About this file

This document is an Environmental Protection Agency (EPA) General Conditions file related to water quality and stormwater management, specifically addressing turbidity standards, erosion controls, and compliance requirements for construction projects. The file outlines detailed environmental regulations for land disturbances, including specific requirements for projects that disturb one or more acres of land, mandating the development of a Stormwater Pollution Prevention Plan (SWPPP) and implementation of runoff prevention measures. The guidelines establish precise turbidity limits for various water body types, requiring monitoring and reporting, with specific distance-based compliance points and notification protocols for exceeding established turbidity thresholds.

The associated state and local contract opportunity involves the Alaska Railroad Corporation (ARRC) soliciting sealed bids for a comprehensive coating replacement project at Seattle Pier 15.5, with a mandatory pre-proposal site visit scheduled for March 31, 2025. The project requires detailed surface preparation and recoating of multiple metallic infrastructure components, including pontoon supports, exterior surfaces, access tubes, guide dolphin steel pipe piles, and fender panels. ARRC encourages Disadvantaged Business Enterprise (DBE) participation, with an aspiration to achieve a 4.0% DBE participation rate for federal fiscal years 2025-2027. Sealed bids will be accepted until 3:00 PM on April 24, 2025, with project completion expected by December 31, 2026. The contract will be awarded to the most advantageous and responsive bidder, with ARRC reserving the right to reject any bids and negotiate changes as needed.

Text of this file

EPA General Condition 2 – Soil Erosion and Sediment Controls

Turbidity shall not exceed background turbidity by more than 50 Nephelometric Turbidity Units (NTU) above background instantaneously or more than 25 NTU above background for more than ten consecutive days.8 Projects or activities that are expected to exceed these levels require an individual project-specific CWA Section 401 WQC.

The turbidity standard shall be met at the following distances from the discharge:

Wetted Stream Width at Discharge

Point

Approximate Downstream Point to

Sample to Determine Compliance

Up to 30 feet 50 feet

>30 to 100 feet 100 feet

>100 feet to 200 feet 200 feet

>200 feet 300 feet

Lake, Pond, Reservoir Lesser of 100 feet or maximum surface distance

For Marine Water Point of Compliance for Temporary Area of

Mixing

Estuaries or Marine Waters Radius of 150 feet from the activity causing the turbidity exceedance

Measures to prevent and/or reduce turbidity shall be implemented and monitored prior to, during, and after construction. Turbidity monitoring shall be done at the point of compliance within 24 hours of a precipitation event of 0.25 inches or greater. During monitoring and maintenance, if turbidity limits are exceeded or if measures are identified as ineffective, then additional measures shall be taken to come into compliance and EPA shall be notified within 48 hours of the exceedance or measure failure.

EPA General Condition 3 - Compliance with Stormwater Pollution Prevention and the National Pollutant Discharge Elimination System Permit Provisions For land disturbances during construction that 1) disturb one or more acres of land, or 2) will disturb less than one acre of land but are part of a common plan of development or sale that will ultimately disturb one or more acres of land, the permittee shall obtain and implement Construction Stormwater General Permit requirements,9 including:

1. The permittee shall develop a Stormwater Pollution Prevention Plan (SWPPP)10 and submit it to EPA Region 10 and appropriate Corps District; and

2. Following construction, prevention or treatment of ongoing stormwater runoff from impervious surfaces that includes soil infiltration shall be implemented.

EPA General Condition 4 – Projects or Activities Discharging to Impaired Waters Projects or activities are not authorized under the NWPs if the project will involve point source discharges into an active channel (e.g., flowing or open waters) of a water of the U.S. listed as impaired under CWA Section 303(d) and/or if the waterbody has an approved Total Maximum Daily Load (TMDL) and the discharge may result in further exceedance of a specific parameter (e.g., total suspended solids, dissolved oxygen, temperature) for which the waterbody is listed or has an approved TMDL. The current lists of impaired waters of the U.S. under CWA Section 303(d) and waters of the U.S. for which a TMDL has been approved are available on EPA Region 10’s web site at:

https://www.epa.gov/tmdl/impaired-waters-and-tmdls-region-10.

�$�5�5�&

�3�/�$�1

�3�8�5�3�2�6�(�� �3�5�2�3�2�6�(�'��

�,�1�� �$�7��

�$�3�3�/�,�&�$�7�,�2�1���%�<��

�6�+�(�(�7 �R�I�� �'�$�7�(��

�'�$�7�8�0�� �$�'�-�$�&�(�1�7���3�5�2�3�(�5�7�<���2�:�1�(�5�6��

�$�.�5�5���3�,�(�5�������������&�2�$�7�,�1�*�6

�6�,�7�(���3�/�$�1

NWS-2022-695

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .