Addendum 5_Levee Rehab Engineering RFP.pdf
PDF 97 KB Posted
- Solicitation number
- S-C26014-00008932
- Issued by
- Multnomah County, Oregon
About this file
This document is an addendum to a Request for Proposals (RFP) for engineering services related to the rehabilitation of two levee segments in Multnomah County, Oregon for the purpose of FEMA accreditation. The RFP is issued by the Multnomah County Drainage District (MCDD) and the Columbia Corridor Drainage Districts Joint Contracting Authority (JCA). The addendum announces a change to the optional pre-proposal on-site conference, which will now be held on January 26, 2024 from 12:00 - 2:00 PM. The proposal due date remains unchanged. Attendees will meet at the MCDD office and visit the Sunderland Levee and Salmon Creek Levee project sites.
The contract opportunity is for permitting, professional engineering design, bid assistance, and construction support services for the levee rehabilitation projects. The jurisdictions involved include Multnomah County and the City of Portland. No additional details regarding pricing, funding, or other contract terms are provided in the addendum.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 5 January 23, 2024
RFP # S-C26014-00008932
MCDD Levee Rehabilitations for FEMA Accreditation Engineering Services
This addendum modifies the solicitation document(s) only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original solicitation document and shall become part of the work required.
Description of Change(s) and Clarifications:
1. Item #1: Optional Pre-Proposal On-Site Conference Schedule Change
a. District Response: There will be an optional pre-proposal on-site conference for this solicitation held on Friday January 26, 2024 from 12:00 – 2:00pm. Attendees will meet at the MCDD
Office: 1880 NE Elrod Dr, Portland, OR 97211, walk to the Sunderland Levee project site, and subsequently drive to the Salmon Creek Levee project site.
PROPOSAL DUE DATE AND TIME:
Proposal due date and time remains unchanged.
RECEIPT OF THIS ADDENDUM BY THE BIDDER IS TO BE ACKNOWLEDGED BY ENTERING
THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Nicole Handley, Procurement and Contract Analyst
Multnomah County Drainage District No. 1
File details come from the government source that posted it. Updated .