This is Addendum No. 3 issued by Century A&E for the Department of Corrections' Lakeland Correctional Facility Facility Monitoring System project (File No. 472/15262.SMDG, Index No. 32501), dated June 29, 2018. The addendum modifies the original bidding documents from June 8, 2018 and previous addenda from June 22 and June 27, 2018. The key modification clarifies the demolition work requirements for the Boiler Controls Contractor regarding the existing monitoring and control panel. The contractor must verify and mark all inputs, outputs, wires, and sensors for both components that will remain and those that will be demolished by the Electrical Contractor.
The addendum specifies that the existing panel will remain to control the boiler feed water pumps and condensate transfer pumps, while other portions will be selectively demolished in a phased approach to accommodate a new SCADA panel. The Electrical Contractor is required to review the list of inputs and outputs created by the Boiler Controls Contractor and selectively demolish items that will no longer be used, as verified by the Owner and Engineer. No drawing changes were included in this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement 15262.pdf | ||
| Specs 15262 Monitor.pdf | ||
| LEIN Request 15262.pdf | ||
| Addendum 2 15262.pdf | ||
| Addendum 1 15262.pdf | ||
| Drawings 15262 Monitor.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 3
June 29, 2018
Century A&E, Project No.: MIS 025.02
RE: Department of Corrections
Lakeland Correctional Facility – Facility Monitoring System File No. 472/15262.SMDG, Index No. 32501
TO: PROSPECTIVE BIDDERS
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2018, Addenda No. 1 dated June 22, 2018 and Addenda No. 2 dated June 27m 2018 as noted below. This Addendum consists of two (2) typed pages.
GENERAL CLARIFICATIONS
1. The intent of this addenda is to clarify demolition work required by the Boiler Controls
Contractor relating to the existing monitoring and control panel. Per Addenda No. 2, the Boiler Controls Contractor was to verify and mark all inputs and outputs, wires, etc. of any control items that were to remain. Per Addenda No. 3 and as described here-in, the Boiler Controls Contractor shall verify and mark all inputs and outputs, wires, etc. of all control and monitoring points, both that will remain and that will eventually be demolished by the Electrical Contractor.
SPECIFICATIONS
1. Section 01010 – Summary of Work
a. In Paragraph II, F, 1. – Boiler Controls Contractor, delete item d. regarding demolition work and replace with the following:
d. Verify and properly mark all inputs and outputs, wires, and sensors, etc.
for the exiting control and monitoring panels. Prepare a list of all wires and points. Work with the Electrical Contractor, Owner and Engineer to verify what wires, conduit, etc. are to be demolished by the Electrical Contractor.
Addenda No.3 Thumb Correctional Facility – Facility Monitoring System File No. 472/15262.SMD, Index No. 32501 June 29, 2018
b. In Paragraph II, F, 3. –Electrical Contractor, add the words in bold below at the end of item a. relating to demolition:
a. Selectively demolish in a phased approach portions of the existing monitoring and control panels including all associated controls, non-mechanical sensors and all associated power and control conduit and wire for control and monitoring functions that will be picked up by the new SCADA panel. The existing panel will remain to control the boiler feed water pumps and the condensate transfer pumps. The Boiler Control Contractor will mark all wires, sensors, and gauges are to remain and that will be demolished. Review the list of inputs and outputs created by the Boiler Controls Contractor and selectively demolish those items that will no longer be used as verified by the Owner and Engineer.
DRAWINGS:
1. N/A
END OF ADDENDUM NO. 3
| GENERAL CLARIFICATIONS |
| 1. The intent of this addenda is to clarify demolition work required by the Boiler Controls Contractor relating to the existing monitoring and control panel. Per Addenda No. 2, the Boiler Controls Contractor was to verify and mark all inputs and outp... |
| SPECIFICATIONS |
| 1. Section 01010 – Summary of Work |
| a. In Paragraph II, F, 1. – Boiler Controls Contractor, delete item d. regarding demolition work and replace with the following: |
| b. In Paragraph II, F, 3. –Electrical Contractor, add the words in bold below at the end of item a. relating to demolition: |