Addendum 2_EPS Chiller.pdf

PDF 872 KB Posted

Attached to
Intermediate School Chiller Replacement
Solicitation number
RFP EDPS 210000000275 3
Issued by
Calhoun County, East Grand Rapids City, Michigan

About this file

This is Addendum No. 2 to the bidding documents for an Intermediate School Chiller Replacement project by Edwardsburg Public Schools located in Edwardsburg, Michigan. The project scope includes replacement of the existing chiller and two water heaters at the intermediate school facility. The pre-bid meeting was held on November 30, 2020, at 2:00 PM, with attendance no longer mandatory but requiring bidders to schedule separate site visits with CARMI Design Group if not attending. The question deadline was December 1, 2020, at 5:00 PM, with bids due on Friday, December 4, 2020, at 2:00 PM. Contract award was scheduled for Monday, December 14, 2020, at 7:00 PM. Construction work must be completed by April 9, 2021, with product procurement to begin immediately upon contract award. The addendum includes significant technical clarifications and modifications to the original bidding documents dated November 18, 2020, including revised chiller specifications with aluminum micro-channel condenser coils, modified cooling capacity requirements (1,782.0 MBH at 95°F ambient and 10.29 EER minimum), and detailed mechanical system notes regarding roof penetrations, refrigerant piping sizing, chiller placement on concrete pads with neoprene supports, and interlock requirements between the chiller's refrigerant monitoring system and existing boilers.

Bidders were required to submit bid bonds equal to 5 percent of the bid amount, along with payment and performance bonds. The project requires a single contract with base bid and voluntary alternates, and all bidders must acknowledge receipt of the addendum with their bids. The contract will be based on AIA documents to be generated by CARMI Design Group, with the project subject to State of Michigan plan review. Fourteen contractors were identified as plan holders, including mechanical, electrical, and HVAC firms from Indiana and Michigan. Additional clarifications addressed in the addendum include contractor responsibility for temporary toilet facilities, coordination with school administration regarding construction noise that could affect students, asphalt protection and restoration if the chiller is craned from adjacent pavement, manufacturer-certified roof work to maintain Fibertite roof warranty, and confirmation of chilled water chemical pot feeder capacity to match existing equipment specifications. Addendum No. 3 was anticipated to be released on December 3, 2020, with further clarifications on refrigerant salvaging, equipment recycling, and a revised bid form.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

68817 Cass Street; P.O. Box 627 Edwardsburg, Michigan 49112

Phone: 269.663.5073 Fax: 269.663.6021

Addendum No. 2 Intermediate School Chiller Replacement Edwardsburg Public Schools

2 December 2020

This addendum forms a part of the Contract Documents and modifies the original Bidding Documents (PROJECT MANUAL dated 18 November 2020). Please acknowledge receipt of this Addendum when submitting your bid. This Addendum has been distributed to the plan holders of record only. It is the bidder’s responsibility to distribute Addendum information to subcontractors and material suppliers. This Addendum reflects modifications from the Owner, Architect, and Bidders.

ATTACHMENTS

1. Pre-bid sign in sheet

2. Pre-bid agenda

3. Plan holders list

4. Revised drawing sheet M3.1

GENERAL / CLARIFICATION

1. Contractors will be responsible for providing their own temporary toilet facilities.

2. The awarded contractor will be asked to coordinate construction that could be a potential noise concern for students with CARMI and the school. This is in an effort to help the school plan ahead if they need to move students around.

3. If it is determined by the awarded contractor that the new chiller will need to be craned from the adjacent asphalt in lieu of the adjacent grass, they will be responsible for properly protecting the asphalt from damage. In the event that the existing asphalt is damaged, the contractor will be responsible for restoring it to new condition.

4. Roof penetrations through the existing Fibertite roof membrane will require a manufacture certified contractor to protect to roof warranty.

5. PLEASE BE AWARE, THERE WILL BE AN ADDENDUM #3 RELEASE TOMORROW

MORNING (12/3/20) WITH CLARIFICATION ON THE FOLLOWING:

SALVAGING OF REFRIGERANT

RECYCLING OF REMOVED EQUIPMENT

REVISED BID FORM

SPECIFICATIONS

1. Section 236223 – Air Cooled Chiller

a. Add - Paragraph 2.06.E condenser coils shall be aluminum micro-channel design.

CARMI Design Group, Inc.

68817 Cass Street . P.O. Box 627 . Edwardsburg, MI 49112

P: 269.663.5073 . F: 269.663.6021 . E: tony@carmi.biz

DRAWINGS

1. P 1.0

a. Clarify – Sheet note #2 refers to the existing intake wall louver on the southwest corner of the boiler room.

2. M 2.0

a. Added note: Existing exhaust fan EF-401 shall be rebalanced to 1,500 CFM of exhaust.

b. Add Note: The three (3) existing boilers shall be interlocked to the refrigerant monitoring system. When the refrigerant monitoring system is activated the three (3) boilers shall be disabled from firing. When the refrigerant monitoring system is reset the three (3) boilers shall be enabled to fire.

c. Add Note: Set exterior chiller unit level on existing concrete pad with neoprene pads.

Coordinate exact location of exterior chiller to maintain service clearance between chiller control panel, chiller control panel door swing and existing enclosure wall. Modify and extend existing concrete pad as required for new exterior chiller placement.

d. Add Note: Contractor shall remove the existing cyclone fence privacy slats in the two (2) center sections of the existing cyclone fence adjacent to the north side of the chiller for proper air flow of chiller.

e. Add Note: The refrigerant piping routing, equivalent lengths, quantity of elbows, etc. shall be reviewed with the chiller manufacturer prior to installation and the refrigerant piping shall be sized per the chiller manufacturer’s recommendations and requirements.

f. Add Note: Existing chilled water chemical pot feeder appears to be 2-gallon unit. New chilled water chemical pot feeder shall match the existing chemical pot feeder capacity.

Confirm the exact chilled water chemical pot feeder capacity in the field.

3. M 3.0

a. Revise: Revise chiller cooling capacity from 1,840.0 MBH at 90 F ambient and 11.2 EER to 1,782.0 MBH at 95 F ambient and 10.29 EER minimum at 390 GPM at 45 F LWT.

b. Add: Add to chiller remarks – aluminum micro-channel coils.

4. M 3.1

a. Replace: Replace sheet M 3.1 with the revised sheet M 3.1.

END OF ADDENDUM NO. 2

68817 Cass Street; P.O. Box 627

Edwardsburg, Michigan 49112

Phone: 269.663.5073 Fax: 269.663.6021

MA

Meeting Agenda

Edwardsburg Public Schools Intermediate School Chiller Replacement Pre-Bid Meeting

11.30.20 @ 2:00 PM

1. Introductions

▪ Anne Flautt, EPS Chief Financial Officer

▪ Tony Leininger, CARMI

▪ Tanner Leininger, CARMI

▪ Randy Boersen, CARMI

▪ Ed Kiger, Millies

2. Bidding Schedule

▪ Addendum 1 Release Monday, 11.30.20

▪ Question Deadline Tuesday, 12.1.20 @ 5pm

▪ Addendum 2 Release Wednesday, 12.2.20

▪ Bids Due Friday, 12.4.20 @ 2:00pm

▪ Contract Award Monday, 12.14.20 @ 7:00 pm

3. Construction Schedule

▪ Product procurement shall begin upon contract award. Work is to be complete by 9 April 2021.

4. Summary of Work:

▪ Replace existing chiller and two water heaters.

5. Instructions to Bidders

▪ Comparable experience and ability to adhere to schedule

▪ Project is not tax exempt

▪ Bid Bond, Payment and Performance bonds required

▪ AIA contract and related documents to be generated by CARMI.

▪ This project will be going to the State of Michigan for plan review

6. Bid Form

▪ Single contract

▪ Base bid

▪ Voluntary alternates

▪ 5% bid bond

▪ Familial Relationship Statement

▪ Iran Disclosure Statement

▪ Addendum acknowledgement

7. Corrections / Addendum Discussion

▪ Addendum #1

- Due to unprecedented challenges with COVID-19 and its effect on the industry, attendance at the 30 November 2020, 2:00 PM pre-bid meeting is no longer mandatory for bidders. However, any bidder who does not attend the pre-bid meeting will be required to schedule a separate site visit with CARMI Design Group before the bid due date. All separate site visits will recap the pre-bid meeting and will require a conference call with CARMI and Millies Engineering to ensure full comprehension of the project.

8. Consultant Contact Info:

Plumbing and Mechanical Engineer Ed Kiger, Project Manager Millies Engineering Group Valparaiso, IN ekiger@milliesengineeringgroup.com O: (219) 595-6502 C: (219) 613-3354

9. Owner Requirements

10. Document Distribution (Electronic)

11. Site Visit

12/1/20

Contractors Contact Address Phone Email

H & G Services Scott Mackling Larry Cripe 225 S. Lafayette Blvd, South Bend, IN 46601

574-282-2596 574- 850-8767 smackling@hgservices.com lcripe@hgservices.com

D.A. Dodd Justin Steinbeck 1251 Paw Paw Ave, Benton Harbor, MI 49022 269-926-7873 justinsteinbeck@dadodd.com

Emcor Services - Shambaugh Travis Reed 5870 Carbonmill Dr, South Bend, IN 46628 574-232-6900 treed@shambaugh.com

Andy J. Egan Company Dave Jaworowski Dave Antonowtsch 2085 Plaza Drive, Benton Harbor, MI 49022

269-356-5526 269- 217-3872 jaworowskid@andyegan.com antonowitschd@andyegan.com

Ideal Consolidated Jason Weides 806 W. Sample St, South Bend, IN 46601 574-282-1228 jweides@idealconsolidated.com

BC Mechanical, Inc. Mike Fields 882 Anderson Rd, Niles, MI 49120 269-663-5335 info@bcmechanicalinc.com mike@bcmechanicalinc.com

Dynamic Mechanical Services, Inc.

Mike Bacsa Matt Kazmierzak 1606 Chestnut St, Mishawaka, IN 46545 574-257-0123 mbacsa@dynamicmechanical.net mattk@dynamicmechanical.net

J. J. White Jim White 1904 N Kenmore St, South Bend, IN 46628 574-307-7310 jwhite@jjwhiteinc.com

Griffen Plumbing & Heating, Inc. Shane Bays 2310 Toledo Rd, Elkhart, IN 46516 574-304-3257 sbays@griffen.com

Kalamazoo Mechanical, Inc. Don Keegan 5507 E. Cork St, Kalamazoo, MI 49048 269-910-8741 don@kalamazoomechanical.com

Mall City Mechanical Jeremy Kellogg 7184 Douglas Ave, Kalamazoo, MI 49009 269-532-6915 jkellogg@mcm-team.com

Beaudoin Electric Ron Gunn 3042 S Pipestone Rd, Sodus, MI 49126 269-208-1061 ron@beaudoinelectric.com

Brite Electric Tony Cave 51285 Bittersweet Rd # I, Granger, IN 46530 574-514-9203 tcave@briteelectric.net

R.W. Lapine, Inc.

Bill Brown Frank Nykamp Joe Kelley 5140 E. ML Ave, PO Box 2045 Kalamazoo, MI 49048

269-666-3787 269-303-0504 269-388-2045 bbrown@rwlservice.net fnykamp@rwlservice.net jkelley@rwlservice.net

MacLellan HVAC & Mechanical Steve Wojton 5314 W. 79th St, Indianapolis, IN 46268 616-780-3180 steve.wojton@maclellanhvac.com

CARMI Design Group / 68817 Cass Street / PO Box 627 / Edwardsburg, MI 49112 / Phone: 269-663-5073 / Fax: 269-663-6021

Plan Holders List Edwardsburg Public Schools, Intermediate School Chiller Replacement

MILLIES

ENGINEERING GROUP

9711 Valparaiso Drive

221 N. LaSalle Street

(219) 924-8400

Munster, Indiana 46321

Chicago, Illinois 60601 www.milliesengineeringgroup.com

Copyright © 2020 Millies Engineering Group

AutoCAD SHX Text

GRADE MOUNTED PIPE SUPPORTS - TYPICAL

AutoCAD SHX Text

AutoCAD SHX Text

SD

AutoCAD SHX Text

AutoCAD SHX Text

TD

AutoCAD SHX Text

AutoCAD SHX Text

CWP

AutoCAD SHX Text

CHWR

AutoCAD SHX Text

CHWR

AutoCAD SHX Text

SET CHILLER BUNDLE LEVEL ON EXIST CONCRETE PAD

AutoCAD SHX Text

CHWS

AutoCAD SHX Text

CHWR

AutoCAD SHX Text

CHWR

AutoCAD SHX Text

CHWR

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

SET NEW CHILLER LEVEL ON EXISTING SUPPORTS

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text

GRADE

AutoCAD SHX Text

BY-PASS FILTER SYSTEM

AutoCAD SHX Text

POT FEEDER LOCATE 6'-0" A.F.F. (MAX.) (SEE SPEC.)

AutoCAD SHX Text

CHWS

AutoCAD SHX Text

CHWS

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text

BOILER ROOM

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

BOILER RM FLOOR

AutoCAD SHX Text 6"

AutoCAD SHX Text

EXIST CHILLED WATER PIPING TO BUILDING DISTRIBUTION

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

CHWS

AutoCAD SHX Text 6"

AutoCAD SHX Text

PACKAGED

AutoCAD SHX Text

CHILLER PIPING DIAGRAM

AutoCAD SHX Text

SCHEMATIC ONLY

AutoCAD SHX Text

EQUIPMENT LEGEND

AutoCAD SHX Text

GE-3X

AutoCAD SHX Text

SUCTION DIFFUSER

AutoCAD SHX Text

TRIPLE DUTY VALVE

AutoCAD SHX Text

SD-1

AutoCAD SHX Text

TD-1

AutoCAD SHX Text

BELL & GOSSETT

AutoCAD SHX Text

BELL & GOSSETT

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TAG

AutoCAD SHX Text

MANUFACTURER

AutoCAD SHX Text

MODEL #

AutoCAD SHX Text 6 x 4

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text

SIZE

AutoCAD SHX Text

5' MAX PSI PRESSURE DROP

AutoCAD SHX Text

5' MAX PSI PRESSURE DROP

AutoCAD SHX Text

3DS-6B

AutoCAD SHX Text 6"~

AutoCAD SHX Text

SET NEW PUMPS LEVEL ON EXIST CONCRETE PAD

AutoCAD SHX Text

TRUMPET VALVE

AutoCAD SHX Text

B & G TRIPLE DUTY VALVE

AutoCAD SHX Text

BASE MOUNTED CENTRIFUGAL PUMP

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

B & G SUCTION DIFFUSER

AutoCAD SHX Text

FLEXIBLE CONNECTOR (TYPICAL)

AutoCAD SHX Text

4" HIGH CONCRETE HOUSEKEEPING PAD

AutoCAD SHX Text

INCREASER

AutoCAD SHX Text

DISCHARGE

AutoCAD SHX Text

MODEL #TE-3

AutoCAD SHX Text

SUCTION

AutoCAD SHX Text

SEE MECH. ROOM PLAN AND PIPING

AutoCAD SHX Text

DIAGRAM FOR PIPE SIZES.

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

BASE MOUNTED PUMP DETAIL

AutoCAD SHX Text

(NTS)

AutoCAD SHX Text d e s i g n

AutoCAD SHX Text a r c h i t e c t u r e

AutoCAD SHX Text

NO.

AutoCAD SHX Text

ISSUED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

THE INFORMATION ON THIS SHEET IS THE

AutoCAD SHX Text PROPERTY OF CARMI design group inc.

AutoCAD SHX Text

AND MAY NOT BE REPRODUCED WITHOUT

AutoCAD SHX Text

WRITTEN CONSENT FROM

AutoCAD SHX Text Copyright 2020

AutoCAD SHX Text CARMI design group inc.

AutoCAD SHX Text c

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

CAD FILE #

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT #

AutoCAD SHX Text P: 269.663.5073 F: 269.663.6021

AutoCAD SHX Text

68817 CASS STREET; P.O. BOX 627

AutoCAD SHX Text

EDWARDSBURG, MICHIGAN 49112

AutoCAD SHX Text

CHILLER REPLACEMENT

AutoCAD SHX Text

EDWARDSBURG MICHIGAN

AutoCAD SHX Text

18 NOVEMBER 2020

AutoCAD SHX Text 2020.031

AutoCAD SHX Text

EK

AutoCAD SHX Text

EDWARDSBURG PUBLIC SCHOOLS

AutoCAD SHX Text

AutoCAD SHX Text

FOR BID

AutoCAD SHX Text 11/18/20

AutoCAD SHX Text

BAK

AutoCAD SHX Text

MECHANICAL DIAGRAMS & DETAILS

AutoCAD SHX Text M3.1

AutoCAD SHX Text MODIFY EXISTING WALL PIPE PENETRATIONS FOR NEW PIPING PENETRATIONS. SLEEVE & SEAL WALL PENETRATIONS WEATHERTIGHT COMPLETE AS REQUIRED.

AutoCAD SHX Text AIR COOLED CHILLER w/REMOTE BUNDLE

AutoCAD SHX Text

CHWS

AutoCAD SHX Text

CHWR

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

CTE

AutoCAD SHX Text

CTE

AutoCAD SHX Text

CTE

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text PROVIDE & LOCATE ALL CHILLER REFRIGERANT SPECIALTIES (I.E. SITE GLASS, FILTER DRYER, REFRIGERANT RELIEF VALVE, RELIEF VALVE, ETC.) PER CHILLER MANUFACTURER'S REQUIREMENTS COMPLETE AS REQUIRED.

AutoCAD SHX Text 6"

AutoCAD SHX Text

CHILLER BUNDLE

AutoCAD SHX Text

CTE

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ADDENDUM #2

AutoCAD SHX Text 12/2/20

Addendum 2_Intermediate School Chiller Replacement
Pre-Bid Sign in_Scan
PreBid Agenda_EPS Intermediate Chiller Replace
Plan Holders_Intermediate Chiller Replacement_12.1.20
M3.1

File details come from the government source that posted it. Updated .