1998 Seattle Pier 15.5 Ramp Modifications.pdf

PDF 11 MB Posted

Attached to
25-22 ITB ARRC Seattle PIER 15. 5 COATING
Solicitation number
ITB 25-22 ARRC Seattle PIER 15.5 COATING
Issued by
Aleutians East Borough, Alaska

About this file

These engineering design drawings detail the Pier 15 1/2 Ramp Modifications project for Crowley Marine Services located in Seattle, Washington. The document is a comprehensive set of technical plans prepared by Summit Technology Consulting Engineers in August 1998, specifically focusing on structural modifications to an existing marine facility ramp. The drawings include detailed site plans, vicinity maps, pontoon plans, sections, elevation views, and various structural and mechanical details for the ramp infrastructure.

The project appears to involve complex structural modifications to an existing marine ramp, with intricate engineering specifications for replacement and reinforcement of structural elements. The drawings show precise technical details including pile configurations, transfer span elevations, bracing structures, and multiple sectional views with specific dimensional annotations. The documents are dated 8/10/98 and include multiple sheets (G1-S5) covering site layout, sections, details, and technical specifications for the marine infrastructure modifications at Crowley Marine Services' Seattle facility.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-1 Vac Map and Index.pdf

S-1 Plan_Sec_Elev_Notes.pdf
S-2 Sections and Details.pdf
S-3 Sections and Details.pdf
S-4 Sections and Details.pdf
S-5 Exist Transfer Span Ref. Dwg.pdf

File details come from the government source that posted it. Updated .