Addendum #3 7.18.22
84 KB Posted
- Attached to
- Heard County Middle Baseball/Softball Press Box
- Solicitation number
- 55151-22-SLSB-07162022
- Issued by
- Henry County, Georgia
About this file
This is Addendum No. 3 issued July 18, 2022, by Heard County Schools in Georgia for a two-story Concessions/Press Box Building project at Heard County Middle School located at 269 Old Field Road, Franklin, Georgia 30217. The project requires a single lump sum bid from general contractors. A mandatory pre-bid meeting is scheduled for August 11, 2022, at 9:00 am at the school site; contractors who attended the initial mandatory pre-bid meeting on June 30, 2022, may attend but are not required to do so. Sealed bids must be submitted to the Heard County School System Board Room at 131 East Court Square, Franklin, Georgia 30217, by 10:00 am EST on Monday, August 22, 2022. Bids will be publicly opened and read aloud. Bid documents are available through DeLoach Architects at 721 Walnut Street, Macon, Georgia 31201, by calling (478) 742-4999 for access to their online FTP site; no partial sets will be provided, and no deposits or refunds are required. No bid may be withdrawn for sixty days after opening.
The contract will be awarded based on the lowest single lump sum bid reduced by deductive alternates in consecutive numerical ascending order, with no additive alternates used to determine the low bidder. A bid bond equal to five percent of the base bid is required and must accompany the submission; only bid bonds are acceptable as bid security, with no personal checks, cashier's checks, certified checks, or cash permitted. Performance and payment bonds amounting to 100 percent of the contract sum will be required upon award. All bonds must be issued by a surety licensed to conduct business in Georgia, listed on the Federal Register, and acceptable to the owner. The Heard County Schools Board reserves the right to waive technicalities or irregularities and to reject any or all bids.
Text of this file
ADDENDUM NO. 3
July 18, 2022
A CONCESSIONS / PRESS BOX BUILDING
at
HEARD COUNTY MIDDLE SCHOOL
269 Old Field Road Colonel Way Franklin, Georgia 30217
ADDENDUM NO. 3
CHANGES TO SPECIFICATIONS:
SECTION 00030 – ADVERTISEMENT FOR BIDS
Page 00030-1 [REPLACE this page in its entirety with Page 00030-1 (Revised 07/18/2022) and labeled as Attachment I at the end of this Addendum.]
SECTION 00100 – INSTRUCTIONS TO BIDDERS
Page 00100-1/ Paragraph 2
CHANGE TO READ:
[2. MANDATORY PRE-BID MEETING
There will be a MANDATORY pre-bid meeting at the time and location as listed below:
August 11, 2022 at 9:00 am at
HEARD COUNTY MIDDLE SCHOOL
269 Old Field Road Franklin, GA 30217
This Pre- Bid meeting is mandatory for all General Contractors. Contractors who attended the Mandatory Pre-Bid Meeting on June 30, 2022 may attend this meeting, but are not required to attend.]
ATTACHMENTS
Attachment I – Advertisement for Bids (Revised: 07/18/2022)
END OF ADDENDUM NO. 1
A CONCESSIONS/ PRESS BOX BUILDING
HEARD COUNTY MIDDLE SCHOOL
ADVERTISEMENT FOR BIDS 00030-1
(Revised: 07/18/2022)
SECTION 00030
ADVERTISEMENT FOR BIDS
Sealed bids from General Contractors will be received by the Heard County School System in the Board Room located at 131 East Court Square, Franklin, GA 30217 until 10:00 am EST, on Monday, August 22, 2022 for the following project:
A CONCESSIONS/ PRESS BOX BUILDING
At
HEARD COUNTY MIDDLE SCHOOL
269 Old Field Road Franklin, GA 30217
The Owner will receive a “Single Lump Sum Bid” for this project. The contract will be awarded based on the lowest Single Lump Sum Bid reduced by Deductive Alternates, if any, taken in consecutive numerical ascending, prioritized order. No Additive Alternate will be used to determine the low bidder.
Bids will be publicly opened and read aloud. Interested parties are invited to attend.
Bid documents may be examined at the Architect’s office: DeLoach Architects, 721 Walnut Street, Macon, Georgia 31201 or by calling (478) 742-4999 and requesting a password and link to DeLoach Architect’s online FTP site. Bid documents will not be sent to plan rooms.
Bid documents may be downloaded or hardcopies may be ordered through DeLoach Architect’s office. Please call (478) 742-4999 to request a password and link. No partial sets will be downloaded or printed. No deposits are required and no refunds will be made.
There will be a MANDATORY pre-bid meetings at the time and location as listed below:
• August 11, 2022 at 9:00 am at
HEARD COUNTY MIDDLE SCHOOL
269 Old Field Road Franklin, GA 30217
This Pre-Bid meeting is mandatory for all General Contractors. Contractors who attended the Mandatory Pre-Bid Meeting on June 30, 2022 may attend this meeting, but are not required to attend.
No bid may be withdrawn for a period of sixty (60) days after Bids are opened.
Submitted Proposals shall include the completed signed Bid Form (along with the Security & Immigration Compliance Form) and the Bid Bond. Bid bond in the amount of five percent of the base bid is required and must be submitted with the bid. A bid bond is the only acceptable form of bid security. No personal checks, cashier’s checks, certified checks or cash will be accepted in lieu of the bid bond. Performance and payment bonds amounting to 100 percent of the contract sum will be required. All bonds shall be written by a Surety licensed to conduct business in the State of Georgia, listed on the Federal Register and acceptable to the owner.
Owner reserves the right to waive technicalities or irregularities and to reject any or all Bids.
BY: Heard County Schools Rodney Kay, Superintendent
END OF SECTION 00030
Rex Text Box
ATTACHMENT I
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement for Bid | — | |
| Addendum #2 7.5.22 | — | |
| Addendum #1 6.13.22 | — | |
| Addendum #4 8.8.22 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .