Addendum_4.pdf
PDF 3 MB Posted
- Attached to
- Torgersen Hall Roofing Replacement
- Solicitation number
- IFB-115880
- Issued by
- Montgomery County, Virginia
About this file
Addendum #3 to Torgersen Hall Roofing Replacement Solicitation
This addendum document issued by Virginia Polytechnic Institute and State University Procurement Department on April 27, 2026, provides clarifications and revised drawings for the Torgersen Hall Roofing Replacement project (Solicitation #443882620) located at 620 Drillfield Drive, Blacksburg, Virginia. The project encompasses removal of existing EPDM roofing systems, installation of new 60-mil black EPDM roofing membranes with R-20 or R-30 polyisocyanurate insulation depending on roof area, removal and reinstallation of stainless steel counterflashings, replacement of water-damaged gypsum sheathing on screen walls, coating of exposed and concealed structural steel members, and removal and reinstallation of existing Hokie Stone masonry on select rising walls. Sealed bids were due electronically by 2:00 PM on April 15, 2026, with public bid opening scheduled for April 16, 2026. A mandatory pre-bid conference was held on March 20, 2026, and requests for information were due by March 25, 2026. Substantial completion is required within 150 calendar days from authorization to proceed, with final completion within 30 consecutive calendar days thereafter, with construction estimated to begin June 1, 2026.
The addendum supersedes previous bid documents dated February 27, 2026, and incorporates four major revisions: clarification that Roof Area K (Auditorium) requires R-20 insulation rather than R-30; specification that clerestory and penthouse through-wall flashings are removed under separate scope with only counterflashing reinstallation required; clarification that an exterior wall contractor will install sheet metal copings and receivers, with this project responsible for counterflashing installation on parapet walls and both fabrication and installation on screen walls; and revised drawing notations reflecting these scope modifications. The contractor must provide a 2-year warranty covering all defects in materials and workmanship and a 20-year no-dollar limit, non-prorated manufacturer's warranty for roofing materials. All work must comply with the Virginia Uniform Statewide Building Code 2021, Virginia Existing Building Code 2021, Virginia Tech Design and Construction Manual 2023, ASCE 7-22 standards, and applicable OSHA requirements. A bid bond equal to five percent of the total bid amount is required, and contract award will be based on the apparent low bidder meeting all submission and compliance requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Torgersen Roof Drawings 100_.pdf | ||
| Addendum_2.pdf | ||
| IFB 443882620_Addendum_1.pdf | ||
| Project Manual Torgersen Roof 100_.pdf | ||
| Addendum_3.pdf | ||
| Project Manual Torgersen Roof 100_.pdf | ||
| IFB 443882620_Addendum_1.pdf | ||
| Torgersen Roof Drawings 100_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY
PROCUREMENT DEPARTMENT
ADDENDUM NO. 3
DATE: April 27, 2026 TO: All Offerors FROM: Deirdre Curry, Contracting Officer TOTAL PAGE(S): 1 page (not including attachments) SOLICITATION TITLE: Torgersen Hall Roofing Replacement
SOLICITATION NUMBER: 443882620
I. CLARIFICATIONS AND ADDITIONAL INFORMATION
1. See Addendum 4 Cover Letter dated April 15, 2026, attached hereto as Exhibit A.
2. See revised 100% drawings dated April 15, 2026, attached hereto as Exhibit B.
II. REQUESTS FOR INFORMATION
None.
Exhibit A Addendum 4 Cover Letter Dated April 15, 2026
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
Chicago, Illinois 60603
312.372.0555 tel www.wje.com
MEMORANDUM April 15, 2026
Torgersen Hall - Roofing Replacement
Addendum #1
WJE PROJECT NO. 2022.6672
TO Mackenzie Mabe
Supervisory Project Manager of Non-Capital Construction
Virginia Tech
230 Sterrett Drive
Blacksburg, Virginia 24061
FROM Jason Aspin, Bryan Rouse, and Ian Chin
ADDENDUM NO. 1 TO THE BID DOCUMENTS
Project: Torgersen Hall - Roofing Replacement
Owner: Virginia Polytechnic Institute and State University
Date: April 13, 2026
This Addendum forms a part of the Contract Documents and modifies the Bid Set Drawings dated
February 27, 2026. Bidders shall acknowledge receipt of this Addendum in the Bid Form and incorporate the following revisions into their bids.
1. Drawing Revisions: The drawings dated April 13, 2026, labeled “Addendum #1”, supersede the corresponding drawings issued on February 27, 2026.
2. Roof Insulation Clarification: At Roof Area K (the Auditorium), the new roofing system shall include
R‑20 polyisocyanurate insulation, similar to the existing construction.
3. Through Wall Flashing Clarification: Clerestory and penthouse through‑wall flashings are being removed and replaced under a separate scope of work and will be completed before roofing replacement begins. Roofing work at these locations includes removal and reinstallation of stainless steel sheet‑metal counterflashings only.
4. Sheet Metal Copings and Counterflashings:
a. An exterior wall contractor is currently performing repairs under a separate project.
b. At the parapet walls, the exterior wall contractor will install new sheet metal copings with receivers and provide new removable counterflashings. This project includes the installation of those counterflashings fabricated by the exterior wall contractor.
c. At the screen walls, the exterior wall contractor will install new sheet metal copings with receivers.
This project includes the fabrication and installation of new counterflashings.
5. Drawing Changes:
a. G-002: The scope of work has been updated to reflect the changes above.
b. A‑103: Notes on through‑wall flashing repairs above the auditorium roof have been deleted.
Torgersen Hall - Roofing Replacement
MEMORANDUM | WJE No. 2022.6672 | April 15, 2026 Page 2
c. A‑501: Roof Area K (the auditorium) has been removed from the list of roofs in Detail 3a that require new R‑30 insulation. A‑501: Detail 3b was added to describe new R‑20 insulation at Roof
Area K (Auditorium).
d. A-503: Detail 1 has been revised to include the installation of a new sheet metal counterflashing to be fabricated by others.
e. A‑503: Notes for Details 2, 4, and 5 were revised to require removal and reinstallation of existing sheet‑metal counterflashing.
f. A‑503: Detail 6 and all related references have been voided; recently repaired through‑wall flashings shall remain.
g. A‑504: Details 4 and 6 were revised to require removal and reinstallation of existing sheet‑metal counterflashing.
h. Detail 6 has been revised to include the installation of a new sheet metal counterflashing to be fabricated by others.
6. Except as modified by this Addendum, all other requirements of the Drawings, Specifications, and Bid
Documents remain unchanged and in full force and effect.
Exhibit B Revised 100% Drawings dated April 15, 2026
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\G -0
C ov er
S he et.
dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
Chicago, Illinois 60603
312.372.0555 tel
Torgersen Hall Roofing Replacement
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department Sterrett Facilities Complex Blacksburg, Virgina 24061
Issued for Bid
2022.6672.0
#1
04-15-26 02-27-26
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Cover Sheet
G-001
Torgersen Hall Roofing Replacement 620 Drillfield Drive Blacksburg, Virgina 24061
CLIENT:
Virginia PolyTechnic Institute and State University VT Facilities Department Sterrett Facilities Complex Blacksburg, Virgina 24061
ARCHITECT:
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600 Chicago, Illinois 60603WJE
Sheet List Table
Sheet Number Sheet Title
G-001 Cover Sheet
G-002 General Notes
G-003 Construction Staging Plan
G-004 Wind Uplift Diagram
A-101 Overall Roof Plan
A-102 Roof Plan - Area A
A-103 Roof Plan - Area B
A-104 Roof Plan - Area C
A-501 Roofing Details
A-502 Roofing Details
A-503 Details
A-504 Details
A-505 Screen Wall Details
A-506 Coping Details
Issued - February 27, 2026
A7 SCALE: NTS
Virginia Tech Campus Map N
TORGERSEN HALL
DOCUMENT VERSION
VIRGINIA CONSTRUCTION CODE 2021
VIRGINIA EXISTING BUILDING CODE 2021
VIRGINIA TECH - DESIGN AND CONSTRUCTION MANUAL 2023
VIRGINIA TECH - CONSTRUCTION & PROFESSIONAL SERVICES MANUAL 2020
MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES ASCE 7-22
HOKIE STONE MASONRY GUIDE SPECIFICATIONS PREPARED BY VIRGINIA TECH
CODE
1. AUTHORITY HAVING JURISDICTION: ALL WORK SHALL COMPLY WITH THE RULES AND
REGULATIONS OF ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, AND ALL OTHER
AUTHORITIES HAVING JURISDICTION, INCLUDING:
2. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH THE APPLICABLE
REQUIREMENTS OF THE GOVERNING EDITION OF THE WILLIAMS-STEIGER OCCUPATIONAL
SAFETY AND HEALTH ACT (OSHA).
3. THE CONTRACTOR SHALL PROVIDE PROPERLY ENGINEERED CONSTRUCTION
SAFEGUARDS AND SHALL SUBMIT DOCUMENTATION TO THE UBO VALIDATING THE
APPROPRIATENESS OF THE SAFEGUARDS AS PART OF OBTAINING A PERMIT FOR
OVERHEAD WORK. THOSE SAFEGUARDS WILL BE INSPECTED BY THE BUILDING OFFICIAL
AND MUST BE APPROVED PRIOR TO THE START OF OVERHEAD WORK.
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\G -0
G en er al No tes .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
General Notes
G-002
GENERAL REQUIREMENTS
1. OWNER: VIRGINIA POLYTECHNIC INSTITUTE AND STATE UNIVERSITY (VIRGINIA TECH)
2. ARCHITECT: IAN R. CHIN OF WISS, JANNEY, ELSTNER ASSOCIATES, INC., OR HIS REPRESENTATIVES
3. BUILDING: TORGERSEN HALL, 620 DRILLFIELD DRIVE, BLACKSBURG, VIRGINIA 24061
4. DESIGN ROOF LIVE LOAD: 30 POUNDS PER SQUARE FOOT
5. AUTHORITY HAVING JURISDICTION: ALL WORK SHALL COMPLY WITH THE RULES AND REGULATIONS OF ALL
APPLICABLE FEDERAL, STATE, AND LOCAL CODES, AND ALL OTHER AUTHORITIES HAVING JURISDICTION, INCLUDING:
a. VIRGINIA UNIFORM STATEWIDE BUILDING CODE - 2021
b. VIRGINIA TECH DESIGN AND CONSTRUCTION MANUAL - 2022
c. CONSTRUCTION & PROFESSIONAL SERVICES MANUAL - 2020
d. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES (ASCE 7-10)
e. HOKIE STONE MASONRY GUIDE SPECIFICATIONS PREPARED BY VIRGINIA TECH
f. THE LATEST EDITION OF ALL CODES AND STANDARDS SHALL APPLY.
6. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE GOVERNING EDITION OF THE WILLIAMS-STEIGER OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA).
7. DEFINITIONS:
a. CONSTRUCTION DOCUMENTS: THE CONSTRUCTION DOCUMENTS INCLUDE DRAWINGS, GENERAL NOTES, AND PROJECT MANUAL PREPARED BY THE ARCHITECT. THE CONSTRUCTION DOCUMENTS SHALL BE TAKEN IN THEIR ENTIRETY AND AS A WHOLE. IF A DISCREPANCY IS FOUND IN THE CONSTRUCTION DOCUMENTS, THE ARCHITECT SHALL DECIDE AS TO WHICH GOVERNS.
b. EPDM: ETHYLENE PROPYLENE DIENE TERPOLYMER. A SYNTHETIC RUBBER MEMBRANE.
c. FLASHING: AN IMPERVIOUS MATERIAL INSTALLED IN A WALL SYSTEM AND SLOPED TO THE EXTERIOR TO
CONTAIN AND REDIRECT MOISTURE THAT PENETRATED THE WALL BACK TO THE EXTERIOR THROUGH
WEEPS
d. HOKIE STONE: A LOCAL DOLOMITIC LIMESTONE
e. HOKIE STONE MASONRY: HOKIE STONE UNITS LAID IN RANDOM ASHLAR PATTERN WITH DRYPACK
(EXISTING HOKIE STONE MASONRY) OR MORTAR IN JOINTS (NEW HOKIE STONE MASONRY). HOKIE STONE MASONRY WALL CONSTRUCTION IS A MAJOR IDENTIFYING CHARACTERISTIC OF BUILDINGS ON VIRGINIA
TECH'S CAMPUS.
f. INSULATION: RIGID POLYISOCYANURATE INSULATION
g. MORTAR: PORTLAND CEMENT, HYDRATED LIME, AND SAND CONFORMING TO ASTM C270, TYPE S OR N, MIXED WITH THE MAXIMUM AMOUNT OF WATER TO PRODUCE A WORKABLE CONSISTENCY.
h. RAKE JOINTS: REMOVAL OF EXISTING DRYPACK FROM JOINTS IN HOKIE STONE VENEER TO THE SPECIFIED
DEPTH WITHOUT DAMAGE TO THE HOKIE STONE. SUBSEQUENT BRUSHING, VACUUMING, OR FLUSHING OF JOINTS WITH OIL-FREE COMPRESSED AIR AS NECESSARY TO REMOVE ALL TRACES OF LOOSE DRYPACK, DIRT, AND DEBRIS AND EFFLORESCENCE ON THE SURFACES OF THE HOKIE STONE AND REMAINING DRYPACK AT
RAKED JOINTS.
i. SPLICE IN FLASHING: SHALL BE LAPPED AT LEAST 6 INCHES AND SEALED WITH COMPATIBLE SEALANT
j. WEEPS: 2 INCHES HIGH, OPEN, AND VENTED HEAD JOINTS ON HOKIE STONE MASONRY SPACED NO MORE
THAN 24 INCHES ON CENTER THAT DIRECTS MOISTURE COLLECTED ON THE FLASHING TO THE EXTERIOR OF
THE WALL ASSEMBLY. WEEPS SHALL BE PLACED IMMEDIATELY ON THE TOP OF THE FLASHING.
8. THE CONTRACTOR SHALL CONSTRUCT THE WORK IN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS.
9. PRIOR TO BIDDING, THE CONTRACTOR AND ITS SUBCONTRACTORS SHALL REVIEW THE CONSTRUCTION
DOCUMENTS AND SHALL VISIT THE PROJECT SITE TO BECOME FAMILIAR WITH CONDITIONS RELATED TO THE WORK, THE PARTICULAR CHARACTERISTICS OF THE HOKIE STONE MASONRY, AND WITH THE REQUIREMENTS OF
THE WORK.
10. THE CONTRACTOR AND ITS SUBCONTRACTORS SHALL EXAMINE THE WORK AREAS AND THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED, SHALL NOTIFY OWNER AND ARCHITECT IN WRITING OF ANY CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY COMPLETION OF THE WORK, AND SHALL NOT PROCEED WITH THE WORK UNTIL UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED IN A MANNER ACCEPTABLE TO THE
CONTRACTOR AND ITS SUBCONTRACTORS.
11. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION. ALL RIGGING, EQUIPMENT, AND PROCEDURES SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS.
THE CONTRACTOR SHALL MAKE ANY INSPECTIONS OR ANALYSIS NECESSARY TO VERIFY THAT EXISTING BUILDING ELEMENTS HAVE ADEQUATE LOAD CAPACITY TO SUPPORT ANY REQUIRED RIGGING OR STORAGE FORCES HE
CHOOSES TO IMPOSE ON THEM.
12. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SAFETY ON THE CONSTRUCTION SITE.
13. THE CONTRACTOR SHALL PROVIDE LABOR, SUPERVISION, MATERIALS, EQUIPMENT, AND SERVICES AS
REQUIRED TO COMPLETE THE WORK IN ACCORDANCE WITH DRAWINGS, GENERAL NOTES, AND PROJECT MANUAL.
14. THE CONTRACTOR SHALL HAVE ALL MATERIALS REQUIRED FOR THE WORK DELIVERED TO THE PROJECT SITE
UNDAMAGED, IN MANUFACTURER'S ORIGINAL AND UN-OPENED CONTAINERS, LABELED WITH THE
MANUFACTURER DATE, TYPE, AND NAME OF PRODUCT AND MANUFACTURER.
15. THE CONTRACTOR SHALL STORE ALL MATERIALS OFF GROUND, UNDER COVER, IN A DRY LOCATION, SEPARATED TO PREVENT CONTAMINATION, AND SHALL COMPLY WITH THE MATERIAL MANUFACTURER'S WRITTEN
INSTRUCTIONS FOR MINIMUM AND MAXIMUM TEMPERATURE REQUIREMENTS FOR STORAGE.
16. THE CONTRACTOR SHALL NOT STORE MATERIALS OR PLACE ANY LOAD ON THE ROOF THAT EXCEED THIS
SPECIFIED DESIGN LIVE LOAD OF 30 POUNDS PER SQUARE FOOT.
17. THE CONTRACTOR SHALL COORDINATE THE WORK WITH OTHER TRADES INVOLVED WITH THE WORK TO
ENSURE PROPER SEQUENCING AND CONSTRUCTION.
18. THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS PRIOR TO STARTING THE WORK.
19. THE BUILDING WILL BE OCCUPIED DURING THE CONSTRUCTION PERIOD. THE CONTRACTOR AND ITS
SUBCONTRACTORS SHALL COOPERATE WITH OWNER DURING CONSTRUCTION OPERATIONS TO MINIMIZE
CONFLICTS.
20. THE CONTRACTOR SHALL CONSTRUCT A 6-FOOT-TALL SITE ENCLOSURE FENCE THAT PREVENTS ACCESS INTO
THE WORK AREA.
21. ALL CONSTRUCTION AND/OR CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE OWNER.
22. THE EXISTING MEANS OF EGRESS AND PEDESTRIAN WALKWAYS SHALL BE MAINTAINED AND PROTECTED FROM
THE WORK AT ALL TIMES BY OVERHEAD PROTECTION CANOPIES CONSTRUCTED BY THE CONTRACTOR. DURING THE WORK, THE CONTRACTOR SHALL PROVIDE FOR SAFE ACCESS AND EGRESS IN AND OUT OF THE BUILDING AT ALL TIMES. THE CONTRACTOR SHALL WORK WITH THE UNIVERSITY BUILDING OFFICIAL (UBO) ON PHASING AND/OR SEQUENCING PLANS TO ASSURE PEDESTRIAN SAFETY BOTH ENTERING AND EXITING THE BUILDING. THE CONTRACTOR SHALL PROVIDE PROPERLY ENGINEERED CONSTRUCTION SAFEGUARDS AND SHALL SUBMIT DOCUMENTATION TO THE UBO VALIDATING THE APPROPRIATENESS OF THE SAFEGUARDS AS PART OF OBTAINING A PERMIT FOR OVERHEAD WORK. THOSE SAFEGUARDS WILL BE INSPECTED BY THE BUILDING OFFICIAL AND MUST BE APPROVED PRIOR TO THE START OF OVERHEAD WORK. THE SAFEGUARDS MUST REMAIN IN-PLACE UNTIL ALL
OVERHEAD WORK IS RELEASED BY THE OWNER.
23. THE CONTRACTOR SHALL PROTECT AND MAINTAIN FIREFIGHTER ACCESS TO STANDPIPES AT EXTERIOR WALLS
AT ALL TIMES.
24. THE CONTRACTOR SHALL MAINTAIN EXISTING BUILDING IN A WEATHER TIGHT CONDITION THROUGHOUT
CONSTRUCTION PERIOD.
25. THE CONTRACTOR SHALL REMOVE, CLEAN, STORE, AND RE-INSTALL ALL EXISTING FIXTURES ATTACHED TO
MASONRY WALLS IN THE WORK AREA, INCLUDING BUT NOT LIMITED TO LIGHT FIXTURES.
26. THE CONTRACTOR SHALL LEAVE, INTACT AND UNDISTURBED, ELEMENTS THAT ARE TO REMAIN IN THE
EXISTING BUILDING AND ALL SERVICES SHALL REMAIN IN USE DURING THE WORK.
27. THE CONTRACTOR SHALL PROPERLY PROTECT AND MAKE SAFE ADJACENT PROPERTY AND BUILDING ELEMENTS
AS JOB CONDITIONS REQUIRE.
28. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN EFFECTIVE, NON-STAINING PROTECTION FOR ADJACENT SURFACES AND AREAS BELOW THE WORK DURING PERFORMANCE OF THE WORK. PROTECT SURFACES FROM
DAMAGE AND FROM CONTACT WITH DROPPINGS FROM THE WORK.
29. THE CONTRACTOR SHALL PROTECT PEOPLE, MOTOR VEHICLES, AND SURFACES ADJACENT TO THE WORK BEING CONSTRUCTED, THE CONSTRUCTION SITE, PLANTS, AND SURROUNDING STRUCTURES FROM DUST, SPILLAGE, DEBRIS, AND INJURY RESULTING FROM THE WORK; AND SHALL PROVIDE METHODS AND PROCEDURES TO ENSURE
THAT NOTHING CAN DRIP ON THE PUBLIC.
30. THE CONTRACTOR SHALL PROVIDE EXHAUST VENTILATION AS NECESSARY TO PREVENT DUST AND FUMES
FROM REACHING THE PUBLIC.
31. THE CONTRACTOR SHALL CONTROL, COLLECT, AND LEGALLY DISPOSE OF SPILLAGE AND WASTE FROM
OPERATIONS.
32. THE CONTRACTOR SHALL MAINTAIN ITS PROTECTION SYSTEMS IN PLACE UNTIL COMPLETION OF THE WORK.
33. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO THE EXISTING AND ADJACENT
CONSTRUCTION (BUILDING, SIDEWALKS, PARKING LOTS, CARS, AND LANDSCAPING) TO REMAIN THAT IS CAUSED BY THE WORK. ANY SUCH DAMAGE SHALL BE REPORTED TO THE OWNER AND ARCHITECT PRIOR TO REPAIRING THE
DAMAGE.
34. THE CONTRACTOR SHALL NOT UNREASONABLY ENCUMBER THE SITE WITH MATERIALS OR EQUIPMENT. THE
CONTRACTOR SHALL:
a. CONFINE THE MATERIALS AND EQUIPMENT TO THE AREAS INDICATED IN THE CONTRACT DOCUMENTS OR
BY THE DIRECTION OF THE OWNER.
b. NOT LOAD STRUCTURE WITH WEIGHT THAT WILL ENDANGER THE STRUCTURE.
c. MAINTAIN THE OPERATION OF THE ROOF DRAINS AND SCUPPERS AT ALL TIMES AND PROTECT DRAINS AND
SCUPPERS FROM CLOGGING.
d. ASSUME FULL RESPONSIBILITY FOR THE PROTECTION AND SAFEKEEPING OF PRODUCTS STORED ON
PREMISES.
e. MOVE STORED MATERIAL PRODUCTS THAT INTERFERE WITH OPERATIONS OF THE BUILDING.
35. THE CONTRACTOR SHALL INSTITUTE THE NECESSARY MEASURES TO PREVENT OR MINIMIZE DUST, FUMES, ODORS, DEBRIS, OR LIQUIDS FROM THIS PROJECT FROM ENTERING INTERIOR AND OTHER NON-CONSTRUCTION
AREAS OF THE BUILDING.
36. THE CONTRACTOR SHALL CLEANUP AND REMOVE CONSTRUCTION DEBRIS FROM THE BUILDING SITE DAILY TO
THE SATISFACTION OF THE OWNER.
37. THE CONTRACTOR SHALL MAINTAIN NOISE LEVELS FROM THE WORK TO A MINIMUM TO MINIMIZE DISRUPTIONS TO EXISTING BUILDING OPERATIONS. DELAYS DUE TO THE ADDRESSING OF NOISE COMPLAINTS ARE
NOT A BASIS FOR AN EXTRA CHARGE.
38. THE CONTRACTOR SHALL PROVIDE OWNER AND ARCHITECT COMPLETE ACCESS TO ALL WORK AREAS PRIOR
TO, DURING, AND AFTER COMPLETION OF, THE WORK.
39. THE OWNER AND/OR ARCHITECT MAY PERFORM QUALITY CONTROL TESTS ON A RANDOM BASIS TO EVALUATE THE WORK FOR CONFORMANCE TO THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL MAKE ACCESS AVAILABLE TO INSPECT AND TO TEST THE AREAS OF THE WORK SELECTED BY THE OWNER AND/OR ARCHITECT AND SHALL MAKE APPROPRIATE REPAIRS AFTER COMPLETION OF INSPECTION. DEFECTIVE WORK FOUND WILL BE
REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
40. WHERE DISSIMILAR METALS WILL CONTACT EACH OTHER OR CORROSIVE SUBSTRATES, PROTECT AGAINST GALVANIC ACTION BY PAINTING CONTACT SURFACES WITH BITUMINOUS COATING OR BY APPLYING
SELF-ADHERING UNDERLAYMENT TO ONE CONTACT SURFACE.
EXISTING CONDITIONS
1. DETAILS OF THE EXISTING ROOFING AND EXTERIOR WALLS ON THE BUILDING THAT ARE SHOWN IN THE
CONSTRUCTION DOCUMENTS ARE BASED UPON LIMITED INSPECTIONS PERFORMED BY THE ARCHITECT AND HIS ASSOCIATES AND FROM AVAILABLE DRAWINGS OF THE BUILDING. INFORMATION SHOWN REGARDING EXISTING EXTERIOR WALLS IS BELIEVED TO BE ACCURATE BUT HAS NOT BEEN CONFIRMED AT ALL LOCATIONS OF THE WORK.
THE CONTRACTOR SHALL MEASURE AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH THE WORK SHOWN. THE CONTRACTOR SHALL INFORM THE OWNER AND ARCHITECT IN
WRITING OF ANY DISCREPANCIES FOUND.
2. UNANTICIPATED CONDITIONS ENCOUNTERED DURING THE COURSE OF THE WORK WHICH REQUIRE ADDITIONAL REPAIRS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND ARCHITECT IN WRITING. NO ADDITIONAL REPAIR WORK SHALL BE PERFORMED UNLESS APPROVED IN ADVANCE BY THE ARCHITECT AND OWNER.
REQUIRED CONTRACTOR SUBMITTAL
1. SUBMITTALS ARE ITEMS THAT THE CONTRACTOR IS REQUIRED TO PROVIDE TO THE ARCHITECT FOR REVIEW FOR
CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS PRIOR TO CONSTRUCTION. THE PURPOSE OF THE
CONTRACTOR SUBMITTALS IS AS FOLLOWS:
a. ESTABLISH THE CONTRACTOR'S UNDERSTANDING OF THE CONSTRUCTION DOCUMENTS PRIOR TO
CONSTRUCTION.
b. TO GIVE THE CONTRACTOR THE OPPORTUNITY TO MAKE ADVANCE SUGGESTIONS FOR ALTERNATE
PRODUCTS.
c. TO GIVE THE CONTRACTOR THE OPPORTUNITY TO ADDRESS INSTALLATION DETAILS THAT MAY NOT BE
EXPLICITLY SHOWN IN THE CONTRACT DOCUMENTS.
d. TO HAVE THE CONTRACTOR CHECK THE AVAILABILITY OF SPECIFIED MATERIALS.
e. TO VERIFY CONFORMANCE OF SUBMITTED MATERIALS AND PRODUCTS TO CONTRACT DOCUMENTS.
2. SUBMITTALS INCLUDE, BUT ARE NOT LIMITED TO, THE FOLLOWING:
a. MATERIAL DATA SHEETS, CERTIFICATIONS, AND OTHER PERTINENT INFORMATION INCLUDING
INSTALLATION AND MAINTENANCE INSTRUCTIONS FROM MANUFACTURERS FOR SPECIFIED PRODUCTS OR
FOR CONTRACTOR REQUESTED ALTERNATE PRODUCTS.
b. TEST REPORTS AND CERTIFICATIONS SUBSTANTIATING PRODUCTS COMPLY WITH SPECIFIED
REQUIREMENTS.
c. PRODUCT SAMPLES.
d. CONTRACTOR GENERATED SKETCHES OR DRAWINGS (SHOP DRAWINGS) SHOWING ALL ASPECTS OF THE
INSTALLATION OF THE SPECIFIED PRODUCTS OR SYSTEMS.
3. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR REVIEW BY THE ARCHITECT THAT ARE PROJECT SPECIFIC
ONLY AND HAVE BEEN REVIEWED AND APPROVED BY THE MEMBRANE MANUFACTURER PRIOR TO SUBMISSION TO THE ARCHITECT. THE MANUFACTURERS' STANDARD DETAILS ARE NOT ADEQUATE TO CONVEY THE WORK ON THIS PROJECT AND WILL NOT BE ACCEPTED FOR SUBMISSION. THE ARCHITECT WILL REVIEW THE SHOP DRAWINGS FOR CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS PRIOR TO FABRICATION OF ANY ITEMS. THE SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AT LEAST TWO WEEKS PRIOR TO THE
BEGINNING OF THE RELATED PORTION OF THE WORK.
4. WHEN A SUBMITTAL OR PART OF A SUBMITTAL IS NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL CLEARLY POINT OUT, IN WRITING, IN THE SUBMITTAL, FOR THE ARCHITECT'S ATTENTION, THAT THE SUBMITTAL IS NOT IN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS.
5. THE CONTRACTOR SHALL PERFORM NO WORK RELATED TO ANY SUBMITTAL PRIOR TO RECEIVING A RESPONSE
FROM THE ARCHITECT THAT THE SUBMITTAL CONFORMS TO THE CONSTRUCTION DOCUMENTS.
MOCK-UP
1. THE CONTRACTOR SHALL CONSTRUCT THE ON-THE-BUILDING MOCK-UP OF THE ABOVE REPAIR OF THE EXISTING
HOKIE STONE VENEER ON EXTERIOR PENTHOUSE WALLS AT THE LOCATION SHOWN ON THE DRAWINGS
(MOCK-UP).
SCOPE OF WORK
1. PRIOR TO BEGINNING WORK:
a. PHOTOGRAPH AND DOCUMENT THE EXISTING CONDITION OF THE BUILDING EXTERIOR AND ANY INTERIOR
SPACES THAT WILL BE ACCESSED DURING THE WORK.
b. RUN WATER THROUGH EACH ROOF DRAIN TO CONFIRM THE DRAINS AND DRAINPIPES ARE CLEAR AND
FLOWING FREELY.
2. ON PARAPET WALLS: INSTALL NEW REMOVEABLE COUNTERFLASHINGS (FABRICATED BY OTHERS) IN THE EXISTING
COPING CAP RECEIVERS.
3. ON SCREEN WALLS:
a. REMOVE EXISTING EPDM ROOFING MEMBRANE FROM THE BACK SIDE OF THE SCREEN WALLS.
b. REMOVE AND REPLACE WATER-DAMAGED EXTERIOR GYPSUM SHEATHING.
c. AT CONCEALED STEEL FRAMING INSIDE THE SCREEN WALLS, REMOVE SURFACE CORROSION, CLEAN, PRIME, AND COAT THE STEEL WHERE NEEDED.
d. AT EXPOSED STEEL FRAMING OUTSIDE THE SCREEN WALLS, CLEAN, PRIME AND COAT THE ALL OF THE
EXPOSED STEEL.
e. INSTALL NEW WEATHER RESISTIVE BARRIER INCLUDING HIGH TEMPERATURE UNDERLAYMENT ON THE
BEAM ENCLOSURES.
f. INSTALL NEW FURRING CHANNELS AND SHEET METAL WALL PANELS ON THE BACK SIDE OF THE SCREEN
WALLS.
4. LIGHTNING PROTECTION:
a. TEMPORALLY RELOCATE LIGHTNING PROTECTION CABLES FOR CONSTRUCTION.
b. REINSTALL THE LIGHTNING PROTECTION CABLES.
c. RECERTIFY THE LIGHTNING PROTECTION SYSTEM AT THE COMPLETION OF THE PROJECT.
5. DISPOSE OF THE EXISTING ROOFING:
a. REMOVE AND PROPERLY DISPOSE OF THE EXISTING ROOFING SYSTEM INCLUDING GRAVEL BALLAST, EPDM
MEMBRANE, XPS INSULATION AND THERMAL BARRIER.
b. DELIVER STONE BALLAST TO VT'S LANDFILL AT PRICE'S FORK ROAD AND 460.
c. REMOVE ABANDONED CURBS AND OTHER ROOF TOP EQUIPMENT IDENTIFIED BY VIRGINIA TECH.
6. AT ROOF DRAINS:
a. IF ONE OR MORE CLAMPING RING BOLTS BREAK OR CANNOT BE REMOVED, RETAP ALL FOUR FASTENER
HOLES AND INSTALL NEW BOLTS.
b. INSTALL NEW ADJUSTABLE DRAIN EXTENSION TO ACCOMMODATE THE INCREASED THERMAL INSULATION.
