This Addendum 2 document, issued by Frederick Water in Virginia on August 14, 2026, modifies the bidding documents for the Whetzel Well Raw Water Line Relocation project. The project consists of constructing approximately 4,700 linear feet of 12-inch HDPE raw water line with associated fittings, bends, valves, air release valves, and connections to existing facilities, including testing and site restoration. The addendum clarifies project scope, corrects references to other inapplicable projects, confirms that blasting is permitted in accordance with Section 31 20 00, and establishes that open-cut installation methodology has received VDOT approval, though the formal Land Use Permit has not yet been issued. The addendum confirms no geotechnical report exists for the project area, no prevailing wage requirements apply, no minority or small business participation goals have been established, and no engineer's estimate is available. Bidders must acknowledge receipt of this addendum on their bid forms or face potential disqualification.
The addendum adds Division 26 - Electrical specifications to the contract documents, requiring the contractor to provide complete electrical work for the magnetic flow meter, including two 2-inch conduits, 115-volt single-phase power from the Chlorine Building, signal wiring, grounding, and terminations, with Frederick Water responsible for SCADA programming and system integration. Suitable material for berm construction is available onsite, and pavement restoration shall comply with the issued VDOT Land Use Permit requirements. The contractor bears responsibility for obtaining and paying for all required permits, including the VDOT Land Use Permit, except where specifically stated otherwise. Frederick Water will provide water for filling, flushing, and pressure testing at no cost to the contractor, who must coordinate all water-related activities. Existing site conditions must be documented prior to construction, and no additional compensation will be provided for work required to satisfy VDOT Land Use Permit and restoration requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
August 14, 2026
ADDENDUM 2
WHETZEL WELL RAW WATER LINE RELOCATION
This Addendum contains 6 pages and listed attachments and forms a part of the bidding documents and modifies the Project Manual dated July 17, 2026 and Drawings dated April 28, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification.
CORRECTIONS AND CLARIFICATONS:
1. Project Title - Addendum 1: Where the project title appears in Addendum 1 as "Whetzel Springs Raw Water Line Relocation," revise it to read "Whetzel Well Raw Water Line Relocation."
2. Instructions to Bidders - Article 5, Section 5.03 - Other Site-Related Documents:
Delete Section 5.03 in its entirety and replace it with the following:
5.03 Other Site-Related Documents
A. No other Site-related documents are available.
The previous reference to the "Sliwinski WTP and Quarry Pump Station Record Drawings" was inadvertently carried over from another project and is not applicable to this Project. No change is made to Section 5.02.
3. Addendum 1 - Response to Questions, Question No. 2 - Blasting: Delete the response to Question No. 2 in its entirety and replace it with the following:
Question 2: Is blasting an option?
Response: Yes. Blasting is permitted and shall be performed in accordance with Section 31 20 00 - Earth Moving, Paragraph 3.14 - Blasting, and all other applicable requirements of the Contract Documents. The Contractor shall comply with all limitations, qualifications, submittal requirements, notifications, monitoring requirements, and other requirements specified therein.
4. Section 31 20 00 – Earth Moving, Paragraph 3.9.K Delete the words “and on quarry property.”
Paragraph 3.9.K is revised to read:
“For trenches within VDOT right-of-way, trench shall be filled from 1 foot above top of pipe to within 6 inches of grade with select fill (VDOT No. 21A or No. 21B).”
5. Table of Contents: Add Division 26 – Electrical, including Sections 26 05 33- Conduits for Electrical Systems and 26 05 830-Wiring Connections.
RESPONSE TO QUESTIONS:
1. Will a staging area be designated for this project?
A staging area will be designated by Frederick Water in coordination with Carmeuse prior to construction.
2. Please confirm that a Geotechnical Report is unavailable for the project area.
Confirmed. Frederick Water has no geotechnical report for the Project area.
3. Is a Land Use Permit required for the project?
A VDOT Land Use Permit is required for Work within the VDOT right-of-way. In accordance with the Contract Documents, the Contractor is responsible for determining, obtaining, and paying for permits required for performance of the Work unless specifically stated otherwise in the Contract Documents.
4. Are there any minority or small and/or local business goals affiliated with the contract?
No specific minority-owned, small-business, or local-business participation percentage or goal has been established for this Contract.
5. Are there prevailing wages for this contract?
No project-specific prevailing wage requirement is included in the Contract Documents.
6. Who will be responsible for road/site repairs due to pre-existing conditions? For example, if a roadway is susceptible to potholes due to thin asphalt or unsuitable material, will the Contractor be compensated for repairs not due to construction?
Existing conditions shall be documented prior to construction. The Contractor shall comply with all VDOT Land Use Permit and restoration requirements, and no additional compensation will be provided for work required to satisfy those requirements.
7. Due to the complexity of the project, please consider extending the bid due date.
Frederick Water will not be extending the bid due date. The bid due date remains as stated in the Contract Documents.
8. Is the demolished shed to be restored afterwards?
No. The existing shed shall be demolished and removed from the site and shall not be replaced or reconstructed. Demolition, removal, and lawful disposal shall be included in the Contractor's Bid.
9. Will a shutdown need to be scheduled for quarry operations during the open-cut installation of casing?
A shutdown of quarry operations is not currently anticipated as part of the Work. The Contractor shall coordinate its construction activities with Frederick Water and quarry operations to minimize interference with ongoing operations. Any activity requiring interruption of or significant disruption to quarry operations shall be coordinated in advance and shall not proceed without prior written approval.
10. Addendum No. 1 specifies open-cut work for casing installation. Section 33 05 05, Paragraph 1.3.B states that VDOT regulations generally require installation by boring, pushing, or jacking and that inclusion of the Section does not constitute VDOT approval of open cut.
a. Has the VDOT Land Use Permit been applied for or issued, and does it expressly authorize the pavement cut as required by Paragraph 1.3.A?
VDOT has indicated approval of the proposed open-cut crossing; however, the formal VDOT Land Use Permit has not yet been issued. The awarded Contractor shall apply for and obtain the VDOT Land Use Permit, with Frederick Water providing any required Owner authorization. Open-cut pavement construction shall not begin until the issued permit expressly authorizes the pavement cut.
b. If VDOT does not authorize open cut, will trenchless installation of the casings be treated as a change to the Contract compensable under General Conditions Article 11, or does Frederick Water consider that scope to be included in the base bid?
The Base Bid shall be based on open-cut construction. VDOT has indicated approval of the proposed open-cut method. If the final VDOT Land Use Permit requires a materially different installation method, the matter will be addressed in accordance with the Contract modification provisions
11. Are there any railroad restrictions or requirements for the work areas nearby?
Frederick Water is not aware of any railroad restrictions or requirements applicable to the Work. If railroad requirements are subsequently imposed that constitute a change in the Work, they will be addressed in accordance with the Contract modification provisions.
12. Section 31 20 00, Paragraph 3.9.K requires VDOT 21A/21B select fill from 1 foot above pipe to within 6 inches of grade for trenches within VDOT right-of-way and on quarry property. Since the entire alignment is on quarry property, does select fill apply to the full 4,700 LF, or only within the VDOT right-of-way?
The VDOT No. 21A or No. 21B select-fill requirement applies only to trenches within the VDOT right-of-way.
13. Does any subsurface, rock-probe, or boring data exist for the alignment?
No. Frederick Water has no subsurface investigation, rock-probe, boring, or geotechnical data for the pipeline alignment. Bidders shall base their Bids on the information contained in the Contract Documents and their examination of the Project site.
14. Section 31 20 00, Paragraph 3.3.B.6 says remove rock to 6 inches below pipe;
Paragraph 3.9.F says 12 inches below pipe with 12 inches of aggregate. Which governs?
Section 31 20 00, Paragraph 3.3.B.6 is hereby revised to be consistent with Paragraph 3.9.F for utility trenches.
15. Section 33 12 43, Paragraph 1.1.B defers all meter electrical, conduit, power, grounding and SCADA work to the Drawings, but there is no Division 26 specification in the Project Manual. Please confirm the full electrical/SCADA scope.
Division 26 – Electrical is included with this Addendum and shall become part of the Contract Documents. The Contractor shall provide the electrical work required for the magnetic flow meter, including conduit, power wiring, signal wiring, grounding, terminations, and associated electrical components required for a complete installation, in accordance with Division 26, Section 33 12 43, and the Drawings.
Frederick Water will be responsible for SCADA programming and system integration.
16. Mag Meter Electrical / SCADA Requirements- We did not locate electrical drawings or specifications showing the electrical requirements for the mag meter. Sheet 4 of 5 indicates that two 2-inch conduits are required. Could the following information be provided?
Source panel/location? Chlorine Building Required voltage for the mag meter? 115 Voltage Single Phase SCADA termination points? – Chlorine Building to Manhole Party responsible for SCADA programming and system integration, if required?
Frederick Water is responsible for SCADA programming and system integration.
17. Berm / Imported Fill-The drawings contain several notes stating that the pipe may be installed at existing ground level and covered with a berm to obtain the required 48 inches of cover. Is suitable material for constructing these berms available onsite, or should bidders include importing suitable fill material in their bids?
Suitable material for construction of the berms is available onsite. Onsite material used for berm construction shall meet the applicable requirements of the Contract Documents.
18. VDOT PAVING REQUIREMENT-Please confirm the required paving section, including stone base, asphalt thickness, and whether milling and overlay will be required.
Pavement restoration shall be in accordance with the issued VDOT Land Use Permit and approved restoration detail. Aggregate base and asphalt types and thicknesses, including any required milling and overlay, shall be as required by VDOT.
19. Is an engineer’s estimate or estimated construction value available for the project?
No Engineer's Estimate or estimated construction value is available for this Project.
20. Who is responsible for providing and paying for the water required for filling, flushing, and pressure testing the new waterline?
Frederick Water will provide the water required for filling, flushing, and pressure testing the new waterline at no cost to the Contractor. The Contractor shall be responsible for coordinating the water source, connections, filling, flushing, testing, discharge, and disposal in accordance with the Contract Documents.
ATTACHMENTS:
Division 26 – Electrical
• Section 26 05 33 – Conduits for Electrical Systems
• Section 26 05 83 – Wiring Connections
END OF ADDENDUM 2
Frederick Water
Connie Morrison-Henry, Purchasing Manager
SECTION 26 05 33 – CONDUITS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL
1.1 SUMMARY
A. This Division includes materials, installation, and requirements for:
1. Wiring connections to equipment
2. Conduit systems (PVC, steel, liquidtight)
3. Electrical accessories and fittings
4. Coordination with equipment furnished under other sections
B. Electrical work includes rough-in, terminations, conduit routing, and support for equipment requiring electrical connection in the project.
1.2 REFERENCE STANDARDS
A. NECA 1 - Standard for Good Workmanship in Electrical Construction; 2010.
B. NECA 111 - Standard for Installing Nonmetallic Raceways (RNC, ENT, LFNC); 2003.
C. NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit, Electrical Metallic
Tubing, and Cable; 2012.
D. NEMA RN 1 - Polyvinyl-Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and
Intermediate Metal Conduit; 2005.
E. NEMA TC 2 - Electrical Polyvinyl Chloride (PVC) Conduit; 2013.
F. NEMA TC 3 - Polyvinyl Chloride (PVC) Fittings for Use with Rigid PVC Conduit and Tubing;
2015.
G. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
H. UL 514B – Conduit, Tubing, and Cable Fittings; Current Edition, Including All Revisions.
I. UL 651 – Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings; Current Edition, Including All Revisions.
1.3 ADMINISTRATIVE REQUIREMENTS
A. Coordination:
1. Coordinate minimum sizes of conduits with the actual conductors to be installed, including adjustments for conductor sizes increased for voltage drop.
2. Coordinate the arrangement of conduits with structural members, ductwork, piping, equipment and other potential conflicts installed under other sections or by others.
3. Verify exact conduit termination locations required for boxes, enclosures, and equipment installed under other sections or by others.
4. Notify Engineer of any conflicts with or deviations from the contract documents. Obtain direction before proceeding with work.
B. Sequencing:
1. Do not begin installation of conductors and cable until installation of conduit is complete between outlet, junction and splicing points.
1.4 SUBMITTALS
A. See Section 01 33 00 Submittal Procedures for submittals procedures.
B. Product Data: Provide manufacturer's standard catalog pages and data sheets for conduits and fittings.
C. Project Record Documents: Record actual routing for conduits installed underground, conduits embedded within concrete slabs, and conduits 2 inch (53 mm) trade size and larger.
1.5 QUALITY ASSURANCE
A. Conform to requirements of NFPA 70.
1.6 DELIVERY, STORAGE & HANDLING
A. Receive, inspect, handle, and store conduit and fittings in accordance with manufacturer's instructions.
PART 2 - PRODUCTS
2.1 CONDUIT APPLICATIONS
A. Do not use conduit and associated fittings for applications other than as permitted by NFPA 70 and product listing.
B. Unless otherwise indicated and where not otherwise restricted, use the conduit types indicated for the specified applications. Where more than one listed application applies, comply with the most restrictive requirements. Where conduit type for a particular application is not specified, use galvanized steel rigid metal conduit
C. Underground:
1. Exterior, Direct-Buried: Use rigid PVC conduit.
2. Where rigid polyvinyl (PVC) conduit is provided, transition to PVC-coated galvanized steel rigid metal conduit where emerging from underground.
2.2 CONDUIT REQUIREMENTS
A. Provide all conduit, fittings, supports, and accessories required for a complete raceway system.
B. Provide products listed, classified, and labeled as suitable for the purpose intended.
C. Minimum Conduit Size, Unless Otherwise Indicated:
1. Underground, Interior: 0.75-inch trade size.
2. Underground, Exterior: 0.75-inch trade size.
D. Where conduit size is not indicated, size to comply with NFPA 70 but not less than applicable minimum size requirements specified.
2.3 RIGID POLYVINYL CHLORIDE (PVC) CONDUIT
A. Manufacturers:
1. Cantex Inc: www.cantexinc.com
2. Carlon, a brand of Thomas & Betts Corporation: www.carlon.com
3. JM Eagle: www.jmeagle.com http://www.carlon.com/ http://www.jmeagle.com/
B. Description: NFPA 70, Type PVC rigid polyvinyl chloride conduit complying with NEMA TC 2 and listed and labeled as complying with UL 651; Schedule 40 unless otherwise indicated, Schedule 80 where subject to physical damage; rated for use with conductors rated 90 degrees C.
C. Fittings:
1. Manufacturer: Same as manufacturer of conduit to be connected.
2. Description: Fittings complying with NEMA TC 3 and listed and labeled as complying with UL 651; material to match conduit.
2.4 ACCESSORIES
A. Conduit Joint Compound: Corrosion-resistant, electrically conductive; suitable for use with the conduit to be installed.
B. Solvent Cement for PVC Conduit and Fittings: As recommended by manufacturer of conduit and fittings to be installed.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that field measurements are as indicated.
B. Verify that mounting surfaces are ready to receive conduits.
C. Verify that conditions are satisfactory for installation prior to starting work.
3.2 INSTALLATION
A. Install products in accordance with manufacturer's instructions.
B. Perform work in accordance with NECA 1 (general workmanship).
C. Install rigid polyvinyl chloride (PVC) conduit in accordance with NECA 111.
D. Conduit Routing:
1. Unless dimensioned, conduit routing indicated is diagrammatic.
2. When conduit destination is indicated without specific routing, determine exact routing required.
3. Arrange conduit to maintain adequate headroom, clearances, and access.
4. Arrange conduit to provide no more than the equivalent of four 90 degree bends between pull points.
5. Arrange conduit to provide no more than 150 feet between pull points.
6. Route conduits above water and drain piping where possible. Arrange conduit to prevent moisture traps. Provide drain fittings at low points and at sealing fittings where moisture may collect.
7. Maintain minimum clearance of 6 inches between conduits and piping for other systems.
8. Maintain minimum clearance of 12 inches between conduits and hot surfaces.
E. Underground Installation:
1. Provide trenching and backfilling in accordance with Section 31 20 00 - Earth Moving.
3.3 FIELD QUALITY CONTROL
A. Correct deficiencies and replace damaged or defective conduits.
3.4 CLEANING
A. Clean interior of conduits to remove moisture and foreign matter.
3.5 PROTECTION
A. Immediately after installation of conduit, use suitable manufactured plugs to provide protection from entry of moisture and foreign material and do not remove until ready for installation of conductors.
END OF SECTION 26 05 33
SECTION 26 05 83 – WIRING CONNECTIONS
PART 1 - GENERAL
1.1 SUMMARY
A. Electrical connections to equipment.
1.2 REFERENCE STANDARDS
A. NEMA WD 1 - General Color Requirements for Wiring Devices; 1999 (R 2010).
B. NEMA WD 6 - Wiring Devices - Dimensional Specifications; 2012.
C. NFPA 70 - National Electrical Code; Most Recent Edition Adopted by Authority Having
Jurisdiction, Including All Applicable Amendments and Supplements.
1.3 ADMINISTRATIVE REQUIREMENTS
1.4 SUBMITTALS
A. See Section 01 33 00 Submittal Procedures for submittals procedures.
B. Product Data: Provide wiring device manufacturer’s catalog information showing dimensions, configurations, and construction.
C. Manufacturer's Instructions: Indicate application conditions and limitations of use stipulated by product testing agency. Include instructions for storage, handling, protection, examination, preparation, and installation of product.
1.5 QUALITY ASSURANCE
A. Conform to requirements of NFPA 70.
B. Products: Listed, classified, and labeled as suitable for the purpose intended.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Flexible Conduit: Provide flexible conduit suitable for the application. Use liquidtight flexible conduit with watertight connectors in damp or wet locations.
B. Conductors and signal cables for the magnetic flow meter shall comply with Section 33 12 43, the approved meter manufacturer requirements, and NFPA 70.
C. Grounding and bonding for the magnetic flow meter shall comply with Section 33 12 43 and the approved meter manufacturer requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that equipment is ready for electrical connection, wiring, and energization.
3.2 ELECTRICAL CONNECTIONS
A. Make electrical connections in accordance with equipment manufacturer's instructions.
B. Make conduit connections to equipment using flexible conduit. Use liquidtight flexible conduit with watertight connectors in damp or wet locations.
C. Provide receptacle outlet only where equipment is furnished with an attachment plug.
D. Install suitable strain-relief clamps and fittings for cord connections at outlet boxes and equipment connection boxes.
END OF SECTION 26 05 83
| Division 26-Electrical.pdf |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCE STANDARDS |
| 1.3 ADMINISTRATIVE REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE & HANDLING |
| 2.1 CONDUIT APPLICATIONS |
| 2.2 CONDUIT REQUIREMENTS |
| 2.3 RIGID POLYVINYL CHLORIDE (PVC) CONDUIT |
| 2.4 ACCESSORIES |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCE STANDARDS |
| 1.3 ADMINISTRATIVE REQUIREMENTS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 2.1 MATERIALS |
| 3.1 EXAMINATION |
| 3.2 ELECTRICAL CONNECTIONS |