Addendum 2 _ City Hall Renovation Project.pdf

PDF 9 MB Posted

Attached to
City Hall Renovations (Amended 10/14)
Solicitation number
PE-65650-NONST-2025-000000010
Issued by
Dodge County, Georgia

About this file

This document is an addendum to a state and local contract opportunity for the renovation of the City Hall building in Peachtree City, Georgia. The project includes renovating both the upper and lower lobbies, installing a new elevator, replacing the HVAC equipment in the server room, and updating the electrical backup system and switchgear. The city's budget for this project is approximately $1,400,000. Sika Sarnafil is the only accepted manufacturer for roofing materials, and the contractor will be responsible for providing temporary storage for displaced IT equipment and furniture. Some sprinkler head relocation is required, and the contractor must maintain dust control and temperature in the server rooms during construction.

The contract opportunity requires the successful contractor to enter into direct contracts with subcontractors specified by the city, and the city will be responsible for moving and storing materials from the impacted work areas. The existing roof system is reported to be in relatively good condition, having outlasted its warranty, though the metal canopy roofs show signs of deterioration. No asbestos testing has been performed on the existing roof, but the city has provided a recent roof assessment report.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Peachtree City 151 Willowbend Road Peachtree City, GA 30269 Phone: 770-631-2515 Fax: 770-631-2507 PeachtreeCityGA.gov Purchasing Department

CITY OF PEACHTREE CITY

CITY HALL RENOVATION PROJECT

25-103BES

ADDENDUM #2

1. CLARIFICATION: Bidders encouraged to review the Summary Section 01 10 00 for phasing requirements.

2. QUESTION: Has the City done any core cuts on the roof?

ANSWER: No. The city will provide the most recent roof assessment in this addendum.

3. QUESTION: What is the city’s budget for this project?

ANSWER: Approximately $1,400,000.00.

4. CLARIFICATION: Sika Sarnafil is the only accepted manufacturer for roofing materials, including but not limited to membrane, adhesives, etc., on this project.

Any roofing products needed for Sarnafil to warranty installation of the roof needs to be manufactured or approved by Sarnafil.

5. CLARIFICATION: CPL is working on plan revisions to include the following in future addendum:

a. Replacement of Main Switch Gear and UDP in Communications Room.

b. Power by-pass plan to enable contractor to keep power to all server areas during the course of the project.

6. CLARIFICATION: CPL is providing with this addendum plan revisions to include the following:

a. Temporary Stud Wall details and locations throughout the project

b. A new door into the downstairs Electrical/IT room from open office area

7. CLARIFICATION: New storefront doors with appropriate handicap access controls at upper lobby entrance are shown in the architectural plans. The handicap push button is shown on elevation 8/A701.

8. CLARIFICATION: Question was raised on if UPS was being replaced. Yes, see plans.

9. CLARIFICATION: Contractor to provide a clean, lockable Conex type structure to place displaced IT equipment, furniture, etc., on site for the project.

10. QUESTION: Is the contractor or city responsible for moving the furniture and stored items currently located in the IT area?

ANSWER: No, once the Contractor has delivered the temporary storage structure to site the City will handle all movement and storage of materials from the IT area and any other work spaces anticipated to be impacted by construction.

11. QUESTION: Are sprinkler modifications required?

ANSWER: Some sprinkler heads may have to be relocated due to the renovation. CPL will issue a sprinkler plan denoting the area of renovation and hazard classification for a sprinkler contractor to evaluate. See attached drawing.

12. QUESTION: In the IT renovation area, is dust control an issue?

ANSWER: Yes, dust control is important. Contractor shall provide a dust barrier at all openings and shall provide adhesive dust mats where traveling between construction and non-construction areas.

13. QUESTION: The City has listed multiple vendors for exclusive use. If these subs make mistakes, who is responsible? How will this be handled?

ANSWER: It is anticipated that the prime contractor will enter into construction contracts with these subcontractors just like any other construction project. If mistakes are made by the subcontractor, it will be between the subcontractor and the prime contractor. The City will have a contract with the prime contractor.

14. CLARIFICATION: Renovation of the upstairs lobby and downstairs lobby cannot occur simultaneously as displaced staff will be temporarily relocated to the Community Room.

15. CLARIFICATION: Contractor to maintain IT server rooms (Three (3)) at a constant temperature of 60 degrees Fahrenheit when servers are in operation.

Portable AC units shall be provided and maintained by the contractor for times when the main units in server room are down.

16. QUESTION: FROM FITZGERALD - The only plumbing I saw was on sheet

H201 detail 1. I want to confirm that the only plumbing in this project is adding the new sump pump to the elevator shaft.

ANSWER: Yes, this is the only plumbing scope.

17. QUESTION: FROM FITZGERALD - Will there be any changes to existing roof drains during the roof replacement?

ANSWER: The existing roof drain and emergency overflow drain locations are to remain where they are now, and no additional roof drain/overflow drain locations will be added to the roof. It is anticipated that the existing roof drain baskets and overflow baskets will need to be removed with the tear-off of the existing roof systems. Bidders should assume a new retrofit type of drain assembly is to be installed at all roof drain and emergency overflow drain locations like “Sarnadrain with U-Flow” detail shows (Future addendum). It is anticipated that the existing drain body and piping is to remain.

18. QUESTION: Has the City done any asbestos testing on the roof?

ANSWER: No; however the City did have a thorough assessment made of the roof, see attachments.

19. QUESTION: I viewed the project plans and was unable to find Roof/Floor Plan dimensions, I was hoping you could provide me with these plans?

ANSWER: Dimensions were inadvertently turned off on the issued set of plans. See sheet A202 (Future Addendum) with dimensions.

20. QUESTION: 077200 Section 2.02 Roof Hatches indicates a new Bilco hatch. Is the existing roof hatch to be reused or replaced with a new hatch?

ANSWER: Per note 7 on plan sheet A100 the existing roof hatch is to remain.

21. QUESTION: Are the chillers being replaced on roof?

ANSWER: Yes, see sheet H200.

22. QUESTION: Is there room for a crane?

ANSWER: Yes, in the back parking lot.

23. QUESTION: Will the tree limbs be trimmed?

ANSWER: Yes, the City will trim and remove tree limbs near to the roof. See revision made to note 3 on sheet A100 (Future addendum).

24. QUESTION: Are we to replace the roof hatch?

ANSWER: See answer to item 19 above.

25. CLARIFICATION: All door hardware to be manufactured by Best, no subs.

Attachment(s) Future Addendum Attachments Roof Assessment Sarnadrain Detail Plan Revisions – Revised A101, A200, Sheets A100, A202

A201, A900, FP200

Concrete Special Inspections and Procedures

25 September 2024

PEACHTREE CITY:

ROOF INSPECTIONS

R22.16989.05

9/19/2023 10/16/2023

1/96

Scope of work…………………………………………………………………………………………………………………….…………3

Peachtree City City Hall……………………………………………………………………………………….……………..4-16

Evaluation of the City Hall…………………………………………………………………………………..………5

Roof Assessment Issue Report…………………………………………………………………..……….6-16

Peachtree City Library……………………………………………………………………………………………….………17-29

Building Overview………………………………………………………………………………………………..………18

Eagle Hawk Roof Inspection Report………………………………………………………..…….19-29

Kedron Aquatics Center…………………………………………………………………………………….……………30-83

Evaluation of Kedron Aquatics Center………………………………………………………...……

Roof Assessment Issue Report…………………………………………………………………………32-83

Proposed Options for New Roofs or Coatings…………………………………………………….…84-85

Table of Contents

Proposed Options for New Roofs or Coatings…………………………………………………….…84-86

Recommendations ………………………...................................................................................…….…87-93

Appendix………………………………………………...................................................................................…….…87-93

2/96

Recommendations…………………………………….........................................................................…….…87-89

Appendix………………………………………………...................................................................................…….…90-96

The (city of) Peachtree City, Georgia (Fayette County) commissioned roofing assessment studies of both their existing City Hall Building and the Kedron Hall Aquatics Center building. We evaluated the conditions of the existing roofing systems. The two facilities have different roofing systems.

The City Hall building has a white membrane roof over the two-story occupied building with upper and lower-level metal standing seam entrance canopy roofs. A review of a portion of the adjacent building, Peachtree City Library membrane roof area was also evaluated. The Kedron Aquatics Center has metal standing seam roofs over the main building, entrance canopy and pool chemicals out-building. The aerial drone photography included these two facilities along with city hall’s adjacent library building.

The onsite roofing inspections at each facility included surveys of the roof condition using visual inspection (hands-on) along with aerial drone scanning, including thermal. In this report we describe our findings and propose remedies &/or options to consider.

Peachtree city area as depicted on Fayette County, GA mapping services.

https://qpublic.schneidercorp.com/ www.fayettecountymaps.com

City Hall and Kedron Aquatics Center

Roofing Assessments

Peachtree City, Georgia

3/96 https://qpublic.schneidercorp.com/ http://www.fayettecountymaps.com/

Peachtree City City Hall

4/96

City Hall 151 Willowbend Road, Peachtree City, GA 30269 Site area: 9.2230 acres Membrane Roof area: 12,170 sf Canopy Roof area: 1,092 sf Roofing Warranty: No, Expired

Aerial photograph (Google.com) of the existing building site

The City Hall is a two-story, approximately 22,378 sf building which currently is occupied. The primary roofing system is estimated at 12,170sf and is believed to be a white PVC membrane roofing system over rigid insulation. The upper and lower level entrance canopies approximate 1,050sf of metal standing seam roof area.

The existing roofing systems appear to be in relatively good condition and have lasted beyond their warrantees and life expectancy. The membrane roof was in good condition and shows signs of good maintenance program. The metal roof finish is pealing away from the metal.

Sika Sarnafil, the current roofing manufacturer reported that the roof system was warrantied on November 30, 2006, as an overlay system set above a ¼” thick overlayment board secured through the existing roof system for 15 years. The 1988 original building construction drawings show a Built-Up Roofing System over rigid insulation installed over corrugated metal decking. No destructive testing was performed such as “coring” through the roofing system, to ascertain whether an intermediary roof system had been installed.

5/96

Peachtree City Hall:

Roof Assessment Issue Report

Click on map to view project in DroneDeploy platform

6/96 https://www.dronedeploy.com/app2/sites/649ecb5698b07f1a39bc122f?jwt_token=eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzUxMiJ9.eyJpZCI6IjY0OWVjYjU2MDY5OGQ2OGJjM2E2NjAzZiIsInR5cGUiOiJQdWJsaWNTaGFyZVYyIiwiYWNjZXNzX3R5cGUiOiJwcm9qZWN0In0.14Kibt-MmPKtPjPEzoZQewcmfnnYkh_woB1JDRXCe_q8HXnzfsL-QnHXJDvTuD57chELwi9uFVdGKwqFGFUpLQ

�* � �$#.�/#�#&�$�0!&�,1 ���� !"��#$� %�&$�'����(�)��*�� +&�, -

�( � �$#.�/#�#&�$�0!&�,1 ���� �,!� %�&$�'����(�)��*�� +&�, -

�2 � �$#.�%$#,"�,1�%�#'�/#,�.� ���� �,!� %�&$�'����(�)��*�� +&�, -

�� � 3!!4� �'��#,� ���� !"��#$� %�&$�'����(�)��*�� +&�, -

�� � 3!!4� �'��#,� (��� �,�'#. %�&$�'����(�)��*�� +&�, -

�5 � 3!!4� �'��#,� ���� �,!� %�&$�'����(�)��*�� +&�, -

�6 � 3!!4� �'��#,� ���� �,!� %�&$�'����(�)��*�� +&�, -

�7 � 3!!4� �'��#,� ���� !"��#$� %�&$�'����(�)��*�� +&�, -

89:;<=>?@A@@

7/96

���������� �����!
��������������

#01%20324$5�6�� 7

8�%980:;� ��"<))==���><"*>''*

7/28/2023 Site Photo

8/96

!�"�#"$� %���&'(��)�'(�*+,����-.�/ ���0��

!12#31435"6�7�� 8

9�#:91;<� '' ,)),=(��=, *=)=&

9/96

�������������������������������
����

�/0!1/213 4�5�� 6

7�!87/9:� ���;''('%��<;�(<'<=

10/96

�-. /-0/1�2�3�� 4

5� 65-78� $$�9&&':%��;9�';&;)