7. AT SELECT HOKIE STONE RISING WALLS:
a. REMOVE THE EXISTING HOKIE STONE, SALVAGE AND CATALOG IT FOR REINSTALLATION
b. RAISE THE EXISTING SHEET METAL THROUGH-WALL FLASHING
c. REINSTALL THE EXISTING HOKIE STONE
8. INSTALL NEW ROOFING ON METAL ROOF DECKS:
a. MECHANICALLY FASTEN A GYPSUM THERMAL BARRIER BOARDS TO THE METAL DECK WITH FASTENERS
SPACED TO MEET THE PROJECT WIND UPLIFT REQUIREMENTS. FASTEN BOARDS TO THE TOP FLUTE IN THE
METAL DECK ONLY, UNLESS APPROVED BY THE ARCHITECT.
b. INSTALL NEW SELF-ADHERING AIR-VAPOR BARRIER.
c. INSTALL NEW R-20 OR R-30 POLYISOCYANURATE INSULATION OR TAPERED POLYISOCYANURATE
INSULATION ``WITH ¼” PER FOOT SLOPE IN RIBBONS OF POLYURETHANE FOAM ADHESIVE SPACED TO
MEET THE PROJECT WIND UPLIFT REQUIREMENTS.
d. INSTALL NEW COVER BOARDS IN RIBBONS OF POLYURETHANE FOAM ADHESIVE SPACED TO MEET THE
PROJECT WIND UPLIFT REQUIREMENTS.
e. INSTALL NEW 60-MIL BLACK EPDM MEMBRANE AND RELATED FLASHINGS IN LOW VOC SOLVENT-BASED
ADHESIVE.
f. EXTEND FLASHINGS A MINIMUM OF 8-INCHES ABOVE THE FINISHED ROOF. APPLY SEALANT BEHIND THE LEADING EDGE OF THE FLASHING AND MECHANICALLY ANCHOR THE LEADING EDGE WITH A TERMINATION
BAR. APPLY SEALANT ALONG THE TOP OF THE TERMINATION BAR.
g. INSTALL NEW WALKWAY-PADS.
9. WARRANTIES:
a. PROVIDE A 2-YEAR CONTRACTOR'S WARRANTY COVERING ALL DEFECTS IN MATERIALS AND
WORKMANSHIP.
b. PROVIDE A 20-YEAR NO-DOLLAR LIMIT, NON-PRORATED MANUFACTURER'S WARRANTY COVERING ALL
DEFECTS IN MATERIALS.
#1
EXIT
EXIT
EX
IT
EXIT
PROVIDE
HIGH-BAY
CANOPY AT
OVERHEAD
DOOR
EXIT EXITEXIT
MAINTAIN RAMP ACCESS OR
COORDINATE ALTERNATE
ACCESSIBLE ACCESS PATH
WITH OWNER
EX
IT
MAINTAIN RAMP ACCESS OR
COORDINATE ALTERNATE
ACCESSIBLE ACCESS PATH
WITH OWNER
FDC
FDC
OVERHEAD
PROTECTION
POTENTIAL
MATERIAL
LAY-DOWN
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\G -0
C on str uc tio n S tag ing P lan .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
IRC/LRM
Construction Staging Plan
G-003
NOTES:
1. CONTRACTOR TO MAINTAIN ACCESS TO ALL BUILDING ENTRANCES DURING THE WORK.
2. TEMPORARY CLOSURE OF AN ENTRANCE TO BE COORDINATED WITH OWNER
3. PROVIDE PEDESTRIAN CANOPIES TO PROTECT FROM OVERHEAD WORK. ALL OVERHEAD PROTECTION IS A
DELEGATED DESIGN. EXTENTS SHOWN ON SHEET G-102 ARE FOR GENERAL SCOPE ONLY.
4. PROVIDE CONSTRUCTION FENCING AT ALL AREAS OF WORK.
5. MAINTAIN FIRE DEPARTMENT ACCESS TO EXISTING FIRE DEPARTMENT CONNECTION POINTS (FDC)
THROUGHOUT THE PROJECT.
6. USE OF POTENTIAL MATERIAL LAY-DOWN AREAS SHALL BE COORDINATED WITH THE PROGRESS OF THE WORK. ALL LAY-DOWN AREAS SHALL NOT BE IN USE SIMULTANEOUSLY UNLESS OTHERWISE AGREED TO BY
THE OWNER.
7. CONTRACTOR TO RESTORE LAY-DOWN AREAS TO PRE-CONSTRUCTION CONDITION.
LEGEND:
1 SCALE: 9/256" = 1'-0"
Construction Staging and Egress Plan
ROOF DROOF A
ROOF G
ROOF H
ROOF E
ROOF C
ROOF F
ROOF J
ROOF K ROOF M
ROOF L
ROOF N ROOF O
ROOF B
28'-0"
'-0
'-0
16'-0"
9' -8
'-0
28'-0"
'-0
'-0
16'-0" 34'-7"12'-0" 12'-0"
'-7
'-0
'-0
32'-0" 21'-8" 32'-0"
28'-0"
16'-0"
'-0
'-0
'-0
9'
-8
'-0
'-6
'-0
20'-0"11'-11"
12'-0"16'-11"
'-0
"16 '-0
12'-0"16'-11"
'-0
'-0
"32 '-0
44'-10"
7'-11"
8'-0"
11'-2"
'-0
'-3
6'-0"
6' -0
" 3' -0
6'-0"
6' -0
3'-0"
3'-0"
3'-0"
3' -0
3' -0
ROOF O ROOF P
'-0
'-6
'-0
20'-0" 11'-11"
ROOF Q
KEY
WIND UPLIFT RESISTANCE: PROVIDE ROOFING SYSTEM THAT IS IDENTICAL TO SYSTEMS THAT
HAVE BEEN SUCCESSFULLY TESTED BY QUALIFIED TESTING AGENCY TO RESIST THE WIND
UPLIFT PRESSURES AND FM RATINGS LISTED IN THE TABLE BELOW.
ZONE 1' - INTERIOR OF FIELD
ZONE 2 - PERIMETERS
ZONE 3 - CORNERS
WIND UPLIFT PRESSURES (IN PSF) CALCULATED USING FM GLOBAL ROOF NAV
ALL OTHER ROOFS
NA
ROOF F
1'
ZONES
-37 psf (1-75)
-79 (1-165)
NA
-42 psf (1-90)
-75 psf (1-165) 2 -58 psf (1-120) -55 psf (1-120)
ZONE 1 - EXTERIOR OF FIELD
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\G -0
W ind U pli ft D iag ra m.
dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Wind Uplift Diagram
G-0041 SCALE: 1/16" = 1'-0"
Wind Uplift Diagram
2 SCALE: 1/16" = 1'-0"
Wind Uplift Diagram - South End
M
AT
C H
L
IN
E M
AT
C
H L
IN
E
M
AT
C H
L
IN
E M
AT
C
H L
IN
E
ROOF A
ROOF H
ROOF E
ROOF D
ROOF B
ROOF J
ROOF F
ROOF C
ROOF M
ROOF K
ROOF L
ROOF N
ROOF O
ROOF P
ROOF Q
'-0
32'-5"
'-3
229'-4"
'-8
64'-4" 85'-8" 75'-5"
'-0
24'-10" 150'-0" 37'-10" 39'-2"
'-3
'-4
1 2"
72'-9" 16'-7"
6'
-0
42'-11 2"
2'
-1 1"
64'-5"
'-5
61'-5" 140'-6" 61'-5" 11'-111 2"
'-0
'-1
0"
RDOD
RD
RD
RD
OD
OD
P
P
L
L
L
L
L
RD
P
P
RD OD
L LL L L L L L
RD RD RD
RD
OD
VSP
RD
LL L
LL L
L
L
L
RD
RD
HS
HS
VS
P P
P
P P
P
L L L L L L L L L L L L
RD
RD RD RD
P
VS
P P
VS
L L L
L L L
L
L L L
L
L
L L L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
RD OD
P
P
RD OD
RD
P
L LL L
L LL L
L
L
P
P
VS
RD
RD RD
L
L
L
L
L
P
P
RD
RD
P
VS
RD
P
VS
RD
P
P
RD
OD
P
OD
OD
RDRD
RD
P
P
LL
L
LL
L
LL
RD
OD
RD
OD
RD
RD
RD
RD
P P
P
PP
PP
P
L L L L
L L L L
L L
L L
OD
RD RD
RD
P
P
P
RD
RD
OD
VS
OD
OD
OD
OD
OD
RD
PAVERS TO BE
REMOVED?
ENCLOSED
AHU
ENCLOSED
AHU
ENCLOSED
AHU
ENCLOSED
AHU
ENCLOSED
AHU
N .I.
C
EX
PA
N
SI
O N
J O
IN
T
EX
PA
N
SI
O N
J O
IN
T
EX
PA
N
SI
O N
J O
IN
T
EX
PA
N
SI
O N
J O
IN
T
CLEAN, PREPARE AND COAT ALL
EXTG. EXPOSED, OVERHEAD STEEL BEAMS
(TYP).
CLEAN, PREPARE AND COAT EXTG.
CONCEALED STEEL COLUMNS AS NEEDED
CLEAN, PREPARE AND COAT ALL
EXTG. EXPOSED, OVERHEAD STEEL BEAMS
(TYP).
CLEAN, PREPARE AND COAT EXTG.
CONCEALED STEEL COLUMNS AS NEEDED
CLEAN, PREPARE AND COAT ALL
EXTG. EXPOSED, OVERHEAD STEEL BEAMS
(TYP).
CLEAN, PREPARE AND COAT EXTG.
CONCEALED STEEL COLUMNS AS NEEDED
LEGEND
ROOF DRAIN
OVERFLOW DRAIN
PENETRATION
LIGHTENING TERMINAL
HOT STACK
VENT STACK
EQUIPMENT CURB
EXHAUST FAN
HATCH
LADDER - REMOVE AND REINSTALL
CRENELLATION W/ NEW TAPERED
INSULATION SUMP
WALKWAY PAD
RD
OD
VS
P
L
HS
DETAIL
9 / A-501
9 / A-501
4, 5, 6 / A-502
3 / A-502
1, 2 / A-502
#, #, 8 / A-501
10, 11 / A-501
# / A-501
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\A -1
O ve ra ll R oo f P lan
.dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om
W iss
Ja nn ey
, E lst ne r A ss oc iat es
, In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Overall Roof Plan
A-101
1 SCALE: 13/256" = 1'-0"
Overall Roof Plan N
A-102
A-103
A-104
ROOF A
ROOF H
ROOF E
ROOF D
ROOF B
ROOF J
ROOF F
'-0
32'-5"
'-3
229'-4"
'-8
64'-4" 85'-8" 75'-5"
'-0
24'-10" 150'-0" 37'-10" 39'-2"
'-3
P
RD
P
P
RD OD
L LL L L L L L
RD RD RD
RD
OD
VSP
RD
LL L
LL L
L
L
L
RD
RD
HS
HS
VS
P P
P
P P
P
L L L L L L L L L L L L
RD
RD RD RD
P
VS
P P
VS
L L L
L L L
L
L L L
L
L
L L L L
L
L
L
RD OD
P
L
L
P
RD
P
VS
RD
P
P
RD
OD
P
OD
OD
RDRD
RD
P
P
LL
L
LL
L
LL
RD
OD
RD
OD
RD
RD
OD
OD
PAVERS TO BE
REMOVED?
ENCLOSED
AHU
EX
PA
N
SI
O N
J O
IN
T
EX
PA
N
SI
O N
J O
IN
T
EX
PA
N
SI
O N
J O
IN
T
CLEAN, PREPARE AND COAT ALL
EXTG. EXPOSED, OVERHEAD STEEL BEAMS
(TYP).
CLEAN, PREPARE AND COAT EXTG.
CONCEALED STEEL COLUMNS AS NEEDED
LEGEND
ROOF DRAIN
OVERFLOW DRAIN
PENETRATION
LIGHTENING TERMINAL
HOT STACK
VENT STACK
EQUIPMENT CURB
EXHAUST FAN
HATCH
LADDER - REMOVE AND REINSTALL
CRENELLATION W/ NEW TAPERED
INSULATION SUMP
WALKWAY PAD
RD
OD
VS
P
L
HS
DETAIL
9 / A-501
9 / A-501
4, 5, 6 / A-502
3 / A-502
1, 2 / A-502
#, #, 8 / A-501
10, 11 / A-501
# / A-501
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\A -1
R oo f P lan
Ar ea
A .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Roof Plan - Area A
A-102
1 SCALE: 3/32" = 1'-0"
Roof Plan - Area A N
2 SCALE: 3/32" = 1'-0"
Key Plan
A-504
A-504 1A-504
A-504 3 A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
CLERESTORY
WINDOW
PRECAST
RISING WALL
A-503
A-503
A-503
A-503
A-503
A-504
A-503
A-503
A-503
A-503
A-504
A-503
A-503
A-503
A-503
A-503
A-503
A-503
PRECAST
RISING WALL
CLERESTORY
WINDOW
A-501
A-501
A-501
A-501
SIM
A-505
A-505
A-505
A-505
A-505
A-505
A-505
A-505
A-505 1 A-505
SIM
SIM
SIM
SIM
SIM
ROOF J
ROOF F
ROOF C
ROOF M
ROOF K
ROOF L
ROOF N
'-4
1 2"
72'-9" 16'-7"
6'
-0
42'-11 2"
2'
-1 1"
64'-5"
'-5
RD
RD
RD
OD
OD
P
P
L
L
L
L
L
RD
P
P
RD OD
L
RD
OD
L L L L L
RD RD
P
P
VS
L L L
L L L
L
L L L
L
L
L L L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
RD OD
P
P
RD OD
RD
P
L LL L
L LL L
L
L
P
P
VS
RD
RD RD
L
L
L
L
L
P
P
RD
RD
P
VS
RD
P
VS
RD
P
P
RD
OD
P
OD
RD
L
RD
RD
P P
P
PP
PP
P
OD
OD
OD
OD
ENCLOSED
AHU
ENCLOSED
AHU
LEGEND
ROOF DRAIN
OVERFLOW DRAIN
PENETRATION
LIGHTENING TERMINAL
HOT STACK
VENT STACK
EQUIPMENT CURB
EXHAUST FAN
HATCH
LADDER - REMOVE AND REINSTALL
CRENELLATION W/ NEW TAPERED
INSULATION SUMP
WALKWAY PAD
RD
OD
VS
P
L
HS
DETAIL
9 / A-501
9 / A-501
4, 5, 6 / A-502
3 / A-502
1, 2 / A-502
#, #, 8 / A-501
10, 11 / A-501
# / A-501
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\A -1
R oo f P lan
Ar ea
B .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Roof Plan - Area B
A-103
1 SCALE: 3/32" = 1'-0"
Roof Plan - Area B N
2 SCALE: 3/32" = 1'-0"
Key Plan
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
PRECAST
RISING WALL
CLERESTORY
WINDOW
A-503
A-503
A-503
A-503
A-503
A-503
A-503
A-503
60'-5"
RAISE THROUGH WALL FLASHING
IN HOKIE STONE RISING WALL
'-4
1 2"
R
AI
SE
T
H R
O U
G H
W
AL
L
FL
AS
H
IN
G
IN
H
O
KI
E
ST
O N
E R
IS
IN
G W
AL
L
13'-5"
RAISE THROUGH WALL FLASHING
IN HOKIE STONE RISING WALL
8' -0
M O
C K-
U P
PROPOSED MOCK-UP LOCATION FOR THE
RAISED THROUGH WALL FLASHING REPAIR
THE NEW ROOFING SYSTEM ON ROOF C
IS TO HAVE R-20 INSULATION
#1
#1 #1
ROOF N
ROOF O
ROOF P
ROOF Q
61'-5" 140'-6" 61'-5" 11'-111 2"
'-0
'-1
0"
RDOD
RD
RD
P P
P
PP
PP
P
L L L L
L L L L
L L
L L
OD
RD RD
RD
P
P
P
RD
RD
OD
VS
OD
RDENCLOSED
AHU
ENCLOSED
AHU
ENCLOSED
AHU
ENCLOSED
AHU
N .I.
C
EX
PA
N
SI
O N
J O
IN
T
CLEAN, PREPARE AND COAT ALL
EXTG. EXPOSED, OVERHEAD STEEL BEAMS
(TYP).
CLEAN, PREPARE AND COAT EXTG.
CONCEALED STEEL COLUMNS AS NEEDED
CLEAN, PREPARE AND COAT ALL
EXTG. EXPOSED, OVERHEAD STEEL BEAMS
(TYP).
CLEAN, PREPARE AND COAT EXTG.
CONCEALED STEEL COLUMNS AS NEEDED
LEGEND
ROOF DRAIN
OVERFLOW DRAIN
PENETRATION
LIGHTENING TERMINAL
HOT STACK
VENT STACK
EQUIPMENT CURB
EXHAUST FAN
HATCH
LADDER - REMOVE AND REINSTALL
CRENELLATION W/ NEW TAPERED
INSULATION SUMP
WALKWAY PAD
RD
OD
VS
P
L
HS
DETAIL
9 / A-501
9 / A-501
4, 5, 6 / A-502
3 / A-502
1, 2 / A-502
#, #, 8 / A-501
10, 11 / A-501
# / A-501
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\A -1
R oo f P lan
Ar ea
C .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Roof Plan - Area C
A-104
N1 SCALE: 3/32" = 1'-0"
Roof Plan - Area C
2 SCALE: 3/32" = 1'-0"
Key Plan
A-503
A-503
A-503
A-503
A-503
A-503
A-504
A-501
A-501
SIM
SIM
A-501
SIM
A-501
SIM
A-505
A-505
A-505
A-505
A-505
A-505
A-505
A-505
EXTG R-20, 14:12 TAPERED XPS INSULATION
TO BE REMOVED
EXTG 58" GYPSUM SUBSTRATE BOARD
TO BE REMOVED
EXTG METAL DECK
TO REMAIN
EXTG LOOSE LAID EPDM ROOFING
MEMBRANE TO BE REMOVED
EXTG CRUSHED STONE BALLAST TO BE
REMOVED AND DELIVERED TO VT'S LANDFILL
AT PRICE'S FORK ROAD AND 460
NEW 12" DENS-DECK PRIME COVER BOARD IN
LOW RISE POLYRUETHANE FOAM ADHESIVE
NEW R-30, 14:12 TAPERED
POLYISOCYANURATE INSULATION IN LOW
RISE POLYURETHANE FOAM ADHESIVE
NEW SELF-ADHERING AIR/VAPOR BARRIER
(SHOWN DASHED)
NEW 58" GYPSUM SUBSTRATE BOARD
MECHANICALLY ATTACHED TO THE TOP
FLUTES OF THE EXTG METAL DECK, DO NOT
FASTEN TO THE BOTTOM FLUTES
EXTG (FLAT) METAL DECK
NEW ADHERED 60 MIL EPDM ROOFING
MEMBRANE
2'-0"
TAPERED INSULATION SUMP
NEW ADJUSTABLE DRAIN EXTENSION
APPLY WATER CUTOFF SEALANT BETWEEN
DRAIN EXTENSION AND EPDM ROOFING
MEMBRANE
CUT A HOLE IN THE EPDM MEMBRANE THAT IS
LARGER IN DIAMETER THAN THE DRAIN PIPE
AND AT LEAST 1" INSIDE THE CLAMPING RING
NEW CLAMPING RING, BOLTS AND STRAINER
(IF EXISTING BOLTS ARE BROKEN OR CANNOT
BE REMOVED, DRILL OUT BOLTS AND RETAP
DRAIN)
SPRAY FOAM INSULATION BETWEEN DRAIN
BODY AND INSULATION BOARDS
FASTENERS AND SEAM PLATES
AT 12 INCH CENTERS MAX
NEW DOUGLAS FIR OR SOUTHERN
YELLOW PINE 2x4 AND 2x6
NAILERS FASTENED AT 12 INCH
CENTERS (INCLUDE UP TO TWO
LAYERS OF EXTERIOR GRADE
PLYWOOD AS NEEDED TO MATCH
INSULATION HEIGHT)
NEW DOUGLAS FIR OR SOUTHERN YELLOW PINE
2x6 NAILER, WITH #12, 2.5" LONG SELF-DRILLING
SCREWS IN TWO STAGGERED ROWS EACH AT 18"
CENTERS (12" CENTERS WITHIN 16'-0" OF
CORNERS) (MIN 4 PER SIDE)
NEW DOUGLAS FIR OR SOUTHERN YELLOW
PINE 2x12 W TWO OFFSET ROWS OF
FASTENERS AT 12 INCH CENTERS
ADHERE NEW EPDM FLASHING WITH BONDING
ADHESIVE AND PRESS INTO PLACE WITH A
HAND ROLLER
PRESSURE SENSITIVE TAPE
4"
FASTENERS AT 8" CENTERS
(MINIMUM 2 PER SIDE)
FLASH AIR/VAPOR BARRIER UP
ALL NAILERS (TYP)
TERMINATION BAR WITH TWO (2)
SCREWS PER SIDE (MIN) (6/A-501)
SHEET METAL SCREWS WITH
SEALING WASHERS AT 12" ON
CENTER (MINIMUM 2 PER SIDE)
NEW 26 GA S.S. SLIP METAL
STYLE COUNTERFLASHING
REMOVE AND REINSTALL
EXISTING EXHAUST FAN ON
NEW WOOD NAILERS TO MATCH
HEIGHT OF NEW INSULATION
3"
TERMINATION BAR WITH TWO (2)
SCREWS PER SIDE (MIN) (6/A-501)
SHEET METAL SCREWS WITH SEALING
WASHERS AT 12" ON CENTER (MINIMUM 2 PER
SIDE)
NEW 26 GA S.S. SLIP METAL STYLE
COUNTERFLASHING
EXTG MECHANICAL EQUIPMENT
THAT CAN NOT BE RAISED
FOR EQUIPMENT THAT CAN
NOT BE RAISED, INSTALL
NEW INSULATION AND
COVER BOARD ABOVE EXTG
CURBS (IF FLASHING
HEIGHT BECOMES LESS
THAN 5" NOTIFY ARCHITECT
AND CONSIDER REVISING
THE TAPERED INSULATION
LAYOUT OR ADDING DRAINS)
5"
NEW 12" DENS-DECK PRIME COVER BOARD IN
LOW RISE POLYRUETHANE FOAM ADHESIVE
NEW R-30 POLYISOCYANURATE INSULATION
IN LOW RISE POLYURETHANE FOAM
ADHESIVE
NEW SELF-ADHERING AIR/VAPOR BARRIER
(SHOWN DASHED)
NEW 58" GYPSUM SUBSTRATE BOARD
MECHANICALLY ATTACHED TO THE TOP
FLUTES OF THE EXTG METAL DECK, DO NOT
FASTEN TO THE BOTTOM FLUTES
EXTG (SLOPED) METAL DECK
NEW ADHERED 60 MIL EPDM ROOFING
MEMBRANE
NEW TERMINATION BAR WITH CONCRETE
SCREWS AT 12" CENTERS AND A
CONTINUOUS TOOLED BEAD OF SEALANT
WATER CUT OFF MASTIC (BUTYL SEALANT)
BEHIND THE TOP LEADING EDGE OF THE
EPDM MEMBRANE
NEW TERMINATION BAR WITH CONCRETE
SCREWS AT 12" CENTERS (SEE TABLE FOR
INTERMEDIATE FASTENER SPACING)
6"
SELF-ADHERING EPDM FLASHING MEMBRANE
LAP SEALANT
WALL HEIGHT
LESS THAN 3'
UP TO 5' TALL
UP TO 10' TALL
INTERMEDIATE FASTENER REQUIREMENT
NO INTERMEDIATE FASTENERS REQUIRED
INTERMEDIATE FASTENERS AT MID HEIGHT
OF WALL
AT 3' CENTERS
FLEXIBLE MEMBRANE TO
RETAIN BATT INSULATION
FILL WITH BATT
INSULATION
PRESSURE SENSITIVE TAPE
FASTENERS AND SEAM PLATES
AT 12 INCH CENTERS MAX
NEW DOUGLAS FIR OR SOUTHERN YELLOW PINE
2x NAILERS WITH 10d 3" NAILS IN TWO
STAGGERED ROWS AT 18" CENTERS
FASTENERS W/ WASHERS AT 12" CENTERS
BACKER ROD WITH DIAMETER EQUAL TO 1.5
TIMES THE EXPANSION JOINT WIDTH
ADHERED EPDM MEMBRANE FLASHING
(LOOSE LAID OVER BACKER ROD)
NEW DOUGLAS FIR OR SOUTHERN YELLOW PINE
2x6 NAILERS, WITH #12, 2.5" LONG SELF-DRILLING
SCREWS IN TWO STAGGERED ROWS EACH AT 18"
CENTERS (12" CENTERS WITHIN 12'-0" OF WALLS).
FASTEN TO THE TOP FLUTES IN THE EXTG METAL
DECK, DO NOT FASTEN TO THE BOTTOM FLUTES
2" M
IN
TURN NEW AIR/VAPOR BARRIER UP WALL TO
TOP OF INSULATION
SE
E
TY
PI
C
AL
D
ET
AI
LS
NEW 6" WIDE, REINFORCED MEMBRANE
ATTACHMENT STRIP WITH NAIL-IN ANCHORS
AND SEAM PLATES AT 12" CENTERS MAX
ADHERE NEW EPDM FLASHING WITH BONDING
ADHESIVE AND PRESS INTO PLACE WITH A
HAND ROLLER
ADHERE NEW EPDM FLASHING WITH BONDING
ADHESIVE AND PRESS INTO PLACE WITH A
HAND ROLLER
NAIL-IN ANCHORS AND SEAM PLATES
AT 12" CENTERS MAX
SE
E
TY
PI
C
AL
D
ET
AI
LS
NEW PRESSURE SENSITIVE TAPE
TURN NEW AIR/VAPOR BARRIER UP WALL TO
TOP OF INSULATION
NEW 12" DENS-DECK PRIME COVER BOARD IN
LOW RISE POLYRUETHANE FOAM ADHESIVE
NEW R-20 POLYISOCYANURATE INSULATION
IN LOW RISE POLYURETHANE FOAM
ADHESIVE
NEW SELF-ADHERING AIR/VAPOR BARRIER
(SHOWN DASHED)
NEW 58" GYPSUM SUBSTRATE BOARD
MECHANICALLY ATTACHED TO THE TOP
FLUTES OF THE EXTG METAL DECK, DO NOT
FASTEN TO THE BOTTOM FLUTES
EXTG (SLOPED) METAL DECK
NEW ADHERED 60 MIL EPDM ROOFING
MEMBRANE
#1
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\A -5
R oo fin g D eta ils .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner Associates, Inc.
10 South LaSalle Street, Suite 2600
620 Drillfield Drive Blacksburg, Virgina 24061
Virginia PolyTechnic Institute and State University
VT Facilities Department
GM/JAA
February 27, 2026
As Noted
LRM/IRC
Roofing Details
A-501
1 SCALE: 3" = 1'-0"
Extg EPDM Roofing
2 SCALE: 3" = 1'-0"
New R-30 EPDM Roofing on Flat Metal Deck
9 SCALE: 3" = 1'-0"
Drain
8 SCALE: 3" = 1'-0"
Field Fabricated Wood Curb
11 SCALE: 3" = 1'-0"
Exhaust Fan10 SCALE: 3" = 1'-0"
Exhaust Fan - Cannot Be Raised
3a SCALE: 3" = 1'-0"
New R-30 EPDM Roofing on Sloped Metal Deck
(ROOF AREAS B, H, K, AND M)(ROOF AREAS A, C, D, E, F, G, J, L, N, O, P AND Q)
6 SCALE: 3" = 1'-0"
Termination Detail 7 SCALE: 3" = 1'-0"
Intermediate Termination Detail
12 SCALE: 3" = 1'-0"
Roof-to-Roof Expansion Joint
4 SCALE: 3" = 1'-0"
Wall or Curb with Continous Field Membrane 5 SCALE: 3" = 1'-0"
Wall or Curb with Separate Flashing
3b SCALE: 3" = 1'-0"
New R-20 EPDM Roofing on Sloped Metal Deck
(ROOF AREA K)
8"
1' -0
CUT INSULATION AND COVER BOARDS
TO FIT WITHIN 14" OF STACK (FILL GAPS
LARGER THAN 14" WITH SPRAY FOAM)
3"
CUT MEMBRANE TIGHT TO STACK
LAP SEALANT (TYP)
SELF-ADHERING EPDM TARGET SHEET WITH
HOLE 1" SMALLER THAN PIPE DIAMETER
LAP SEALANT
EXTEND EXTG STACK 12" ABOVE INSULATION
WITH OMG TUBOS VENT PIPE EXTENSION
WRAP STACK WITH SELF-ADHERING EPDM
FLASHING AND LAP 1" MIN. ONTO TARGET SHEET
BUTYL SEALANT AROUND TOP OF
EXTG STACK
3"
1"
EPDM STRIP AND S.S. DRAW BAND
FLASH STACK WITH AIR/VAPOR BARRIER
8"
1' -0
CUT INSULATION AND COVER BOARDS
TO FIT WITHIN 14" OF STACK (FILL GAPS
LARGER THAN 14" WITH SPRAY FOAM)
3"
CUT MEMBRANE TIGHT TO STACK
LAP SEALANT (TYP)
SELF-ADHERING EPDM TARGET SHEET WITH
HOLE 1" SMALLER THAN PIPE DIAMETER
LAP SEALANT
EXTEND EXTG STACK 12" ABOVE INSULATION
WITH NEW CAST IRON EXTENSION
3"
1"
WRAP STACK WITH SELF-ADHERING EPDM
FLASHING AND LAP 1" MIN. ONTO TARGET SHEET
EPDM STRIP AND S.S. DRAW BAND
FLASH STACK WITH AIR/VAPOR BARRIER
HIGH TEMPERATURE SEALANT
" M
IN
GA. GALV. STORM COLLAR
FLUE (EXTEND PIPE IF NECESSARY TO
ACHIEVE PROPER HEIGHT)
24 GA GALV. METAL PIPE FLASHING, SET IN
WATER CUT-OFF MASTIC AND FASTEN
CONTINUOUS BEAD OF LAP SEALANT
12" SELF-ADHERED UNCURED EPDM
FLASHING
5" SELF-ADHERED UNCURED EPDM
FLASHING
ADHERED EPDM FIELD MEMBRANE
D
ET
AI
L
/ S
H
EE
T A-
INSPECT FIRE SAFING AND REPLACE IF
NEEDED
NEW DOUGLAS FIR OR SOUTHERN YELLOW PINE
2x6 NAILERS WITH A MINIMUM OF THREE #12, 2.5"
LONG SELF-DRILLING SCREWS PER BOARD.
FASTEN TO THE TOP FLUTES IN THE EXTG METAL
DECK, DO NOT FASTEN TO THE BOTTOM FLUTES
NEW DOUGLAS FIR OR SOUTHERN YELLOW PINE
2x6 NAILERS WITH A MINIMUM OF FOUR 10D, 3"
LONG NAILS PER BOARD
8"
CUT INSULATION AND COVER BOARDS
TO FIT WITHIN 14" OF STACK (FILL GAPS
LARGER THAN 14" WITH SPRAY FOAM)
3"
CUT MEMBRANE TIGHT TO PIPE
LAP SEALANT (TYP)
SELF-ADHERING EPDM TARGET SHEET WITH
HOLE 1" SMALLER THAN PIPE DIAMETER
LAP SEALANT
3"
1"
WRAP STACK WITH SELF-ADHERING EPDM
FLASHING AND LAP 1" MIN. ONTO TARGET SHEET
EPDM STRIP AND S.S. DRAW BAND
FLASH PIPE WITH AIR/VAPOR BARRIER
LAP SEALANT
SEAL BETWEEN PIPE/CONDUIT
AND AIR/VAPOR BARRIER
SELF-ADHERING SEALER POCKET
WITH PLASTIC SUPPORT STRIP
TURN SELF-ADHERING FLASHING
INTO POCKET
SEALER
EXTG PIPES
SPRAY FOAM INSULATION
3"
3"
26 GA S.S. COVER PLATES CUT TO
FIT TIGHT AROUND PIPES
LAP AIR/VAPOR BARRIER OVER
SHEET METAL COVER PLATES
3"
NOTE: SEALANT PANS
ARE ONLY TO BE USED
W/ WRITTEN APPROVAL
FROM THE ARCHITECT
8"
CUT INSULATION AND COVER BOARDS
TO FIT WITHIN 14" OF STACK (FILL GAPS
LARGER THAN 14" WITH SPRAY FOAM)
3"
CUT MEMBRANE TIGHT TO
TUBE/POST
LAP SEALANT (TYP)
SELF-ADHERING EPDM TARGET SHEET WITH
HOLE 1" SMALLER THAN TUBE/POST
DIAMETER
LAP SEALANT
3"
1"
WRAP STACK WITH SELF-ADHERING EPDM
FLASHING AND LAP 1" MIN. ONTO TARGET SHEET
EPDM STRIP AND S.S. DRAW BAND
FLASH TUBE/POST WITH AIR/VAPOR
BARRIER
LAP SEALANT
SELF-ADHERING SEALER POCKET
WITH PLASTIC SUPPORT STRIP
TURN SELF-ADHERING FLASHING
INTO POCKET
SEALER
EXTG UNISTRUT SUPPORT
3"
3"
SEALANT AROUND BASE OF
UNISTRUT
Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Doylestown | Honolulu | Houston | Indianapolis | London | Los Angeles Milwaukee | Minneapolis | New Haven | Northbrook (HQ) | New York Pittsburgh | Philadelphia | Portland | Princeton | Raleigh | San Antonio San Diego | San Francisco | Seattle | South Florida | Washington, DC
Client
Consultants
2"1"1/2"0
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
Pl ott ed : 4
/15 /20
3:
P
M by
A sp in, Ja so n
F ile
N am e:
p:\
\20
.6x xx
\20
.66
.0
- c ds to rg er se n h all re ro of.
irc \D ra wi ng s\S he ets
\A -5
R oo fin g D eta ils .dw g
C op yri gh t 2
6.
A ll r igh ts re se rve d.
N o p ar t o f th is do cu me nt ma y b e r ep ro du ce d i n a ny fo rm or by an y m ea ns w ith ou t p er mi ss ion fr om W iss
Ja nn ey , E lst ne r A ss oc iat es , In c.
(W
JE
W
JE
di sc lai ms an y r es po ns ibi lity fo r it s u na uth or ize d u se
Sheet No.
Sheet Title
Scale
Checked
Drawn
Date
Project No.
DateMark Description
Project
F
E
D
C
B
A
F
E
D
C
B
A
Wiss, Janney, Elstner…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .