESKTOP REC -
- BACKBOARD REC A 20 1 7 360 180 8 1 20 A MONITOR REC -
- CONTROL RM DESKTOP REC A 20 1 9 360 180 10 1 20 A MONITOR REC -
- MONITOR REC A 20 1 11 180 180 12 1 20 A MONITOR REC -
- FUTURE PLC-11 A 20 1 13 500 - 14 1 20 - SPARE -
- SPARE - 20 1 15 - - 16 1 20 - SPARE -
- SPARE - 20 1 17 - - 18 1 20 - SPARE -
MODIFICATION (MODS) LEGEND: TOTAL 1,940 1,440 1,260 540 540 540 TOTAL NOTES/ACCESSORIES:
GFCI - GROUND FAULT CIRCUIT INTERRUPTER (5mA) PHASE TOTAL (VA) TOTAL LOAD (VA) EPD - EQUIPMENT PROTECTION DEVICE (30mA GFCI) 2,480 1,980 1,800 6,260 LOD - LOCK-ON DEVICE PHASE TOTAL (A) TOTAL LOAD (A) LTG/RECP CIRCUITS (WHERE NOTED ABOVE):
LFD - LOCK-OFF DEVICE 21 17 15 17 A: 2#12, #12GND, 3/4"C
ETU - ELECTRONIC TRIP UNIT B: 3#12, #12GND, 3/4"C
C: 2#10, #10GND, 3/4"C
| Add 4 |
| Attachment 1 - A005 |
| Attachment 2 - E003 |
| Attachment 3 - E809 |
| Attachment 4 - E810 |
| Attachment 5 - E811 |
| ADDENDUM NO: 4 |
| DATE: 6/2/25 |
| REFER TO CONTRACT DRAWING NUMBER: E003 |
| ATTACHMENT NO: 2 |
| BY: DW |
| Sheet #: 1 |
| ##: 1 |
| ADDENDUM NO: 4 |
| DATE: 6/2/25 |
| REFER TO CONTRACT DRAWING NUMBER: E809 |
| ATTACHMENT NO: 2 |
| BY: DW |
| Sheet #: 1 |
| ##: 1 |
| Text1: 4 |
| Text2: 4 |
| Text3: 6/2/25 |
| Text4: DW |
| Text5: E810 |
| Text6: 1 |
| Text7: 1 |
| Text1: 4 |
| Text2: 5 |
| Text3: 6/2/25 |
| Text4: DW |
| Text5: E811 |
| Text6: 1 |
| Text7: 1 |
File details come from the government source that posted it. Updated .