Addendum 3 .pdf

PDF 46 MB Posted

Attached to
66th Street Industrial Park Waterline Improvements Phase 1
Solicitation number
W2410C1
Issued by
Garfield County, Oklahoma

About this file

This document is Addendum 3 to the Plans and Specifications for the 66th Street Industrial Park Waterline Improvements Phase 1 (Project No. W-2410C1) issued by the City of Enid, Oklahoma. The project involves installing waterlines in the industrial park area, spanning sections in Garfield County. The addendum provides clarifications and modifications to the original contract documents, including specifications for waterline installation methods, materials, and construction requirements. Key clarifications include permitting for dry boring with 10 ft cover, removal of casing spacer requirements, installation of fire hydrants, and use of 24" OD C906 HDPE pipe. The project requires maintaining 66th Street's through traffic during construction and uses horizontal directional drilling for bores.

The contract includes detailed bid items and quantities for various waterline components, such as pipe materials (HDPE and PVC), gate valves, fire hydrant assemblies, and associated installation work. The proposal outlines base bid and alternate bid options, with specific line items for mobilization, construction staking, traffic control, pipe installation, and various other infrastructure improvements. The contractor is required to provide performance and maintenance bonds, maintain public liability insurance, and complete the project within the calendar days specified in the bid. The addendum indicates that materials and installation are separate line items, and the project involves waterline segments on Chestnut Avenue that are owned by the City of Enid.

View the file

Other files

File Type Posted
Addendum 6.pdf PDF
Addendum 2.pdf PDF
Addendum 5 .pdf PDF
Addendum 1 .pdf PDF
Addendum 4.pdf PDF
REQSL1331576 (2).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NO. 3

TO

PLANS AND SPECIFICATIONS

FOR

66th Street Industrial Park Waterline Improvements Phase 1 W-2410C1

10/3/24

This Addendum No. 3 forms a part of the contract documents as described above. The original contract documents remain in full force and effect except as modified herein.

Clarification:

1. Alternate bid 2, the contractor will install the waterline per permit requirement, dry bore, with 10 ft cover.

2. The casing spacer for the poly pipe is not required, but lubrication is required during the installation.

3. Sta. 130+00, fence removal and replacement are incidental for the project.

4. Installation of fire hydrant per standard detail.

5. The proposed waterline is 24” OD C906, HDPE, DIPS, DR-9.

6. 66th Street must remain open to through traffic during the construction.

7. The EJ valves and hydrants are not accepted for this project.

8. All the bores can be done by horizontal directional drilling.

9. The materials and installation are separate line items.

10. The sodding is replaced with hydro mulch.

11. The waterline segments on Chestnut are the City of Enid’s property.

12. The are no conflicts with utilities.

13. The potholes data will be provided on existing pipelines crossing with depth, pipe size and materials.

14. “Bore pits will conflict with pipelines casing will all need to be extended?”- We need a specific location to answer this question.

15. At 66th Street & Chestnut Avenue, the bore can shift further north to accommodate the construction. The northwest quarter of the intersection is the City of Enid’s property.

16. Sheet 23, the contractor will tie into the end of the existing waterline.

17. Sta. 57+00, the contractor will bore the under the driveway.

18. Base bid #23, it is the incidental concrete driveway.

19. Alternate bid 1, that is a casing annotation for the rail road track bore, not the concrete.

20. The 6” class B bedding with sand is required for this project.

Modification:

1. Sheet 3, updated the bid quantities.

2. At Sta. 23+00, an additional temporary construction of 50 ft. wide by 75 ft. length.

3. Sheet 8, updated the existing Garber waterline.

4. Sta. 56+87.50 and sta. 71+66.85 the contractor will bore underneath the driveway at the wind turbine laydown yard.

Proposal:

1. Updated Proposal

PROPOSAL

Addendum 3 Proposal – Page 1

TO: The Honorable Mayor and Board of Commissioners The City of Enid, Garfield County, Oklahoma

Pursuant to the notice inviting proposals, the undersigned bidder herewith submits his proposal.

He declares he has carefully examined the Plans, Specifications and forms of Contract and bonds as set forth in the proceedings for:

66th Street Industrial Park Waterline Improvements Phase 1

W-2410C1 and that he has reached a full understanding of everything required on said Plans and Specifications, and that he has informed himself as to the kind and quantities of various materials to be furnished and/or the nature and location of the work to be done, and all other matters affecting the work.

The undersigned bidder proposes and agrees that if his proposal is accepted, to enter into contract with THE CITY OF ENID, on forms prescribed, with approved sureties, within seven (7) days, after notice of award to execute the Contract, and to furnish to the City a satisfactory Performance and Statutory Bond in the sum of 100% of the contract price, guaranteeing the faithful performance of the work and payment of bills.

To do any extra work not covered by the following schedule of prices or stipulated lump sum price which may be ordered by the Engineer and to accept as full compensation therefor such prices as may be agreed upon in writing by the Engineer and the Contractor in accordance with Section 108.04 of the General Provisions.

It is further agreed that the Contractor shall begin the work on the date as provided in these Specifications and to prosecute said work in such a manner as to complete all work contracted for within the number of calendar days submitted in the bid.

The Contractor shall take out and maintain public liability and OCP insurance in accordance with Section

106.25 of the General Provisions of the Specifications. A copy of said Specifications is now on file in the Office of the City Clerk of the City of Enid.

Upon completion of the Contract, the Contractor shall furnish to the City a satisfactory Maintenance Bond in the amount of 100% of the final contract price, guaranteeing the maintenance of the work for a period of THREE (3) years after acceptance by the City.

Accompanying this proposal is a proposal guaranty for 5% of the total bid, payable to the CITY OF ENID, OKLAHOMA, which is to be forfeited, as liquidated damages, if, in the event that this proposal is accepted, the undersigned shall fail to execute the contract and furnish satisfactory contract bond under the conditions and within the time specified in this proposal. Otherwise said proposal guaranty is to be returned to the undersigned.

Project Name: 66th Street Industrial Park Waterline Improvements Phase 1 Project No.: W-2410C1

Addendum 3 Proposal – Page 2

Base Bid Sta. 22+50 to 49+50 & Sta. 51+00 to 119+57

Line No. Bid Item Description Quantity Unit Unit Price Extended Price

1 Mobilization

1 LS

2 Bonds & Insurance

1 LS

3 Construction Staking/As-Built

1 LS

4 Construction Traffic Control

1 LS

30" Casing (By Boring), Complete in Place

245 LF

6 24" C906 HDPE, DR-9, Material 2437 LF

24" C906 HDPE, DR-9, Installation by Boring, Complete in Place

300 LF

24" C906 HDPE, DR-9, Installation by Open Trench, Complete in Place 2137 LF

9 18" C900 PVC, DR-18, Material

7943 LF

18" C900 PVC, DR-18, Installation by

210 LF

Open Trench, Complete in Place

7733 LF

8" C900 PVC Pipe, DR-18, Material (By Open Trench) 31 LF

8" C900 PVC Pipe, DR-18, Installation by

31 LF

Fire Hydrant Assembly with Valve, Complete in Place

8 EA

15 Ductile Iron Fittings

8687 LBS

16 PVC to HDPE Transition Connection

5 EA

17 6" Class B Bedding with Sand

503 CY

Type A Aggregate Backfill Under Pavement (0.85 ton/yd3)

24 CY

19 24" Gate Valve & Box Complete in Place

1 EA

20 18" Gate Valve & Box Complete in Place

8 EA

21 8" Gate Valve & Box Complete in Place 1 EA

22 1" Air Relief Valve

5 EA

Pressure Testing and Disinfection Complete in Place

1 LS

Addendum 3 Proposal – Page 3

24 HDPE 8" Tie-in

1 EA

25 Tie into Existing Waterline

2 EA

Concrete Street & Alley Repair, Complete in Place 18 SY

Concrete Driveway Repair, Complete in

160 SY

28 Hydro Mulch

4708 SY

29 Construction Sign, Complete in Place 2 EA

*Additional Concrete Repair, Complete in

400 SY

* Line item only to be used at the discretion of the Engineer.

Base Bid Total

Contract Time (Calendar Days)

Total Base Bid in Words:

Alternate Bid 1 Sta 0+00 to 22+50

Line No. Bid Item Description Quantity Unit Unit Price Extended Price

A-1 24" C906 HDPE, DR-9, Material

587 LF

A-2 24" C906 HDPE, DR-9, Installation by

400 LF

A-3 24" C906 HDPE, DR-9, Installation by Open Trench, Complete in Place 187 LF

A-4 18" C900 PVC, DR-18, Material

1904 LF

A-5

80 LF

A-6

1824 LF

A-7 12" C900 PVC Pipe, DR-18, Material (By Open Trench) 5 LF

A-8 12" C900 PVC Pipe, DR-18, Installation by Open Trench, Complete in Place

5 LF

Addendum 3 Proposal – Page 4

A-9 Fire Hydrant Assembly with Valve, Complete in Place 3 EA

A-10 Ductile Iron Fittings

3102 LBS

A-11 PVC to HDPE Transition Connection 1 EA

A-12 6" Class B Bedding with Sand

119 CY

A-13 18" Gate Valve & Box Complete in Place

2 EA

A-14 Tie into Existing Waterline

1 EA

A-15 Concrete Driveway Repair, Complete in Place 31 SY

A-16 Hydro Mulch

793 SY

Alternate 1 Bid Total

Total Alternate Bid 1 in Words:

Alternate Bid 2 Sta 49+00 to 51+00

Line No. Bid Item Description Quantity Unit Unit Price Extended Price

B-1 24" Casing (By Boring), Complete in

140 LF

B-2 18" C900 PVC, DR-18, Material

200 LF

B-3

140 LF

B-4

60 LF

B-5 6" Class B Bedding with Sand

4 CY

B-6 Hydro Mulch 27 SY

Alternate 2 Bid Total

Total Alternate Bid 2 in Words:

Addendum 3 Proposal – Page 5

Addendum 3 Proposal – Page 6

A Bidder's Bond, Certified or Cashier's Check is enclosed in the amount of $______________, as required.

STATE OF )

) SS:

COUNTY OF )

___________________________________; of lawful age, being first duly sworn, upon his oath, deposes and says, that he executed the accompanying bid on behalf of the bidder named therein for the construction of the above improvement in THE CITY OF ENID, OKLAHOMA, that he had lawful authority so to do and that the bidder has not been a party to any collusion among bidders in restraint of freedom of competition by agreement to bid at a fixed price or to refrain from bidding; or with any State or City official or employee as to quantity, quality, or price in the prospective contract, or any other terms of said prospective contract; or in any discussions between bidders and any State or City officials concerning exchange of money or other thing of value for special consideration in the letting of a contract; said bidder has neither directly nor indirectly entered into any agreement, express or implied, with any bidder or bidders, having for its object the controlling of the price or amount of such bid or bids, the limiting of the bids or bidders, the parceling or farming out to any bidder or bidders, or other persons of any part of the contract or any part of the profits thereof and that he has not and will not divulge the sealed bid on such public improvement to any person whatsoever, except those having a partnership or other financial interest with him in said bid or bids, until after the sealed bid or bids are opened.

If partnership, give name and address of each partner

By:

Address:

Email:________________________________________

Incorporated under the laws of the State of:

Subscribed and sworn to before me this _____ day of _______________________, 20____.

Notary Public

(SEAL)

My Commission Expires:

W - 2410C1 REVISION 1

LOCATED

IN THE

GARFIELD COUNTY, OKLAHOMA

CITY OF ENID

The City Of Enid, Oklahoma

66th INDUSTRIAL PARK

WATERLINE IMPROVEMENTS PHASE 1

PROJECT SITE

SE 1/4, SECTION 36, T-23N, R-6W, NW1/4, SECTION 6, T-22N, R-5W, and SE 1/4, SECTION 1, T-22N, R-6W

AutoCAD SHX Text

WILLOW ROAD

AutoCAD SHX Text

MARKET STREET

AutoCAD SHX Text

30TH STREET

AutoCAD SHX Text

16TH STREET

AutoCAD SHX Text

OWEN K. GARRIOTT ROAD

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text Business Loop

AutoCAD SHX Text

PURDUE AVENUE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text o

AutoCAD SHX Text o

AutoCAD SHX Text

AutoCAD SHX Text

78TH STREET

AutoCAD SHX Text

42ND STREET

AutoCAD SHX Text

26 TH ST

AutoCAD SHX Text

E. BIRCH AVE.

AutoCAD SHX Text

FRANTZ AVENUE

AutoCAD SHX Text State Ave.

AutoCAD SHX Text

66TH STREET

AutoCAD SHX Text

54TH STREET

AutoCAD SHX Text

CHESTNUT STREET

AutoCAD SHX Text

CITY OF ENID CONTACTS

AutoCAD SHX Text City Manager

AutoCAD SHX Text Jerald Gilbert

AutoCAD SHX Text Jason Unruh, P.E.

AutoCAD SHX Text Telephone: (580) 234-0400 Fax: (580) 234-8946

AutoCAD SHX Text 401 West Owen K. Garriott Road

AutoCAD SHX Text Index of Sheets

AutoCAD SHX Text

COVER

AutoCAD SHX Text

AutoCAD SHX Text 002-003

AutoCAD SHX Text Enid, Oklahoma 73702

AutoCAD SHX Text P.O. Box 1768

AutoCAD SHX Text Vicinity Map

AutoCAD SHX Text n.t.s.

AutoCAD SHX Text City Engineer

AutoCAD SHX Text

CITY COMMISSIONERS

AutoCAD SHX Text Rob Stallings

AutoCAD SHX Text Keith Siragusa

AutoCAD SHX Text David Mason

AutoCAD SHX Text Cheryl Patterson

AutoCAD SHX Text Derwin Norwood

AutoCAD SHX Text Ward 5

AutoCAD SHX Text Ward 6

AutoCAD SHX Text Ward 1

AutoCAD SHX Text Ward 2

AutoCAD SHX Text Ward 3

AutoCAD SHX Text Ward 4

AutoCAD SHX Text Mayor

AutoCAD SHX Text

* ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH CITY OF ENID CONSTRUCTION STANDARDS.

AutoCAD SHX Text Whitney Roberts

AutoCAD SHX Text Scott Orr

AutoCAD SHX Text

UTILITY CONTACTS

AutoCAD SHX Text Company

AutoCAD SHX Text Contact

AutoCAD SHX Text Phone #

AutoCAD SHX Text Suddenlink

AutoCAD SHX Text Oklahoma Natural Gas

AutoCAD SHX Text

AT&T

AutoCAD SHX Text Director of Public Utilities

AutoCAD SHX Text Oklahoma Gas & Electric

AutoCAD SHX Text Joseph Mojica

AutoCAD SHX Text David Hunter

AutoCAD SHX Text Bryan Brown

AutoCAD SHX Text Keith Ward

AutoCAD SHX Text Scott Blodgett

AutoCAD SHX Text 405-743-6180

AutoCAD SHX Text 580-249-2353

AutoCAD SHX Text 580-249-2230

AutoCAD SHX Text 580-278-4378

AutoCAD SHX Text 580-231-3349

AutoCAD SHX Text Storm Water Management

AutoCAD SHX Text Ashley Humphrey

AutoCAD SHX Text 580-616-7311

AutoCAD SHX Text Pioneer Telephone Co.

AutoCAD SHX Text 580-541-4228

AutoCAD SHX Text Joshua Brown

AutoCAD SHX Text

NOTES, QUANTITY ESTIMATE

AutoCAD SHX Text James Thomas

AutoCAD SHX Text 580-231-1217

AutoCAD SHX Text Water Production

AutoCAD SHX Text Traffic Control

AutoCAD SHX Text Michael Williams

AutoCAD SHX Text 580-616-7337

AutoCAD SHX Text

ONE NET

AutoCAD SHX Text 888-566-3638

AutoCAD SHX Text Murali Katta, P.E.

AutoCAD SHX Text Director of Engineering

AutoCAD SHX Text

* QUANTITIES SHOWN ON THE PLANS ARE ESTIMATED. CONTRACTOR SHALL THOROUGHLY REVIEW PLANS AND SPECIFICATIONS, AND CONFIRM QUANTITIES. PAYMENT WILL BE MADE BASED UPON AS-BUILT MEASUREMENTS.

AutoCAD SHX Text Tam Nguyen

AutoCAD SHX Text Project Engineer

AutoCAD SHX Text

PLAN & PROFILE

AutoCAD SHX Text 101-118

AutoCAD SHX Text 301-307

AutoCAD SHX Text

STANDARD DETAILS

GENERAL CONSTRUCTION NOTES:

1. Construction and daily maintenance of all erosion control measures shall be performed by the contractor prior to the initiation of any land disturbing activities. Inspection of these structures will be performed by the city of Enid on a regular basis. The contractor shall be responsible for the repair or replacement of all erosion control devices damaged due to construction.

2. The contract time includes all necessary weather days submitted in the bid proposal.

3. The contractor shall maintain an as-built markup set of plans, which shall be turned in to the engineer at the end of construction. This item includes all critical survey information such as flow lines, and any approved modifications to the plans.

4. Utilities are shown for general information only. The contractor shall be responsible for the location and protection of existing buried utilities. Contractor shall notify OKIE @1-800-522-6543, prior to excavation. Contractors shall contact all utility companies to provide utility locations before starting excavation or removal. Contractor shall pothole utilities when necessary. Actual location and depth does vary and shall be field verified. Utilities in existing right-of-way conflicting with project will be adjusted by utility companies per their plans and schedule for adjustment.

5. Contractor shall be responsible for verification of location and depth of all utilities prior to excavation: damage to any utilities or structure during excavation and construction of proposed water mains shall be the responsibility of the contractor.

6. Trenching and excavation which cross existing and/or proposed pavement or channels shall be compacted to 95% of the standard proctor density (ASTM D-696) through and a minimum of 5ft beyond the referenced area. All bore pits and trenching except paving, shall be water jetted for compaction.

7. It shall be contractor's responsibility to provide waste areas or disposal sites for excess material which is not desirable to be incorporated into the work on this project (excavation or broken concrete). City landfill fees will not be waived for disposal of materials from this project.

8. Contractor shall submit to the engineer for approval a traffic control plan at the pre- construction meeting. This plan shall be implemented in accordance with the manual on uniform traffic control devices (MUTCD), latest edition. Notice to proceed will not be issued without approval of plan.

9. Contractor shall submit a proposed construction sequence at pre-construction meeting. Construction sequence should provide for minimal service interruptions to residents.

10. All materials and products shall have approved submittal by the engineer and owner prior to notice to proceed.

11. It is the responsibility of the contractor to visit the proposed construction site to verify site conditions.

12. All testing shall be in accordance with city of Enid standard specifications. No pavement shall be placed on subgrade that has not passed a compaction test to City inspector's discretion regardless of size of the area. ODOT class A or crusher run, compacted in 8” lifts, tested every 2 foot. See city standard for pavement repair.

13. Contractor shall saw cut the existing pavement to obtain a clean, straight edge prior to placing the concrete approach. If necessary, asphalt can be placed between the saw cut and edge of new concrete.

14. Contractor will be responsible for returning to the job site to repair any settlement of backfill that occurs during the three-year maintenance period.

15. Contractor shall be required to hand rake all disturbed areas and leave job site in a neat and smooth condition suitable for residential mowing. Remove all large clods and debris prior to final acceptance by city. Contractor shall restore all disturbed areas to their original condition and material to the satisfaction of the project inspector, including but not limited to fencing, surface features, bracing of poles, street signs, trees, sod and landscaping.

16. The contractor shall be responsible for replacing all landscaping and irrigation in as good or better condition as existing and for grading all disturbed areas to drain as good or better than existing conditions. The cost of this shall be considered incidental and included in the cost of other items unless specifically noted in the quantities.

17. Contractor shall preserve or replace all existing land boundary monuments. This work shall be performed by a registered professional surveyor.

18. Any work not classified as a contract pay item shall be considered incidental construction. The cost for such work shall be included in the price bid for other items.

19. Contractor shall provide all sod required to repair all disturbed areas. Replacement sod shall be of the like kind (Fescue or Bermuda) of existing conditions. It also includes watering for 7 consecutive days.

WATER CONSTRUCTION NOTES:

1. All work to comply with city of Enid standards and construction specifications and shall conform to the department of environmental quality standards as outlined on OAC 252:626 and 656.

2. Contractor shall notify all local home and business owners to coordinate the work. Contractor shall provide notice in the form of door hangers to all homeowners and businesses at least 48 hours prior to shutting off water.

3. Contractor shall provide access to all businesses and residents at all times. No more than one block or 400 feet of trench shall be open at once. All testing, compaction, service connections, clean up, and pavement repair shall be completed before removing additional pavement and opening new trench.

4. Contractor shall coordinate with the city's inspectors or public utilities department prior to closing any existing valves during shut outs and tie-ins. Operation of any existing water line valves shall be done by city staff only. Contractor shall coordinate outages for minimal service interruption.

5. All water valves shall be installed behind curb and out of driving surface wherever possible.

6. Contractor shall install proposed water mains at least 10 feet horizontally from any existing or proposed sewer lines, at least 2 feet vertical separation from any existing or proposed sewer lines, proposed storm sewer, raw water lines, petroleum product lines, natural gas lines, and other buried utility lines, and at least 15 feet from all parts of septic tanks, absorption fields, or other sewerage treatment and disposal systems. Water mains crossing under a sewer shall require sufficient structural support for the sewer to prevent damage to the water main and no sewer line joint shall be less than nine (9) feet from the waterline. According with DEQ 252:626, all sanitary sewer crossings above the water main must be replaced with 20 ft PVC pipe with no joists.

7. PVC pressure pipe shall be AWWA C-900, pressure class 200 and with a minimum dimension ratio of eighteen (DR-18).

8. There shall be a minimum of 3' of cover to the top of proposed water lines.

9. Where not indicated, water lines shall be a minimum of 5' from property lines and easement lines and 3' behind back of curbs

10. Installation of pipe shall include installing 12 gauge tracer wire and locator tape. Cost shall be included in price bid for pipe. All tracer wire shall be connected to valves and fire hydrants. All service lines require tracer wire into the meter tile. Locator tape shall be installed 24-inches above the pipe. All tracer wire (main and service lines) shall be interconnected so that locates can be performed from a single, energized point.

11. All water main service connections shall be connected to existing water meters with new polyethylene pipe unless specified otherwise on the plans. All service connections shall include removal and replacement of five (5) linear feet on the private side, removal and disposal of old meter box, stainless steel double strap saddle and gasket, brass corporation stop, ball cock valve, 6” brass nipple, outlet meter rise, new water meter can & lid. All services shall be 1” minimum through the meter and reduced as necessary to connect to existing services beyond the meter. Double long services shall consist of a 2” main line and two (2) 1” meters and services and all labor and materials necessary for their construction. Services shall be stubbed under existing curb line, and if curb removal is necessary it shall be included in the cost of this item. All service connections shall be adequately marked by contractor so they can be referenced and recorded on as built plans by construction inspector.

12. Any pipe bored with a casing shall be internal locking pipe. Contractor shall use an approved internal joint restraint system for all boring greater than one joint of pipe. The approved internal joint restraint system shall be for PVC pipe (EAGLE LOC 900, CERTA-LOK, etc.). PVC pipe shall be pulled through bores, not pushed.

13. All fittings shall be mechanical joint type as specified under ductile iron fittings. All fittings shall have polyethylene encasement tubing with a thickness of 8 mil.

14. All mechanical joint restraints shall be MEGALUG as manufactured by EBAA iron or approved equal.

15. All water meters shall have new round meter cans and lids. All meter boxes shall be adjusted level with surface at completion of finished grading operation. All meter boxes shall be accessible and left uncovered at the completion of each work day. It will be the responsibility of the contractor to locate and uncover any meters which require access.

16. All fire hydrants shall be painted safety yellow B54-Y37, alkyd coating from Sherwin Williams industrial and marine coatings.

17. Contractor shall salvage all existing fire hydrants at the city inspector's discretion and deliver to city service center located at 1500 w. Poplar avenue. Installation of 6" cap where fire hydrants were removed. All rejected fire hydrants shall become the property of the contractor.

18. Hydrostatic and leakage test: after the pipe has been laid and backfilled. In accordance with OAC 252:626-19-2(e), test the installed pipe for leakage in accordance with AWWA standard specifications. Leakage must not exceed 10 gal/inch diameter per mile of pipe per 24 hours at 150 psi testing pressure. This shall be included in the unit price bid for pipe. No additional payment will be made.

19. Chlorinating water mains: before being placed in service, all mains shall be chlorinated in accordance with OAC 252:626-19-2(f) and "AWWA standard for disinfecting water mains, "AWWA designation c-65a. Obtain safe bacteriological samples on two consecutive days before placing the water line into service. Chlorinated water used for disinfection of new pipes shall be dechlorinated and disposed to storm sewer. The cost shall be included in the unit price bid for pipe. No additional payment will be made.

20. (h) Separation of water mains and sewers from contamination sources. (1) Horizontal separation. (A) Measure the separation distance edge to edge. (B) Locate water mains at least 10 feet horizontally from any existing or proposed sewer lines. (C) Locate water mains at least 5 feet horizontally from any existing or proposed storm sewers, raw water lines, petroleum product lines, natural gas lines, and other buried utility lines. (D) Locate cast iron waterlines at least 10 feet from any gasoline storage tank and lines and PVC water lines at least 50 feet horizontally from any gasoline storage tank and lines. (E) Locate waterlines at least 15 feet from all parts of septic tanks and absorption fields, or other sewage treatment and disposal systems. (2) Vertical Separation. (A) Measure the separation distance from edge to edge. (B) Lay waterlines crossing sewer lines to provide a minimum vertical distance of 24 inches between the water main and the sewer line. Arrange the piping so that joints in a 20-foot length of PVC or 18-foot length of cast iron sewer pipe will be equidistant from the water main. Where a water main crosses under a sewer, provide adequate structural support for the sewer to prevent damage to the water main. (C) Maintain a 2-foot vertical separation between waterlines and any existing or proposed 76 storm sewers, raw water lines, petroleum product lines, natural gas lines, and other buried utility lines.

AutoCAD SHX Text 401 West Owen K. Garriott Road

AutoCAD SHX Text P.O. Box 1768

AutoCAD SHX Text Enid, Oklahoma 73702

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Number

AutoCAD SHX Text Date

AutoCAD SHX Text Description

AutoCAD SHX Text The City Of Enid

AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946

AutoCAD SHX Text %%uContacts:

AutoCAD SHX Text Project Number:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text Project Title:

AutoCAD SHX Text Murali Katta, P.E., Director of Engineering

AutoCAD SHX Text Tam Nguyen, Project Engineer

AutoCAD SHX Text Jason Unruh, P.E., City Engineer

AutoCAD SHX Text of

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Designed By:

AutoCAD SHX Text Approved By:

AutoCAD SHX Text

TN

AutoCAD SHX Text

TN

AutoCAD SHX Text

JU

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

WL-002

AutoCAD SHX Text Sheet:

AutoCAD SHX Text Section:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

66TH STREET

AutoCAD SHX Text

ENID, OKLAHOMA

AutoCAD SHX Text W-2410C

AutoCAD SHX Text

66TH STREET INDUSTRIAL

AutoCAD SHX Text

PARK WATER IMPROVEMENT

MAY 2024

OR MECHANICAL JOINT RESTRAINTS

AutoCAD SHX Text

CAST IRON VALVE BOX

AutoCAD SHX Text

HYDRANT DRAIN PORTS

AutoCAD SHX Text

ROCK OR GRAVEL TO SURROUND

AutoCAD SHX Text

APPROX. 1/2 G.Y. CRUSHED

AutoCAD SHX Text

5-1/4" VALVE OPENING

AutoCAD SHX Text

COMPRESSION SHUTOFF

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

TYPICAL FIRE HYDRANT ASSEMBLY

AutoCAD SHX Text

CONCRETE BLOCK

AutoCAD SHX Text

STRAPPING LUGS

AutoCAD SHX Text 15"x15"x6"

AutoCAD SHX Text

BACKFILL

AutoCAD SHX Text

COMPACTED

AutoCAD SHX Text 3'-6"

AutoCAD SHX Text

6" MECHANICAL JOINT PIPE

AutoCAD SHX Text

FOR INLET CONNECTION

AutoCAD SHX Text

WATER

AutoCAD SHX Text

SUPPLY

AutoCAD SHX Text

6 GATE VALVE

AutoCAD SHX Text

& VALVE BOX (TYP.)

AutoCAD SHX Text

PROVIDE 3/4" TENSION RODS

AutoCAD SHX Text

DEPTH OF BURY

AutoCAD SHX Text

OPERATING ASSEMBLY TO BE

AutoCAD SHX Text

LUBRICATED PER MANUFACTURER'S

AutoCAD SHX Text

RECOMMENDATIONS

AutoCAD SHX Text

ALL HYDRANTS TO BE

AutoCAD SHX Text

TRAFFIC MODEL

AutoCAD SHX Text

W/IMPACT FLANGES.

AutoCAD SHX Text

18" MINIMUM

AutoCAD SHX Text

2 - 2-1/2" HOSE NOZZLES & 1 - 4" PUMPER

AutoCAD SHX Text EITHER MUELLER, M. & H, or AVK.

AutoCAD SHX Text

CAPS W/PENTAGON NUTS

AutoCAD SHX Text

NOZZLE W/ NAT'L. STD. THREADS CHAINED

AutoCAD SHX Text

SPEC. C502 AND MANUFACTURED BY

AutoCAD SHX Text

ALL HYDRANTS TO CONFORM TO AWWA

AutoCAD SHX Text

1-1/2" PENTAGON OPERATING

AutoCAD SHX Text

NUT OPEN LEFT

AutoCAD SHX Text 6"

AutoCAD SHX Text

GATE VALVE & VALVE BOX

AutoCAD SHX Text

INCLUDED IN OTHER ITEMS.

AutoCAD SHX Text

BLOCKING COMPLETE. " TEE " SHALL BE

AutoCAD SHX Text

HYDRANT, GATE VALVE & BOX AND CONCRETE

AutoCAD SHX Text

1. FIRE HYDRANT ASSEMBLY SHALL INCLUDE

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

STANDARD DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

2" SQ OPERATING NUT

AutoCAD SHX Text

LEFT OPEN

AutoCAD SHX Text

WATER

AutoCAD SHX Text

2' X 2' OR 30" DIA. CONCRETE COLLAR

AutoCAD SHX Text

STD. WATER METER LID

AutoCAD SHX Text

IN-LINE STANDARD BALL COCK VALVE

AutoCAD SHX Text

W/STAINLESS STEEL BAND

AutoCAD SHX Text

STAINLESS STEEL SERVICE CLAMP

AutoCAD SHX Text

WATER SERVICE LINE CONNECTION

AutoCAD SHX Text

TO PREVENT FUTHER SETTLEMENT.

AutoCAD SHX Text

2. SOIL AROUND SERVICE CONNECTION SHALL BE COMPACTED

AutoCAD SHX Text

MENT OR EXPANSION AND/OR CONTRACTION.

AutoCAD SHX Text

TO COUNTERACT THE EFFECTS OF A LOAD DUE TO SETTLE-

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

PRIOR TO CONNECTING TO PROVIDE FLEXIBILITY AND "GIVE"

AutoCAD SHX Text

1. ALWAYS PUT A BEND OR "GOOSENECK" IN SERVICE LINE

AutoCAD SHX Text 45%%D

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

STOP

AutoCAD SHX Text

BRASS CORPORATION

AutoCAD SHX Text

CONTINUOUS POLY PIPE

AutoCAD SHX Text

WATER MAIN

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text

BLOW-OFF DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 45%%D

AutoCAD SHX Text

BALL COCK VALVE

AutoCAD SHX Text

1" STANDARD

AutoCAD SHX Text

CORPORATION STOP

AutoCAD SHX Text

1" BRASS

AutoCAD SHX Text

POLY PIPE

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text

METER BOX

AutoCAD SHX Text

METER YOKE OR EQUAL

AutoCAD SHX Text

MUELLER COPPER

AutoCAD SHX Text

VALVE

AutoCAD SHX Text

METER

AutoCAD SHX Text

ANGLE

AutoCAD SHX Text

METER

AutoCAD SHX Text

WATER

AutoCAD SHX Text

GROUND LINE

AutoCAD SHX Text

SHALL BE REPLACED AT A MINIMUM OF FIVE FEET ON

AutoCAD SHX Text

3. REPLACEMENT/RELOCATION OF WATER SERVICE LINES

AutoCAD SHX Text

END USER SIDE.

AutoCAD SHX Text

3. VALVES SHALL BE MANUFACTURED BY

AutoCAD SHX Text

EITHER MUELLER, M & H, OR AVK.

AutoCAD SHX Text

GENERAL NOTE:

AutoCAD SHX Text

PVC PRESSURE PIPE (POLY PIPE) SHALL BE AWWA C-900, PRESSURE

AutoCAD SHX Text

CLASS 200 AND WITH A MINIMUM DIMENSION RATIO OF EIGHTEEN (DR-18).

AutoCAD SHX Text

END USER SIDE

AutoCAD SHX Text

POLY PIPE

AutoCAD SHX Text 1.

AutoCAD SHX Text 2'

AutoCAD SHX Text

3. ALL RESTRAINT JOINTS OR MECHANICAL JOINTS

AutoCAD SHX Text

MUST BE MEGALUG, OR AN APPROVED EQUAL.

AutoCAD SHX Text

2. FIRE HYDRANTS MUST BE SAFETY YELLOW B54-Y37,

AutoCAD SHX Text

ALKYD COATING FROM SHERWIN WILLIAMS

AutoCAD SHX Text

INDUSTRIAL AND MARINE COATINGS.

AutoCAD SHX Text

4. STD. WATER METER LID SHALL BE FROM ACCUCAST.

AutoCAD SHX Text

MODEL #872006.

AutoCAD SHX Text

STD. WATER METER BOX

AutoCAD SHX Text

5. STD. WATER METER BOX SHALL BE FROM OLDCASTLE/CARSON.

AutoCAD SHX Text

MODEL #22002001.

AutoCAD SHX Text

COMPACTED BACKFILL

AutoCAD SHX Text

1. GATE VALVE TO CONFORM TO AWWA C500.

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

2. GATE VALVE TO BE IRON BODY BRONZE

AutoCAD SHX Text

MOUNTED NON-RISING STEM W/DOUBLE

AutoCAD SHX Text

DISC GATES OF SIZE SHOWN ON PROJECT

AutoCAD SHX Text

PLANS.

AutoCAD SHX Text

PLUG

AutoCAD SHX Text

6" DIA VALVE & BOX

AutoCAD SHX Text

6. ALL IRRIGATION METERS SHALL HAVE BACKFLOW PREVENTION

AutoCAD SHX Text

SYSTEMS. MODEL #

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

3' FROM BACK OF CURB

AutoCAD SHX Text

±1' FROM BACK

AutoCAD SHX Text

OF RIGHT-OF-WAY

AutoCAD SHX Text

TRACER WIRE

AutoCAD SHX Text

TOP SECTION CAST IRON

AutoCAD SHX Text

BASE-ABS PLASTIC

AutoCAD SHX Text

TRACER WIRE ACCESS BOX FOR TWO TERMINALS

AutoCAD SHX Text

ABOVE GROUND (PAINTED BLUE)

AutoCAD SHX Text

LID (CAST IRON)

AutoCAD SHX Text

TRACER WIRE ACCESS BOX FOR

AutoCAD SHX Text

TWO TERMINALS FLUSH WITH GRADE

AutoCAD SHX Text

HDPE TRACER WIRE

AutoCAD SHX Text

(PAINTED BLUE)

AutoCAD SHX Text

TRACER WIRE WIRE ACCESS BOX ABOVE GROUND AND FLUSH WITH GRADE

AutoCAD SHX Text

SHOULD BE COBRA COPPPERHEAD OR EQUIVALENT.

AutoCAD SHX Text 2.

AutoCAD SHX Text

6" PVC PIPE

AutoCAD SHX Text

SDR-40 TYP.

AutoCAD SHX Text

DETAIL OF AIR/VACUUM - RELEASE VALVE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AIR/VACUUM-RELEASE VALVE

AutoCAD SHX Text

WATER

AutoCAD SHX Text

MAIN

AutoCAD SHX Text

BRASS CORP. STOP

AutoCAD SHX Text

VARIABLE

AutoCAD SHX Text

4" M. J. PLUG DRILL & TAP

AutoCAD SHX Text

M. J. TEE

AutoCAD SHX Text

POLY PIPE

AutoCAD SHX Text + Slope

AutoCAD SHX Text

BRASS ANGLE VALVE

AutoCAD SHX Text

STANDARD METER BOX

AutoCAD SHX Text

W/LOCKING LID

AutoCAD SHX Text

EQUAL AREA OF PIPE

AutoCAD SHX Text

OF ALL OPENINGS SHALL

AutoCAD SHX Text

PERFORATED NIPPLE - AREA

AutoCAD SHX Text 2' - 0"

AutoCAD SHX Text

PROPERTY OR R/W LINE

AutoCAD SHX Text

GALV. IRON PIPE

AutoCAD SHX Text 401 West Owen K. Garriott Road

AutoCAD SHX Text P.O. Box 1768

AutoCAD SHX Text Enid, Oklahoma 73702

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Number

AutoCAD SHX Text Date

AutoCAD SHX Text Description

AutoCAD SHX Text The City Of Enid

AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946

AutoCAD SHX Text %%uContacts:

AutoCAD SHX Text Project Number:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text Project Title:

AutoCAD SHX Text Murali Katta, P.E., Director of Engineering

AutoCAD SHX Text Tam Nguyen, Project Engineer

AutoCAD SHX Text Jason Unruh, P.E., City Engineer

AutoCAD SHX Text of

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Designed By:

AutoCAD SHX Text Approved By:

AutoCAD SHX Text

TN

AutoCAD SHX Text

TN

AutoCAD SHX Text

JU

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text

MISCELLANEOUS

AutoCAD SHX Text

WL-302

AutoCAD SHX Text Sheet:

AutoCAD SHX Text Section:

AutoCAD SHX Text

CONSTRUCTION

AutoCAD SHX Text

WATER LINE

AutoCAD SHX Text

STANDARD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

66TH STREET

AutoCAD SHX Text

ENID, OKLAHOMA

AutoCAD SHX Text W-2410C

AutoCAD SHX Text

66TH STREET INDUSTRIAL

AutoCAD SHX Text

PARK WATER IMPROVEMENT

9" P.C. CONCRETE (3500 P.S.I.)

AutoCAD SHX Text

HIGH EARLY STRENGTH

AutoCAD SHX Text

TRENCH

AutoCAD SHX Text

WIDTH

AutoCAD SHX Text

SAME WIDTH AS

AutoCAD SHX Text

DITCH NOT TO

AutoCAD SHX Text

EXCEED 12" WIDE

AutoCAD SHX Text

SAME WIDTH AS

AutoCAD SHX Text

DITCH NOT TO

AutoCAD SHX Text

EXCEED 12" WIDE

AutoCAD SHX Text 9"

AutoCAD SHX Text 9"

AutoCAD SHX Text

EXCEED 12" WIDE

AutoCAD SHX Text

DITCH NOT TO

AutoCAD SHX Text

SAME WIDTH AS

AutoCAD SHX Text

EXCEED 12" WIDE

AutoCAD SHX Text

DITCH NOT TO

AutoCAD SHX Text

SAME WIDTH AS

AutoCAD SHX Text

WIDTH

AutoCAD SHX Text

TRENCH

AutoCAD SHX Text

HIGH EARLY STRENGTH

AutoCAD SHX Text

9" P.C. CONCRETE (3500 P.S.I.)

AutoCAD SHX Text 5" - 6"

AutoCAD SHX Text

TYP.

AutoCAD SHX Text

EXIST. CONC.

AutoCAD SHX Text

STR. PAVE.

AutoCAD SHX Text

SAW TO 1/2"

AutoCAD SHX Text

DEPTH

AutoCAD SHX Text

REMOVE EXIST.

AutoCAD SHX Text

PAVE. TO REGULAR

AutoCAD SHX Text

LINES

AutoCAD SHX Text

EXIST. SOIL

AutoCAD SHX Text

ASPH. W/

AutoCAD SHX Text

BITUM. SURF.

AutoCAD SHX Text 2 1/2"

AutoCAD SHX Text

EXIST. SURF. CSE.

AutoCAD SHX Text

EXIST. BASE CSE.

AutoCAD SHX Text

TACK COAT

AutoCAD SHX Text

2 1/2" TYPE " B " HMHL ASPHALTIC CONC.

AutoCAD SHX Text

SELECT SOIL MATERIAL COMPACTED

AutoCAD SHX Text

TO 95% STANDARD PROCTOR DENSITY.

AutoCAD SHX Text

STREET PAVEMENT SHALL NOT BE REPLACED UNTIL

AutoCAD SHX Text

SATISFACTORY TEST RESULTS HAVE BEEN RECEIVED

AutoCAD SHX Text

FROM A COMMERCIAL TESTING LABORATORY, UNLESS

AutoCAD SHX Text

SPECIFICALLY WAIVED BY THE ENGINEER.

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

FOR REPLACEMENT OF

AutoCAD SHX Text

TYPICAL SECTION

AutoCAD SHX Text

FOR REPLACEMENT OF

AutoCAD SHX Text

P.C. CONCRETE STREET & ALLEY PAVEMENT

AutoCAD SHX Text

BITUMINOUS STREET & ALLEY PAVEMENT

AutoCAD SHX Text 2"R

AutoCAD SHX Text 2"R

AutoCAD SHX Text D + 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text D/2

AutoCAD SHX Text 1' - 0"

AutoCAD SHX Text 1"

AutoCAD SHX Text D

AutoCAD SHX Text 30"

AutoCAD SHX Text 4"

AutoCAD SHX Text 22"

AutoCAD SHX Text 4"

AutoCAD SHX Text

TOOL EDGE 1/2" R.

AutoCAD SHX Text

SHALL BE REQUIRED IN COMMERCIAL

AutoCAD SHX Text

AND INDUSTRIAL SUBDIVISIONS AND

AutoCAD SHX Text

ARTERIAL STREETS CENTERED AT

AutoCAD SHX Text

EXPANSION JOINTS & END OF CURB

AutoCAD SHX Text

FOR FUTURE EXTENSIONS.

AutoCAD SHX Text

TOOLED OR SAWED CONTRACTION JOINTS SHALL BE CONSTRUCTED AT

AutoCAD SHX Text

20 FOOT INTERVALS. EXPANSION JOINTS SHALL BE CONSTRUCTED AT

AutoCAD SHX Text

PC'S AND PT'S OR AT 600 FOOT INTERVALS.

AutoCAD SHX Text

COMBINED CURB & GUTTER DETAIL

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

3/4" DEFORMED BARS 2'-6" LONG

AutoCAD SHX Text o

AutoCAD SHX Text

BELOW WATER MAIN.

AutoCAD SHX Text

IS TWO (2) FEET OR LESS AND WHEN SANITARY SEWER IS

AutoCAD SHX Text

WHERE VERTICAL SEPARATION OF WATER MAIN AND SEWER

AutoCAD SHX Text

THIS DETAIL APPLIES TO ALL SANITARY SEWER CROSSINGS

AutoCAD SHX Text

NOTE:

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

CAST IRON OR DUCTILE IRON PIPE

AutoCAD SHX Text

SAN. SEWER BELOW

AutoCAD SHX Text 2'

AutoCAD SHX Text

6" MIN. FILL

AutoCAD SHX Text

WATER MAIN ABOVE

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

OF HEALTH BULLETIN 0589.

AutoCAD SHX Text

TO BACKFILLING PER OKLA. STATE DEPT.

AutoCAD SHX Text

TESTED TO ASSURE WATER-TIGHTNESS PRIOR

AutoCAD SHX Text

AND SEWER, THE SEWER MUST BE PRESSURE

AutoCAD SHX Text

CAN BE PROVIDED BETWEEN THE WATER MAIN

AutoCAD SHX Text

2. WHEN LESS THAN TWO FEET OF SEPARATION

AutoCAD SHX Text

CROSSES ABOVE THE WATER MAIN.

AutoCAD SHX Text

CROSSINGS WHERE THE SANITARY SEWER

AutoCAD SHX Text

1. THIS DETAIL APPLIES TO ALL SANITARY SEWER

AutoCAD SHX Text

VARIES

AutoCAD SHX Text

WATER MAIN BELOW

AutoCAD SHX Text

SAN. SEWER ABOVE

AutoCAD SHX Text

IRON PIPE

AutoCAD SHX Text

CAST IRON OR DUCTILE

AutoCAD SHX Text

PIPE BARREL

AutoCAD SHX Text

ALL AROUND SEWER

AutoCAD SHX Text

6" MIN. CONCRETE ENC.

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text

VARIABLE

AutoCAD SHX Text

SEE PLANS

AutoCAD SHX Text O.D.

AutoCAD SHX Text 6"

AutoCAD SHX Text 2'-0"

AutoCAD SHX Text 8"

AutoCAD SHX Text 6"

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 8"

AutoCAD SHX Text O.D.

AutoCAD SHX Text 8"

AutoCAD SHX Text 12"

AutoCAD SHX Text 6"

AutoCAD SHX Text O.D.

AutoCAD SHX Text 6"

AutoCAD SHX Text 2'-0"

AutoCAD SHX Text 8"

AutoCAD SHX Text 6"

AutoCAD SHX Text 2'-10"

AutoCAD SHX Text

SANITARY SEWER CROSSING

AutoCAD SHX Text

SANITARY SEWER ENCASEMENT DETAIL

AutoCAD SHX Text

STANDARD CONCRETE PIER

AutoCAD SHX Text

RESTRAINING COLLAR CONCRETE PIER

AutoCAD SHX Text

6 NO. 4 BARS

AutoCAD SHX Text

EXIST. GRD.

AutoCAD SHX Text

4 NO. 4 BARS

AutoCAD SHX Text

4 NO. 4 BARS

AutoCAD SHX Text

4 NO. 4 BARS

AutoCAD SHX Text

4 NO. 4 BARS

AutoCAD SHX Text

3 NO. 4 BARS

AutoCAD SHX Text

5 NO. 4 BARS

AutoCAD SHX Text 401 West Owen K. Garriott Road

AutoCAD SHX Text P.O. Box 1768

AutoCAD SHX Text Enid, Oklahoma 73702

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Number

AutoCAD SHX Text Date

AutoCAD SHX Text Description

AutoCAD SHX Text The City Of Enid

AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946

AutoCAD SHX Text %%uContacts:

AutoCAD SHX Text Project Number:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text Project Title:

AutoCAD SHX Text Murali Katta, P.E., Director of Engineering

AutoCAD SHX Text Tam Nguyen, Project Engineer

AutoCAD SHX Text Jason Unruh, P.E., City Engineer

AutoCAD SHX Text of

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Designed By:

AutoCAD SHX Text Approved By:

AutoCAD SHX Text

TN

AutoCAD SHX Text

TN

AutoCAD SHX Text

JU

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text

STANDARD CONCRETE PIER,

AutoCAD SHX Text

WL-304

AutoCAD SHX Text Sheet:

AutoCAD SHX Text Section:

AutoCAD SHX Text

CROSSING DETAIL,

AutoCAD SHX Text

SEWER-WATER LINE

AutoCAD SHX Text

& PAVEMENT REPAIR

AutoCAD SHX Text

FOR UTILITY CROSSING

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

66TH STREET

AutoCAD SHX Text

ENID, OKLAHOMA

AutoCAD SHX Text W-2410C

AutoCAD SHX Text

66TH STREET INDUSTRIAL

AutoCAD SHX Text

PARK WATER IMPROVEMENT

VARIABLE (MIN. 4' - 0")

AutoCAD SHX Text

20# ROOFING FELT BETWEEN ROOF AND

AutoCAD SHX Text

EACH WAY

AutoCAD SHX Text

#7 BARS @ 12" CTRS.

AutoCAD SHX Text

#5 @ 6" CTRS. EACH WAY

AutoCAD SHX Text

TO TOP OF VAULT.

AutoCAD SHX Text

BLOCKS WITH GROUT

AutoCAD SHX Text

FILL ALL CONCRETE

AutoCAD SHX Text 6"

AutoCAD SHX Text A

AutoCAD SHX Text

FLOW

AutoCAD SHX Text 6"

AutoCAD SHX Text

#5 @ 8" CTRS

AutoCAD SHX Text

REBAR

AutoCAD SHX Text 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text

SUMP

AutoCAD SHX Text A

AutoCAD SHX Text

OFFSTREET PLAN VIEW

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

(TYP. FOR 4)

AutoCAD SHX Text

LIFTING HOOK

AutoCAD SHX Text D

AutoCAD SHX Text 6"

AutoCAD SHX Text 18"

AutoCAD SHX Text

STANDARD CONCRETE

AutoCAD SHX Text

BLOCK

AutoCAD SHX Text

FLOW

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text

OFFSTREET VALVE VAULT TOP

AutoCAD SHX Text

ELEVATION VIEW SECTION AA

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

(NOT FOR TRAFFIC LOADS)

AutoCAD SHX Text

UNDISTURBED EARTH OR

AutoCAD SHX Text

COMPACTED MATERIAL

AutoCAD SHX Text

3" CLR.

AutoCAD SHX Text D

AutoCAD SHX Text

POUR SUMP MONOLITHIC WITH FLOOR

AutoCAD SHX Text

JOINT MATERIAL

AutoCAD SHX Text

3/4" BITUMINOUS EXPANSION

AutoCAD SHX Text

300 M OR EQUAL, 10 MILS.

AutoCAD SHX Text

KUPPERS C.T. EPOXY NO.

AutoCAD SHX Text

WATERPROOF COATING

AutoCAD SHX Text

OTHERWISE USE WATER STOPS

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text 6"

AutoCAD SHX Text

GROUT

AutoCAD SHX Text

METER

AutoCAD SHX Text

BUTT JOINT

AutoCAD SHX Text

WALL, AND BETWEEN TWO PIECE ROOF

AutoCAD SHX Text 0.3D

AutoCAD SHX Text

SHALL BE SHOP FABRICATED. A REPORT SHALL BE FURNISHED ON THE

AutoCAD SHX Text

TO ANSI/ASTM C478 CONCRETE 3000 PSI (MIN.). ALL REINFORCING STEEL

AutoCAD SHX Text

3. WHEN CONCRETE METER VAULT SECTIONS ARE USED, THEY SHALL CONFORM

AutoCAD SHX Text

7 DAY & 28 DAY STRENGTH OF THE CONCRETE.

AutoCAD SHX Text

1) THE TAP MADE TO THE WATER MAIN, 2) THE POURING OR PLACEMENT OF

AutoCAD SHX Text

IN ADVANCE SO THAT AN INSPECTOR MAY WITNESS EACH OF THE FOLLOWING:

AutoCAD SHX Text

INSPECTION NOTICE SHALL BE GIVEN TO THE ENGINEER 48 HOURS

AutoCAD SHX Text 2.

AutoCAD SHX Text

VALVE AT THE CONNECTING SLEEVE.

AutoCAD SHX Text

LINE TAPPING SLEEVE TO DOWNSTREAM FROM THE METER CHECK

AutoCAD SHX Text

1. USE PVC PIPING AND D.I./C.I. FITTINGS FROM THE MAIN

AutoCAD SHX Text A

AutoCAD SHX Text

VARIABLE (APPROX. 1'-0")

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text

METER

AutoCAD SHX Text

SIZE

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

VAULT SIZE LEGEND

AutoCAD SHX Text C

AutoCAD SHX Text 6"

AutoCAD SHX Text

48" MIN.

AutoCAD SHX Text 1 1/2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COMPACTED MATERIAL

AutoCAD SHX Text

#5 @ 6" CTRS. EACH WAY

AutoCAD SHX Text 9"

AutoCAD SHX Text

DOWEL 3"

AutoCAD SHX Text

IN WALL

AutoCAD SHX Text 9"

AutoCAD SHX Text

PVC WATER STOP,

AutoCAD SHX Text

2 X 4 KEY, TYPICAL

AutoCAD SHX Text

3" CLR.

AutoCAD SHX Text

#5 @ 8" CTRS.

AutoCAD SHX Text

#4 @ 12" CTRS.

AutoCAD SHX Text 9"

AutoCAD SHX Text

#7 @ 10" CTRS. EACH WAY

AutoCAD SHX Text D

AutoCAD SHX Text

UNDISTURBED EARTH OR

AutoCAD SHX Text 1' - 6"

AutoCAD SHX Text 8"

AutoCAD SHX Text

SEE SUMP

AutoCAD SHX Text

NOTE ABOVE

AutoCAD SHX Text

#7 @ 8" CTRS. EACH WAY

AutoCAD SHX Text

3/4" BITUMINOUS EXPANSION

AutoCAD SHX Text

MATERIAL AROUND TOP OF

AutoCAD SHX Text

VAULT TO SAME DEPTH AS

AutoCAD SHX Text

20# ROOFING FELT BETWEEN

AutoCAD SHX Text

ROOF AND WALL, AND BETWEEN

AutoCAD SHX Text

TWO PIECE ROOF BUTT JOINT.

AutoCAD SHX Text

STREET.

AutoCAD SHX Text

LIFTING HOOK DETAIL

AutoCAD SHX Text 6"

AutoCAD SHX Text

#8 BAR GALV.

AutoCAD SHX Text 3"

AutoCAD SHX Text

ROOF SLAB

AutoCAD SHX Text

WELD HOOK TO ROOF

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text 6"

AutoCAD SHX Text

SLAB REINFORCING

AutoCAD SHX Text

3" X 6" X 5" DEEP RECESS HOOK

AutoCAD SHX Text

TO RECEIVE LIFTING HOOK

AutoCAD SHX Text 9"

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

VAULT FOR TRAFFIC LOADS

AutoCAD SHX Text

ELEVATION VIEW ALTERNATE VALVE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

1-7/8" CIRCULAR HOLE IN CENTER OF ALUMINUM HINGED

AutoCAD SHX Text

LID, C.I. FRAME

AutoCAD SHX Text

NEENAH R 6660 K H OR EQUAL, 2' X 2' MANHOLE WITH

AutoCAD SHX Text

THE VAULT, AND 3) THE INSTALLTION OF THE LID AND ECR DEVICE.

AutoCAD SHX Text

4. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FURNISH

AutoCAD SHX Text

FITTINGS COMPATIBLE WITH THE TYPE OF PIPE FURNISHED.

AutoCAD SHX Text

5. BOLTS & NUTS SHALL CONFORM TO ASTM A307 GR. B, AND ASTM

AutoCAD SHX Text

A563 GR. A RESPECTIVELY.

AutoCAD SHX Text

LID-MOUNTED TOUCH PAD FOR ECR

AutoCAD SHX Text

ECR CABLE

AutoCAD SHX Text

NOTE: ALL NUMBERS ARE IN INCHES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

6. IF IT IS A PRE-CAST VAULT, IT SHALL MEET THE SAME STANDARD OF STEEL

AutoCAD SHX Text

AND CONCRETE STRENGTH AND REQUIRE A SUBMITTAL AND APPROVAL BY

AutoCAD SHX Text 6"

AutoCAD SHX Text

METER

AutoCAD SHX Text

SIZE

AutoCAD SHX Text

AutoCAD SHX Text

VALVE TYPE

AutoCAD SHX Text

VALVE DETAILS

AutoCAD SHX Text 1 1/2

AutoCAD SHX Text

FLANGE BALL COCK VALVE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

FLANGE BALL COCK VALVE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

ENGINEER.

AutoCAD SHX Text

7. COPPER PIPE LINE MATERIALS ARE NOT APPROVED.

AutoCAD SHX Text

FLOW

AutoCAD SHX Text B

AutoCAD SHX Text

8. FOR 3" METERS, PIPE SIZE SHOULD BE 4" BEFORE THE METER BOX

AutoCAD SHX Text

AND REDUCED AFTER THE VALVE.

AutoCAD SHX Text

9. ALL SERVICE LINES SHALL HAVE MINIMUM 30" COVER.

AutoCAD SHX Text

10. ALL NON TRAFFIC AREAS WITH POURED IN PLACE BOX SHALL BE 6" WALL THICKNESS.

AutoCAD SHX Text

#5 @ 6" CTRS. 90° BEND TIE-ROD

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

ON CUSTOMER SIDE

AutoCAD SHX Text

GATE VALVE FLANGED, NRS W/CITY OF ENID STD. C.I. VALVE BOX & LID

AutoCAD SHX Text METER SUPPORT 6"x9" CINDER BLOCKS, SPACE EVENLY OUTSIDE OF METER, APPROVED BY CITY OF ENID

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text 6"

AutoCAD SHX Text

11. ALL VALVES ARE FLANGED ENDS.

AutoCAD SHX Text

12. THE COST OF THE METER SHALL INCLUDE ONLY THE METER.

AutoCAD SHX Text

6" MINIMUM (TYP.)

AutoCAD SHX Text

6" MINIMUM (TYP.)

AutoCAD SHX Text

13. OFF STREET BLOCK WALL CONSTRUCTION CAN BE USED. TRAFFIC LOADS POURED IN PLACE OR PRE-CAST ARE ALLOWED.

AutoCAD SHX Text

NOTE: ALL NUMBERS ARE IN INCHES.

AutoCAD SHX Text 401 West Owen K. Garriott Road

AutoCAD SHX Text P.O. Box 1768

AutoCAD SHX Text Enid, Oklahoma 73702

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text Number

AutoCAD SHX Text Date

AutoCAD SHX Text Description

AutoCAD SHX Text The City Of Enid

AutoCAD SHX Text Tele: (580) 234-0400 Fax: (580) 234-8946

AutoCAD SHX Text %%uContacts:

AutoCAD SHX Text Project Number:

AutoCAD SHX Text Project Location:

AutoCAD SHX Text Project Title:

AutoCAD SHX Text Murali Katta, P.E., Director of Engineering

AutoCAD SHX Text Tam Nguyen, Project Engineer

AutoCAD SHX Text Jason Unruh, P.E., City Engineer

AutoCAD SHX Text of

AutoCAD SHX Text Date:

AutoCAD SHX Text Drawn By:

AutoCAD SHX Text Designed By:

AutoCAD SHX Text Approved By:

AutoCAD SHX Text

TN

AutoCAD SHX Text

TN

AutoCAD SHX Text

JU

AutoCAD SHX Text Sheet Title:

AutoCAD SHX Text

WATER METER VAULT

AutoCAD SHX Text

WL-305

AutoCAD SHX Text Sheet:

AutoCAD SHX Text Section:

AutoCAD SHX Text

4" & 6" METER

AutoCAD SHX Text 1 1/2", 2", 3", AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

66TH STREET

AutoCAD SHX Text

ENID, OKLAHOMA

AutoCAD SHX Text W-2410C

AutoCAD SHX Text

66TH STREET INDUSTRIAL

AutoCAD SHX Text

PARK WATER IMPROVEMENT

18" MIN

AutoCAD SHX Text

UNDISTURBED EARTH

AutoCAD SHX Text

CARRIER PIPE

AutoCAD SHX Text

GROUT FILL ANNULAR SPACE IF>2"

AutoCAD SHX Text

VENT PIPE W/ BUG SCREEN (IF REQ'D)

AutoCAD SHX Text

STAINLESS STEEL CASING SPACERS AS REQ'D EQUALLY SPACED EVERY 5 FEET

AutoCAD SHX Text

CASING PIPE

AutoCAD SHX Text

SEAL ENDS OF CASING

AutoCAD SHX Text

CASING ID

AutoCAD SHX Text

GROUT FILL ANNULAR SPACE B/W BORE AND CASING IF SPACING >2"

AutoCAD SHX Text

BORE HOLE

AutoCAD SHX Text

CASING PIPE

AutoCAD SHX Text

UNDISTURBED EARTH

AutoCAD SHX Text

CARRIER PIPE

AutoCAD SHX Text

STAINLESS STEEL CASING SPACER

AutoCAD SHX Text

GLASS FILLED POLYMER RUNNER

AutoCAD SHX Text NOTES: SEALED CASING ENDS: NEOPRENE RUBBER END SEALS SECURED WITH 316 STAINLESS STEEL BANDING REQUIRED. PLUGGED PIPE ENDS: BOTH ENDS OF THE CASING PIPE SHALL BE PLUGGED WITH A NON-SHRINK GROUT, GROUTED MASONRY, OR APPROVED EQUAL. EACH PLUG SHALL BE A MINIMUM LENGTH OF 18". GROUTING PRESSURE SHALL NOT EXCEED THE PIPE MANUFACTURER'S RECOMMENDATIONS. VENT PIPES: VENT PIPES SHALL BE INSTALLED ON BOTH ENDS OF CASING FOR BORINGS THAT CROSS ODOT ROADS AND RAILROAD CROSSINGS, VENTS SHALL BE 2" DIA FOR CASING SIZES <+30-IN. VENTS SHALL BE A 4" DIA FOR CASING SIZES >30-IN. VENT OPENINGS SHALL FACE DOWNWARDS TO POINT TOWARDS THE GROUND AND SHALL BE PAINTED ACCORDING TO UTILITY TYPE. BUG SCREEN SHALL BE INCLUDED ON THE OPEN END OF VENT PIPE. VENT PIPES SHALL BE TURNED OUTWARDS FROM THE STREET AND SHALL BE ON THE RIGHT-OF-WAY LINE. CASING PIPE SIZE: STEEL CASING PIPE SHALL HAVE THE FOLLOWING MINIMUM DIAMETERS: SEE TABLE 1. FOR INSTALLATION UNDER BNSF RAILROADS, PIPE CASING SHALL EXTEND TO ROW LINE. FOR INSTALLATION UNDER ODOT HIGHWAY/ARTERIAL STREETS, PIPE CASING SHALL EXTEND TO EDGE OF ROADWAY WITH VENT PIPES EXTENDING OUT TO ROW LINE. CASING PIPE THICKNESS: STEEL CASING PIPE SHALL HAVE THE FOLLOWING MINIMUM THICKNESS(ES), IN INCHES, FOR THE INDICATED MAXIMUM DEPTH OF COVER(S), IN FEET: SEE TABLE 2. CASING MATERIAL: STEEL CASING PIPE SHALL CONFORM WITH ASTM A-130, STANDARD SPECIFICATION FOR ELECTRIC-FUSION (ARC). WELDED STEEL PIPE (NPS4 AND OVER). THE STEEL MATERIAL SHALL BE NEW, SMOOTH WALL, CARBON STEEL, GRADE B, WITH A MINIMUM THIRTY-FIVE-THOUSAND (35,000 PSI) POUNDS PER SQUARE INCH YIELD STRENGTH. CARRIER PIPE: CARRIER PIPE SHALL BE INTERNAL RESTRAINT PIPE. SPACER BAND WIDTH SHALL BE 8" FOR CARRIER PIPE DIA <12" AND 12" FOR CARRIER PIPE DIA >36".

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

8 TO 10

AutoCAD SHX Text

AutoCAD SHX Text

10 TO 12

AutoCAD SHX Text

AutoCAD SHX Text

NOTE: ALL NUMBERS ARE IN INCHES.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

16 TO 18

AutoCAD SHX Text

18 TO 20

AutoCAD SHX Text

14 TO 16

AutoCAD SHX Text

28 TO 30

AutoCAD SHX Text

31 TO 33

AutoCAD SHX Text

54 TO 60

AutoCAD SHX Text

42 TO 48

AutoCAD SHX Text

36 TO 42

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TABLE 1 RECOMMENDED CASING SIZING

AutoCAD SHX Text

PIPE NOMINAL SIZE

AutoCAD SHX Text

SUGGESTED CASING PIPE INSIDE DIAMETER

AutoCAD SHX Text

PIPE NOMINAL SIZE

AutoCAD SHX Text

SUGGESTED CASING PIPE INSIDE DIAMETER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

20 TO 22