Addendum_3.doc

DOC document 28 KB Posted

Attached to
DNR Root River St Trl Rock Stabilization
Solicitation number
2000017828
Issued by
Freeborn County, Minnesota

About this file

This addendum is issued by the Minnesota Department of Natural Resources, Division of Parks and Trails, and modifies the Request for Proposal for rock stabilization services along the Root River State Trail near Old Barn Resort. The original proposal deadline remains January 29, 2026, at 2:00 P.M., with no change to the event due date. The project requires consulting firms to conduct an initial assessment and detailed survey to identify hazards, develop conceptual through final plans and specifications, and provide technical services during construction for stabilization of the existing rock bluff along a segment of the Root River State Trail north of Heron Road between Preston and Lanesboro, Minnesota. The selected firm must demonstrate experience in geology, rock slope failures, rock removal, and civil engineering, as large and small-scale rock removal is anticipated. The Notice to Proceed is estimated for the end of February 2026.

Addendum No. 3 makes a technical revision to Section 2.2 of the RFP regarding the survey horizontal datum, clarifying that NAD83 County Coordinates should be used instead of NAD93 County Coordinates. Vendors must acknowledge receipt and understanding of this addendum by submitting the addendum form with their proposal. No information is provided regarding pricing, set-asides, incumbent contractors, funding sources, or contract term and renewal options.

View the file

Other files

File Type Posted
ADDENDUM_2_for_rfp.doc DOC document
RFP_Root_River_Trail_Rock_Stabilization.docx DOCX document
ptrfpattachments.docx DOCX document
DNR_Root_River_St_Trl_Rock_Stabilization.pdf PDF
ptsamplecontractsandexhibits.docx DOCX document
ADDENDUM_1_for_rfp.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF MINNESOTA

DEPARTMENT OF NATURAL RESOURCES

DIVISION OF PARKS AND TRAILS

ADDENDUM

Addendum No. 3 to Request for Proposal

FOR

Root River State Trail near Old Barn Resort - Rock Stabilization Event Due Date: January 29, 2026 Time: 2:00 P.M.

New Event Due Date: No Change

VENDORS: EVENT DUE DATE HAS NOT CHANGED.

SCOPE OF ADDENDUM

Revisions to the RFP language:

Section 2 “Tasks and Deliverables” of the RFP is amended as follows:

2.2 Survey

II. Horizontal datum: NAD93 NAD83 County Coordinates

Questions and Answers:

1. Can you provide an estimated date for the Notice to Proceed?

Answer: End of February 2026

2. Survey: Is the Horizontal Datum supposed to be NAD83 County Coordinates instead of NAD93 County Coordinates?

Answer: Yes, it should be NAD83

This addendum shall become part of the proposal.

This vendor shall acknowledge the addendum by submitting this form with their proposal.

File details come from the government source that posted it. Updated .