This document is Addendum Number 3 for Invitation to Bid (ITB) 25-22-213097 issued by the Alaska Railroad Corporation (ARRC) for the Seattle PIER 15.5 COATING project. The addendum provides clarification on a specific technical question regarding surface preparation requirements for coating application. The ITB closing date is set for May 1, 2025, at 3:00 PM local time, with the document addressing a bidder's inquiry about surface preparation methods in Appendix G Technical Specifications.

The addendum specifically addresses a question about surface preparation techniques, with ARRC accepting the manufacturer's UHP Hydroblasting (2000-2500 bar) method to remove previous coatings and expose the original profile. To be considered compliant, bidders must submit the manufacturer's letter of surface preparation and the manufacturer's warranty associated with the UHP Hydroblasting surface preparation. This clarification provides potential bidders with specific guidance on acceptable surface preparation methods for the coating project, ensuring clarity in the bidding process and technical requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ALASKA RAILROAD CORPORATION

327 W. Ship Creek Ave.

Anchorage, AK 99501 ThompsonC@akrr.com

Phone 907-265-2068 Cell 907-854-3141

April 28, 2025

Addendum Number 3

Invitation to Bid 25-22-213097 ARRC Seattle PIER 15.5 COATING

ITB closing date, Offers will be received UNTIL 3:00 PM LOCAL TIME ON MAY 1, 2025

This addendum is being issued to provide information as follows:

Question 1: In Appendix G Technical specs, Part 2 Products, Section 3.3 Zone 2.B Surface preparation, requires a minimum 3.0 mil profile, and, Section 3.3 Zone 2.C: Comply with manufactures written installation procedures and individual product data sheet application bulletins. Per Belzona 5831 Manufacture’s surface preparation installation, can be meet with UHP Hydroblasting (2000-2500 bar) to remove previous coatings and expose original profile.

Will ARRC accept this Manufactures surface preparation, in lieu of the required minimum 3.0 mil profile?

Answer 1: ARRC will accept manufacture’s surface preparation of UHP Hydroblasting (2000- 2500 bar) to remove previous coatings and expose original profile, with the following submittals:

Manufacture’s Letter of Surface preparation, and Manufactures warranty associated with UHP Hydroblasting surface preparation.

Sincerely, C. Lee Thompson Contract Administrator Alaska Railroad Corporation