About this file
This document is Addendum 4 to the City Hall Renovation Project, a state and local contract opportunity issued by Fayette County, Georgia. The project involves renovating both lobbies of City Hall, installing a new elevator, replacing HVAC equipment in the server room, and updating the electrical backup system and switchgear. The closing date for this amended contract opportunity is October 2nd. No other details are provided regarding response deadlines, site visits, bidder's conferences, or the contract term and renewal options.
The addendum does not contain information about pricing terms, set-asides, incumbents, funding sources and requirements, or other salient commercial details. The document focuses solely on the technical scope of work for the renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF PEACHTREE CITY
CITY HALL RENOVATION PROJECT
25-103BES
ADDENDUM #4
1. CLARIFICATION: The outside push buttons for both sets of lobby doors will be located on stand-alone pillars set away from the building and must meet ADA standards. See attached specification sheet from BEA.
2. QUESTION: What type of glass is in the window and what type of glass is in front of the window (installed with standoffs) there is some drawings on it, but not really any specifics and nothing in the specs.
ANSWER: Please provide tempered float glass for these windows.
3. QUESTION: Do you possibly have the specs to the HVAC system?
ANSWER: HVAC system is detailed on the mechanical drawings (H000- H900) in the plans provided in the bid documents.
4. CLARIFICATION: The Sika Sarnafil technical rep took a core sample of the roof and has determined the following
a. Core was 3.5” thick total
b. Adhered PVC cover sheet, MF ½ dens deck, swept gravel Built up roof, steel decking (3”).
c. Checked slope in I beams supporting the bar joist with a bubble level and appeared the bar joist are level.
d. Checked slope in the bar joist supporting the steel deck with a bubble level and appeared the bar joist have a prominently ¼” slope per foot in the decking
5. QUESTION: What is the makeup of the existing roof system between the metal roof deck and the Sarnafil PVC membrane?
ANSWER: See item 4.
6. QUESTION: Is all the slope in the existing deck system or is there taper insulation on any or all of the roof area?
ANSWER: See item 4.
7. QUESTION: Where will the roof contractors be able to locate dumpsters for the removal of the existing roof system?
ANSWER: Space will be provided in the rear parking lot for dumpsters.
8. QUESTION: What area of the building perimeter will be available for access via a Lull or Telehandler?
ANSWER: Space will be provided in the rear parking lot for accessing the roof from the ground. CLARIFICATION: The outside push buttons for both sets of lobby doors will be located on stand-alone pillars set away from the building and must meet ADA standards.
9. QUESTION: What area of the property is available for material staging?
ANSWER: Space will be provided in the rear parking lots for material staging.
10. QUESTION: Are walk-pads to be included and if so where?
ANSWER: Yes, walk pads shall be included, see revised sheet A202.
11. QUESTION: Has any info been given by the architect on the contradiction regarding the insulation attachment?
ANSWER: Please refer to attached Sika handbook for details on insulation attachment.
12. CLARIFICATION: CPL has provided the following plan revisions as promised in the previous addendum:
a. Replacement of Main Switch Gear and UDP in Communications Room.
b. Power by-pass plan to enable contractor to keep power to all server areas during the course of the project.
13. QUESTION: Section 07 54 19 page 4, 2.05 “Cover Boards”, calls for ¼” dens deck prime cover board, on drawing A -202 the notes call for 5/8” dens deck prime cover board, Sika typically use ½”. Please clarify which thickness to use for this project.
ANSWER: Provide 5/8” thick cover board as indicated on drawings.
14. CLARIFICATION: Contractor needs to provide for resistance test on main electrical feeders into the building from the transformer to determine if they are suitable to be re-used.
15. CLARIFICATION: On Sheet E001 Note D under Panel General Notes states breakers can be re-used if possible. This is incorrect, contractor shall provide all new breakers.
Attachment (s) 00 41 00 Bid Form Revised 00 43 13 Bid Security Form Revised Plan Revisions – Revised G001, A101, A102, A103, A200, A201, A202,A701,A702, A900, H200, E001, E100, E101,E201,H200 Sika Installation Handbook___ September 2024 Revised Specifications Sections For PVC Roofing BEA Bollard Specifications Sheet
9 October 2024
City Hall Renovations 00 41 00-1
25-103BES REVISED 10/09 BID FORM
SECTION 00 41 00
BID FORM
TABLE OF CONTENTS
Page
Article 1 – Bid Recipient
Article 2 – Bidder’s Acknowledgements
Article 3 – Bidder’s Representations
Article 4 – Bidder’s Certification
Article 5 – Basis of Bid
Article 6 – Time of Completion
Article 7 – Attachments to This Bid
Article 8 – Defined Terms
Article 9 – Bid Submittal
City Hall Renovations 00 41 00-2
ARTICLE 1 – BID RECIPIENT
1.01 This Bid is submitted to: City of Peachtree City
151 Willowbend Road Peachtree City, GA 30269
This Bid is submitted from:
(Name and Address of Individual, Partnership, or Corporation)
P.O. Box Not Acceptable
This Bid is for: City Hall Renovations
October 17, 2024/3:00 pm
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an
Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2 – BIDDER’S ACKNOWLEDGEMENTS
2.01 Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for 60 calendar days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.
ARTICLE 3 – BIDDER’S REPRESENTATIONS
3.01 In submitting this Bid, Bidder represents that:
A. Bidder has examined and carefully studied the Bidding Documents, other related data identified in the Bidding Documents, and the following Addenda, receipt of which is hereby acknowledged:
City Hall Renovations 00 41 00-3
B.
Addendum No. Addendum Date
C. Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
D. Bidder is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
E. Bidder has carefully studied all (if applicable): (1) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in SC-4.02 as containing reliable "technical data," and (2) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in SC-4.06 as containing reliable "technical data."
F. Bidder has considered the information known to Bidder; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports (if applicable) and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents; and (3) Bidder’s safety precautions and programs.
G. Based on the information and observations referred to in Paragraph 3.01.E above, Bidder does not consider that further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents.
H. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.
I. Bidder has given Purchasing Agent written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by Purchasing Agent is acceptable to Bidder.
City Hall Renovations 00 41 00-4
1. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.
ARTICLE 4 – BIDDER’S CERTIFICATION
4.01 Bidder certifies that:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation;
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid;
C. Bidder has not solicited or induced any individual or entity to refrain from bidding; and
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process;
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.
ARTICLE 5 – BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
A. LUMP SUM BASE BID
LUMP SUM BASE BID
Lump Sum Base Bid Price $ Allowance for Materials Testing $10,000.00
TOTAL LUMP SUM BASE BID PRICE $
City Hall Renovations 00 41 00-5
All specified cash allowances are included in the price(s) set forth above and have been computed in accordance with Paragraph 11.02 of the General Conditions.
CHANGE ORDER UNIT PRICES
Item No. Description Unit Bid Unit Price 1 Replacement metal roof decking SF $ 2 Replacement Ceiling Tiles Each $ 3 Replacement metal HVAC Duct LF $ 4 Concrete cy $
The bid items outlined above have been provided for bid comparison. The bid unit prices will also be utilized for establishing contract price modifications in the event of a duly authorized change order to results in the modification of the contract amount due to the contractor. Examples of such modification shall include but not be limited to increases in the scope of work resulting in additional work or modifications of the scope of work wherein the amount of work is reduced.
B. LUM SUM BASE BID WITH ADD/ALTERNATE.
Contractor to provide price below for additional work above and beyond Base Bid work for the alternate cabinet work, video display, and associated wiring and equipment.
ADD/ALTERNATE TO LUMP SUM BASE BID
Lump Sum Base Bid Price $ Alt. 1 Planar Display/Display Case Upper Lobby $ Allowance for Testing and Materials $10,000 TOTAL LUMP SUM PRICE w/ Alt. 1 $
ARTICLE 6 – TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages.
ARTICLE 7 – ATTACHMENTS TO THIS BID
7.01 The following documents are submitted with and made a condition of this Bid:
City Hall Renovations 00 41 00-6
A. All documents as outlined in Section 00 22 13 “Supplementary Instructions to Bidders.”
ARTICLE 8 – DEFINED TERMS
8.01 The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 9 – BID SUBMITTAL
9.01 This Bid is submitted by:
If Bidder is:
An Individual
Name (typed or printed):
By:
(Individual’s signature)
Doing business as:
A Partnership
Partnership Name:
By:
(Signature of general partner -- attach evidence of authority to sign)
Name (typed or printed):
A Corporation
Corporation Name: (SEAL)
State of Incorporation:
Type (General Business, Professional, Service, Limited Liability):_______
By:
(Signature -- attach evidence of authority to sign)
Name (typed or printed):
Title:
(CORPORATE SEAL)
City Hall Renovations 00 41 00-7
Attest
Date of Qualification to do business in Georgia is ____/____/____.
A Joint Venture
Name of Joint Venture:
First Joint Venturer Name: (SEAL)
By:
(Signature of first joint venture partner -- attach evidence of authority to sign)
Name (typed or printed):
Title:
Second Joint Venturer Name: (SEAL)
By:
(Signature of second joint venture partner -- attach evidence of authority to sign)
Name (typed or printed):
Title:
(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above.)
Bidder's Business Address
Phone No. _____________________________________ Fax No.
E-mail _____________________________________
SUBMITTED on , 20____.
State Contractor License No. . [If applicable]
END OF SECTION
City Hall Renovations 00 43 13-1
25-103BES REVISED 10/09 BID SECURITY FORM
SECTION 00 43 13
BID SECURITY FORM
BIDDER (Name and Address):
SURETY (Name and Address of Principal Place of Business):
OWNER (Name and Address):
City of Peachtree City 151 Willowbend Road Peachtree City, GA 30269
BID
Bid Due Date: October 17, 2024/3:00 pm
Description:
Renovate both lobbies of City Hall, install a new elevator, replace the HVAC equipment in the server room, and update the electrical backup system and switchgear
BOND
Bond Number:
Date (Not earlier than Bid due date):
Penal sum $ (Words) (Figures)
Surety and Bidder, intending to be legally bound hereby, subject to the terms set forth below, do each cause this Bid Bond to be duly executed by an authorized officer, agent, or representative.
BIDDER SURETY
(Seal) (Seal) Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal
By: By:
Signature Signature (Attach Power of Attorney)
Print Name Print Name
Title Title
Attest: Attest:
Signature Signature
Title Title
City Hall Renovations 00 43 13-2
Note: Surety companies executing bonds must appear on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.
1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to pay to Owner upon default of Bidder the penal sum set forth on the face of this Bond. Payment of the penal sum is the extent of Bidder’s and Surety’s liability. Recovery of such penal sum under the terms of this Bond shall be Owner’s sole and exclusive remedy upon default of Bidder.
2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents.
3. This obligation shall be null and void if:
3.1 Owner accepts Bidder’s Bid and Bidder delivers within the time required by the Bidding
Documents (or any extension thereof agreed to in writing by Owner) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Documents, or
3.2 All Bids are rejected by Owner, or
3.3 Owner fails to issue a Notice of Award to Bidder within the time specified in the Bidding
Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by Paragraph 5 hereof).
4. Payment under this Bond will be due and payable upon default of Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from Owner, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.
5. Surety waives notice of any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by Owner and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.
6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in Paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.
7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.
8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier, or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.
9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent, or representative who executed this Bond on behalf of Surety to execute, seal, and deliver such Bond and bind the Surety thereby.
10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in
City Hall Renovations 00 43 13-3 conflict therewith shall continue in full force and effect.
11. The term “Bid” as used herein includes a Bid, offer, or proposal as applicable.
END OF SECTION
STEEL
RIGID INSULATION
EARTH
GRAVEL TYPE 1
(ENGINEERED FILL)
GROUT
PRECAST CONCRETE
CRUSHED STONE
CONCRETE MASONRY UNIT
(CMU)
METAL STUD PARTITION
BRICK
ROUGH WOOD BLOCKING
WOOD, FINISHED WOODWORK
ROUGH WOOD BLOCKING,
NON-CONTINUOUS
PLYWOOD (LARGE SCALE)
GYPSUM BOARD
BATT OR LOOSE INSULATION
1 HR RATING
2 HR RATING
SMOKE RATINGCAVITY DRAINAGE MAT
ALUMINUM
STANDING SEAM ROOF
CONCRETE, POURED
TERRAZZO
EXISTING BUILDING MATERIALS
DRAWING LIST
SHEET NUMBER SHEET NAME SHEET ISSUE DATE Permit Issue Date ADDENDUM #2 ADDENDUM #3
GENERAL
G000 COVER 08/30/2024 08/30/2024
G001 DRAWING LIST & ABBREVIATIONS 09/25/2024 08/30/2024 09/24/2024 09/25/2024
G201 LIFE SAFETY PLAN - LOWER LEVEL 08/30/2024 08/30/2024
G202 LIFE SAFETY PLAN - UPPER LEVEL 08/30/2024 08/30/2024
STRUCTURAL
S200 ELEVATOR PLAN AND DETAILS 08/30/2024 08/30/2024
S900 TYPICAL NOTES 08/30/2024 08/30/2024
ARCHITECTURAL
A101 OVERALL DEMOLITION PLAN LOWER LEVEL 09/25/2024 08/30/2024 09/24/2024 09/25/2024
A102 OVERALL DEMOLITION PLAN UPPER LEVEL 09/25/2024 08/30/2024 09/25/2024
A103 ROOF PLAN - EXISTING CONDITIONS AND DEMO SCOPE 09/25/2024 08/30/2024 09/25/2024
A200 OVERALL FLOOR PLAN LOWER LEVEL 09/25/2024 08/30/2024 09/24/2024 09/25/2024
A201 OVERALL FLOOR PLAN UPPER LEVEL 09/24/2024 08/30/2024 09/24/2024
A202 OVERALL PROPOSED ROOF PLAN 09/25/2024 08/30/2024 09/25/2024
A400 WALL TYPES 08/30/2024 08/30/2024
A501 ELEVATOR SECTIONS & ENLARGED PLANS 08/30/2024 08/30/2024
A601 OVERALL REFLECTED CEILING PLAN LOWER LEVEL 08/30/2024 08/30/2024
A602 OVERALL REFLECTED CEILING PLAN UPPER LEVEL 08/30/2024 08/30/2024
A701 ENLARGED FLOOR PLAN AND INTERIOR ELEVATIONS 08/30/2024 08/30/2024
A702 ENLARGED FLOOR PLAN AND INTERIOR ELEVATIONS 08/30/2024 08/30/2024
A800 TYPICAL DETAILS 08/30/2024 08/30/2024
A801 ROOF DETAILS 08/30/2024 08/30/2024
A802 ROOF DETAILS 08/30/2024 08/30/2024
A900 DOOR PANELS, FRAME TYPES & SCHEDULES 09/24/2024 08/30/2024 09/24/2024
INTERIORS
I200 FIRST FLOOR FINISH PLAN 08/30/2024 08/30/2024
I201 SECOND FLOOR FINISH PLAN 08/30/2024 08/30/2024
MECHANICAL
H000 HVAC SYMBOLS LEGEND AND CONTRACTOR NOTES 08/30/2024 08/30/2024
H001 HVAC SPECIFICATIONS 08/30/2024 08/30/2024
H100 CPU REPLACEMENT FIRST AND SECOND FLOOR DEMOLITION PLANS 08/30/2024 08/30/2024
H101 PARTIAL UPPER AND LOWER LEVEL DEMOLITION PLAN 08/30/2024 08/30/2024
H200 CPU REPLACEMENT FIRST AND SECOND FLOOR NEW WORK PLANS 09/25/2024 08/30/2024 09/25/2024
H201 PARTIAL UPPER AND LOWER LEVEL NEW WORK PLAN 08/30/2024 08/30/2024
H800 DETAILS 08/30/2024 08/30/2024
H900 SCHEDULES 08/30/2024 08/30/2024
FIRE PROTECTION
FP 200 LOWER LEVEL FIRE PROTECTION PLAN 09/24/2024 09/24/2024
ELECTRICAL
E000 ELECTRICAL LEGEND, NOTES & SPECIFICATIONS 08/30/2024 08/30/2024
E001 ELECTRICAL ONE-LINE DIAGRAM 08/30/2024 08/30/2024
E100 ELECTRICAL DEMOLITION PLAN 08/30/2024 08/30/2024
E101 PARTIAL UPPER AND LOWER LEVEL ELECTRICAL DEMOLITION PLAN 08/30/2024 08/30/2024
E200 ELECTRICAL POWER PLAN 08/30/2024 08/30/2024
E201 PARTIAL UPPER AND LOWER LEVEL POWER PLANS 08/30/2024 08/30/2024
E300 ELECTRICAL LIGHTING PLAN 08/30/2024 08/30/2024
E301 PARTIAL UPPER AND LOWER LEVEL LIGHTING PLAN 08/30/2024 08/30/2024
615 Molly Lane Suite 100, Woodstock, GA 30189
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
/2
/2
:4
:2
A
M
1/4" = 1'-0" p ro je c t lo c a ti o n
D D e si g n
P ro je c t Fi le s o n
B
IM
PEACHTREE CITY
151 Willowbend Rd
Peachtree City, GA 30269
CITY HALL RENOVATION
R24.16574.00
DRAWING LIST & ABBREVIATIONS
MBR NAW
09/25/2024
PERMIT SET
G001
1. GENERAL CONTRACTOR (GC) SHALL SURVEY JOB SITE PRIOR TO COMMENCING WORK AND SHALL VERIFY ALL DIMENSIONS AND NOTE ALL
CONDITIONS WHICH WILL AFFECT OR BE AFFECTED BY WORK ON THIS PROJECT AND SUCH CONDITIONS OR DISCREPANCIES SHALL BE REPORTED
IMMEDIATELY TO THE ARCHITECT. FAILURE TO DO SO WILL NOT JUSTIFY ANY ADDITIONAL CHARGES.
2. DO NOT SCALE DRAWINGS. IF A DIMENSION IS NEEDED, CONTACT THE ARCHITECT.
3. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES WHICH OCCUR WITHIN THE CONTRACT DOCUMENTS PRIOR TO THE
ORDERING OF MATERIALS OR EXECUTION OF WORK.
4. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE CODES, LAWS, RULES AND REGULATIONS OF ALL CONSTITUTED PUBLIC
AUTHORITIES HAVING JURISDICTION.
5. CONTRACTOR SHALL CLEAN ALL SPACES AND SURFACES THOROUGHLY UPON COMPLETION OF THE WORK, INCLUDING REMOVING DUST, DEBRIS, OILS, STAINS, FINGERPRINTS AND LABELS FROM EXPOSED FINISHED SURFACES, INCLUDING GLAZING.
6. PROJECT CLEANUP SHALL INCLUDE A "VACUUM CLEAN" INTERIOR SPACE WITH RESTORATION OF ALL DAMAGED SURFACES AND ITEMS (INTERIOR &
EXTERIOR) TO "LIKE NEW" CONDITION.
7. AFTER COMPLETION OF WORK ALL ADDITIONAL MATERIALS REMAINING DUE TO CONSTRUCTION SHALL BECOME THE PROPERTY OF THE GENERAL
CONTRACTOR AND SHALL BE DISPOSED OF / REMOVED FROM THE SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS, RULES, AND REGULATIONS UNLESS
NOTIFIED OTHERWISE. CONTRACTOR SHALL ALSO REMOVE ALL WASTE DEBRIS, RUBBISH, TOOLS, EQUIPMENT AND SURPLUS MATERIALS UPON COMPLETION
OF WORK. THROUGHOUT CONSTRUCTION, SITE SHALL BE ORGANIZED AND CLEANED BY CONTRACTOR ON A DAILY BASIS.
8. THE CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO PROTECTING THE EXISTING SIDEWALK, PARKING LOT, AND LANDSCAPING FROM THE
EQUIPMENT NECESSARY TO COMPLETE THE PROJECT.
9. THE ROOF PLANS AND DETAILS ARE REPRESENTATIVE IN NATURE AND ARE PROVIDED TO SHOW THE RELATIONSHIP BETWEEN SPECIFIED MATERIALS. FOR
CLARITY, ALL SPECIFIED MATERIALS REQUIRED FOR USE MAY NOT BE SHOWN ON THE CONSTRUCTION DOCUMENTS AND THE CONTRACTOR SHALL ENSURE
THAT CONSTRUCTION, INSTALLATION, AND APPLICATION OF MATERIALS IS DONE IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS.
10. WEATHER PROTECTION TO BE PROVIDED FOR STORED MATERIALS. FASTENERS, ADHESIVES, SEALANTS, AND ACCESSORIES SHOULD ALSO BE COVERED
TO PROTECT THEM FROM WEATHER. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR STORAGE REQUIREMENTS.
GENERAL NOTES FILL PATTERNS
A
AFF ABOVE FINISHED FLOOR
ACT ACOUSTICAL CEILING TILE
AWP ACOUSTICAL WALL PANEL
ADJ ADJACENT
A/C AIR CONDITIONING
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT, ARCHITECTURAL
AD AREA DRAIN
@ AT
AUTO AUTOMATIC
B
BP BEARING PLATE
BITUM BITUMINOUS
BLK BLOCK
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BLDG BUILDING
C
CLG CEILING
CLG HT CEILING HEIGHT
CL CENTER LINE
CER CERAMIC
CO CLEAN OUT
CLR CLEAR
COL COLUMN
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
D
DP DAMP PROOFING
DEMO DEMOLISH
DEPT DEPARTMENT
DET,DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DR DOOR
DBL DOUBLE
DN DOWN
DS DOWNSPOUT
DWG DRAWING
DF DRINKING FOUNTAIN
E
EA EACH
EF EACH FACE
EW EACH WAY
E EAST
ELEC ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE(D)
EXHST EXHAUST
EXIST EXISTING
EXP EXPANSION
EJ EXPANSION JOINT
F
FAB FABRICATE
FT FEET
FIG FIGURE
FF FINISH FLOOR
FEC FIRE EXTINGUISHER CABINET
FL,FLR FLOOR
FD FLOOR DRAIN
FTG FOOTING
FND FOUNDATION
G
GALV GALVANIZED
G GAS
GA GAUGE
GEN GENERAL
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GSF GROSS SQUARE FOOT
GYP GYPSUM
GYP BD GYPSUM BD
GWB GYPSUM WALL BOARD
H
HDWR HARDWARE
HVAC HEATING, VENTILATING & AIR
CONDITIONING
HT, HGT HEIGHT
HWY HIGHWAY
HM HOLLOW METAL
HB HOSE BIBB
HW HOT WATER
HR HOUR
I
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
J
JAN JANITOR
JS JANITOR SINK
JT JOINT
L
LAM LAMINATE(D)
LAV LAVATORY
LH LEFT HAND
LW LIGHT WEIGHT
M
MACH MACHINE
MH MAN HOLE
MFR MANUFACTURE
MAS MASONRY
MO MASONRY OPENING
MAT MATERIALS
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
MR MOISTURE RESISTANT
MTD MOUNTED
N
NOM NOMINAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO, # NUMBER
O
OC ON CENTER
OPNG OPENING
OD OUTSIDE DIAMETER
OH OVERHEAD
P
PT PAINT(ED)
PR PAIR
PART PARTITION
PVMT PAVEMENT
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PVC POLYVINYL CHLORIDE
PRE FAB PREFABRICATED
PT PRESSURE TREATED
PL PROPERTY LINE
Q
QTY QUANTITY
R
RAD RADIUS
RECP RECEPTACLE
RE: REFER TO
REINF REINFORCED(ING)
REQ'D REQUIRED
REV REVISED
RH RIGHT HAND
R RISER
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
S
SAN SANITARY
SECT SECTION
SIM SIMILAR
SSM SOLID SURFACE MATERIAL
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
ST STL STRUCTURAL STEEL
STRUCT STRUCTURE, STRUCTURAL
SUSP SUSPENDED
T
TEL TELEPHONE
TEMP TEMPERATURE
THK THICKNESS
TOS TOP OF SLAB/STEEL
TOW TOP OF WALL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V
VIF VERIFY IN FIELD
W
WC WATER CLOSET
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
W WEST
WIND WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
Y
YD YARD
PROJECT ABBREVIATIONS
PROJECT ISSUE & REVISION SCHEDULE
# Date Description
1 09/24/2024 ADDENDUM 2
2 09/25/2024 ADDENDUM 3
RELEASED FOR
PERMIT
1 2
David Borkowski Void
STEEL
RIGID INSULATION
EARTH
GRAVEL TYPE 1
(ENGINEERED FILL) GROUT
PRECAST CONCRETE
CRUSHED STONE
CONCRETE MASONRY UNIT
(CMU)
METAL STUD PARTITION
BRICK
ROUGH WOOD BLOCKING
WOOD, FINISHED WOODWORK
ROUGH WOOD BLOCKING,
NON-CONTINUOUS
PLYWOOD (LARGE SCALE)
GYPSUM BOARD
BATT OR LOOSE INSULATION
1 HR RATING
2 HR RATING
SMOKE RATINGCAVITY DRAINAGE MAT
ALUMINUM
STANDING SEAM ROOF
CONCRETE, POURED
TERRAZZO
EXISTING BUILDING MATERIALS
DRAWING LIST
SHEET NUMBER SHEET NAME SHEET ISSUE DATE Permit Issue Date ADDENDUM #2 ADDENDUM #3 ADDENDUM #4
GENERAL
G000 COVER 08/30/2024 08/30/2024
G001 DRAWING LIST & ABBREVIATIONS 10/07/2024 08/30/2024 09/24/2024 09/25/2024 10/07/2024
G201 LIFE SAFETY PLAN - LOWER LEVEL 08/30/2024 08/30/2024
G202 LIFE SAFETY PLAN - UPPER LEVEL 08/30/2024 08/30/2024
STRUCTURAL
S200 ELEVATOR PLAN AND DETAILS 08/30/2024 08/30/2024
S900 TYPICAL NOTES 08/30/2024 08/30/2024
ARCHITECTURAL
A101 OVERALL DEMOLITION PLAN LOWER LEVEL 09/25/2024 08/30/2024 09/24/2024 09/25/2024
A102 OVERALL DEMOLITION PLAN UPPER LEVEL 09/25/2024 08/30/2024 09/25/2024
A103 ROOF PLAN - EXISTING CONDITIONS AND DEMO SCOPE 09/25/2024 08/30/2024 09/25/2024
A200 OVERALL FLOOR PLAN LOWER LEVEL 09/25/2024 08/30/2024 09/24/2024 09/25/2024
A201 OVERALL FLOOR PLAN UPPER LEVEL 10/07/2024 08/30/2024 09/24/2024 10/07/2024
A202 OVERALL PROPOSED ROOF PLAN 10/07/2024 08/30/2024 09/25/2024 10/07/2024
A400 WALL TYPES 08/30/2024 08/30/2024
A501 ELEVATOR SECTIONS & ENLARGED PLANS 08/30/2024 08/30/2024
A601 OVERALL REFLECTED CEILING PLAN LOWER LEVEL 08/30/2024 08/30/2024
A602 OVERALL REFLECTED CEILING PLAN UPPER LEVEL 08/30/2024 08/30/2024
A701 ENLARGED FLOOR PLAN AND INTERIOR ELEVATIONS 10/07/2024 08/30/2024 10/07/2024
A702 ENLARGED FLOOR PLAN AND INTERIOR ELEVATIONS 10/07/2024 08/30/2024 10/07/2024
A800 TYPICAL DETAILS 08/30/2024 08/30/2024
A801 ROOF DETAILS 08/30/2024 08/30/2024
A802 ROOF DETAILS 08/30/2024 08/30/2024
A900 DOOR PANELS, FRAME TYPES & SCHEDULES 10/07/2024 08/30/2024 09/24/2024 10/07/2024
INTERIORS
I200 FIRST FLOOR FINISH PLAN 08/30/2024 08/30/2024
I201 SECOND FLOOR FINISH PLAN 08/30/2024 08/30/2024
MECHANICAL
H000 HVAC SYMBOLS LEGEND AND CONTRACTOR NOTES 08/30/2024 08/30/2024
H001 HVAC SPECIFICATIONS 08/30/2024 08/30/2024
H100 CPU REPLACEMENT FIRST AND SECOND FLOOR DEMOLITION PLANS 08/30/2024 08/30/2024
H101 PARTIAL UPPER AND LOWER LEVEL DEMOLITION PLAN 08/30/2024 08/30/2024
H200 CPU REPLACEMENT FIRST AND SECOND FLOOR NEW WORK PLANS 09/25/2024 08/30/2024 09/25/2024
H201 PARTIAL UPPER AND LOWER LEVEL NEW WORK PLAN 08/30/2024 08/30/2024
H800 DETAILS 08/30/2024 08/30/2024
H900 SCHEDULES 08/30/2024 08/30/2024
FIRE PROTECTION
FP 200 LOWER LEVEL FIRE PROTECTION PLAN 09/24/2024 09/24/2024
ELECTRICAL
E000 ELECTRICAL LEGEND, NOTES & SPECIFICATIONS 08/30/2024 08/30/2024
E001 ELECTRICAL ONE-LINE DIAGRAM 08/30/2024 08/30/2024
E100 ELECTRICAL DEMOLITION PLAN 08/30/2024 08/30/2024
E101 PARTIAL UPPER AND LOWER LEVEL ELECTRICAL DEMOLITION PLAN 08/30/2024 08/30/2024
E200 ELECTRICAL POWER PLAN 08/30/2024 08/30/2024
E201 PARTIAL UPPER AND LOWER LEVEL POWER PLANS 08/30/2024 08/30/2024
E300 ELECTRICAL LIGHTING PLAN 08/30/2024 08/30/2024
E301 PARTIAL UPPER AND LOWER LEVEL LIGHTING PLAN 08/30/2024 08/30/2024
615 Molly Lane Suite 100, Woodstock, GA 30189
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
/7 /2
:3 :0
P
M
1/4" = 1'-0" p ro je c t lo c a ti o n
D D e si ro je c t Fi le s o n
B
IM
PEACHTREE CITY
151 Willowbend Rd
Peachtree City, GA 30269
CITY HALL RENOVATION
R24.16574.00
DRAWING LIST & ABBREVIATIONS
MBR NAW
10/07/2024
PERMIT SET
G001
1. GENERAL CONTRACTOR (GC) SHALL SURVEY JOB SITE PRIOR TO COMMENCING WORK AND SHALL VERIFY ALL DIMENSIONS AND NOTE ALL
CONDITIONS WHICH WILL AFFECT OR BE AFFECTED BY WORK ON THIS PROJECT AND SUCH CONDITIONS OR DISCREPANCIES SHALL BE REPORTED
IMMEDIATELY TO THE ARCHITECT. FAILURE TO DO SO WILL NOT JUSTIFY ANY ADDITIONAL CHARGES.
2. DO NOT SCALE DRAWINGS. IF A DIMENSION IS NEEDED, CONTACT THE ARCHITECT.
3. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY DISCREPANCIES WHICH OCCUR WITHIN THE CONTRACT DOCUMENTS PRIOR TO THE
ORDERING OF MATERIALS OR EXECUTION OF WORK.
4. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE CODES, LAWS, RULES AND REGULATIONS OF ALL CONSTITUTED PUBLIC
AUTHORITIES HAVING JURISDICTION.
5. CONTRACTOR SHALL CLEAN ALL SPACES AND SURFACES THOROUGHLY UPON COMPLETION OF THE WORK, INCLUDING REMOVING DUST, DEBRIS, OILS, STAINS, FINGERPRINTS AND LABELS FROM EXPOSED FINISHED SURFACES, INCLUDING GLAZING.
6. PROJECT CLEANUP SHALL INCLUDE A "VACUUM CLEAN" INTERIOR SPACE WITH RESTORATION OF ALL DAMAGED SURFACES AND ITEMS (INTERIOR &
EXTERIOR) TO "LIKE NEW" CONDITION.
7. AFTER COMPLETION OF WORK ALL ADDITIONAL MATERIALS REMAINING DUE TO CONSTRUCTION SHALL BECOME THE PROPERTY OF THE GENERAL
CONTRACTOR AND SHALL BE DISPOSED OF / REMOVED FROM THE SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS, RULES, AND REGULATIONS UNLESS
NOTIFIED OTHERWISE. CONTRACTOR SHALL ALSO REMOVE ALL WASTE DEBRIS, RUBBISH, TOOLS, EQUIPMENT AND SURPLUS MATERIALS UPON COMPLETION
OF WORK. THROUGHOUT CONSTRUCTION, SITE SHALL BE ORGANIZED AND CLEANED BY CONTRACTOR ON A DAILY BASIS.
8. THE CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO PROTECTING THE EXISTING SIDEWALK, PARKING LOT, AND LANDSCAPING FROM THE
EQUIPMENT NECESSARY TO COMPLETE THE PROJECT.
9. THE ROOF PLANS AND DETAILS ARE REPRESENTATIVE IN NATURE AND ARE PROVIDED TO SHOW THE RELATIONSHIP BETWEEN SPECIFIED MATERIALS. FOR
CLARITY, ALL SPECIFIED MATERIALS REQUIRED FOR USE MAY NOT BE SHOWN ON THE CONSTRUCTION DOCUMENTS AND THE CONTRACTOR SHALL ENSURE
THAT CONSTRUCTION, INSTALLATION, AND APPLICATION OF MATERIALS IS DONE IN ACCORDANCE WITH THE MANUFACTURERS WRITTEN INSTRUCTIONS.
10. WEATHER PROTECTION TO BE PROVIDED FOR STORED MATERIALS. FASTENERS, ADHESIVES, SEALANTS, AND ACCESSORIES SHOULD ALSO BE COVERED
TO PROTECT THEM FROM WEATHER. REFER TO MANUFACTURER'S WRITTEN INSTRUCTIONS FOR STORAGE REQUIREMENTS.
GENERAL NOTES FILL PATTERNS
A
AFF ABOVE FINISHED FLOOR
ACT ACOUSTICAL CEILING TILE
AWP ACOUSTICAL WALL PANEL
ADJ ADJACENT
A/C AIR CONDITIONING
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT, ARCHITECTURAL
AD AREA DRAIN
@ AT
AUTO AUTOMATIC
B
BP BEARING PLATE
BITUM BITUMINOUS
BLK BLOCK
BLKG BLOCKING
BD BOARD
BOT BOTTOM
BLDG BUILDING
C
CLG CEILING
CLG HT CEILING HEIGHT
CL CENTER LINE
CER CERAMIC
CO CLEAN OUT
CLR CLEAR
COL COLUMN
CONC CONCRETE
CMU CONCRETE MASONRY UNIT
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CJ CONTROL JOINT
D
DP DAMP PROOFING
DEMO DEMOLISH
DEPT DEPARTMENT
DET,DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DR DOOR
DBL DOUBLE
DN DOWN
DS DOWNSPOUT
DWG DRAWING
DF DRINKING FOUNTAIN
E
EA EACH
EF EACH FACE
EW EACH WAY
E EAST
ELEC ELECTRICAL
ELEV ELEVATION
ENTR ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE(D)
EXHST EXHAUST
EXIST EXISTING
EXP EXPANSION
EJ EXPANSION JOINT
F
FAB FABRICATE
FT FEET
FIG FIGURE
FF FINISH FLOOR
FEC FIRE EXTINGUISHER CABINET
FL,FLR FLOOR
FD FLOOR DRAIN
FTG FOOTING
FND FOUNDATION
G
GALV GALVANIZED
G GAS
GA GAUGE
GEN GENERAL
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GSF GROSS SQUARE FOOT
GYP GYPSUM
GYP BD GYPSUM BD
GWB GYPSUM WALL BOARD
H
HDWR HARDWARE
HVAC HEATING, VENTILATING & AIR
CONDITIONING
HT, HGT HEIGHT
HWY HIGHWAY
HM HOLLOW METAL
HB HOSE BIBB
HW HOT WATER
HR HOUR
I
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
INTERM INTERMEDIATE
INV INVERT
J
JAN JANITOR
JS JANITOR SINK
JT JOINT
L
LAM LAMINATE(D)
LAV LAVATORY
LH LEFT HAND
LW LIGHT WEIGHT
M
MACH MACHINE
MH MAN HOLE
MFR MANUFACTURE
MAS MASONRY
MO MASONRY OPENING
MAT MATERIALS
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MIN MINIMUM
MISC MISCELLANEOUS
MR MOISTURE RESISTANT
MTD MOUNTED
N
NOM NOMINAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NO, # NUMBER
O
OC ON CENTER
OPNG OPENING
OD OUTSIDE DIAMETER
OH OVERHEAD
P
PT PAINT(ED)
PR PAIR
PART PARTITION
PVMT PAVEMENT
PL PLATE
PLBG PLUMBING
PLYWD PLYWOOD
PVC POLYVINYL CHLORIDE
PRE FAB PREFABRICATED
PT PRESSURE TREATED
PL PROPERTY LINE
Q
QTY QUANTITY
R
RAD RADIUS
RECP RECEPTACLE
RE: REFER TO
REINF REINFORCED(ING)
REQ'D REQUIRED
REV REVISED
RH RIGHT HAND
R RISER
RD ROOF DRAIN
RM ROOM
RO ROUGH OPENING
S
SAN SANITARY
SECT SECTION
SIM SIMILAR
SSM SOLID SURFACE MATERIAL
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STOR STORAGE
ST STL STRUCTURAL STEEL
STRUCT STRUCTURE, STRUCTURAL
SUSP SUSPENDED
T
TEL TELEPHONE
TEMP TEMPERATURE
THK THICKNESS
TOS TOP OF SLAB/STEEL
TOW TOP OF WALL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V
VIF VERIFY IN FIELD
W
WC WATER CLOSET
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
W WEST
WIND WINDOW
W/ WITH
W/O WITHOUT
WD WOOD
Y
YD YARD
PROJECT ABBREVIATIONS
PROJECT ISSUE & REVISION SCHEDULE
# Date Description
1 09/24/2024 ADDENDUM 2
2 09/25/2024 ADDENDUM 3
3 10/07/2024 ADDENDUM 4
RELEASED FOR
PERMIT
1 2
B
A
1 2 32.6
B.1
C
D
DEMOLITION GENERAL NOTES
1. ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATIONS OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS & DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLITION WORK.
2. ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLITION AREA WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITION WORK.
3. REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE NEW
WORK. WHERE NEW FINISHES ARE SCHEDULED AT EXISTING CONDITIONS, REMOVE
EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE FOR NEW FINISH.
4. THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
5. POWER, COMMUNICATION, & FIRE PROTECTION SHUT DOWNS SHALL NOT EFFECT
PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR TO REROUTE
OR PROVIDE TEMPORARY POWER, COMMUNICATION, & FIRE PROTECTION.
COORDINATE SHUT DOWNS WITH OWNER AND GENERAL MANAGER ON SITE.
6. WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
7. TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
A. FIRE PROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
B. ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
C. ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO BE
SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO DEMOLITION.
THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS A RESULT OF
PREVIOUS CONSTRUCTION OR ADDITIONS.
8. THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
9. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
DEMOLITION KEY NOTES
1 STANDING SEAM METAL ROOF EXISTING TO REMAIN, N.I.C.
2 PROTECT EXISTING WALKWAY DURING CONSTRUCTION. WALKWAY N.I.C.
TRIM BACK TREE AND CLEAR ROOF OF DEBRIS. WORK TO BE PERFORMED BY THE
CITY.
EXISTING MECHANICAL ROOFTOP EQUIPMENT. SEE MECHANICAL REPLACEMENT
DRAWINGS FOR EXTENT OF EQUIPMENT REMOVAL/ REPLACEMENT.
REMOVE EXISTING MEMBRANE ROOFING SYSTEM DOWN TO METAL DECKING.
PREP DECK TO RECEIVE NEW ROOFING.
REMOVE EXISTING METAL COPING IN ITS ENTIRETY AND PREP SURFACE TO
RECEIVE NEW COPING. REPLACE BLOCKING W/ NEW 2xPT BLOCKING.
7 EXISTING ROOF HATCH TO REMAIN.
8 EXISTING MECHANICAL EQUIPMENT TO REMAIN.
DEMO EXISTING WALL (AND GLAZING WHERE SHOWN) AND PREPARE SURFACE
FOR NEW WORK. FOR WORK OUTSIDE THE MAIN LOBBY AND ELEVATOR AREA,
REFER TO MEP DRAWINGS TO COORDINATE EXACT OPENING REQUIREMENTS.
10 DEMO EXISTING WINDOWS AND PREPARE SURFACE TO RECEIVE NEW WORK.
DEMO EXISTING DOOR AND FRAME AND PREPARE SURFACE TO RECEIVE NEW
WORK.
12 REMOVE EXISTING DOOR AND PREPARE SURFACE TO RECEIVE NEW DOOR.
13 REMOVE EXISTING MILLWORK AND PREPARE SURFACE TO RECEIVE NEW WORK.
REMOVE EXISTING FLOORING AND BASE AND PREPARE SURFACE TO RECEIVE
NEW WORK.
15 DEMO EXISTING CEILING
16 REMOVE AND RELOCATE EXISTING DOOR AS INDICATED IN DOOR SCHEDULE.
FITNESS
OFFICE
OFFICE
CONFERENCE OFFICE OFFICE
STOR./ PRINT
ELECTRICAL/ IT ELEC./ TEL. ROOM
OFFICE OFFICE
MECHANICAL
STORAGE
EQUIPMENT
COMPUTER LAB
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRS
ELEV.
TOILET
ELEV. EQUIP. RN.
STOR.
MEN'S RR
JAN.
WOMEN'S RR
LOCKERS/ SHOWER
WOMEN'S RR LOCKERS/ SHOWER
MEN'S RR
STORAGE
STORAGE
STORAGE
STORAGE
COMMUNITY ROOM
VESTIBULE
OFFICE
CORRIDOR
OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
OPEN OFFICE
BREAKROOM
CORRIDOR
FILE STORAGE
FILE STORAGE
STORAGE
STOR.
MECH.
AREA OF DEMOLITION WORK.
SEE CORRESPONDING KEYNOTES
DEMOLITION GRAPHIC SYMBOLS LEGEND
ITEM TO BE DEMOLISHED. SEE CORRESPONDING KEYNOTE
KEYNOTE SYMBOL. SEE DEMOLITION KEY NOTES FOR SCOPE OF WORK.A1
AREA OF PLAN NOT IN
CONTRACT (N.I.C.)
EF EXISTING EXHAUST FAN. SEE HVAC DRAWINGS FOR EXTENT OF WORK.
RD EXISTING ROOF DRAIN. SEE HVAC DRAWINGS FOR EXTENT OF WORK.
ERD EXISTING OVERFLOW ROOF DRAIN. SEE HVAC DRAWINGS FOR EXTENT OF
WORK.
615 Molly Lane Suite 100, Woodstock, GA 30189
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
/2
/2
:4
:1
A
M
As indicated p ro je c t lo c a ti o n
D D e si ro je c t Fi le s o n
B
IM
PEACHTREE CITY
151 Willowbend Rd
Peachtree City, GA 30269
CITY HALL RENOVATION
R24.16574.00
OVERALL DEMOLITION PLAN
LOWER LEVEL
Author Checker
09/25/2024
PERMIT SET
A101
PROJECT
NORTH
1/8" = 1'-0"A101
1 OVERALL DEMOLITION PLAN LOWER LEVEL
PROJECT ISSUE & REVISION SCHEDULE
# Date Description
1 09/24/2024 ADDENDUM 2
2 09/25/2024 ADDENDUM 3
RELEASED FOR
PERMIT
1 2 32.6
B.1
C
D
3'-6"
DEMOLITION GENERAL NOTES
1. ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATIONS OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS & DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLITION WORK.
2. ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLITION AREA WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITION WORK.
3. REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE NEW
WORK. WHERE NEW FINISHES ARE SCHEDULED AT EXISTING CONDITIONS, REMOVE
EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE FOR NEW FINISH.
4. THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
5. POWER, COMMUNICATION, & FIRE PROTECTION SHUT DOWNS SHALL NOT EFFECT
PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR TO REROUTE
OR PROVIDE TEMPORARY POWER, COMMUNICATION, & FIRE PROTECTION.
COORDINATE SHUT DOWNS WITH OWNER AND GENERAL MANAGER ON SITE.
6. WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
7. TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
A. FIRE PROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
B. ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
C. ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO BE
SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO DEMOLITION.
THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS A RESULT OF
PREVIOUS CONSTRUCTION OR ADDITIONS.
8. THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
9. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
DEMOLITION KEY NOTES
1 STANDING SEAM METAL ROOF EXISTING TO REMAIN, N.I.C.
2 PROTECT EXISTING WALKWAY DURING CONSTRUCTION. WALKWAY N.I.C.
TRIM BACK TREE AND CLEAR ROOF OF DEBRIS. WORK TO BE PERFORMED BY THE
CITY.
EXISTING MECHANICAL ROOFTOP EQUIPMENT. SEE MECHANICAL REPLACEMENT
DRAWINGS FOR EXTENT OF EQUIPMENT REMOVAL/ REPLACEMENT.
REMOVE EXISTING MEMBRANE ROOFING SYSTEM DOWN TO METAL DECKING.
PREP DECK TO RECEIVE NEW ROOFING.
REMOVE EXISTING METAL COPING IN ITS ENTIRETY AND PREP SURFACE TO
RECEIVE NEW COPING. REPLACE BLOCKING W/ NEW 2xPT BLOCKING.
7 EXISTING ROOF HATCH TO REMAIN.
8 EXISTING MECHANICAL EQUIPMENT TO REMAIN.
DEMO EXISTING WALL (AND GLAZING WHERE SHOWN) AND PREPARE SURFACE
FOR NEW WORK. FOR WORK OUTSIDE THE MAIN LOBBY AND ELEVATOR AREA,
REFER TO MEP DRAWINGS TO COORDINATE EXACT OPENING REQUIREMENTS.
10 DEMO EXISTING WINDOWS AND PREPARE SURFACE TO RECEIVE NEW WORK.
DEMO EXISTING DOOR AND FRAME AND PREPARE SURFACE TO RECEIVE NEW
WORK.
12 REMOVE EXISTING DOOR AND PREPARE SURFACE TO RECEIVE NEW DOOR.
13 REMOVE EXISTING MILLWORK AND PREPARE SURFACE TO RECEIVE NEW WORK.
REMOVE EXISTING FLOORING AND BASE AND PREPARE SURFACE TO RECEIVE
NEW WORK.
15 DEMO EXISTING CEILING
16 REMOVE AND RELOCATE EXISTING DOOR AS INDICATED IN DOOR SCHEDULE.
STAIRS
ELEV.
BREAKROOM OFFICE OFFICE OFFICE
OFFICESTORAGE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
IT
CORRIDOR
COURT CLERK
MECHANICAL ROOM
JANITORTOILETSTORAGE
OFFICECOPY/PRINT
CONFERENCE
GREEN SCREEN RM
OFFICE
OFFICE STORAGE
MEN'S RR WOMEN'S RR
OFFICE OFFICE
CORRIDOR
OFFICE OFFICE INFORMATION
CORRIDORCORRIDOR
CORRIDOR
CORRIDOR
FILE STORAGE
VAULT
OFFICE
COURT ROOM
COPY/ PRINT
HOLDING
VESTIBULE
CORRIDOR
LOBBY
AREA OF DEMOLITION WORK.
SEE CORRESPONDING KEYNOTES
DEMOLITION GRAPHIC SYMBOLS LEGEND
ITEM TO BE DEMOLISHED. SEE CORRESPONDING KEYNOTE
KEYNOTE SYMBOL. SEE DEMOLITION KEY NOTES FOR SCOPE OF WORK.A1
AREA OF PLAN NOT IN
CONTRACT (N.I.C.)
EF EXISTING EXHAUST FAN. SEE HVAC DRAWINGS FOR EXTENT OF WORK.
RD EXISTING ROOF DRAIN. SEE HVAC DRAWINGS FOR EXTENT OF WORK.
ERD EXISTING OVERFLOW ROOF DRAIN. SEE HVAC DRAWINGS FOR EXTENT OF
WORK.
615 Molly Lane Suite 100, Woodstock, GA 30189
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
/2
/2
:4
:1
A
M
As indicated p ro je c t lo c a ti o n
D D e si ro je c t Fi le s o n
B
IM
PEACHTREE CITY
151 Willowbend Rd
Peachtree City, GA 30269
CITY HALL RENOVATION
R24.16574.00
OVERALL DEMOLITION PLAN
UPPER LEVEL
Author Checker
09/25/2024
PERMIT SET
A102
PROJECT
NORTH
1/8" = 1'-0"A102
1 OVERALL DEMOLITION PLAN UPPER LEVEL
PROJECT ISSUE & REVISION SCHEDULE
# Date Description
2 09/25/2024 ADDENDUM 3
RELEASED FOR
DEMOLITION GENERAL NOTES
1. ALL DRAWINGS ARE GRAPHIC REPRESENTATION OF APPROXIMATE LOCATIONS OF
MATERIALS TO BE REMOVED. IT IS THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY
ALL EXISTING CONDITIONS & DIMENSIONS PRIOR TO COMMENCEMENT OF ALL
DEMOLITION WORK.
2. ALL ITEMS TO BE SALVAGED WITHIN THE DEMOLITION AREA WILL BE REMOVED BY THE
OWNER PRIOR TO ONSET OF DEMOLITION WORK.
3. REMAINING SUBSTRATES SHALL BE LEFT IN A CONDITION ACCEPTABLE TO RECEIVE NEW
WORK. WHERE NEW FINISHES ARE SCHEDULED AT EXISTING CONDITIONS, REMOVE
EXISTING FINISHES DOWN TO SUBSTRATE AND PREPARE SURFACE FOR NEW FINISH.
4. THE CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY EXISTING FINISHES AND
EQUIPMENT NOT REMOVED UNDER THE SCOPE OF WORK. ANY DAMAGE WILL BE
REPAIRED TO THE OWNER/ARCHITECT'S SATISFACTION.
5. POWER, COMMUNICATION, & FIRE PROTECTION SHUT DOWNS SHALL NOT EFFECT
PORTIONS OF BUILDING(S) THAT NEED TO REMAIN IN USE. CONTRACTOR TO REROUTE
OR PROVIDE TEMPORARY POWER, COMMUNICATION, & FIRE PROTECTION.
COORDINATE SHUT DOWNS WITH OWNER AND GENERAL MANAGER ON SITE.
6. WORK AREAS SHALL BE MAINTAINED AND ALL WORK AREAS SHALL BE LEFT BROOM
CLEANED AT END OF EACH DAY.
7. TYPICAL BUILDING COMPONENTS TO BE LEFT IN PLACE WHICH ARE NOT TO BE
DEMOLISHED, UNLESS NOTED OTHERWISE:
A. FIRE PROOFING ON COLUMNS AND BEAMS WHICH IS NOT PART OF A WALL OR
CEILING SYSTEM. THIS INCLUDES PLASTER, MASONRY, AND CONCRETE COVERS
WHICH MAY BE ENCAPSULATED BY THE WALL OR CEILING ASSEMBLIES.
B. ELECTRIC, PLUMBING AND HVAC LINES FEEDING AREAS TO REMAIN IN
OPERATION. COORDINATE WITH MEP DRAWINGS.
C. ANY STRUCTURES UNCOVERED AS A RESULT OF DEMOLITION WHICH APPEAR TO BE
SUPPORTING IN NATURE AND REQUIRING VERIFICATION PRIOR TO DEMOLITION.
THIS INCLUDES EQUIPMENT SUPPORTS AND STRUCTURE ADDED AS A RESULT OF
PREVIOUS CONSTRUCTION OR ADDITIONS.
8. THE OWNER WILL REMOVE ALL MOVEABLE OR UNATTACHED ITEMS TO BE SAVED OR
STORED PRIOR TO CONTRACTORS' SALVAGE OPERATIONS. ITEMS TO BE SALVAGED
INCLUDE BUT ARE NOT LIMITED TO, THOSE ITEMS SHOWN ON THE DRAWINGS.
9. IN THE CASE THAT ANY SUSPICIOUS MATERIALS ARE UNCOVERED THAT APPEAR TO
CONTAIN HAZARDOUS MATERIALS SUCH AS BUT NOT LIMITED TO MOLD, LEAD PAINT
OR ASBESTOS, LEAVE THE PREMISES AND NOTIFY THE OWNER & ABATEMENT
CONTRACTOR FOR REQUIRED TESTING AND/OR REMOVALS.
AREA OF DEMOLITION WORK.
SEE CORRESPONDING KEYNOTES
DEMOLITION GRAPHIC SYMBOLS LEGEND
ITEM TO BE DEMOLISHED. SEE CORRESPONDING KEYNOTE
KEYNOTE SYMBOL. SEE DEMOLITION KEY NOTES FOR SCOPE OF WORK.A1
AREA OF PLAN NOT IN
CONTRACT (N.I.C.)
EF EXISTING EXHAUST FAN. SEE HVAC DRAWINGS FOR EXTENT OF WORK.
RD EXISTING ROOF DRAIN. SEE HVAC DRAWINGS FOR EXTENT OF WORK.
ERD EXISTING OVERFLOW ROOF DRAIN. SEE HVAC DRAWINGS FOR EXTENT OF
WORK.
DEMOLITION KEY NOTES
1 STANDING SEAM METAL ROOF EXISTING TO REMAIN, N.I.C.
2 PROTECT EXISTING WALKWAY DURING CONSTRUCTION. WALKWAY N.I.C.
TRIM BACK TREE AND CLEAR ROOF OF DEBRIS. WORK TO BE PERFORMED BY THE
CITY.
EXISTING MECHANICAL ROOFTOP EQUIPMENT. SEE MECHANICAL REPLACEMENT
DRAWINGS FOR EXTENT OF EQUIPMENT REMOVAL/ REPLACEMENT.
REMOVE EXISTING MEMBRANE ROOFING SYSTEM DOWN TO METAL DECKING.
PREP DECK TO RECEIVE NEW ROOFING.
REMOVE EXISTING METAL COPING IN ITS ENTIRETY AND PREP SURFACE TO
RECEIVE NEW COPING. REPLACE BLOCKING W/ NEW 2xPT BLOCKING.
7 EXISTING ROOF HATCH TO REMAIN.
8 EXISTING MECHANICAL EQUIPMENT TO REMAIN.
DEMO EXISTING WALL (AND GLAZING WHERE SHOWN) AND PREPARE SURFACE
FOR NEW WORK. FOR WORK OUTSIDE THE MAIN LOBBY AND ELEVATOR AREA,
REFER TO MEP DRAWINGS TO COORDINATE EXACT OPENING REQUIREMENTS.
10 DEMO EXISTING WINDOWS AND PREPARE SURFACE TO RECEIVE NEW WORK.
DEMO EXISTING DOOR AND FRAME AND PREPARE SURFACE TO RECEIVE NEW
WORK.
12 REMOVE EXISTING DOOR AND PREPARE SURFACE TO RECEIVE NEW DOOR.
13 REMOVE EXISTING MILLWORK AND PREPARE SURFACE TO RECEIVE NEW WORK.
REMOVE EXISTING FLOORING AND BASE AND PREPARE SURFACE TO RECEIVE
NEW WORK.
15 DEMO EXISTING CEILING
16 REMOVE AND RELOCATE EXISTING DOOR AS INDICATED IN DOOR SCHEDULE.
B
A
1 2 32.6
B.1
C
D
RD
ERD RD
RD
ERD
ERD
RD
ERD
RD
A103
A103
A103
A103
A103
A103
EF
A103
A1036
A103
A103
A103
A103
615 Molly Lane Suite 100, Woodstock, GA 30189
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
/2
/2
:4
:2
A
M
As indicated p ro je c t lo c a ti o n
D D e si ro je c t Fi le s o n
B
IM
PEACHTREE CITY
151 Willowbend Rd
Peachtree City, GA 30269
CITY HALL RENOVATION
R24.16574.00
ROOF PLAN - EXISTING
CONDITIONS AND DEMO SCOPE
CPL BKS
09/25/2024
PERMIT SET
CD
A103
PROJECT
NORTH
1/8" =…