About this file

This is Addendum 1 to the bidding documents for the Whetzel Springs Raw Water Line Relocation project issued by Frederick Water in Virginia on August 10, 2026. The project consists of construction of approximately 4,700 linear feet of 12-inch HDPE raw water line, including associated fittings, bends, valves, air release valves, and tie-ins to existing facilities, testing, and restoration. A pre-bid conference was held on July 28, 2026, with attendance from seven contractor firms representing Snyder Environmental, Morgan Contracting, Bushong Contracting, BD Excavating, and Judy Excavating, along with four Frederick Water representatives and one representative from Pennoni. The addendum clarifies project requirements and modifies the original Project Manual dated July 17, 2026, and Drawings dated April 28, 2026. Bidders must acknowledge receipt of this addendum on the Bid Form or face potential disqualification.

Key project clarifications include the demolition and removal of an existing shed within the project area at the Contractor's cost, careful removal and reinstallation of existing chain-link fencing with replacement of damaged materials at no cost to the Owner, and installation of specific gate types at designated stations. All pipeline installation, including roadway crossings, must be completed using open-cut construction methods; trenchless installation methods such as jack-and-bore are not permitted. Rock excavation shall be performed using mechanical methods only, with blasting prohibited. Disturbed areas must be restored to original grades and contours with backfill compacted to a minimum of 95% of maximum dry density per ASTM D698, and the Contractor is responsible for obtaining all required permits and coordinating with permitting authorities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

August 10, 2026

ADDENDUM 1

WHETZEL SPRINGS RAW WATER LINE RELOCATION

This Addendum contains 2 pages and listed attachments and forms a part of the bidding documents and modifies the Project Manual dated July 17, 2026 and Drawings dated April 28, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject bidder to disqualification.

CLARIFICATONS:

1. The attendance list from the pre-bid conference is attached.

2. Shed Demolition: The existing shed located within the project area shall be demolished and removed from the site. Demolition and disposal of the shed shall be included in the Contractor’s bid.

3. Chain-Link Fence: The existing chain-link fence shall be carefully removed, protected from damage, and reinstalled following completion of the work. Any fence materials damaged by the Contractor shall be replaced with matching materials at no additional cost to the Owner. The fences at the following stations: 5+53, 9+50, 10+77 & 14+61 will be demolished by the Contractor. At stations 5+53 and 14+61 the Contractor will install 55" high 12' long 2" x 12 gauge tubing (6 bars) County Line Utility Tube Gate green color. At stations 9+50 and 10+77 the Contractor will install 55" high American wire fence with 12.5 wire gauge, horizontal spacing (stay wire) of 6", Hinge-Joint and standard graduated vertical mesh opening.

4. Trenchless Installation: Jack-and-bore or other trenchless installation methods will not be required. All pipeline installation, including roadway crossings, shall be completed by open-cut construction in accordance with the Contract Documents and applicable permitting requirements.

RESPONSE TO QUESTIONS:

1. How close to original grade to maintain?

Disturbed areas shall be restored to the original lines, grades, and contours and shall smoothly match the adjacent undisturbed ground. Final grading shall maintain existing drainage patterns and shall not create low areas where water may pond.

Backfill shall be compacted to a minimum of 95% of the maximum dry density in accordance with ASTM D698.

2. Is blasting an option?

Blasting will not be permitted. Rock excavation shall be performed using mechanical methods and shall be included in the Contractor’s bid.

3. Is an electrical permit required?

The Contractor shall be responsible for determining whether an electrical permit or any other permits are required for the Work. The Contractor shall coordinate with the appropriate permitting authorities and obtain all required permits, inspections, and approvals.

ATTACHMENTS:

1. List of Pre-Bid Conference Attendees (1 page)

END OF ADDENDUM 1

Frederick Water

Connie Morrison-Henry, Purchasing Manager

ATTACHMENT 1

Pre Bid Conference Attendees

Project: Whetzel Spring Raw Water Line Relocation

Owner: Frederick Water Date: 7/28/2026

Name Company Phone Email

Lisa Miller

Snyder Environmental 304-725-9140 lmiller@snyderenv.com

Erin Lee Morgan Contracting 865-249-8640 estimating@morgan1.com

Bryan Gywn Bushong Contracting 540-459-5975 bryan@bushongcontracting.com

Ryan Hoy BD Excavating 540-868-2797 ryan@bdexcavating.com Bryan Henry BD Excavating 540-868-2797 bryan@bdexcavating.com John Smith BD Excavating 540-868-2797 john.smith@bdexcavating.com Jamie Judy Judy Excavating 540-869-2310 jamie.judy @judyexcavating.com

Connie Morrison- Henry Frederick Water 540-866-0126 chenry@frederickwater.com

Scott Bender Frederick Water 540-868-1061 sbender@frederickwater.com Brandon Abshire Frederick Water 540-868-1061 BAbshire@frederickwater.com Shuma Gresham Frederick Water 540-868-1061 Shuma.Gresham@frederickwater.com Karl Schaeffer Pennoni KSchaeffer@Pennoni.com

File details come from the government source that posted it. Updated .