ADDENDUM_3.pdf
PDF 1 MB Posted
- Solicitation number
- PE-63110-NONST-2025-000000056
- Issued by
- Clayton County, Georgia
About this file
This is Addendum #3 issued by Southern A&E, LLC for the Renovations to Tara Stadium project for Clayton County Public Schools in Morrow, GA. The addendum, dated December 2, 2024, with a bid date of December 18, 2024, includes changes to specifications and drawings. Key changes include replacement of Section 00 00 30 (Table of Contents), Section 00 30 00 (Bid Form), addition of Section 10 51 13 (Lockers), and revision of drawing A102 to include a bench with back rest for ADA compliance location on the plan.
The revised sections include detailed specifications for locker benches, with requirements for 17-1/2 inch height assemblies, minimum 9-1/2 inch wide tops (20-inch wide for ADA-compliant benches), and extruded aluminum construction with clear anodic finish. The specifications also detail requirements for fixed pedestals, materials, fabrication standards, and installation requirements. The drawing revision A102 adds detail for ADA-compliant bench locations in the fieldhouse renovation plan, which includes three floors of approximately 16,205 total square feet plus 2,501 square feet of storage area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM _4_COMPLETE.pdf | ||
| ADDENDUM _2 COMPLETE.pdf | ||
| Addendum4_Combined.pdf | ||
| Tara Stadium Fieldhouse _ Bid Advertisement.pdf | ||
| ADDENDUM _1_COMPLETE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAE A d d e n d u m N o . # 3 Page 1 of 1
P:\01606050\addendums\ADDENDUM 3
Southern A&E, LLC 7951 Troon Circle Austell, Georgia 30168 (770)-819-7777
Project Name: Renovations to Tara Stadium Project Number: 01-606-050
Client: Clayton County Public Schools City/State: Morrow, GA
Addendum Date: 12/02/2024 Bid Date: 12/18/2024
TO REGISTERED HOLDERS OF BID DOCUMENTS
INFORMATION CONTAINED IN THIS ADDENDUM SUPERSEDES PREVIOUS INFORMATION
CONTAINED IN BID DOCUMENTS
CHANGES TO SPECS:
1) Section 00 00 30 – Table of Contents
a) Replace section with revised form, copy attached.
2) Section 00 30 00 – Bid Form
a) Replace section with revised form, copy attached.
3) Section 10 51 13 – Lockers
a) Add this section in its entirety. Copy attached
CHANGES TO DRAWINGS:
1) DRAWING A102:
Delete drawing A102 and replace with revised drawing A102 dated 12-02-2024. Copy attached.
a) Bench with back rest for ADA compliance location added on plan.
ATTACHMENTS:
Specifications Sections:
00 00 30 – Table of Contents 00 30 00 – Bid Form 10 51 13 – Lockers
Revised Drawings:
A102 revised 12/02/2024
END OF ADDENDUM #3
SAE TABLE OF CONTENTS 00 00 30 - 1
Table of Contents
SECTION
NUMBER TITLE
00 00 30 Table of Contents
SERIES 0- BIDDING REQUIREMENTS AND CONTRACT FORMS
00 03 00 Advertisement for Bids 00 10 00 Instructions to Bidders 00 30 00 Bid Form 00 30 10 SLBE Program-Required Documents 00 31 00 Bid Bond 00 45 00 Representations and Certifications 00 52 13 Agreement Form – Stipulated Sum 00 70 00 Standard Form of Fixed Price Construction Contract 00 80 00 Supplementary Conditions
DIVISION 1- GENERAL REQUIREMENTS
01 10 00 Summary 01 21 00 Allowances 01 22 00 Unit Prices 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 41 00 Structural Tests and Special Inspections 01 50 00 Temporary Facilities and Controls 01 56 39 Temporary Tree and Plant Protection 01 60 00 Product Requirements 01 73 00 Execution 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents
DIVISION 2- EXISTING CONDITIONS
02 41 16 Structure Demolition 02 41 19 Selective Structure Demolition
DIVISION 3- CONCRETE
03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete
DIVISION 4- MASONRY
04 20 00 Unit Masonry
DIVISION 5- METALS
05 12 00 Structural Steel Framing 05 21 00 Steel Joists Framing 05 31 00 Steel Decking 05 50 00 Metal Fabrications 05 51 00 Metal Stairs 05 52 13 Pipe & Tube Railings
DIVISION 6- WOOD, PLASTICS, AND COMPOSITES
06 10 53 Miscellaneous Rough Carpentry 06 41 13 Wood-Veneer Faced Cabinets
DIVISION 7- THERMAL AND MOISTURE PROTECTION
07 13 26 Self-Adhering Sheet Waterproofing 07 21 00 Thermal Insulation 07 24 13 Polymer-Based EIFS 07 42 13.23 Metal Composite Material Wall Panels 07 42 17 Metal Soffit Panels 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 07 62 00 Sheet Metal Flashing and Trim 07 71 00 Roof Specialties 07 72 00 Roof Accessories
SAE TABLE OF CONTENTS 00 00 30 - 2
07 92 00 Joint Sealants 07 95 00 Expansion Control
DIVISION 8- OPENINGS
08 11 13 Hollow Metal Doors and Frames 08 14 16.04 Flush Wood Doors 08 31 13 Access Doors and Frames 08 33 23 Overhead Coiling Doors 08 41 13 Aluminum Framed Entrances and Storefronts 08 71 00 Door Hardware 08 80 00 Glazing
DIVISION 9- FINISHES
09 21 16.23 Gypsum Board Shaft Wall Assemblies 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 13 Ceramic Tiling 09 51 13 Acoustical Panel Ceilings 09 65 13 Resilient Wall Base and Accessories 09 67 23 Resinous Flooring 09 68 13 Tile Carpeting 09 91 14 Exterior Re-Painting 09 91 23 Interior Painting 09 91 24 Interior Re-Painting
DIVISION 10- SPECIALTIES
10 14 19 Dimensional Letter Signage 10 14 23 Panel Signs 10 21 13.17 Phenolic-Core Toilet Compartments 10 28 00 Toilet, Bath, and Laundry Accessories 10 44 16 Fire Extinguishers and Cabinets 10 51 13 Lockers 10 73 10 Walkway and Canopy Covers
DIVISION 11- EQUIPMENT
11 31 13 Commercial Appliances 11 40 00 Foodservice Equipment
DIVISION 12- FURNISHINGS
12 24 13 Roller Window Shades
DIVISION 13- SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14- CONVEYING EQUIPMENT
14 24 00 Hydraulic Elevators
DIVISION 21- FIRE SUPPRESSION
21 05 17 Sleeves and Sleeve Seals for Fire-Suppression Piping 21 05 18 Escutcheons for Fire-Suppression Piping 21 05 23 General-Duty Valves for Fire Protection Piping 21 05 53 Identification for Fire-Suppression Piping and Equipment 21 11 00 Facility Fire-Suppression Water-Service Piping 21 11 16 Facility Fire Hydrants 21 11 19 Fire Department Connections 21 13 13 Wet-Pipe Sprinkler Systems
DIVISION 22- PLUMBING
22 05 13 Common Motor Requirements for Plumbing Equipment 22 05 17 Sleeves and Sleeve Seals for Plumbing Piping 22 05 18 Escutcheons for Plumbing Piping 22 05 19 Meters and Gages for Plumbing Piping 22 05 23 General-Duty Valves for Plumbing Piping 22 05 29 Hangers and Supports for Plumbing Piping and Equipment 22 05 53 Identification for Plumbing Piping and Equipment 22 07 19 Plumbing Piping Insulation 22 11 13 Facility Water Distribution Piping 22 11 16 Domestic Water Piping 22 11 19 Domestic Water Piping Specialties 22 11 23 Domestic Water Pumps 22 13 13 Facility Sanitary Sewers
SAE TABLE OF CONTENTS 00 00 30 - 3
22 13 16 Sanitary Waste and Vent Piping 22 13 19 Sanitary Waste Piping Specialties 22 13 21 Miscellaneous Drain Piping 22 14 13 Facility Storm Drainage Piping 22 14 23 Storm Drainage Piping Specialties 22 14 29 Sump Pumps 22 32 00 Domestic Water Filtration Equipment 22 34 00 Fuel-Fired, Domestic-Water Heaters 22 42 13.13 Commercial Water Closets 22 42 13.16 Commercial Urinals 22 42 16.13 Commercial Lavatories 22 42 16.16 Commercial Sinks 22 42 23 Commercial Showers and Bathtubs 22 47 16 Pressure Water Coolers
DIVISION 23- HVAC
23 05 13 Common Motor Requirements For HVAC Equipment 23 05 17 Sleeves And Sleeve Seals For HVAC Piping 23 05 18 Escutcheons For HVAC Piping 23 05 29 Hangers And Supports For HVAC Piping And Equipment 23 05 48.13 Vibration Controls For HVAC 23 05 53 Identification For HVAC Piping And Equipment 23 05 93 Testing, Adjusting, And Balancing For HVAC 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 09 00 Instrumentation And Control For HVAC 23 11 23 Facility Natural-Gas Piping 23 23 00 Refrigerant Piping 23 31 13 Metal Ducts 23 33 00 Air Duct Accessories 23 34 23 HVAC Power Ventilators 23 37 13 Diffusers, Registers, And Grilles 23 41 00 Particulate Air Filtration 23 44 00 Air Purification Systems 23 74 33 Dedicated Outdoor Air Units 23 81 26 Split-System Air-Conditioners 23 81 29 Variable Refrigerant Flow Split Systems 23 82 39.19 Wall And Ceiling Unit Heaters 23 91 16 Mechanical Wall Louvers
DIVISION 26- ELECTRICAL
26 01 00 General Electrical Requirements 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 05 44 Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 53 Identification for Electrical Systems 26 09 23 Lighting Control Devices 26 22 00 Low-Voltage Transformers 26 24 13 Switchboards 26 24 16 Panelboards 26 24 17 Existing Panelboard Modifications 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 51 00 Interior Lighting
DIVISION 27- COMMUNICATIONS
27 01 00 General Requirements for Communications 27 05 26 Grounding and Bonding for Communications Systems 27 05 53 Identification for Communications Systems 27 10 00 Network & Structured Cabling System 27 41 16 Audio/Visual Systems
SAE TABLE OF CONTENTS 00 00 30 - 4
27 51 23.20 VOIP Paging System 27 51 29 Area of Rescue Assistance System 27 53 19 Emergency Responder Radio Coverage System
DIVISION 28- ELECTRONIC SAFETY & SECURITY
28 13 00 Access Control 28 16 00 Intrusion Detection 28 23 00 IP Network Video Surveillance 28 47 00 Addressable Fire-Alarm and Mass-Notification Systems
DIVISION 31- SITE CONSTRUCTION
31 10 00 Site Clearing 31 10 23 Erosion, Sedimentation, and Pollution Control < 1 ac 31 20 00 Earth Moving 31 31 16 Termite Control
DIVISION 32- EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving 32 13 13 Concrete Paving 32 13 73 Concrete Paving Joint Sealants 32 17 23 Pavement Markings 32 17 26 Tactile Warning Tiles 32 31 13 Chain Link Fences and Gates 32 31 19 Decorative Metal Fences and Gates 32 92 00 Turf and Grasses
DIVISION 33- UTILITIES
33 41 00 Storm Utility Drainage Piping 33 46 00 Subdrainage
APPENDICES
Appendix I Schedule of Material Finishes
Renovations to Tara Stadium - Clayton County Schools BID FORM Southern A&E, Architects & Engineers
1287.02 page 00 4113-1 Bid Form (07.2008)
SECTION 00 4113 - BID FORM
Clayton County Board of Education 1058 Fifth Avenue Jonesboro, Georgia 30236
Re: Project No. - 2025002
Renovations to Tara Stadium - Clayton County Schools
Ladies and Gentlemen:
In compliance with your Advertisement for Bids and the Bidding Documents, the undersigned Bidder, [legal name of Bidder]
[address of Bidder]
[telephone number of Bidder] having carefully examined the site and Bidding Documents, including the proposed contract documents and any Addenda thereto, for the Project, proposes and agrees, if this bid is accepted, to enter into a contract with the Owner in the exact form provided in the Bidding Documents and to perform the Work including all services, supervision, labor, equipment and material in conformance with the contract documents, in the time stated therein, for the lump sum of:
_______________________________________________________________________ dollars [written in words] ($______________________________), which sum shall constitute the Base Bid.
The following unit prices are provided in accordance with Specification Section 01 2200 -Unit Prices. The undersigned agrees that the following unit prices shall be used in determining the quantity allowances indicated in Specification Section 00 2100 - Allowances and are included in the Base Bid. The undersigned further agrees that these unit prices shall be used in determining changes to the Contract Price due to changes in quantities of this work, if any, authorized by Change Order, subject to any equitable adjustment to the unit prices in the event of a material change in quantity as set forth in the Contract Documents.
A. In submitting this bid I further agree to the following unit prices for the work indicated:
1. To excavate alluvial deposits, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($________) per cubic yard.
1287.02 page 00 4113-2
2. To excavate mass rock, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($________) per cubic yard.
3. To excavate trench rock, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($________) per cubic yard.
4. To perform rock boring as required for utility installation for the unit price of
($_______) per linear foot.
5. To provide and install additional Type C silt fence for the unit price of
($________) per linear foot.
6. To provide and install additional erosion control matting as specified for the unit price of ($________) per square yard.
7. To provide and install straw mulching for the unit price of ($________) per square foot.
8. To provide and install additional temporary grassing as specified for the unit price of ($________) per square foot.
9. To provide and install additional permanent grassing as specified for the unit price of ($________) per square foot.
10. To provide and install additional Tifway 419 sod as specified for the unit price of ($________) per square foot.
11. To provide and install additional two (2) foot high by eight (8) foot long check dam with two (2) inch to ten (10) inch stone for the unit price of ($_______) each.
12. To provide and install additional staked, hay bale check dam for the unit price of ($________) per bale.
13. To provide and machine place additional rip-rap for the unit price of
($_______) per ton.
14. To provide and install additional Sd2-F inlet sediment trap, fabric-wire backed with support frame for the unit price of ($________) each.
15. To provide and install additional Sd2 block and gravel inlet sediment trap for the unit price of ($________) each.
16. To provide and install additional “Silt Saver”, or equal, inlet sediment trap for the unit price of ($________) each.
17. To provide and install additional polyacrylamide gel blocks as specified for the unit price of ($________) each.
1287.02 page 00 4113-3
18. To provide and install additional concrete walk as detailed on the drawings for the unit price of ($________) per square foot.
19. To provide and install additional 6 feet tall chain link fence as specified for the unit price of ($________) linear foot.
(Quantities shown shall be included in the Base Bid as an Allowance)
Quantity Allowances Unit
Price Allowance
Quantity Allowance
Amount 1 Include in the base bid 75 cu. yd. of unsuitable soil excavation and disposal off-site and replace with suitable compacted fill material from off-site, as specified in Section 31 20 00 “Earth Moving”
$ x 75 CY = $
Include in the base bid 10 cu. yd. of mass rock removal and disposal off-site and replace with suitable compacted fill material from off-site, as specified in Section 31 20 00 “Earth Moving”.
$ x 10 CY = $
Include in the base bid 75 cu. yd. of trench rock removal and disposal off-site and replace with suitable compacted fill material from off-site, as specified in Section 31 20 00 “Earth Moving”
$ x 75 CY = $
Lump Sum Allowances
1 Include the lump–sum cost for providing for providing the “Installation Phase – Scope of Work” of the Emergency Responder Radio Coverage System “Emergency Responder Radio Coverage Systems.”
2 Include the lump-sum cost of 90,000.00 for electric utility co temporary installation and relocation costs.
90,000.00
4 Owner's Contingency: $ 200,000.00
5 TOTAL ALLOWANCES $ 290,000.00
In submitting this Bid, Bidder represents that it has examined the site and locality where the work is to be performed, the legal requirements (Federal, State, and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress, or performance of the work and has made such independent investigations as Bidder deems necessary. The Bid is based on beginning work on site "as-is".
1287.02 page 00 4113-4
The undersigned Bidder agrees that if it is notified in writing by mail, telegraph, facsimile or hand-delivery of the acceptance of this proposal, via Notice of Award or otherwise, within sixty (60) days after the date of the Bid opening, the undersigned Bidder will execute, within five (5) days of the date of the notice, a contract for the Work in accordance with the Bidding Documents in the exact form provided therein for the amount stated above, and at that time will furnish and deliver to the Owner a satisfactory Performance Bond and a satisfactory Payment Bond, both on the exact forms provided in the Bidding Documents and each in an amount equal to one hundred percent (100%) of the Contract Price. The Bidder further agrees to furnish other documents or information as required by the Bidding Documents in accordance therewith.
Enclosed herewith is a fully executed Bid Bond in the exact form required by the Bidding Documents in the amount of not less than five percent (5%) of the Base Bid. The undersigned agrees that the above stated amount is the proper measure of liquidated damages that the Owner will sustain by the failure of the undersigned to execute the Contract and to furnish the Performance Bond and Payment Bond in case this Bid is accepted.
The undersigned Bidder agrees to commence actual physical work on the site with adequate forces and equipment not later than fourteen (14) calendar days of the effective date of the Notice to Proceed to be issued by the Owner, and to complete all of the Work within the time provided in the proposed contract documents.
The undersigned Bidder hereby acknowledges receipt of the following Addenda [insert the number and date of each Addendum; if none, insert "None"]:
The undersigned Bidder is duly organized and existing under the laws of the State of __________________________ as a:
(1) ___ Sole Proprietorship;
(2) ___ Partnership;
(3) ___ Corporation;
(4) ___ Limited Liability Company; or
(5) ___ Other legal entity (specify) _____________________.
The Bidder’s FEI number, or Social Security number if the Bidder is an individual, is as follows: _________________________________.
In accordance with the Bidding Documents, the following are attached hereto or enclosed herewith:
(1) Original and one (1) duplicate of this Bid, appropriately marked;
(2) Bid Bond;
(3) Subcontractor Listing;
(4) Corporate Certificate, Partnership Certificate or Entity Certificate (as applicable); and
(5) Bidder’s and Individuals’ Affidavit of Noncollusion.
The Bidder understands that the Owner reserves the right to reject any or all Bids, and to waive informalities and technicalities in the bidding.
The Bidder understands that all anticipated federal, state and local permits required
1287.02 page 00 4113-5 for the Project have not been obtained. If any permits have not been obtained, the Bidder understands that the Owner’s anticipated date for obtaining all of the required permits is on or before January 21st, 2025.
The Bidder understands that all rights of way and easements anticipated for the Project have not been obtained. If any rights of way or easements have not been obtained, the Bidder understands that the Owner’s anticipated date for obtaining all of the required rights of way or easements is on or before January 21st, 2025.
The Bidder agrees that this Bid may not be revoked or withdrawn for a period of sixty
(60) days after the date and time of Bid opening, but shall remain open for acceptance for a period of sixty (60) days following Bid opening, excepting only as otherwise expressly provided by applicable law.
By submission of this Bid, the Bidder certifies that this Bid has been derived independently, without consultation, communication or agreement as to any matter relating to this Bid with any other Bidder or with any competitor of Bidder. The Bidder hereby certifies that this Bid is made without prior understanding, agreement or connection with any corporation, firm, entity or person submitting a bid for the same Work and is in all respects fair and without collusion or fraud. The Bidder understands that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. The Bidder agrees to abide by all conditions of the Bid and all applicable laws.
By signing this Bid on behalf of Bidder, the individual signatory below represents and warrants that he or she, acting alone, has full power and authority to sign on behalf of Bidder and to fully bind Bidder to the terms and conditions of this Bid and the proposed contract documents.
The full names, titles and addresses of persons and firms interested in the foregoing Bid as principals are as follows:
NAME TITLE ADDRESS
Respectfully submitted, [typed name of Bidder]
By: __________________________________[seal] [signature]
[typed name and title]
[address of Bidder]
[business telephone number]
1287.02 page 00 4113-6
[date of execution]
1287.02 page 00 4113-7
STATE OF _______________________
COUNTY OF _____________________
Came before me, ________________________________________, and after being [typed name of individual signing Bid] duly sworn, deposes and says that he/she is _____________________________________ of
[title]
________________________________ and that all of the foregoing is true and correct to the
[Bidder] best of his/her information and belief.
[signature of individual signing Bid]
Subscribed and sworn to before me this ___ day of ______________, 2024.
(seal)
Notary Public
My Commission Expires:
END OF SECTION 00 4113
1287.02 page 00 4113-8
SAE LOCKERS 10 51 13 - 1
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Locker benches.
1.3 ACTION SUBMITTALS
A. Product Data: For each type of bench.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of bench.
B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.
1. Include identification system and numbering sequence.
C. Samples for Initial Selection: For each type of locker or bench specified, provide manufacturer's color charts showing the full range of colors available.
1.4 INFORMATIONAL SUBMITTALS
A. Sample Warranty: For special warranty.
1.5 CLOSEOUT SUBMITTALS
A. Maintenance Data: For adjusting, repairing, and replacing benches to include in maintenance manuals.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Do not deliver benches until spaces to receive them are clean, dry, and ready for their installation.
1.7 FIELD CONDITIONS
A. Field Measurements: Verify actual dimensions of rooms by field measurements before fabrication.
1.8 COORDINATION
A. Coordinate sizes and locations and other related units of work specified in other Sections to ensure that benches can be supported and installed as indicated.
1.9 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace components of benches that fail in materials or workmanship, excluding finish, within specified warranty period.
1. Damage from deliberate destruction and vandalism is excluded.
2. Warranty Period: 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain benches, and accessories from single source from single manufacturer.
2.2 LOCKER BENCHES
A. Provide bench units with overall assembly height of 17-1/2 inches (445 mm).
B. Bench Tops: Manufacturer's standard one-piece units, with rounded corners and edges.
1. Size: Minimum 9-1/2 inches wide by 1-1/4 inches thick (241 mm wide by 32 mm thick) except provide benches with a minimum 20-inch- (508-mm-) wide tops, and complying with all requirements of Section 903 of the 2010 ADA Standards, where accessible benches are indicated on the Drawings.
2. Extruded aluminum with clear anodic finish.
C. Fixed Pedestals: Manufacturer's standard supports, with predrilled fastener holes for attaching bench top and anchoring to floor, complete with fasteners and anchors, and as follows:
1. Tubular Steel: 1-1/2-inch- (38-mm-) diameter steel tubing threaded on both ends, with standard pipe flange at top and bell-shaped cast-iron base; with baked-enamel or powder-coat finish; anchored with exposed fasteners.
a. Color: As selected by Architect from manufacturer's full range.
D. Materials:
1. Stainless Steel: ASTM A 666, Type 304.
2. Extruded Aluminum: ASTM B 221 (ASTM B 221M), alloy and temper recommended by aluminum producer and manufacturer for type of use and finish indicated.
3. Steel Tube: ASTM A 500/A 500 M, cold rolled.
2.3 FABRICATION
A. Fabricate lockers square, rigid, without warp, and with faces flat and free of dents or distortion. Make exposed metal edges safe to touch and free of sharp edges and burrs.
1. Form body panels, doors, shelves, and accessories from one-piece steel sheet or HDPE unless otherwise indicated.
2. Provide fasteners, filler plates, supports, clips, and closures as required for complete installation.
2.4 ACCESSORIES
A. Fasteners: Zinc- or nickel-plated steel, slotless-type, exposed bolt heads; with self-locking nuts or lock washers for nuts on moving parts.
SAE LOCKERS 10 51 13 - 2
B. Anchors: Material, type, and size required for secure anchorage to each substrate.
1. Provide nonferrous-metal or hot-dip galvanized anchors and inserts on inside face of exterior walls for corrosion resistance.
2. Provide toothed-steel or lead expansion sleeves for drilled-in-place anchors.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine floors, and support bases, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Fixed Locker Benches: Provide no fewer than two pedestals for each bench, uniformly spaced not more than 72 inches (1830 mm) apart. Securely fasten tops of pedestals to undersides of bench tops, and anchor bases to floor.
3.3 PROTECTION
A. Protect benches from damage, abuse, dust, dirt, stain, or paint. Do not permit use during construction.
B. Touch up marred finishes, or replace benches that cannot be restored to factory-finished appearance. Use only materials and procedures recommended or furnished by manufacturer.
END OF SECTION 10 51 13
01 606 050
UP
DN
UP
DN
1. REFER TO COVER SHEET FOR COMPLETE KEYNOTE LIST.
2. REFER TO "WALL PLAN" FOR WALL RATINGS, WALL TYPES AND WALL
DIMENSIONS.
3. REFER TO ENLARGED TOILET PLANS (AS INDICATED ON PLAN) FOR
INFORMATION ON TOILET & BATH ACCESSORIES AND ADDITIONAL DIMENSIONS
OF THESE AREAS.
4. REFER TO CIVIL DRAWINGS FOR COMPLETE SIDEWALK LAYOUT.
XXX
ROOM NUMBER. SEE INTERIOR FINISH SCHEDULE FOR
INFORMATION ON ROOM FINISHES.
DOOR NUMBER. REFER TO DOOR FRAME & DOOR SCHEDULE
FOR INFORMATION ON DOORS.
XXXa
W-x
ALUMINUM WINDOW NUMBER. REFER TO DRAWING A604 FOR
WINDOW ELEVATIONS.
SF-x
ALUMINUM STOREFRONT NUMBER. REFER TO DRAWING A604
FOR WINDOW ELEVATIONS.
NEW CONCRETE BLOCK WALLS.
DIMENSION FROM FACE OF WALL TO FACE OF WALL.
ALL DOORS SHOWN WITHOUT DOOR NUMBER ARE EXISTING
TO REMAIN.
Xx1
GRID/CENTERLINES OF STEEL COLUMNS AND/OR STEEL
FRAMES
NOT IN CONTRACTN.I.C.
EXISTING WALLS TO REMAIN.
GENERAL NOTES
KEY PLAN:
LEGEND
1 HOUR FIRE RATED WALL
2 HOUR FIRE RATED WALL
SMOKE PARTITION WALL
UNRATED WALL
ENVIRONMENTAL PARTITION WALL
A2011
A201
A201
A201 2
1073 SF
VISITORS
LOCKERS
1068 SF
HOME
LOCKERS
11150 SF
SHR
301 SF
STAIR A-1
131 SF
MACHINE
ROOM
64 SF
ELEV
178 SF
STAIR B-1
42 SF
ICE
MACHINE
118 SF
OFFICIALS
A301
A301
187 SF
RR
178 SF
RR
A409
A410
A401
A401
A301
A301
114B
114C
111B
111A
114A
115A
116A
115D115C115B
112B 112C 112D
112A
113A
103A100A
100B
118A
105A
101A
224 SF
CORRIDOR
97 SF
RISER
ROOM
285 SF
ELEC
124 SF
TRAINING
ROOM
77 SF
SHR
A412
53 SF
TOILET
52 SF
J.C.
108A
109A
106A
107B
105C
107A
118C
118B
117A
A301
111C
Ax01 Ax02 Ax03 Ax04 Ax05 Ax06 Ax07
Ay09
Ay08
Ay07
Ay06
Ay05
Ay04
Ay03
Ay02
Ay01
10" 12' - 5" 8' - 7" 16' - 6" 2' - 6" 19' - 2" 7' - 2" 10"
68' - 0"
10" 2' - 10" 4' - 4" 6' - 4" 6' - 6" 11' - 2" 4' - 0" 4' - 4"
1' - 0" 8"
3' - 10" 21' - 4" 10"
2'
0"
4'
1'
3'
0"
3'
5'
4'
2'
0"
9'
5'
7'
7'
6'
0"
1'
5'
3'
8'
3'
0"
0"
3'
0"
6'
4'
4'
6'
6' - 0" 1' - 0"
68' - 0"
14' - 3 1/2" 6' - 4" 6' - 8 1/2" 4' - 4" 10' - 6" 3' - 10" 22' - 0"
1'
8"
8"
8" 8'
8"
6'
8"
11' - 9"
8"
7' - 11" 8" 15' - 10" 8" 26' - 10"
1' - 4" 1' - 2"
1'
8"
8"
6'
8" 6'
8"
6'
8" 5'
8"
8'
8"
8" 4" 10' - 9" 8" 26' - 11" 8" 25' - 8"
10' - 8" 3' - 4" 11' - 8"
1'
11' - 9" 8" 7' - 11"
8"
9' - 6" 8" 8' - 2" 8" 25' - 8" 1' - 2"
0"
8"
8"
2'
1' - 4"
5'
1'
6' - 0"
1' - 0"
F E
C
4" A506
A506
A506
A506
A506
A506
A506
115E
112E
3' - 10"
3' - 10"
3' - 5 1/2"3' - 5"
3' - 5"
3' - 5 1/2"
10 51 13 FIXED
BENCHES IN
CONTRACT
10 51 13 FIXED
BENCHES IN
CONTRACT
10 51 13 FIXED
BENCHES IN
CONTRACT
10 51 13 FIXED
BENCHES IN
CONTRACT
11 31 13 -
COMERCIAL
APPLIANCES -
ICE MAKER - I.C.
10 11 00.A, 8' -
VISUAL DISPLAY
UNIT
10 11 00.A, 8' -
VISUAL DISPLAY
UNIT
.A , 8
V
IS
U A
L D
IS
P
LA
Y
U N
IT
.A , 8
V
IS
U A
L D
IS
P
LA
Y
U N
IT
10 11 00.A, 8' -
VISUAL DISPLAY
UNIT
.A , 8
V
IS
U A
L D
IS
P
LA
Y
U N
IT
.A , 8
V
IS
U A
L D
IS
P
LA
Y
U N
IT
10 11 00.A, 8' -
VISUAL DISPLAY
UNIT
A401
105B
10 51 13 FIXED
BENCHES IN
CONTRACT. PROVIDE
BACK REST FOR ADA
AT THIS BENCH
10 51 13 FIXED
BENCHES IN
CONTRACT. PROVIDE
BACK REST FOR ADA
AT THIS BENCH
A2011
A201
A201
A201 2
64 SF
ELEV
131 SF
STORAGE
301 SF
STAIR A-2
318 SF
STAIR B-2
145 SF
OFFICE
120 SF
OFFICE
120 SF
OFFICE
98 SF
OFFICE
298 SF
CORRIDOR
119 SF
MECH
112 SF
DATA
A301
A410
A409
A301
251 SF
EXECUTIVE
OFFICE
210 SF
CONFERENCE
209A
210A
206A
205A
204A
213A225A
201A 200A
211A
W
W
W02
W02
W02
A506
A506
145 SF
OFFICE
111 SF
OFFICE
140 SF
OFFICE
137 SF
OFFICE
110 SF
OFFICE
120 SF
OFFICE
120 SF
OFFICE
64 SF
TOILET
A412
A401
228A
227A
222A
223A
219A
218A
220A221A
216A
215A
208A
207A
51 SF
TOILET
43 SF
CLOSET
51 SF
TOILET
52 SF
CLOSET
73 SF
PASSAGE
553 SF
CORRIDOR
283 SF
CORRIDOR
231A
214A224A
172 SF
OFFICE
214153 SF
OFFICE
A301
8" 10' - 2" 8" 5' - 0" 8" 9' - 1" 8"
14 SF
CLOSET
Ax01 Ax02 Ax03 Ax04 Ax05 Ax06 Ax07
Ay09
Ay08
Ay07
Ay06
Ay05
Ay04
Ay03
Ay02
Ay01
W
W
W
W
W01
9'
5'
7'
7'
6'
0"
10" 12' - 5" 8' - 7" 16' - 6" 2' - 6" 19' - 2" 7' - 2" 10"
41' - 5" 5' - 6" 21' - 1"
68' - 0"
3'
1'
1'
0"
4'
7"
5'
1'
5'
9'
5'
1'
5'
7"
4'
1'
0"
1'
3'
1'
0"
8"
8"
8"
8"
8"
0"
1'
1' - 2" 11' - 9" 8" 7' - 11" 8" 12' - 5 1/2" 8" 12' - 5 1/2" 8" 6' - 0" 8" 11' - 9"
1' - 2"
9'
0"
8"
7'
8" 6'
8"
0"
8"
8"8" 4"
1"
8" 6'
8"
1'
8"
1" 8"
0"
8" 8'
8"
8" 6'
8"
1'
11' - 9" 8" 26' - 11" 8" 11' - 2" 2' - 1" 8" 11' - 9"
7'
8" 2'
0"
11' - 9" 8" 11' - 4" 8" 14' - 11" 8" 5' - 3" 8" 7' - 2" 1' - 4" 8" 10' - 7"
14' - 10" 5' - 6" 7' - 2" 4' - 0"
6"
4' - 0" 32' - 0"
F E
C
A506
A506
A506
1' - 4"
1'
1'
9'
0" 8"
6'
8" 9'
8"
8"
0" 8"
6'
214B
A2011
A201
A201
A201 2
173 SF
MECH
131 SF
STORAGE
301 301 SF
STAIR A-3
284 SF
FOOD PREP
64 SF
ELEV
152 SF
STORAGE
230 SF
CORRIDOR
1630 SF
HOSPITALITY
SUITE
A301
A301
A410
A409
A401
A405 -
A301
A301
309A
305A
310A
301A 300A
W02
W02 W02
A604
A604
SF−01
SF−02
SF−01
318 SF
STAIR B-3
297 SF
STORAGE
298 SF
CORRIDOR
198 SF
MEN
244 SF
WOMEN
312A
308a
311a
304a
A412
ROOF
ACCESS
LADDER
A301
Ax01 Ax02 Ax03 Ax04 Ax05 Ax06 Ax07
Ay09
Ay08
Ay07
Ay06
Ay05
Ay04
Ay03
Ay02
Ay01
9'
5'
7'
7'
6'
0"
10" 12' - 5" 8' - 7" 16' - 6" 2' - 6" 19' - 2" 7' - 2" 10"
14' - 10" 5' - 6" 21' - 1" 5' - 6" 13' - 11" 7' - 2"
60' - 10" 7' - 2"
68' - 0"
14' - 10" 5' - 6" 7' - 2" 4' - 0" 29' - 4"
W01
8" 6'
8"
8"
9'
8"
1" 8"
6'
8"
1'
20' - 4" 8" 15' - 10" 8" 21' - 0" 1' - 2" 6' - 0"
1'
4'
0"
7'
7'
0"
4'
1'
11' - 9" 8" 7' - 11" 8"
8" 4"
2' - 9" 10" 6' - 4" 4' - 11" 8"
26' - 11" 8" 18' - 6"
1'
1' - 4"
1'
1' - 4"
1'
4"
1'
4"
11' - 9" 8" 26' - 11" 8" 18' - 6"
0"
6'
6'
0"
A104
FEC
A604
1' - 0"
2' - 3" 1' - 2"
10. 28 00 L, MOP & BROOM
HOLDER
A402
A4053
DRAWING NUMBER
REVISIONS
COPYRIGHT 2025 BY SOUTHERN A&E, LLC. ALL RIGHTS RESERVED.
THIS DOCUMENT IS THE PROPERTY OF SOUTHERN A&E, LLC AND SHALL NOT BE COPIED
OR REPRODUCED IN WHOLE OR IN PART WITHOUT EXPRESSED WRITTEN CONSENT
FROM SOUTHERN A&E, LLC.
C
11-19-2024
BID PACKAGE BP-1
SA&E PROJECT NUMBER
ORIGINAL SHEET SIZE: ARCH E1 (30" X 42")
A
TRUE
NORTH
2" GRIDS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
B
C
D
E
F
G
H
I
J
K
L
M
N
KEYPLAN
TARA STADIUM
RENOVATIONS TO:
CLAYTON COUNTY SCHOOLS
1058 FIFTH AVENUE, JONESBORO, GA 30236
1055 BATTLE CREEK RD, JONESBORO, GA 30236
01-606-050
ISSUED FOR CONSTRUCTION
STATE BOARD OF REGISTRATION
FOR PROFESSIONAL ENGINEERS AND LAND
SURVEYORS
SOUTHERN A & E, LLC
ENGINEER FIRM
LICENSE NO: PEF003374
EXP. DATE - 06/30/2026
STORAGE
FIELDHOUSE
CONCESSIONS
NORTHBATHROOMS/
LOCKERS NORTH
CONCESSIONS
SOUTH
BATHROOMS/
LOCKERS SOUTH
CANOPY SOUTH
SCOREBOARD
TICKET BOOTH NORTH
TICKET BOOTH NORTH
A102
NEW FLOOR PLAN - FIELDHOUSE
SCALE: = 1'-0"
0 8 168
1/8"
1/8" = 1'-0"A102
1 FIELDHOUSE-FIRST FLOOR PLAN
GROSS AREA - FIELDHOUSE
Level Area
FH - LEVEL 1 5598 SF
FH - LEVEL 2 5598 SF
FH - LEVEL 3 5008 SF
16205 SF
GROSS AREA - STORAGE
Level Area
FH - LEVEL 1 2501 SF
2501 SF
1/8" = 1'-0"A102
2 FIELDHOUSE- SECOND FLOOR PLAN
1/8" = 1'-0"A102
3 FIELDHOUSE-THIRD FLOOR PLAN
R # Doc # Date
1 AD3 12-02-20241
| ADDENDUM#3 COMPLETE.pdf |
| ADDENDUM #3 |
| 000030_TOC |
| DIVISION 21- FIRE SUPPRESSION |
| DIVISION 22- PLUMBING |
| 23 05 13 Common Motor Requirements For HVAC Equipment |
| 23 05 17 Sleeves And Sleeve Seals For HVAC Piping |
| 23 05 18 Escutcheons For HVAC Piping |
| 23 05 29 Hangers And Supports For HVAC Piping And Equipment |
| 23 05 48.13 Vibration Controls For HVAC |
| 23 05 53 Identification For HVAC Piping And Equipment |
| 23 05 93 Testing, Adjusting, And Balancing For HVAC |
| 23 07 13 Duct Insulation |
| 23 07 19 HVAC Piping Insulation |
| 23 09 00 Instrumentation And Control For HVAC |
| 23 11 23 Facility Natural-Gas Piping |
| 23 23 00 Refrigerant Piping |
| 23 31 13 Metal Ducts |
| 23 33 00 Air Duct Accessories |
| 23 34 23 HVAC Power Ventilators |
| 23 37 13 Diffusers, Registers, And Grilles |
| 23 41 00 Particulate Air Filtration |
| 23 44 00 Air Purification Systems |
| 23 74 33 Dedicated Outdoor Air Units |
| 23 81 26 Split-System Air-Conditioners |
| 23 81 29 Variable Refrigerant Flow Split Systems |
| 23 82 39.19 Wall And Ceiling Unit Heaters |
| 23 91 16 Mechanical Wall Louvers |
| 003000_04_Bid Form |
| 1. To excavate alluvial deposits, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($________) per cubic yard. |
| 2. To excavate mass rock, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($________) per cubic yard. |
| 3. To excavate trench rock, waste off-site and replace with suitable compacted fill obtained off-site for the unit price of ($________) per cubic yard. |
| 4. To perform rock boring as required for utility installation for the unit price of ($_______) per linear foot. |
| 5. To provide and install additional Type C silt fence for the unit price of ($________) per linear foot. |
| 6. To provide and install additional erosion control matting as specified for the unit price of ($________) per square yard. |
| 7. To provide and install straw mulching for the unit price of ($________) per square foot. |
| 8. To provide and install additional temporary grassing as specified for the unit price of ($________) per square foot. |
| 9. To provide and install additional permanent grassing as specified for the unit price of ($________) per square foot. |
| 10. To provide and install additional Tifway 419 sod as specified for the unit price of ($________) per square foot. |
| 11. To provide and install additional two (2) foot high by eight (8) foot long check dam with two (2) inch to ten (10) inch stone for the unit price of ($_______) each. |
| 12. To provide and install additional staked, hay bale check dam for the unit price of ($________) per bale. |
| 13. To provide and machine place additional rip-rap for the unit price of ($_______) per ton. |
| 14. To provide and install additional Sd2-F inlet sediment trap, fabric-wire backed with support frame for the unit price of ($________) each. |
| 15. To provide and install additional Sd2 block and gravel inlet sediment trap for the unit price of ($________) each. |
| 16. To provide and install additional “Silt Saver”, or equal, inlet sediment trap for the unit price of ($________) each. |
| 17. To provide and install additional polyacrylamide gel blocks as specified for the unit price of ($________) each. |
| 18. To provide and install additional concrete walk as detailed on the drawings for the unit price of ($________) per square foot. |
| 19. To provide and install additional 6 feet tall chain link fence as specified for the unit price of ($________) linear foot. |
| (Quantities shown shall be included in the Base Bid as an Allowance) |
| 105113_04_Lockers |
| PART 1 - GENERAL |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| A. Section Includes: |
| 1. Locker benches. |
| A. Product Data: For each type of bench. |
| 1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of bench. |
| B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. |
| 1. Include identification system and numbering sequence. |
| C. Samples for Initial Selection: For each type of locker or bench specified, provide manufacturer's color charts showing the full range of colors available. |
| A. Sample Warranty: For special warranty. |
| A. Maintenance Data: For adjusting, repairing, and replacing benches to include in maintenance manuals. |
| A. Do not deliver benches until spaces to receive them are clean, dry, and ready for their installation. |
| A. Field Measurements: Verify actual dimensions of rooms by field measurements before fabrication. |
| A. Coordinate sizes and locations and other related units of work specified in other Sections to ensure that benches can be supported and installed as indicated. |
| A. Special Warranty: Manufacturer agrees to repair or replace components of benches that fail in materials or workmanship, excluding finish, within specified warranty period. |
| 1. Damage from deliberate destruction and vandalism is excluded. |
| 2. Warranty Period: 10 years from date of Substantial Completion. |
| PART 2 - PRODUCTS |
| A. Source Limitations: Obtain benches, and accessories from single source from single manufacturer. |
| A. Provide bench units with overall assembly height of 17-1/2 inches (445 mm). |
| B. Bench Tops: Manufacturer's standard one-piece units, with rounded corners and edges. |
| 1. Size: Minimum 9-1/2 inches wide by 1-1/4 inches thick (241 mm wide by 32 mm thick) except provide benches with a minimum 20-inch- (508-mm-) wide tops, and complying with all requirements of Section 903 of the 2010 ADA Standards, where accessible be... |
| 2. Extruded aluminum with clear anodic finish. |
| C. Fixed Pedestals: Manufacturer's standard supports, with predrilled fastener holes for attaching bench top and anchoring to floor, complete with fasteners and anchors, and as follows: |
| 1. Tubular Steel: 1-1/2-inch- (38-mm-) diameter steel tubing threaded on both ends, with standard pipe flange at top and bell-shaped cast-iron base; with baked-enamel or powder-coat finish; anchored with exposed fasteners. |
| a. Color: As selected by Architect from manufacturer's full range. |
| D. Materials: |
| 1. Stainless Steel: ASTM A 666, Type 304. |
| 2. Extruded Aluminum: ASTM B 221 (ASTM B 221M), alloy and temper recommended by aluminum producer and manufacturer for type of use and finish indicated. |
| 3. Steel Tube: ASTM A 500/A 500 M, cold rolled. |
| A. Fabricate lockers square, rigid, without warp, and with faces flat and free of dents or distortion. Make exposed metal edges safe to touch and free of sharp edges and burrs. |
| 1. Form body panels, doors, shelves, and accessories from one-piece steel sheet or HDPE unless otherwise indicated. |
| 2. Provide fasteners, filler plates, supports, clips, and closures as required for complete installation. |
| A. Fasteners: Zinc- or nickel-plated steel, slotless-type, exposed bolt heads; with self-locking nuts or lock washers for nuts on moving parts. |
| B. Anchors: Material, type, and size required for secure anchorage to each substrate. |
| 1. Provide nonferrous-metal or hot-dip galvanized anchors and inserts on inside face of exterior walls for corrosion resistance. |
| 2. Provide toothed-steel or lead expansion sleeves for drilled-in-place anchors. |
| PART 3 - EXECUTION |
| A. Examine floors, and support bases, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. |
| B. Prepare written report, endorsed by Installer, listing conditions detrimental to performance of the Work. |
| C. Proceed with installation only after unsatisfactory conditions have been corrected. |
| A. Fixed Locker Benches: Provide no fewer than two pedestals for each bench, uniformly spaced not more than 72 inches (1830 mm) apart. Securely fasten tops of pedestals to undersides of bench tops, and anchor bases to floor. |
| A. Protect benches from damage, abuse, dust, dirt, stain, or paint. Do not permit use during construction. |
| B. Touch up marred finishes, or replace benches that cannot be restored to factory-finished appearance. Use only materials and procedures recommended or furnished by manufacturer. |
| A102.R1.AD3 - NEW FLOOR PLAN - FIELDHOUSE.pdf |
| Sheets |
| A102 - NEW FLOOR PLAN - FIELDHOUSE |
File details come from the government source that posted it. Updated .