Addendum 3_08-05-24.pdf
PDF 9 KB Posted
- Attached to
- Breckenridge Riverwalk Structures Design
- Solicitation number
- 17-06-102-002
- Issued by
- Summit County, Colorado
About this file
This document is Addendum No. 3 to a Request for Proposals (RFP) issued by the Town of Breckenridge for the Breckenridge Riverwalk Structures Design project, solicitation number 17-06-102-002. The addendum, dated August 5, 2024, modifies the original RFP by changing the proposal due date to August 16, 2024 at 10:00 a.m. local time. Bidders are required to acknowledge receipt of this addendum using Attachment A of the original RFP.
The project is partially funded by the Colorado Department of Transportation (CDOT) through the Multimodal Transportation and Mitigation Option Fund, which originates from Federal ARPA funds. A Disadvantage Business Enterprise (DBE) goal of 10% has been established for the project. The design must comply with all CDOT and Town design and construction standards, and project documents will be reviewed by a CDOT representative to ensure compliance. The project aims to improve safety, accessibility, and usability of the Blue River Recreational Path in downtown Breckenridge by creating grade-separated crossings and connecting disjointed pathway sections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum to Request For Proposals 17-06-102-002 Breckenridge Riverwalk Structures Design August 5, 2024
Addendum No. 3
This addendum summarizes additions and/or changes made to the Request for Proposals (RFP).
Receipt of all addenda shall be acknowledged on the form included as Attachment A of the RFP.
The following additions and/or changes shall be made:
CHANGE IN PROPOSAL DUE DATE:
The due date of the proposals shall be changed to August 16, 2024 at 10:00 a.m. local time.
File details come from the government source that posted it. Updated .