7/28/2023 Site Photo

11/96

�+,�-+.-/�0�1�� 2

3��43+56� ���7$$'8"��87�%8!$$

12/96

/0"1/213!4�5�� 6

7�"87/9:� &&�+((;('��;+�);%(<

13/96

#01%20324$5�6�� 7

8�%980:;� ))"<**+=���><"+>((*

14/96

$�%�&%'� (����)*�+,+)*�-./0� ��!�1����2���

$34&53657%8�9�� :

;�&<;3=>� ))#/,,/)*��0/#-0��)

15/96

��������������������������
����������������� ��

"�#�$#%� &���'�(�)*)�(�+,-.���� �/����0���

"12$31435#6�7�� 8

9�$:91;<� ��!-**�=(��>-!+>'*+

16/96

Peachtree City Library

17/96

Peachtree City Library

Site area: 1.07 acres Membrane Roofing area: 6,790 sf (area of visual review only) Metal Roof areas: not evaluated

The Peachtree City Library is a single-story building abutting the municipal court building, both of which are currently occupied. This facility is adjacent to the City Hall.

The library’s primary roofing system is a white PVC membrane roofing system over rigid insulation. There are accent roofs and exterior entrance canopy roofing and accent pop-ups composed of metal standing seam.

The thermal scanning was performed over the entire roof with focus on the darkened/ stained area of the library roof, near the adjacent tree canopy overhangs. It is apparent that tree shading and debris have contributed to the roof discoloration and thus precipitate the scanning of the roof without invasive action to date.

Please refer to the thermal scan and generated report and its findings as follows:

18/96

EagleHawk One Inc. www.eaglehawk.io 1-844-487-2328

ROOF INSPECTION REPORT

Peachtree City City Hall 151 Willowbend Rd

Peachtree City, GA, 30269

August 30th, 2023

Prepared For:

Ben Starks Clark Patterson Lee

Prepared By:

EagleHawk One Inc.

3819 South Park Ave.

Buffalo, NY 14219 716-810-1042

19/96 http://www.eaglehawk.io/

EagleHawk One Inc. www.eaglehawk.io Page 1

Table of Contents Figures

Roof Inspection Results

About EagleHawk

Capabilities and Services

Thermal Inspection & Analysis Methodology

How Water Intrusion and Wetness is Detected

The Importance of Material Properties

Our Analysis Approach

Understanding the Thermal Imagery – Flat Roofs

Inspection Disclaimer

Figures Figure 1 - Traditional Inspection Methods

Figure 2 - Benefits of Drone Based Inspections

20/96

EagleHawk One Inc. www.eaglehawk.io Page 2

Roof Inspection Results Date: 8/24/2023 Time: 9:00 PM Weather Conditions: Clear w/ Cooling Temps

Address: 151 Willowbend Rd, Peachtree City, GA 30269

Customer Name: Ben Starks - CPL

Inspector Name: Mason Lavelle

Thermal Imager Type: DJI Zenmuse H20T

Roof Age: Not Provided Flat Roof Area Inspected: 40,510 sqft Est. Wetness Area: 625 sqft (1.5%)

Roofing Material: TPO

Additional Imagery: https://eaglehawk.box.com/s/rgtmbkd2oatmuv8b3bker1omekumj1xq

The roof on this building has 3 areas of concern as described in the table and as shown in the figures below.

Inspection Notes: The wetness location boxes shown in the visual images below are colored either

“red” or “yellow”. Red indicates that there is a high confidence that the highlighted area contains wetness and yellow indicates there is a possibility this area could be a false positive. Our analysis approach is to always err on the side of caution.

Area # Approximate Size (sqft)

Description

1 20 This area shows evidence of wetness in the insulation propagating from a roof / wall intersection (possible flashing failure).

2 600 This area shows evidence of wetness in the insulation propagating from a drain pathway.

3 5 This area shows evidence of wetness in the insulation propagating from a material failure.

Total 625

21/96 https://eaglehawk.box.com/s/rgtmbkd2oatmuv8b3bker1omekumj1xq

EagleHawk One Inc. www.eaglehawk.io Page 3

Return to Overview 22/96

EagleHawk One Inc. www.eaglehawk.io Page 4

Return to Map23/96

EagleHawk One Inc. www.eaglehawk.io Page 5

Return to Map24/96

EagleHawk One Inc. www.eaglehawk.io Page 6

Return to Map25/96

EagleHawk One Inc. www.eaglehawk.io Page 7

Return to Map26/96

EagleHawk One Inc. www.eaglehawk.io Page 8

Return to Map27/96

EagleHawk One Inc. www.eaglehawk.io Page 9

About EagleHawk EagleHawk’s mission is to provide value based aerial inspection data that allows for smarter and more cost-effective decision-making. We enable property managers, facilities managers, commercial businesses, and residential property owners to effectively reduce risks and costs by providing a better understanding of the condition of their assets.

EagleHawk provides aerial inspection services utilizing the latest in sUAS or “drone” technology. Our drones are equipped with high-resolution 4K cameras and highly sensitive thermal imagers that provide accurate and meaningful inspection data on the condition of roofs, buildings, and structures.

EagleHawk’s pilots are FAA certified and insured.

Capabilities and Services Roof Inspections:

By utilizing drone technology, EagleHawk is able to perform roof inspections that are safer, more affordable, and provide better data than traditional methods, as illustrated in the figures below.

Figure 1 - Traditional Inspection Methods

Figure 2 - Benefits of Drone Based Inspections

Other Capabilities and Services:

• Steam Tunnel Inspection

• Solar Panel Inspection

• Building Heat Loss Inspection

• High Voltage Power Line Inspection

• Aerial Photographs

• Construction Site

• 3D Mapping and Surveying

28/96

EagleHawk One Inc. www.eaglehawk.io Page 10

Thermal Inspection & Analysis Methodology

How Water Intrusion and Wetness is Detected We detect water intrusion and insulation wetness issues with thermal imagers by taking advantage of the physical properties of water. Water soaked or wet materials will typically have a higher density than most dry construction materials and therefore will have a higher thermal capacitance. This means that water-soaked material will dissipate heat more slowly than dry material. Therefore, when we inspect a roof in the early evening after it has been heated by the sun all day, signs of possible water intrusion will appear visible on thermal image because the wet insulation will appear warmer.

The Importance of Material Properties The emissivity properties of the roof surface materials are also important. Surfaces that are matte or rough in texture, such as most flat roof construction materials, emit heat energy very efficiently and the temperature differences on the surface are easily captured by the thermal camera. Reflective materials, such as metals, have low emissivity properties and do not emit heat energy efficiently. Therefore, metal roofs and roofs coated with metal-based coatings cannot be effectively inspected with a thermal camera. Thick materials such as roof ballast stones, pavers, and slate and ceramic tiles tend to dissipate underlying heat throughout the surrounding material and, as a result, tend to mask small to moderate wetness issues that do not provide a large temperature differential. Finally, most clear glass does not transmit thermal energy at all and will often act as a mirror in the thermal energy spectrum.

Our Analysis Approach When we perform our thermal analysis, we consider several factors to determine whether there is a potential issue or not. First, any thermal anomalies are compared against the visual daylight imagery to determine if an exception (an outlying hot or cold spot) was caused by something obvious like a roof vent, mechanical system, or debris/residue on the roof’s surface. We then consider the type of roof material and any reflective coatings that could impact the thermal readings. If a reasonable cause cannot be determined, the thermal anomaly is then logged as a potential issue. Other factors in our analysis include the location of the roof, the surrounding environment, and how the direction of the sun impacts the thermal loading throughout the day, and the time of year.

Understanding the Thermal Imagery – Flat Roofs We perform both a qualitative and quantitative thermal analysis. The qualitative approach leverages the thermal image in the “Iron Colors” pallet, where the cooler temperatures are darker colors and the warmer temperatures are brighter colors. We look for areas that appear warmer than the surrounding roof area and once identified, we try to determine the cause, as discussed above. We then perform a quantitative analysis in which we isolate the temperature interval range that appears to be consistent with wet insulation. The quantitative analysis allows us to reinforce the findings in the qualitative analysis and limit potential false positives that could be caused by coatings and surface emissivity issues.

Overall, within the detailed analysis of each building we try to identify and describe factors that could cause areas of concern to be potential false positives.

Inspection Disclaimer The inspection and report are not a guarantee or warranty that the structures inspected are defect-free, or that concealed defects do not or will not exist. Problems may exist even though signs of such may not be revealed by the inspection. The inspection and report are not a guarantee or warranty that the structures inspected contain defects or issues to the extent shown in the thermal images. Although

Infrared Thermal Imaging is a proven diagnostic tool with the ability to detect issues with a high degree of confidence, it does not guarantee 100% accuracy.

29/96

Kedron Aquatics Center

30/96

Kedron Recreation Park, Kedron Aquatics Center 202 Fieldhouse Drive, Peachtree City, GA Site area: 20.1 acres Aquatics Center Metal Roof Area: 31,650 sf Pump Building Metal Roof Area: 2,550 sf

The Kedron Aquatic Center is a single-story, approximately 25,130 sf building which currently is occupied. The adjacent Pump Building is a single-story, approximately 1,330 sf building in operation containing pool equipment. The roofing system is metal standing seam roof. The existing 31,650 sf Aquatics Center and 2,550 sf Pump Building roofing systems have lasted beyond manufacturer warrantees and life expectancy and show signs of being worn by the elements. The roofs are weathered, scratched and have begun rusting. There is evidence of water infiltration at various locations suspected of seam failure and roof-to-wall flashing issues. Gutters along tree-lines are full of debris with some dislodged and/or clogged downspouts & rainwater pipes.

The existing inflatable air structure that is installed over the pools was not evaluated.

31/96

Kedron Aquatics Center:

Roof Assessment Issue Report

Click on map to view project in DroneDeploy platform

32/96 https://www.dronedeploy.com/app2/sites/64c2b6df0030b17236fe44ff?jwt_token=eyJ0eXAiOiJKV1QiLCJhbGciOiJIUzUxMiJ9.eyJpZCI6IjY0YzJiNmUxMTlmYzEyZTBiOTA2ZTdjNSIsInR5cGUiOiJQdWJsaWNTaGFyZVYyIiwiYWNjZXNzX3R5cGUiOiJwcm9qZWN0In0.K4fz_ugq0wFJkzNhSCrUtCWm0iM1jJjTF0-WWgHofjLn-_NymdbkaYAg0S_k60rCrnY5G9yGoXeQUIe_seF0uQ

/, � ������������� ��!�"��#� $�%&�'(���)0+��,�� -%�� .

/) � ������������� ��!�"��#� $�%&�'(���)0+��,�� -%�� .

)1 � 2� 3�����4�5��' ��!�"��#� 67�7 &��)+��,�� -%�� .

*8 � 2� 3�����4�5��' )�!�"���'�9 $�%&�'(���)0+��,�� -%�� .

11 � 2� 3�����4�5��' ��!�"��#� $�%&�'(���)0+��,�� -%�� .

�� � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�* � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�/ � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�< � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�/ � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

*� � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

*1 � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

0� � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

0* � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

0< � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

1) � :7&&�� ���4��#;� %#7& ��!�"��#� $�%&�'(���)0+��,�� -%�� .

1* � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

10 � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

18 � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

/� � :7&&�� ���4��#;� %#7& ��!�"#4���&� $�%&�'(���)0+��,�� -%�� .

)8 = ���> ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�, = ���> ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�) = ���> ��!�"#4���&� $�%&�'(���)*+��,�� -%�� .

�8 � "�&�9�$&��4����$��'�?���9 ��!�"��#� $�%&�'(���)0+��,�� -%�� .

0, � "�&�9�$&��4����$��'�?���9 ��!�"��#� $�%&�'(���)0+��,�� -%�� .

0) � "�&�9�$&��4����$��'�?���9 ��!�"��#� $�%&�'(���)0+��,�� -%�� .0/ � @##C�D4�� ��!�"��#� $�%&�'(���)0+��,�� -%�� .

EFGHIJKLMNMM

33/96

0) � "�&�9�$&��4����$��'�?���9 ��!�"��#� $�%&�'(���)0+��,�� -%�� .

1� � "�&�9�$&��4����$��'�?���9 ��!�"��#� $�%&�'(���)0+��,�� -%�� .

1< � "�&�9�$&��4����$��'�?���9 ��!�"��#� $�%&�'(���)0+��,�� -%�� .

)0 � @�4���A�% )�!�"���'�9 67�7 &�))+��,�� -%�� .

�8 � @�4���A�% )�!�"���'�9 $�%&�'(���)*+��,�� -%�� .

�0 � @�4���A�% )�!�"���'�9 $�%&�'(���)*+��,�� -%�� .

�1 � @�4���B��& )�!�"���'�9 $�%&�'(���)*+��,�� -%�� .

)* � @##C�D4�� ��!�"��#� 67�7 &�))+��,�� -%�� .

�, � @##C�D4�� ��!�"��#� $�%&�'(���)*+��,�� -%�� .

�) � @##C�D4�� ��!�"��#� $�%&�'(���)*+��,�� -%�� .

�� � @##C�D4�� ��!�"��#� $�%&�'(���)*+��,�� -%�� .

�1 � @##C�D4�� ��!�"��#� $�%&�'(���)*+��,�� -%�� .

** � @##C�D4�� ��!�"��#� $�%&�'(���)0+��,�� -%�� .

01 � @##C�D4�� ��!�"��#� $�%&�'(���)0+��,�� -%�� .

0/ � @##C�D4�� ��!�"��#� $�%&�'(���)0+��,�� -%�� .��� ���� ����

01 � �����2$3("#��3#��4�56(#7 �� �!"#�$ %�&'�()�$�*�+��,�- .&�# /

-- � %�3(7�3#��8�"#'7 �� �!"#�$ %�&'�()�$�*9+��,�- .&�# /

-9 � %�3(7�3#��8�"#'7 �� �!"#�$ %�&'�()�$�*9+��,�- .&�# /

-: � %�3(7�3#��8�"#'7 �� �!"#�$ %�&'�()�$�*�+��,�- .&�# /

9� � %�3(7�3#��8�"#'7 �� �!"#�$ %�&'�()�$�*�+��,�- .&�# /

0� � %���"' *� �!"#"(35 %�&'�()�$�*�+��,�- .&�# /

19 � %���"' *� �!"#"(35 %�&'�()�$�*:+��,�- .&�# /

;<=>?@ABCDCC

34/96

�-. /-0/1�2�3�� 4

5� 65-78� &&�9&�:9$��;9�#<9#:

35/96

�./!0.102 3�4�� 5

6�!76.89� ''�:'�;$%��<:�$;:=<

36/96

�./ 0.102�3�4�� 5

6� 76.89� &&�#&�(�$��:#�(;("�

37/96

!�"�#"$� %���&'(��)�*(�&�+',���-.���/�����0

!12#31435"6�7�� 8

9�#:91;<� ** =**&>(��?= '>'=&

38/96

�-.�/-0/1�2�3�� 4

5��65-78� $$�&$"'&!��9&� : $$

39/96

�/0�1/213�4�5�� 6

7��87/9:� ##;<#�='%��><;=?=�'

40/96

�/0!1/213 4�5�� 6

7�!87/9:� ���;�'<$&��=;�%>;%>

41/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�).-,� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=��,*+��>=�*?**)

42/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�),.*,� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=��)>+��?=�*@*=?

43/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�),.*)� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=��,-+��>=�*?*=, 44/96

#�$�%$&� '���()*��+�,*�(�-.,��������/�����0

#12%31435$6�7�� 8

9�%:91;<� ,,".,�=�*��=.")>.?, 45/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�),.��� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=�,>?+��@=�*A=>-

46/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�),.,*� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=�,>=+��?=�*>*--

47/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�),.,)� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=�,>?+��@=�*>*), 48/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�)).�*� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=�,=>+��?=�*>*-�

49/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+�)).-,� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=�,>?+��?=�*@*-@

50/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$���
�������������

%�&�'&(� "���)*+�,-,�+�)-.)�� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���=�,>?+��?=�*@*,A

51/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+��.*�� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���*�,=,+��>*�?@?�, 52/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+��.),� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���*�,=>+��=*�>?>�*

53/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+��.-�� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���*�,=)+��=*�>?>�@

54/96

����������������
��������������������������
������������������������������
� �����"� �������
�����������������#�����
��������������$��
� �������������

%�&�'&(� "���)*+�,-,�+��.--� ��$���/�����0

%12'31435&6�7�� 8

9�':91;<� ���*�,==+��>*�?@?�>

55/96

'�(�)(*� +���,-.�/0/�.���-1�%��2��!3�����4

'56)75879(:�;�� <

=�)>=5?@� ��&-�/AB.��C-&BDB0A

E�(�� /B0&//�$�F

��8�G(7��(�� /1/&1��$�F

56/96

(�)�*)+� ,���-./��0��/���.1�&� 2��"3�����4

(56*75879):�;�� <

=�*>=5?@� ��'.��10/��A.'BCB-.

D�)�� -�.'�E�%�F

��8�G)7��)�� -�E'0��%�F

57/96

(�)�*)+� ,����-.�/0/�.�/�01�&� 2��"3�����4

(56*75879):�;�� <

=�*>=5?@� ��'-�/A/.��B-'1C1/�

D�)�� �BC'1A�%�E

��8�F)7��)�� �CG'/C�%�E

58/96

�/0!1/213 4�5�� 6

7�!87/9:� ((�*((�'&��;*�%<%*;

59/96

������������
��������������

!/0#1/213"4�5�� 6

7�#87/9:� )) ;))�)���<; '=';)

60/96

���
�����������������

!/0#1/213"4�5�� 6

7�#87/9:� )) ;)�<&���=; '>'�<

61/96

�/0!1/213 4�5�� 6

7�!87/9:� ((�;(�<(&��<;�%=%$=

62/96

!01#20324"5�6�� 7

8�#980:;� ** <*�'=(��=< '>')=

63/96

�+,�-+.-/�0�1�� 2

3��43+56� ##��#!78 ��8��9:�8%

64/96

�,-�.,/.0�1�2�� 3

4��54,67� $$� $"&8!��& �898"�

65/96

�,-�.,/.0�1�2�� 3

4��54,67� ##�%#!8" ��8%�9:9!%

66/96

01"20324!5�6�� 7

8�"980:;� ))�%)'<=&��>%�=?%>%

67/96

���� ��������������������������������������������
���������������������������
�������������������

!01#20324"5�6�� 7

8�#980:;� ** <*�=>(��?< '><='

68/96

���� ��������������������������������������������
���������������������������
�������������������

!01#20324"5�6�� 7

8�#980:;� ** <*�=�(��>< '=<=>

69/96

���� ��������������������������������������������
���������������������������
�������������������

!�"�#"$� %���&'(��)�*(�&�+�,���-.���/�����0

!12#31435"6�7�� 8

9�#:91;<� ** =*�>=(��?= '>'&, 70/96

���� �������������������������������������������������
���������������������������
�������������������

!�"�#"$� %���&'(��)�*(�&&+�,���-.���/�����0

!12#31435"6�7�� 8

9�#:91;<� ** =*�'>(��?= ','&, 71/96

���� ��������������������������������������������
���������������������������
������������������

!01#20324"5�6�� 7

8�#980:;� ** '*�<=(��<' >?>*&

72/96

���� ��������������������������������������������
���������������������������
�������������������

!�"�#"$� %���&'(��)�*(��+,-���./���0�����1

!23#42546"7�8�� 9

:�#;:2<=� ** '*�-&(��-' ,>,*?

73/96

���� ��������������������������������������������
���������������������������
�����������������

!�"�#"$� %���&'(��)�*(��+,-���./���0�����1

!23#42546"7�8�� 9

:�#;:2<=� ** '*�--(��>' ,?,*>

74/96

���� ������������������������������������
���������������������
�������������������

!01#20324"5�6�� 7

8�#980:;� ** '*�<&(��=' >?>*'

75/96

���� ��������������������������������������������
���������������������������
������������������

!/0#1/213"4�5�� 6

7�#87/9:� )) ;)�<;'��=; <>;>>

76/96

���
������������������

�./!0.102 3�4�� 5

6�!76.89� ''�:''�#%��;:�$)$')

77/96

���� ���������������������������������������������������� ��������
������ ����������� ���
�����
���!�" ������������

%�&�'&(� )���*+,��-�.,�**/.����01���2�����3

%45'64768&9�:�� ;

<�'=<4>?� ..!@.�AB,��A@!+C+*B

78/96

������������������������������������������� ����������������
����������� ���� �����
�����
�� !���������������

$�%�&%'� (���)*+��,�-+�),.�*���/0���1�����2

$34&53657%8�9�� :

;�&<;3=>� --!?-�@�+��A?!*B*)B

79/96

���� ������������������������������������������������������� ��������
������ ����������� ���
�����
���!�" ������������

%�&�'&(� )���*+,��-�.,�+/�����01���2�����3

%45'64768&9�:�� ;

<�'=<4>?� ..!+.�@-,��A+!BC+@D

80/96

���� ���������������������������������������������������� ��������
������ ����������� ���
�����
���!�" ������������

%�&�'&(� )���*+,��-�.,�+/*����01���2�����3

%45'64768&9�:�� ;

<�'=<4>?� ..!+.�@.,��A+!BC+C+

81/96

�./!0.102 3�4�� 5

6�!76.89� ((�:(&;$%��<:�=$:;(

82/96

#�$�%$&� '����()�*+*,)��*�-.� �/0���1��� �2����

#34%53657$8�9�� :

;�%<;3=>� ,,"-,*.+)��.-"(?-@, 83/96

Proposed Options for New Roofs or Coatings

84/96

After visiting the sites and reviewing the building roof systems we can report a couple options available to the Owner for consideration. Both the City Hall and Kedron Aquatics Center roof areas have lived beyond their expired roofing warrantees and expected life. The roofing systems can have their life extended through repairs and/or coatings, overlayed or replaced as outlined below.

City Hall Membrane Roof area: 12,170 sf Canopy Roof area: 1,092 sf Roofing Warranty: No, Expired

City Hall Option A: Replacement Budget $284,896 Membrane Roofing: Remove existing roof down to deck and install new membrane roofing system including insulation, underlayment and cover boards. Replace perimeter prefinished metal coping system.

Metal Standing Seam Roofing: Remove and replace the existing standing seam metal roofing system. Replace any wet or damaged scrim lined batt insulation. Repair and refinish perimeter flashings.

City Hall Option B: Coating System Budget $136,176 Membrane Roofing: Remove existing perimeter prefinished metal coping system.

Tare back and remove vertical parapet membrane, install vertical coverboard, install new vertical membrane flashing. Repair 20sf area of roof that appears to be delaminating from original insulation. Replace any damaged insulation. Clean the roof system and prepare to receive new roof coating system with a 10year warranty.

Install new perimeter prefinished aluminium coping system at top of parapet.

Metal Standing Seam Roofing: Clean and prepare the existing standing seam metal roofing system to receive coating system. Repair and refinish perimeter flashings.

City Hall Option C: Repair and Clean Budget $55,045 Membrane Roofing: Remove existing perimeter prefinished metal coping system.

Tear back and remove vertical parapet membrane, install vertical coverboard, install new vertical membrane flashing. Install new perimeter prefinished aluminium coping system at top of parapet. Repair 20sf area of roof that appears to be delaminating from original insulation. Clean the roof system. Repair any seam or membrane issues.

Metal Standing Seam Roofing: Clean and prepare the existing standing seam metal roofing system to receive coating system. Repair and refinish perimeter flashings.

(Refer to unit costs in the Appendix for replacement of west or damaged insulation.)

85/96

Aquatics Center Metal Roof Area: 31,650 sf Pump Building Metal Roof Area: 2,550 sf Roofing Warranty: No, Expired

Kedron Aquatics Center Option A: Replacement Budget $822,740 Remove existing metal standing seam roofing, gutters and downspouts and replace.

Replace any wet or damaged scrim lined batt insulation. Replace all perimeter flashing systems. Clean and/or replace underground drainage system at rear of building. Standard 20year warranty.

Kedron Aquatics Center Option B: Coating System Budget $309,130 Remove and replace gutters and downspouts. Clean and prepare the roof system to receive new coating system with a 10year warranty. Clean and/or replace underground drainage system at rear of building. Connect downspout drainage to underground drainage.

Kedron Aquatics Center Option C: Membrane Overlay System Budget $651,740 Remove and replace gutters and downspouts. Clean and/or replace underground drainage system. Clean and prepare the roof system to receive roofing system overlay which includes: new rigid insulation, coverboard and PVC membrane décor system to mimic standing seam roofing. Clean and/or replace underground drainage system at rear of building. Connect downspout drainage to underground drainage.

(Refer to unit costs in the Appendix for replacement of west or damaged insulation.)

86/96

Recommendations

- Peachtree City City Hall

- Kedron Aquatics Center

87/96

After collecting the data and coordinating with the Peachtree City staff we make the following recommendations for the two facilities:

The current City Hall is not experiencing any water leaks and the staff has maintained the existing roof in mint condition. Recommendation of removing trees that are adjacent to the building we would highly recommend either cutting down the tree or have an active maintenance schedule of pruning the tree to prevent the leaves collecting on the roof. It is according to our experience and beliefs to recommend a new roof system as presented in “option A” for this facility. This will provide the city a longer life span for the building and keep up with the current well-maintained operations of this building. The city would need to schedule staff during the removal of the existing roof and new roof installation, so that the distribution of work would need to be considered.

City Hall Membrane Roof area: 12,170 sf Canopy Roof area: 1,092 sf

City Hall Option A: Replacement Budget $284,896 Membrane Roofing: Remove existing roof down to deck and install new membrane roofing system including insulation, underlayment and cover boards. Replace perimeter prefinished metal coping system.

Metal Standing Seam Roofing: Remove and replace the existing standing seam metal roofing system. Replace any wet or damaged scrim lined batt insulation. Repair and refinish perimeter flashings.

Kedron Facility

The current Kedron Aquatics facility is not experiencing any water leaks, but the life of the current standing seam metal roof is beginning to show its age with its wear and tear. It is to our according to our experience and beliefs to recommend a new roof system presented as “option A” for this facility. Rather than go back to the “hunter green roof”, we would recommend choosing a lighter colored roof. Lighter colored roofs with higher SRI (Solar Reflective Index) values, resulting in less energy expenditures to maintain cooler internal building temperature. We would recommend matching the white colored Ice Rink building’s roof (located on the same campus). We would also recommend the pruning of adjacent trees to prevent leaves and debris damaging the surface and drainage systems of the roofs.

88/96

Aquatics Center Metal Roof Area: 31,650 sf Pump Building Metal Roof Area: 2,550 sf Roofing Warranty: No, Expired

Kedron Aquatics Center Option A: Replacement Budget $822,740 Remove existing metal standing seam roofing, gutters and downspouts and replace.

Replace any wet or damaged scrim lined batt insulation. Replace all perimeter flashing systems. Clean and/or replace underground drainage system at rear of building. Standard 20year warranty.

89/96

Appendix

Budgetary Pricing Reports:

- Peachtree City City Hall

- Kedron Aquatics Center

90/96

ROOFING PROPOSAL

9/27/2023

BUILDING: Peachtree City Hall

ATTN: Micheal Rauth From: Hunter Gray

Tech Sales Rep. Estimator

Sika Corporation Ben Hill Roofing

100 Dan Road 13331 Veterans Memorial Hwy

Canton, MA 02021 Douglasville, GA 30134

470-304-9543 404-838-5482 rauth.michael@us.sika.com hgray@bhroof.com

Low-Slope Roof Plan:

Notes:

o Excluded:

o Any raising of Curbs and required MEP to be by others.

o Budget was based off drawings provided at the time and are budgetary. Final design and site visit will be required.

o BHR to run new DS into existing DS boots. Storm drain cleaning, replacing and or any work on them to be by others.

o Roofing and Sheet Metal colors to be selected from Manufacturer’s standard colors.

o The parties acknowledge that some of the materials and products to be used and installed in the construction of this project may become unavailable, delayed in shipment and/or subject to price increases due to circumstances beyond the control of the contractor, including the COVID-19 pandemic. If a specified product is unavailable or shipment is delayed, contractor shall provide written notice to customer and shall be afforded additional time and substitute products may be considered. If there is an increase in price of materials, equipment, labor, or products between the date of this Agreement and the time when the project is ready for the installation of the affected material, the contract sum shall be increased to reflect the additional cost to obtain the materials, provided that the contractor gives the customer written notice and documentation of the increased costs.

91/96 mailto:rauth.michael@us.sika.com mailto:hgray@bhroof.com

Low Slope and Standing Seam Roofing:

Approximately 12,1700 SF Low Slope and 1,092 SF Standing Seam:

1. Host a pre-construction meeting to discuss mobilization plan and Schedule.

2. Mobilize and set up all safety equipment per OSHA standards.

3. Lift material up and down per mobilization plan.

4. Over existing metal roof system:

a. OPTION A Tear off and reroof with R-25 insulation, coverboard, and PVC.

b. OPTION B Replace base flashings, coping cap, and install coating.

c. OPTION C Replace base flashings, coping cap, and clean roof surface.

5. Provide and install manufacturer’s specific flashing products for all base flashings, wall flashings, pipe vents, and pitch pans.

6. Fabricate and install prefinished standard color metal:

a. Coping Cap (24GA Kynar Steel)

7. Provide owner with a 1-year contractor’s workmanship warranty and 20-year manufacturer’s NDL warranty.

a. The coating warranty is a standard 10-year system warranty with a 1-year contractor’s warranty.

Qualifications:

- This proposal is subject to and conditioned upon the usage of an unrevised AIA document A104-2017/A401-1997, AGC/ASA/ASC standard form otherwise acceptable to BHR.

- All mechanical, electrical, and plumbing work is excluded.

- Unless otherwise stated in this proposal: Davis bacon, federal, or prevailing wage rates; thru-wall flashing or flashing below the roof line; mechanical penetrations not marked on the drawings; wood blocking; deck repair or replacement;

mechanical demo, disconnecting, or raising; hazardous material removal; condensation; interior protection; and non-standard working hours: are excluded. All drainage lines are assumed to be complete and free flowing.

Description Price Initial

Base Scope OPTION A Tear off and reroof with R-25 insulation, coverboard, and PVC. $284,896.00

Base Scope OPTION B Replace base flashings, coping cap, and install coating. $136,176.00

Base scope OPTION C OPTION C Replace base flashings, coping cap, and clean roof surface. $55,045.00

Unit cost to remove and replace any wet or damaged existing vinyl backed insulation + $ 8.00

92/96

BHR COMMERCIAL TERMS AND CONDITIONS (REV 1/2014)

1. Entire Agreement: This Proposal and Contract shall be the entire agreement between the Owner and Ben Hill, notwithstanding any previous communications and negotiations, whether oral or written, there being no covenants or agreements, inducements, guarantees, warranties or considerations, other than as set out herein. Acceptance shall be complete and the contract binding when signed by the OWNER or his representative and an authorized representative of Ben Hill. Any changes in this Proposal and Contract must be approved in writing by an officer of Ben Hill.

2 Payment: All sums not paid when due shall bear interest at the rate of one and a half percent (1 ½%) per month (or the maximum legal rate permitted by law if less). If OWNER does not make payment when due, OWNER agrees to pay all costs and expenses incurred in the collection of any unpaid sums, including reasonable attorney’s fees. Punch items shall not be cause to delay the OWNER’s payment to BEN HILL. In addition if a punch list exists, OWNER should pay 90% and withhold 10% until punch work is completed.

3. Delays: Neither BEN HILL nor OWNER shall be responsible for damages or delays caused by circumstances beyond its control, such as weather conditions, labor disputes and unavailability of materials. However, if OWNER interferes with or interrupts BEN HILL in the performance of its work during work hours, it is agreed that the OWNER shall pay all extra expenses involved in making up the time lost, including, but not limited to, overtime and/or idle time and/or extra traveling expenses caused thereby.

4 .Extra Work: Any work which is performed with OWNER’s knowledge or consent and which is not included on the reverse side or attached shall be deemed as extra and shall be paid for accordingly. Unless specifically included, any work to repair or replace the structural deck by reason of rotten wood, or other conditions making it unsuitable for supporting the roofing materials, shall be extra work.

5. Pre-Existing Conditions, Mold, Lead Based Paint and Asbestos: BEN HILL shall not be responsible or liable for damages resulting from pre-existing conditions; to include mold, lead-based paint, asbestos and other conditions such as deteriorated roofing or rotten wood, which existed prior to BEN HILL’s commencement of work. While BEN HILL shall seek to minimize any such damage, it is understood where such deteriorated conditions exist, the normal performance of work may result in damage. This Proposal and Contract is based upon the assumption by BEN HILL that materials to be removed by BEN HILL do not include or contain asbestos, lead based paint or other toxic materials and that asbestos-containing, lead containing or other toxic materials will not be encountered or disturbed during the course of performing the work. If materials containing asbestos are encountered or mold, lead-based paint or other such conditions are present when performing the work, BEN HILL shall not be responsible or liable for any claims associated with such lead-based paint, asbestos, mold or other pre-existing conditions and OWNER agrees to hold harmless and indemnify BEN HILL against any such claims or losses resulting from lead-based paint, asbestos, mold or other pre-existing conditions found on OWNER’s premises or should mold appear at any time after work is completed.

6. Warranty: BEN HILL’s work will be warranted by BEN HILL in accordance with its standard LIMITED WORKMANSHIP WARRANTY FOR COMMERCIAL ROOFING, which is made a part of this Proposal and Contract and incorporated by reference. A copy of BEN HILL’s LIMITED WORKMANSHIP WARRANTY FOR COMMERCIAL ROOFING, is attached or, if not, will be furnished upon request. BEN HILL SHALL NOT BE LIABLE FOR SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES. The acceptance of the Proposal and Contract by the OWNER signifies his/her agreement that this warranty shall be and is the exclusive remedy against BEN HILL. A manufacturer’s warranty shall be furnished to OWNER is a manufacturer’s warranty is called for on the face of this Proposal and Contract. It is expressly agreed that in the event of any defects in the materials furnished pursuant to this Proposal and Contract, OWNER shall have recourse only against the manufacturer of such material.

7. Access to Work and Working Hours: OWNER shall grant free and open access to work areas for workmen and vehicles and shall allow areas for storage of materials and debris. OWNER agrees to keep driveways, parking lots, and other work sites, clean and available for movement and parking of trucks during normal work hours. BEN HILL shall not be responsible for reasonable wear and movement of trucks, men, equipment, materials, debris, etc. This Proposal and Contract is based upon the performance of all work during BEN HILL’s regular working hours, and extra charges will be made for all work performed other than during BEN HILL’s regular working hours, if required by OWNER.

8. Working Conditions: BEN HILL shall not be required to install its mater either (a) under conditions contrary to manufacturer’s instructions; (b) under adverse weather conditions; (c) under conditions which are generally unacceptable in the trade; and (d) where jobsite conditions are not suitable for proper installation of materials. BEN HILL shall not be required to provide or be responsible for the installation erection of temporary weather protection facilities.

9. Labor and Materials: BEN HILL agrees to furnish labor and materials either directly or through subcontractors retained by BEN HILL to complete the work as specified on face of Proposal and Contract attached.

10. Insurance: Worker’s Compensation, General Liability and such other insurance as is required by law, will be carried by BEN HILL to complete the work as specified, on the Proposal and Contract attached.

11. Utilities: OWNER shall furnish at no cost to BEN HILL all required electric and/or water service.

12. Title to Property: Title of this property is recorded in the name(s) of the OWNER stated on the Proposal and Contract attached unless otherwise noted OWNER agrees inasmuch as the equity in this property is a consideration for BEN HILL performing work to improve the property, said property will not be sold or transferred until full payment is made to BEN HILL.

13. Variances and Zoning: OWNER shall be responsible for variances and zoning changes required in connection with the work provided for hereunder, to include but not be limited to associations, covenants, local building codes, ordinances and any other restrictions effecting BEN HILL’s ability to perform its work.

14. Final Acceptance of Work Upon Completion: OWNER shall have the opportunity to inspect BEN HILL’s work. If OWNER believes that BEN HILL’s work is incomplete or unsatisfactory, OWNER shall so inform BEN HILL in writing at that time, otherwise, BEN HILL’s work shall be deemed accepted.

15. Disputes: At the discretion and sole election of BEN HILL, BEN HILL may require that all disputes, claims or demands, of whatever kind, be resolved by arbitration, administered by and in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association (the “AAA”). This Proposa l and Contract, and all rights, responsibilities, and liabilities arising therefrom, shall be governed and construed in accordance with the laws of the State of Georgia, and any litigation or arbitration with the laws of the State of Georgia, and any litigation or arbitration arising out of this proposal and Contract shall be brought, maintained and Administered in Douglas County should BEN HILL be successful,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .