Addendum 3_EPS Chiller.pdf

PDF 684 KB Posted

Attached to
Intermediate School Chiller Replacement
Solicitation number
RFP EDPS 210000000275 3
Issued by
Calhoun County, East Grand Rapids City, Michigan

About this file

This is an Addendum No. 3 to bidding documents for an Intermediate School Chiller Replacement project issued by Edwardsburg Public Schools located in Edwardsburg, Michigan. The project involves the replacement of an air-cooled chiller system with a Quantech QTC3150THE grade-mounted chiller with remote interior bundle, along with associated chilled water distribution equipment and controls. The chiller has a capacity of 1,782 MBH with 10.29 EER efficiency and will serve a 390 GPM chilled water circulation system. The original bid submission deadline of November 18, 2020 was extended to Wednesday, December 9, 2020 at 3:00 PM due to COVID-19 challenges. Bidders are required to make themselves available for post-bid interviews on December 10, 2020 to allow for award recommendation by December 11, 2020 at 1:00 PM. The addendum requires acknowledgment of receipt and includes a revised bid form and revised drawing sheet M3.0 reflecting chiller capacity revisions from Addendum No. 2. Bidders must have visited the site prior to submission to fully understand field conditions and the existing mechanical systems.

The addendum establishes environmental and equipment handling requirements, including responsible recycling of removed equipment with required documentation and the salvage and recovery of the existing chiller's refrigerant for storage in appropriate containers for future reuse at the owner's other facilities. No pricing information is provided in this addendum document. Contractors are responsible for coordinating the phasing of work to maintain facility operations, scheduling work to minimize downtime, and obtaining written approval for any structural support modifications. All bid submissions must include a bid bond, list of warranted projects, summary schedule, Iran Economic Sanctions Act Certification, and Familial Disclosure Statement. The project manual was originally dated November 18, 2020, with this addendum issued December 3, 2020.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

68817 Cass Street; P.O. Box 627 Edwardsburg, Michigan 49112

Phone: 269.663.5073 Fax: 269.663.6021

Addendum No. 3 Intermediate School Chiller Replacement Edwardsburg Public Schools

3 December 2020

This addendum forms a part of the Contract Documents and modifies the original Bidding Documents (PROJECT MANUAL dated 18 November 2020). Please acknowledge receipt of this Addendum when submitting your bid. This Addendum has been distributed to the plan holders of record only. It is the bidder’s responsibility to distribute Addendum information to subcontractors and material suppliers. This Addendum reflects modifications from the Owner, Architect, and Bidders.

ATTACHMENTS

1. Revised bid form

2. Revised drawing sheet M3.0

GENERAL / CLARIFICATION

1. Due to the continued challenges everyone is facing with COVID-19, the bid due date will be extended to Wednesday, December 9th, 2020 at 3 pm. Bidders will need to make themselves available for post bid interviews the following day (12/10/20) to allow for award recommendation on 12/11/20 by 1 pm.

2. Contractors will be required to responsibly recycling removed equipment to the best of their ability. Contractors will also be required to show documentation of responsibly recycling the removed equipment. This is the owner’s desire, and the intent is to keep as much waste out of the landfill as possible.

3. The existing chiller’s refrigerant is to be salvaged with a recovery tank and placed in appropriate storage containers for future reuse at the owner’s other facilities.

DRAWINGS

1. M 3.0

a. Replace: Replace sheet M 3.0 with the revised sheet M 3.0 with chiller capacity revisions from addendum #2 for clarity.

END OF ADDENDUM NO. 3

Bid Form - 1

BID FORM

PROJECT: Intermediate School

Chiller Replacement OWNER: Edwardsburg Public Schools

69410 Section Street Edwardsburg, MI 49112

PROPOSAL FROM: __________________________________________________________________ Company Name

Address

City, State, ZIP

CONTRACT NO. 1 – Intermediate School Chiller Replacement

Base Bid

___________________________________________________ $______________________ Base Bid Written Amount

Voluntary Alternate (if provided)

Description

_________________________________________________ $______________________ (Add/Deduct) Written Amount

5% BID BOND: YES NO

List of warranted projects: YES NO

Summary Schedule YES NO

Iran Economic Sanctions Act Certification YES NO

Familial Disclosure Statement YES NO

Acknowledge Receipt of

ADDENDUM NO.: ONE TWO THREE

SUBMITTED BY:

_____________________________________________________ Date:________________, 2020 Signature

Printed

Title

MILLIES

ENGINEERING GROUP

9711 Valparaiso Drive

221 N. LaSalle Street

(219) 924-8400

Munster, Indiana 46321

Chicago, Illinois 60601 www.milliesengineeringgroup.com

Copyright © 2020 Millies Engineering Group

AutoCAD SHX Text d e s i g n

AutoCAD SHX Text a r c h i t e c t u r e

AutoCAD SHX Text

NO.

AutoCAD SHX Text

ISSUED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

THE INFORMATION ON THIS SHEET IS THE

AutoCAD SHX Text PROPERTY OF CARMI design group inc.

AutoCAD SHX Text

AND MAY NOT BE REPRODUCED WITHOUT

AutoCAD SHX Text

WRITTEN CONSENT FROM

AutoCAD SHX Text Copyright 2020

AutoCAD SHX Text CARMI design group inc.

AutoCAD SHX Text c

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

CAD FILE #

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text P: 269.663.5073 F: 269.663.6021

AutoCAD SHX Text

68817 CASS STREET; P.O. BOX 627

AutoCAD SHX Text

EDWARDSBURG, MICHIGAN 49112

AutoCAD SHX Text

CHILLER REPLACEMENT

AutoCAD SHX Text

EDWARDSBURG MICHIGAN

AutoCAD SHX Text

18 NOVEMBER 2020

AutoCAD SHX Text 2020.031

AutoCAD SHX Text

EK

AutoCAD SHX Text

EDWARDSBURG PUBLIC SCHOOLS

AutoCAD SHX Text

AutoCAD SHX Text

FOR BID

AutoCAD SHX Text 11/18/20

AutoCAD SHX Text

BAK

AutoCAD SHX Text

MECHANICAL SCHEDULES, NOTES, & SYMBOLS

AutoCAD SHX Text M3.0

AutoCAD SHX Text

UNION

AutoCAD SHX Text

PIPE TURNED DOWN

AutoCAD SHX Text

PIPE TURNED UP

AutoCAD SHX Text

SHUT-OFF VALVE

AutoCAD SHX Text

CIRCUIT SETTER

AutoCAD SHX Text

EXISTING PIPING

AutoCAD SHX Text

CHILLED WATER RETURN PIPING

AutoCAD SHX Text

CHILLED WATER SUPPLY PIPING

AutoCAD SHX Text

SHEET NOTE

AutoCAD SHX Text

SEE SCHEDULES

AutoCAD SHX Text

FLOW SWITCH

AutoCAD SHX Text

PRESSURE GAUGE

AutoCAD SHX Text

THERMOMETER

AutoCAD SHX Text

TRIPLE DUTY VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

SHUT-OFF VALVE IN RISER

AutoCAD SHX Text

CHWR

AutoCAD SHX Text

CHWS

AutoCAD SHX Text

%%UDESCRIPTION

AutoCAD SHX Text

%%USYMBOL

AutoCAD SHX Text

%%UABBREVIATIONS

AutoCAD SHX Text

SYMBOLS/ABBREVIATIONS

AutoCAD SHX Text

%%UDESCRIPTION

AutoCAD SHX Text

PIPING TO BE REMOVED

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text

REFRIGERANT PIPE

AutoCAD SHX Text

GAS COCK

AutoCAD SHX Text

REVERSE ACTING THERMOSTAT

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text

THERMOSTAT

AutoCAD SHX Text T

AutoCAD SHX Text C CHILLER CHILLER CFH CUBIC FEET PER HOUR CUBIC FEET PER HOUR CHWS CHILLED WATER SUPPLY CHILLED WATER SUPPLY CHWR CHILLED WATER RETURN CHILLED WATER RETURN CTE CONNECT TO EXISTING CONNECT TO EXISTING CWP CHILLER WATER CIRCULATION PUMP CHILLER WATER CIRCULATION PUMP DN. DOWN DOWN DS DISCONNECT SWITCH DISCONNECT SWITCH DV DRAIN VALVE DRAIN VALVE EC ELECTRICAL CONTRACTOR ELECTRICAL CONTRACTOR EX EXISTING EXISTING FC FLEXIBLE CONNECTION FLEXIBLE CONNECTION FPM FEET PER MINUTE FEET PER MINUTE FMS FACILITY MANAGEMENT SYSTEM FACILITY MANAGEMENT SYSTEM GPM GALLONS PER MINUTE GALLONS PER MINUTE HP HORSE POWER HORSE POWER HZ HERTZ HERTZ L LIQUID LIQUID MBH 1,000 BTU/HOUR 1,000 BTU/HOUR MC MECHANICAL CONTRACTOR MECHANICAL CONTRACTOR MOD MODULATING MODULATING NTS NOT TO SCALE NOT TO SCALE PRV PRESSURE REDUCING VALVE PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH RPM REVOLUTIONS PER MINUTE REVOLUTIONS PER MINUTE S SUCTION SUCTION SHC SENSIBLE HEAT CAPACITY SENSIBLE HEAT CAPACITY TC TEMPERATURE CONTROL TEMPERATURE CONTROL TYP TYPICAL TYPICAL WC WATER COLUMN WATER COLUMN WPD WATER PRESSURE DROPWATER PRESSURE DROP

AutoCAD SHX Text

TAG

AutoCAD SHX Text C-1

AutoCAD SHX Text

GEF-1

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

QUANTECH

AutoCAD SHX Text

TWIN CITY

AutoCAD SHX Text

MODEL NUMBER

AutoCAD SHX Text

QTC3150THE

AutoCAD SHX Text T-400

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

GRADE MOUNTED AIR COOLED CHILLER WITH REMOTE INTERIOR BUNDLE

AutoCAD SHX Text SUSPENDED INTERIOR GENERAL EXHAUST FANw/INTEGRAL GRILLE

AutoCAD SHX Text

MECHANICAL EQUIPMENT SCHEDULE

AutoCAD SHX Text

EFFICIENCY

AutoCAD SHX Text

10.29 EER

AutoCAD SHX Text

AutoCAD SHX Text

FAN MOTOR DATA

AutoCAD SHX Text

CFM

AutoCAD SHX Text

AutoCAD SHX Text 350.0

AutoCAD SHX Text

TSP

AutoCAD SHX Text

AutoCAD SHX Text 0.3

AutoCAD SHX Text

HP

AutoCAD SHX Text

AutoCAD SHX Text 1/4

AutoCAD SHX Text

RPM

AutoCAD SHX Text

AutoCAD SHX Text 709.0

AutoCAD SHX Text

CHILLED WATER COOLING EQUIPMENT/COIL DATA

AutoCAD SHX Text

MBH

AutoCAD SHX Text 1782.0

AutoCAD SHX Text

AutoCAD SHX Text

SHC

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GPM

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EWT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LWT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MAX

AutoCAD SHX Text

WPD

AutoCAD SHX Text 20.3

AutoCAD SHX Text

AutoCAD SHX Text

CAT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LOAD

AutoCAD SHX Text

HP

AutoCAD SHX Text

AutoCAD SHX Text 1/4

AutoCAD SHX Text

MCA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AMPS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

MOCP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VOLT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ELECTRICAL DATA

AutoCAD SHX Text

PHASE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HZ.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STARTER BY:

AutoCAD SHX Text

MC.

AutoCAD SHX Text X

AutoCAD SHX Text X

AutoCAD SHX Text

EC.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

UNITS

AutoCAD SHX Text

CONTROLLED

AutoCAD SHX Text

BY

AutoCAD SHX Text

CHILLER CTL PANEL/FMS

AutoCAD SHX Text

OCCUPANCY SENSOR

AutoCAD SHX Text

EQUIPMENT

AutoCAD SHX Text

WEIGHT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

NOTE 1

AutoCAD SHX Text

NOTE 2.

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text A. COMMISSIONING: THE OWNER WILL HIRE A COMMISSIONING AGENCY (CXA) TO COMMISSION THE COMMISSIONING: THE OWNER WILL HIRE A COMMISSIONING AGENCY (CXA) TO COMMISSION THE MECHANICAL SYSTEMS FOR THIS PROJECT. THE CXA WILL DEVELOP A COMMISSIONING PLAN THAT WILL OUTLINE THE REQUIREMENTS AND PROCEDURES FOR EACH COMMISSIONED SYSTEM AND WILL BE RESPONSIBLE THAT THE COMMISSIONING MEETS THE REQUIREMENTS OF THE CURRENT ENERGY CODE. THE COMMISSIONING PLAN WILL BE DEVELOPED AFTER CONTRACTS HAVE BEEN AWARDED AND PRIOR TO COMPLETION OF THE SYSTEMS TO BE COMMISSIONED. B. LAYOUT IS DIAGRAMMATIC AND CONTRACTOR SHALL INSTALL DUCTWORK, PIPING AND EQUIPMENT TO LAYOUT IS DIAGRAMMATIC AND CONTRACTOR SHALL INSTALL DUCTWORK, PIPING AND EQUIPMENT TO MEET ACTUAL FIELD CONDITIONS. REVIEW PROJECT SPECIFICATIONS BEFORE STARTING ANY WORK. SUBMIT SHOP DRAWINGS OF WORK AS PER SPECIFICATIONS. C. LAYOUT WORK TO AVOID CONFLICTS BETWEEN DUCTWORK, LIGHTING, CEILINGS, PIPING AND BUILDING LAYOUT WORK TO AVOID CONFLICTS BETWEEN DUCTWORK, LIGHTING, CEILINGS, PIPING AND BUILDING STRUCTURE. D. COORDINATE EQUIPMENT ELECTRICAL REQUIREMENTS (VOLTAGES, PHASE, LOAD, ETC.) BEFORE COORDINATE EQUIPMENT ELECTRICAL REQUIREMENTS (VOLTAGES, PHASE, LOAD, ETC.) BEFORE ORDERING ANY EQUIPMENT. E. DUCTWORK, PIPING, EQUIPMENT, ETC. SHALL NOT BE SUPPORTED FROM THE BOTTOM CHORD OF DUCTWORK, PIPING, EQUIPMENT, ETC. SHALL NOT BE SUPPORTED FROM THE BOTTOM CHORD OF ENGINEERED JOISTS WITHOUT WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER. F. REFRIGERANT PIPING INSTALLATION INCLUDING SIZING IS TO BE AS PER MANUFACTURER'S REFRIGERANT PIPING INSTALLATION INCLUDING SIZING IS TO BE AS PER MANUFACTURER'S RECOMMENDATIONS FOR THE ACTUAL FIELD ROUTING AND FOR THE EQUIPMENT PROVIDED. PROVIDE ALL SUCTION LINE TRAPS, SOLENOID VALVES, SIGHT GLASSES AND FILTER/DRIERS AS PER EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. G. COORDINATE PHASING OF WORK AND PROVIDE TEMPORARY PIPING AS REQUIRED FOR THE COORDINATE PHASING OF WORK AND PROVIDE TEMPORARY PIPING AS REQUIRED FOR THE IMPLEMENTATION OF WORK WHILE MAINTAINING SERVICES TO PORTIONS OF BUILDING TO REMAIN OCCUPIED. H. SCHEDULE WORK TO AVOID DOWNTIME AND INCONVENIENCE TO OWNER. OWNER'S EXISTING FACILITY SCHEDULE WORK TO AVOID DOWNTIME AND INCONVENIENCE TO OWNER. OWNER'S EXISTING FACILITY SHALL REMAIN IN OPERATION AT ALL TIMES. REQUIRED SHUTDOWN OF EXISTING UTILITIES SHALL BE SCHEDULED WITH OWNER'S OPERATING PERSONNEL. NOTIFY OWNER'S REPRESENTATIVE 48 HOURS IN ADVANCE PRIOR TO ANY SHUTDOWN OF EXISTING MECHANICAL SYSTEMS. I. VISIT SITE PRIOR TO BIDDING TO FULLY DETERMINE FIELD CONDITIONS AND TO VERIFY EXISTING VISIT SITE PRIOR TO BIDDING TO FULLY DETERMINE FIELD CONDITIONS AND TO VERIFY EXISTING MECHANICAL SYSTEMS INCLUDING QUANTITIES AND LOCATIONS TO DETERMINE THE FULL EXTENT OF NEW AND DEMOLITION WORK. J. COORDINATE NEW INSTALLATIONS WITH EXISTING SYSTEMS. ANY EXISTING CONDUIT, PIPING, COORDINATE NEW INSTALLATIONS WITH EXISTING SYSTEMS. ANY EXISTING CONDUIT, PIPING, DUCTWORK, EQUIPMENT, ETC., SHALL BE REWORKED AS REQUIRED TO AVOID CONFLICTS WITH THE INSTALLATION OF THE NEW MECHANICAL SYSTEMS. NO EXTRAS WILL BE ALLOWED AFTER BIDDING FOR ANY REWORK OF EXISTING FIELD CONDITIONS TO RESOLVE ANY CONFLICTS OR NOT FULLY UNDERSTANDING THE SCOPE OF THE WORK REQUIRED. EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC., SHALL BE REMOVED AS NOTED ON DRAWINGS AND AS REQUIRED TO MEET SCOPE OF NEW WORK. K. EXISTING INFORMATION IDENTIFIED ON THE CONTRACT DOCUMENTS IS SCHEMATIC ONLY. BE EXISTING INFORMATION IDENTIFIED ON THE CONTRACT DOCUMENTS IS SCHEMATIC ONLY. BE RESPONSIBLE TO PROPERLY ADDRESS EXISTING CONDITIONS FOR A COMPLETE AND PROPER INSTALLATION OF NEW SYSTEMS. EXISTING EQUIPMENT NOT IDENTIFIED SHALL BE REVIEWED AS TO WHETHER THE EQUIPMENT SHALL REMAIN AND BE RECONNECTED TO THE NEW SERVICES, BE RELOCATED, BE ABANDONED, ETC. L. ANY HIDDEN CONDITIONS IDENTIFIED THROUGH THE COURSE OF CONSTRUCTION SHALL BE ANY HIDDEN CONDITIONS IDENTIFIED THROUGH THE COURSE OF CONSTRUCTION SHALL BE IMMEDIATELY REPORTED IN WRITTEN FORM FOR REVIEW AND DIRECTION. OTHERWISE, BE RESPONSIBLE FOR ANY AND REQUIRED CHANGES AND COSTS TO CORRECT SAID HIDDEN CONDITION. M. REMOVE EXISTING EQUIPMENT, PIPING, ETC. PRESENTLY SERVING AREAS THAT ARE BEING REMOVE EXISTING EQUIPMENT, PIPING, ETC. PRESENTLY SERVING AREAS THAT ARE BEING RENOVATED AND THAT ARE NOT REQUIRED TO STAY IN SERVICE. NO EQUIPMENT, DUCTWORK, PIPING, SUPPORTS, HANGERS, ETC, IS TO BE LEFT ABANDONED. VERIFY QUANTITY, LOCATION AND ELEVATION OF EXISTING TO BE REMOVED IN FIELD. REMOVE EXISTING ABANDONED EQUIPMENT, DUCTWORK AND PIPING IN AREAS THAT ARE TO BE RENOVATED. N. REMOVED DUCTWORK, PIPING AND CONTROLS ARE TO BE TERMINATED PROPERLY BACK TO REMOVED DUCTWORK, PIPING AND CONTROLS ARE TO BE TERMINATED PROPERLY BACK TO EXISTING MAINS. PATCH AND SEAL EXISTING DUCTWORK AIRTIGHT. CAP PIPING WATERTIGHT. PROVIDE ADDITIONAL DUCTWORK, PIPING AND CONTROLS AS REQUIRED TO MAINTAIN CONTINUITY OF EXISTING SYSTEMS MODIFIED DUE TO REMOVAL OF PORTION OF SYSTEMS. REPAIR DAMAGED DUCTWORK AND PIPING INSULATION DUE TO NEW INSTALLATION WORK. O. CAPTURE EXISTING REFRIGERANT FROM EXISTING REFRIGERANT PIPING AS REQUIRED AND REUSE OR CAPTURE EXISTING REFRIGERANT FROM EXISTING REFRIGERANT PIPING AS REQUIRED AND REUSE OR DISPOSE OF IN A LEGAL MANNER. P. EXISTING EQUIPMENT SHALL REMAIN PROPERTY OF THE OWNER AND OWNER SHALL DETERMINE IF EXISTING EQUIPMENT SHALL REMAIN PROPERTY OF THE OWNER AND OWNER SHALL DETERMINE IF EQUIPMENT IS TO BE STORED ON SITE AT OWNER SELECTED LOCATION OR IF EQUIPMENT IS TO BE ABANDONED OR REMOVED FROM SITE. Q. PATCH EXISTING CEILING, FLOOR, WALL AND ROOF OPENINGS AND SURROUNDING FINISHES RESULTING PATCH EXISTING CEILING, FLOOR, WALL AND ROOF OPENINGS AND SURROUNDING FINISHES RESULTING FROM REMOVAL OF EXISTING MATERIALS AND EQUIPMENT SO THAT FINISH WILL MATCH EXISTING IN SURROUNDING AREAS. R. REMOVE EXISTING CEILINGS AND LIGHT FIXTURES REQUIRED FOR INSTALLATION OF NEW WORK. REMOVE EXISTING CEILINGS AND LIGHT FIXTURES REQUIRED FOR INSTALLATION OF NEW WORK. REINSTALL CEILING AND LIGHT FIXTURES UPON COMPLETION OF WORK. REPLACE DAMAGED CEILING MATERIALS TO MATCH EXISTING. S. PROVIDE CUTTING, CORE DRILLING AND PATCHING OF EXISTING WALL CONSTRUCTIONS REQUIRED FOR PROVIDE CUTTING, CORE DRILLING AND PATCHING OF EXISTING WALL CONSTRUCTIONS REQUIRED FOR THE INSTALLATION OF NEW PIPING AND EQUIPMENT. SEAL PENETRATIONS THROUGH WALL STRUCTURE WATERTIGHT AND WITH AN APPROVED FIRE STOPPING MATERIAL, INCLUDING APPROVED FIRE RATED SLEEVE. T. REPAIR AND/OR REPLACE DAMAGED PIPE INSULATION THAT OCCURS AS THE RESULT OF THIS REPAIR AND/OR REPLACE DAMAGED PIPE INSULATION THAT OCCURS AS THE RESULT OF THIS CONSTRUCTION. U. DRAIN AND REFILL EXISTING PIPING SYSTEMS AS REQUIRED FOR INSTALLATION OF NEW WORK. DRAIN AND REFILL EXISTING PIPING SYSTEMS AS REQUIRED FOR INSTALLATION OF NEW WORK. PROVIDE CHEMICAL TREATMENT FOR WATER PIPING SYSTEM ACCORDING TO OWNER'S REQUIREMENTS AFTER SYSTEM IS FILLED AND VENTED. PROPERLY VENT PIPING SYSTEMS. V. PROVIDE CONCRETE EQUIPMENT PADS FOR EQUIPMENT INDICATED ON DRAWINGS. COORDINATE PROVIDE CONCRETE EQUIPMENT PADS FOR EQUIPMENT INDICATED ON DRAWINGS. COORDINATE LOCATIONS BEFORE INSTALLATION. PADS ARE TO BE DESIGNED WITH REINFORCEMENT TO HANDLE THE WEIGHT OF THE EQUIPMENT BEING SUPPORTED. EXTERIOR CONCRETE PADS TO BE PROVIDED WITH FROST WALLS (MINIMUM OF 48” BELOW GRADE). BELOW GRADE). W. PROVIDE STRUCTURAL SUPPORT FOR FREE STANDING AND WALL MOUNTED PANELS, VFD'S, MOTOR PROVIDE STRUCTURAL SUPPORT FOR FREE STANDING AND WALL MOUNTED PANELS, VFD'S, MOTOR STARTERS, ETC. IN MECHANICAL ROOMS AS REQUIRED. X. PROVIDE RELIEF VENT PIPING FOR REFRIGERATION EQUIPMENT. PIPING TO BE ROUTED TO THE PROVIDE RELIEF VENT PIPING FOR REFRIGERATION EQUIPMENT. PIPING TO BE ROUTED TO THE EXTERIOR OF BUILDING AS REQUIRED. MULTIPLE RELIEFS ARE TO BE PIPED INDIVIDUALLY, NOT GROUPED TOGETHER IN A COMMON HEADER. THE PIPING IS TO BE SAME SIZE AS RELIEF CONNECTION TO EQUIPMENT. TERMINATION LOCATION TO MEET CODE REQUIREMENTS AND BE APPROVED BY ARCHITECT.

AutoCAD SHX Text NOTE 1: PROVIDE WITH: NEOPRENE PADS SOUND ATTENUATION KIT EX 800A ELECTRICAL POWER FEEDERS SHALL BE RE-USED. PROVIDE APPROPRIATE LUG SIZED ON CHILLER FOR EXISTING 800A WIRE SIZE VARIABLE SPEED CONDENSER FANS FOR HEAD PRESSURE CONTROL ALUMINUM MICRO-CHANNEL COILS SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION

AutoCAD SHX Text

TAG

AutoCAD SHX Text

CWP-1

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

BELL & GOSSETT

AutoCAD SHX Text

MODEL NUMBER

AutoCAD SHX Text e-1510-3BD

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

CHILLED WATER DISTRIBUTION PUMP

AutoCAD SHX Text

GPM

AutoCAD SHX Text

AutoCAD SHX Text

HEAD

AutoCAD SHX Text

(FT.)

AutoCAD SHX Text

AutoCAD SHX Text

HP

AutoCAD SHX Text

AutoCAD SHX Text

PUMP SCHEDULE

AutoCAD SHX Text

PUMP MOTOR DATA

AutoCAD SHX Text

RPM

AutoCAD SHX Text

AutoCAD SHX Text

VOLT

AutoCAD SHX Text

AutoCAD SHX Text

PHASE

AutoCAD SHX Text

AutoCAD SHX Text

HZ.

AutoCAD SHX Text

AutoCAD SHX Text

SUCTION/

AutoCAD SHX Text

DISCHARGE

AutoCAD SHX Text

SIZE

AutoCAD SHX Text 4"/3"

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

AutoCAD SHX Text NOTE 2: PROVIDE WITH: BUILT IN BACK DRAFT DAMPER, INTEGRAL METAL GRILLE, VIBRATION ISOLATORS WALL CAP SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ADDENDUM #3

AutoCAD SHX Text 12/3/20

AutoCAD SHX Text

AutoCAD SHX Text

Addendum 3_cover
5_Bid Form
M3.0-Model

File details come from the government source that posted it. Updated .