Addendum 2_07-11-24.pdf
PDF 10 KB Posted
- Attached to
- Breckenridge Riverwalk Structures Design
- Solicitation number
- 17-06-102-002
- Issued by
- Summit County, Colorado
About this file
This document is an Addendum No. 2 to a Request for Proposals (RFP) for the Breckenridge Riverwalk Structures Design project, issued by the Town of Breckenridge on July 11, 2024. The addendum modifies the original RFP by extending the proposal due date to August 7, 2024 at 10:00 a.m. local time and adds two new documents to the contract: an Addendum 2 Summary and a Proposer's Questions and Answers document, which can be found on the BidNet platform.
The project involves planning and design for improving the Blue River Recreational Path's accessibility and safety in downtown Breckenridge, with a focus on creating grade-separated crossings and bridges to reduce pedestrian-vehicle conflicts. The project is partially funded by a Colorado Department of Transportation (CDOT) Multimodal Transportation and Mitigation Option Fund grant using Federal ARPA funds, which requires compliance with CDOT and Town design standards. A Disadvantage Business Enterprise (DBE) goal of 10% has been established, and the project aims to enhance multimodal transportation, reduce vehicle trips, and improve overall community mobility and safety.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum to Request For Proposals 17-06-102-002 Breckenridge Riverwalk Structures Design July 11, 2024
Addendum No. 2
This addendum summarizes additions and/or changes made to the Request for Proposals (RFP).
Receipt of all addenda shall be acknowledged on the form included as Attachment A of the RFP.
The following additions and/or changes shall be made:
CHANGE IN PROPOSAL DUE DATE:
The due date of the proposals shall be changed to August 7, 2024 at 10:00a.m. local time.
NEW DOCUMENTS ADDED TO THE REQUEST FOR PROPOSALS:
Add the following documents to the contract (see Addendum #2 documents on BidNet):
Addendum 2 Summary (this document) Proposer’s Questions and Answers
File details come from the government source that posted it. Updated .