Addendum 3 22339.pdf

PDF 137 KB Posted

Attached to
751/22339. MNB; Algonac SP/Wetzel RA - Targeted ARPA Projects
Solicitation number
RFP - 171 - 230000000199
Issued by
St. Clair County, Michigan

About this file

This document is Addendum No. 3 to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) for the ARPA Targeted Improvements at Algonac State Park and Wetzel Recreation Area. The RFP seeks professional services for the project, which includes the removal of two vault toilet buildings at Wetzel Recreation Area and requires an environmental survey. The geotechnical allowance and construction QAQC are required for both project areas. DTMB will not contract directly with a geotechnical firm, and it is expected to be part of the proposer's RFP submission. The DTMB and DNR's intent is to have a complete design for the picnic shelter and vault toilet structures to be bid on by the contractor.

The related state and local contract opportunity is for the Algonac SP/Wetzel RA - Targeted ARPA Projects, located in St. Clair County, Michigan. The proposal due date is December 8th, 2022. The document does not provide any information regarding pricing terms, set asides, incumbents, funding requirements and sources, or any other salient details beyond the scope of work and response requirements.

View the file

Other files

File Type Posted
22339 Algonac As Built water_ —
Addendum 2 22339.pdf PDF
Project Statement 22339.pdf PDF
RFP Billable Rate 22339.pdf PDF
SAMPLE Billable Rate Contract (Rev 220207).pdf PDF
Addendum 1 22339.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 7/16)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

REQUEST FOR PROPOSAL

ADDENDUM NO. 3

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals. Addenda will be numbered by the Project Director and distributed through www.Buy4Michigan.com as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

11/28/2022

PROJECT NAME

ARPA Targeted Improvements – Algonac SP/Wetzel RA

FILE NUMBER

751_22339.MNB

PROJECT DIRECTOR

Chris Bahjet

PROPOSAL DUE DATE:

Dec 8th, 2022.

ADDENDUM ITEMS:

These questions and answers to be part of the RFP:

Questions:

1. Is an environmental survey required for the removal of the two vault toilet buildings at Wetzel Recreation Area?

2. Is the geotechnical allowance (and construction QAQC portion) only for Algonac State Park, or for both project areas?

3. Would we be expected to include a geotechnical sub for the allowance, or would DTMB contract with a geotechnical firm directly?

4. Is it preferred to have a full design of the picnic shelter & vault toilet structures during the design phases, or would it be acceptable to have the contractor submit a design based on the provided DNR details during construction?

Answers:

1. Yes. It should be part of the RFP

2. The allowance is for both.

3. DTMB will not contract with a geotechnical firm. It is expected to be part of the RFP.

4. DNR/DTMB intent is to have complete design to be bid on by contractor.

APPROVED BY:

PROJECT DIRECTOR DATE

http://www.buy4michigan.com/

File details come from the government source that posted it. Updated .