Addendum 2-WCCC New Access Road Addendum No 2.pdf
PDF 7 MB Posted
- Attached to
- WCCC New Access Road
- Solicitation number
- B27000435
- Issued by
- Honolulu County, Hawaii
About this file
This addendum document modifies the original solicitation for Work Order 39 - Women's Community Correctional Center (WCCC) New Access Road issued by the Hawaii Department of Corrections and Rehabilitation, Job No. DCR 24-WCCC-0016, located at Tax Map Key (1) 4-2-003:004 in Kailua, Hawaii. Addendum No. 2, dated October 21, 2026, revises the Solicitation, Offer and Contract Form (Section 00410) to add a line item for Allowance A - Arborist Services and modifies Section 01210 - Allowances to include an $8,000 allowance for arborist services. The addendum revises multiple civil engineering drawings including the Demolition and Erosion and Sediment Control Plan (Sheet C06), Site Grading and Drainage Plan (Sheet C08), Typical Sections for Driveway Access Road "A" (Sheet C10), and Miscellaneous Details sheets (C11 and C12) to address protection of an existing monkeypod tree through revised infiltration trench location, addition of root control barriers, tree protection fencing details, and traffic control signage. The addendum provides clarifications confirming that contractors must retain their own qualified arborist for tree trimming and pruning work, that the existing access road will remain available for equipment, that security fencing may be installed to protect trenches and equipment, and that the arborist work plan must be reviewed by the Department before any tree pruning or excavation commences.
The lump sum allowance of $8,000 for arborist services covers professional services including site inspection, arborist work plan preparation, tree identification, protection measure recommendations, construction clearance evaluation, root and canopy impact assessment, permit identification, observation of construction activities, and field reporting. The allowance is an estimate and may increase or decrease based on actual scope and costs, with physical tree work and tree protection installation costs included in the total lump sum bid price rather than charged against the allowance. Unused allowance amounts must be credited to the State through change order at project closeout. Bid security of at least 5 percent of the total lump sum bid amount is required for bids of $25,000 or more, and performance and payment bonds equal to 100 percent of the contract price must be furnished within 10 consecutive calendar days after the award letter. The contract duration is 180 calendar days, with liquidated damages of $750 per calendar day assessed for failure to complete within the specified time. All work must comply with Hawaii's prevailing wage requirements under Chapter 104 HRS and safety and health program requirements under HRS 396-18, with the apprenticeship agreement preference applying due to the estimated contract value exceeding $250,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WO39 WCCC New Access Road Addendum No. 2 (10/21/26) Job No. DCR 24-WCCC-0016 Page 1 of 3
ADDENDUM NO. 2
TO CONSTRUCT
WOMEN’S COMMUNITY CORRECTIONAL CENTER
WORK ORDER 39 – WCCC NEW ACCESS ROAD
JOB NO: DCR 24-WCCC-0016
TAX MAP KEY: (1) 4-2-003:004
KAILUA, HAWAI‘I
FOR AND BY THE DEPARTMENT OF CORRECTIONS AND REHABILITATION
STATE OF HAWAI‘I
DATE OCTOBER 21, 2026
This addendum modifies the original Solicitation Documents for the Project dated September 2026 and any previously issued addenda. The items in this addendum shall govern the work, taking precedence over previously issued specifications and drawings governing the items mentioned. Acknowledge receipt of this Addendum in the space provided on the Solicitation, Offer and Contract Form.
Job No. DCR 24-WCCC-0016 Page 2 of 3
A. CHANGES TO SPECIFICATIONS: The following pages of the Solicitation Documents are revised:
1. REVISED SECTIONS: The following previously issued specification sections are
Revised:
a. Modified SECTION 00410 – SOLICITATION, OFFER, AND CONTRACT
FORM, page 6, Attachment A, paragraph A.1 to add a line item for Allowance A – Arborist Services.
b. Modified SECTION 01210 – ALLOWANCES, page 3, paragraph 3.02.A to add an $8,000 allowance for arborist services.
B. CHANGES TO DRAWINGS:
1. REVISED DRAWINGS: The following previously issued drawings dated [m/d/y] are revised and reissued. These revised drawings supersede the previously issued drawings:
Sheet Group Sheet No. Sheet Name or Description
CIVIL C06 DEMOLITION AND
EROSION AND SEDIMENT
CONTROL PLAN
1) Revised location of infiltration trench to reduce impact on the existing monkeypod tree.
2) Updated “Existing Monkeypod Tree” callout.
CIVIL C08 SITE GRADING AND DRAINAGE PLAN
• Revised location of infiltration trench to reduce impact on the existing monkeypod tree; revised callouts related to the infiltration trench and swales leading to the trench.
• Updated “Existing Monkeypod Tree” callout (same as C06).
• Added traffic control signs and markings (Stop and Left Turn Prohibited signs and pavement stop bar).
• Added stormwater flow arrows to indicate downstream outfall.
CIVIL C10 TYPICAL SECTIONS DRIVEWAY
ACCESS ROAD “A
• Updated sections related to the revised infiltration trench layout.
Job No. DCR 24-WCCC-0016 Page 3 of 3
CIVIL C11 MISCELLANEOUS DETAILS – 1
• Added root control barrier to the edge of pavement facing the monkeypod tree (Detail No. 1).
• Removed root barrier from the infiltration trench detail (Detail No.
5).
• Added traffic control sign detail (Detail No. 6).
• Revised layout and arrangement of the double swing gate detail (Detail No. 4) to accommodate the sign detail.
CIVIL C12 MISCELLANEOUS DETAILS – 2
• Added tree protection fence and notes detail (Detail No. 4).
• Revised layout of the bollard detail (Detail No. 3) to accommodate the tree protection fence and notes detail.
C. CLARIFICATIONS:
Following are the Consultant’s responses (A) to questions (Q) received:
Q1: Please confirm that bidder’s responsibility to contract their own arborist and only under their recommendations, perform the tree trimming and pruning. Can this be a line item for the bid?
A1: Confirmed. The Contractor shall retain a qualified arborist for any required tree trimming or pruning. A cash allowance will be included in the bid.
Q2: Please confirm that the current access road will be available for Super Dumps, and low hanging branches will be trimmed by the owners/site staff.
A2: Confirmed. The existing access road will be available for Super Dumps. Existing exceptional trees shall be protected and/or avoided in accordance with the arborist work plan.
Q3: Please confirm that bidders can install security fencing around the job site to protect trenches and equipment.
A3: Confirmed. Security fencing may be installed around the job site to protect trenches and equipment.
END OF ADDENDUM NO. 2
Addendum No. 2 (10/21/26)
WO39 WCCC New Access Road Solicitation, Offer and Contract Form Job No. DCR 24-WCCC-0016 00410 - 1
SOLICITATION, OFFER AND CONTRACT FORM
1. Job No:
DCR 24-WCCC-0016
2. TYPE OF SOLICITATION
SEALED BID (IFB)
SEALED PROPOSAL (RFP)
3. PAGE OF PAGES
IMPORTANT – The “offer” section must be fully completed by offeror.
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
4. ISSUED BY:
DEPARTMENT OF CORRECTIONS AND
REHABILITATION
ADMINISTRATIVE SERVICES OFFICE
1177 ALAKEA STREET, ROOM 306
HONOLULU, HAWAIʻI 96813
5. ADDRESS OFFER TO:
SAME AS BLOCK 4
6. FOR INFORMATION
Call:
Or Visit:
A. NAME
Mr. Barry S. Rouse Jr.
http://www.hawaii.gov/pwd/construction_bids
B. TELEPHONE NO. (NO
COLLECT CALLS)
(808) 587-1237
SOLICITATION
7. THE STATE OF HAWAII REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS TO
CONSTRUCT:
WOMEN’S COMMUNITY CORRECTIONAL FACILITY
WO39 WCCC NEW ACCESS ROAD
TMK: (1) 4-2-003:004
Kailua, Hawaiʻi
After carefully examining the bid documents including the specifications, drawings, addenda, and other proposed contract documents, the bidder shall furnish all labor, materials, machinery, tools, superintendence, transportation, and other construction accessories, services, and facilities necessary to construct and complete, at its own risk and expense, the work and requirements of the Project for the cost and time stipulated in the COST, TIME AND SCHEDULE article of Attachment A of this Form. The bidder agrees to the conditions and requirements stipulated in this SOLICITATION, OFFER AND CONTRACT FORM and any attachments thereto.
8. The Contractor shall complete the work as stipulated in the COST, TIME, AND SCHEDULE article of Attachment A. This performance period is mandatory.
9. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS WITHIN 10 CONSECUTIVE CALENDAR DAYS AFTER DATE OF THE LETTER OF AWARD. IF ALTERNATE FORMS OF SECURITY WILL BE SUBMITTED, REFER TO STATE OF HAWAII, GENERAL CONDITIONS 3.7.1.3. INCORPORATED HEREIN BY
REFERENCE.
Job No. DCR 24-WCCC-0016 00410 - 2
10. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed bids/offers to perform the Work shall be submitted electronically through the State of Hawaiʻi eProcurement System (HIePRO) under the applicable solicitation no later than the date and time specified in the Notice to Bidders.
Late submissions will not be accepted or considered. The Offeror bears sole responsibility for ensuring successful submission of its bid/offer through HIePRO prior to the solicitation closing date and time. If this is a sealed bid solicitation, bids/offers will be publicly opened at the time specified in the Notice to Bidders.
B. Bid Security is required and must be submitted with the offer if the offer amount is $25,000 or more.
C. Listing of Joint Contractors and Subcontractors – Any offeror must submit with its offer, the name of each person or firm to be engaged by the offeror as a joint contractor or subcontractor in the performance of the contract and the nature and scope of the work to be performed by each. The offeror is directed to complete the joint contractors and subcontractors list form included in the solicitation and submit it with the offer.
D. The Offeror be registered and compliant with Hawaii Compliance Express, link found at http://vendors.ehawaii.gov/hce/splash/welcome.html.
E. All offers are subject to the requirements of the solicitation, including the Specifications, Notice to Bidders, Instruction to Bidders, General Conditions, and Drawings, any Special Conditions, Addenda, Bid Clarifications, and any other provision whether incorporated in full text or by reference in, or attached to, the solicitation.
F. Contractors are hereby notified of the applicability of Section 11-355 HRS, which states that campaign contributions are prohibited from specified State or county government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body.
G. Recycled Product Preference – Certain recycled products are not acceptable for use in this project. Any offeror proposing to use the recycled product preference must complete the recycled product preference schedule form in the solicitation and submit it with the offer.
http://vendors.ehawaii.gov/hce/splash/welcome.html
Job No. DCR 24-WCCC-0016 00410 - 3
OFFER (Must be fully completed by offeror)
11. NAME AND ADDRESS OF OFFEROR (Include Zip Code) (*1)
12. REMITTANCE ADDRESS (Include only if different than item 11)
13. TELEPHONE NO. (Include area code ) FAX NO.
14. EMAIL ADDRESS
15. FEDERAL EMPLOYER ID # (FEIN)
16. HAWAII GENERAL EXCISE ID #
17. BUSINESS ORGANIZATION (*2) 18. CONTRACTOR’S LICENSE NO.
19. The offeror agrees to perform the work required at the price(s) specified in the COST, TIME AND SCHEDULE article of Attachment A in strict accordance with the terms of this solicitation, including any attachments thereto, if this offer is accepted by the State of Hawaii within 60 calendar days after the date offers are due.
20. The offeror has completed Attachment A.
21. COMPLIANCE WITH §3-122-112 (HAR) {BIDDER’S INSTRUCTIONS: Mark one box only. If a Non-Hawaii Business, write your State’s name where incorporated.}
The undersigned represents:
A Hawaii Business incorporated or organized under the laws of the State of Hawaii.
Or A Compliant Non-Hawaii Business not incorporated or organized under the laws of the State of Hawaii, but registered at the State of Hawaii, Department of Commerce and Consumer Affairs, Business Registration Division to do business in the State of Hawaii. State of incorporation: ________________________
22A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
22B. SIGNATURE: I declare under penalty of law that the foregoing is true and correct to the best of my knowledge. (*3)
22C. DATE:
Job No. DCR 24-WCCC-0016 00410 - 4
BIDDERS INSTRUCTIONS AND SOLICITATION, OFFER AND CONTRACT FORM FOOTNOTES (footnotes relate to boxes 11, 17 & 22B) (*1) If the Offeror is a "dba" of a sole proprietor, furnish the exact legal name as registered with the Department of
Commerce and Consumer Affairs.
If Offeror is a “dba” or a “division” of a corporation, furnish the exact legal name of the corporation under which the awarded contract will be executed.
The address included in this box will be used for correspondence.
(*2) For Business Organization, enter one of the following: Sole Proprietor, Partnership, Corporation, Joint Venture, or
Other.
(*3) MANUAL SIGNATURE REQUIRED: attach to this page evidence of the authority of this signatory to submit bids on behalf of the Offer, and also the names and residence addresses of all officers of the company.
Fill in information in all blank spaces or the bid may be invalidated. SOLICITATION, OFFER AND CONTRACT FORM MUST BE INTACT; MISSING PAGES OR ANY ALTERATIONS MAY INVALIDATE THE BID. TYPE OR WRITE ALL
INFORMATION IN INK. USE INK FOR MANUAL SIGNATURE.
Job No. DCR 24-WCCC-0016 00410 - 5
CONTRACT (To be completed by State of Hawaii)
23. CONTRACT NO. 23A. CONTRACT DATE:
24. ITEMS ACCEPTED:
25. AMOUNT: 27. PAYMENT WILL BE MADE BY:
(Department)
By ______________________________________
Signature
Print Name
Title
26. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK
4 UNLESS DIFFERENT ADDRESS STIPULATED HERE
(7 copies unless otherwise specified)
Job No. DCR 24-WCCC-0016 00410 - 6
ATTACHMENT A
A. COST, TIME, AND SCHEDULE
WOMEN’S COMMUNITY CORRECTIONAL CENTER
WO39 – WCCC New Access Road Job No: DCR 24-WCCC-0016
1. COST:
Project Bid Price $________________
Allowance See Section 01210 – ALLOWANCES for description.
Allowance A – Arborist Services $________________
TOTAL LUMP SUM BID PRICE $________________
_____________________________________________________ DOLLARS
{BIDDER’S INSTRUCTIONS: Fill in the total lump sum bid price in numbers and write out the total lump sum bid price in words.}
2. TIME:
See SECTION 01100 – PROJECT REQUIREMENTS for additional time and duration requirements.
Contract Duration 180 Calendar Days
3. SCHEDULE FOR WORK
Contractor shall commence and complete all work within the contract duration stipulated and as follows:
a. After the project is awarded, the contractor shall begin preparatory work, obtain approvals, permits, process submittals or conduct other work as directed. The contractor shall not start any work at the jobsite or order any materials, unless the Department specifically issues a written authorization to proceed with designated work.
b. Upon receipt of the executed contract and a written authorization from the
Department, the contractor may proceed with ordering materials, doing offsite fabrication and similar work, approved by DCR, prior to issuance of the formal Notice to Proceed. The Contractor shall not start any work at the jobsite before the formal Notice to Proceed is issued, unless the Department specifically issues a written authorization to proceed with designated work. Payment for materials ordered and received prior to DCR issuance of the formal Notice to Proceed are subject to the following conditions:
1. The contractor is responsible for all storage costs incurred. No additional compensation will be made;
Job No. DCR 24-WCCC-0016 00410 - 7
2. Ordering materials prior to the formal Notice to Proceed will not decrease or increase the specified contract time; and
3. Conditions as specified in the SECTION 00700 – GENERAL
CONDITIONS, and other conditions required by the contract documents.
c. After issuance of the formal Notice to Proceed or upon written authorization from the Department to proceed with designated work, the contractor shall order approved materials, do off-site fabrication and similar work. The contractor shall start and complete the jobsite work per the dates, times and durations noted in the COST, TIME AND SCHEDULE article.
4. ALLOWANCES
Bidder includes in the Lump Sum Bid Price, cash allowances that are itemized in the COST, TIME AND SCHEDULE article and described in Section 01210 - ALLOWANCES. (The allowance is an estimate and may increase or decrease, depending on the actual cost of the vendor who will perform the work.)
B. BID SECURITY
Mark the applicable box. State in words and numerals the Bid Bond dollar amount.
See the Bidder’s Instructions at the end of this section for additional information.
Enclosed with this BID FORM:
Surety Bond (*4) Legal Tender (*5) Cashier’s Check (*6) Certificate of Deposit (*6) Certified Check (*6) Official Check (*6) Share Certificate (*6) Teller’s Check (*6) Treasurer’s Check (*6) {BIDDER’S INSTRUCTIONS: * See below for footnotes.
(*4) Surety bond underwritten by a company licensed to issue bonds in this State (Note:
Surety bond shall be substantially in the form of the sample in the Appendix to the Interim General Conditions);
(*5) Legal tender; or (*6) A certificate of deposit; share certificate; or cashier’s, treasurer’s, teller’s, or official check drawn by, or a certified check accepted by, and payable on demand to the State by a bank, a savings institution, or credit union insured by the Federal Deposit Insurance Corporation or the National Credit Union Administration.
a. These instruments may be utilized only to a maximum of $100,000.
b. If the required security or bond amount totals over $100,000, more than one instrument not exceeding $100,000 each and issued by different financial institutions shall be accepted.}
In the amount of:
__________________________________________ DOLLARS ($______________)
(Bid Security shall be no less than 5% of the total lump sum bid amount) as required by law.
Job No. DCR 24-WCCC-0016 00410 - 8
C. RECEIPT OF ADDENDA AND BID CLARIFICATIONS
Bidder acknowledges receipt of the following Addenda and Bid Clarifications issued by the Department, and the bidder shall indicate by marking each applicable box:
Addendum No. 1 Bid Clarification No. 1 Addendum No. 2 Bid Clarification No. 2 Addendum No. 3 Bid Clarification No. 3 Addendum No. 4 Bid Clarification No. 4 Addendum No. 5 Bid Clarification No. 5
D. APPRENTICESHIP AGREEMENT PREFERENCE
The estimated value of the public works contract is $250,000 or more and the apprenticeship agreement preference pursuant to Hawaii Revised Statutes §103-55.6 (Act 17, SLH 2009) shall apply. Complete self-certification form below.
E. OTHER CONDITIONS
1. Bidder agrees to pay liquidated damages as specified in SECTION 00410 –
SOLICITATION, OFFER AND CONTRACT FORM.
2. Bidder declares that its firm was not assisted or represented by an individual who has, in a State capacity, been involved in this project or this proposed contract in the past two consecutive years.
3. Anti-collusion Certification – In accordance with §3-122-192 (HAR), the bidder declares that the price submitted for this bid is independently arrived at without collusion.
4. Certification for Safety and Health Programs for Offers in excess of $100,000
– In accordance with HRS 396-18, the bidder certifies that its organization will have a written safety and health plan for this project that will be available and implemented by the date when onsite construction starts. Bidder may obtain the requirements for the safety plan from the Department of Labor and Industrial Relations, Occupational, Safety and Health Division (HIOSH).
5. Labor and Wage Certification (Chapter 104 HRS) – For projects in excess of
$2,000, the bidder shall comply with the requirements of Chapter 104 HRS, “Wages and Hours of Employment on Public Works Construction Projects” and shall certify that:
a. Individuals engaged in the performance of the contract on the job site shall not be paid less than wages the Director of Labor and Industrial Relations determines to be prevailing for corresponding classes of laborers and mechanics employed on public works projects, including any periodic adjustments to the prevailing wages during the performance of the contract;
and
b. Overtime compensation shall be at one and one-half times the basic hourly rate plus fringe benefits for hours worked on Saturday, Sunday, or legal holiday of the State or in excess of eight hours on any other day; and
Job No. DCR 24-WCCC-0016 00410 - 9
c. All applicable laws of the federal and state governments relating to workers’ compensation, unemployment compensation, payment of wages, and safety shall be fully complied with.
6. Upon the acceptance of the bid by the Procurement Officer, the bidder must enter into and execute a contract and furnish a performance and payment bond. These bonds shall conform to the provisions of HRS Sections 103D-324 and 325, and any law applicable thereto.
7. Compliance with §103D-310 HRS: Bidder shall be incorporated or organized under the laws of the State or registered to do business in the State as a separate branch or division that is capable of fully performing under the contract.
F. LISTING JOINT CONTRACTORS OR SUBCONTRACTORS (HRS, 103D-302)
It is the sole responsibility of the bidder to review the requirements of this project and determine the appropriate specialty contractor’s licenses that are required to complete the project. The bidder acknowledges that as a general contractor (‘A’ or ‘B’ license) the bidder is prohibited from undertaking any work solely or as part of a larger project, which would require the bidder (‘A’ or ‘B’ general contractor) to act as a specialty (‘C’ license) contractor in any area in which the bidder (‘A’ or ‘B’ general contractor) has no specialty contractor’s license. The bidder (‘A’ or ‘B’ general contractor) must have the appropriate ‘C’ specialty contractor’s licenses either obtained on its own, or obtained automatically under HAR §16-77-32.
General Engineering ‘A’ Contractors automatically have these ‘C’ specialty contractor’s licenses: C-3, C-9, C-10, C-17, C-24, C-31a, C-32, C-35, C-37a, C-37b, C-38, C-43, C-49, C-56, C-57a, C-57b, and C-61.
General Building ‘B’ Contractors automatically have these ‘C’ specialty contractor’s licenses: C-5, C-6, C-10, C-12, C-24, C-25, C-31a, C-32a, C-42a, and C-42b.
Bidder agrees the completed listing of joint contractors or subcontractors is required for the project and that the bidder, together with the listed joint contractors and subcontractors, have all the specialty contractor’s licenses to complete the work.
Job No. DCR 24-WCCC-0016 00410 - 10
Joint Contractors or Subcontractors List {BIDDER’S INSTRUCTIONS: Refer to SECTION 00210 – INSTRUCTIONS TO BIDDERS for detailed instruction to fill out this list. Write in the complete firm name and nature of work to be performed by the required joint contractor or subcontractor.}
COMPLETE FIRM NAME JOINT CONTRACTOR
OR SUBCONTRACTOR
NATURE OF WORK TO BE PERFORMED
Job No. DCR 24-WCCC-0016 00410 - 11
G. LIQUIDATED DAMAGES
Liquidated damages in the amount of $750.00 per calendar day of delay will be deducted from the Contractor’s final payment if the work is not completed within the time specified in this solicitation and any time extensions granted in writing to the Contractor by the State.
H. COMPENSATION
All payments shall be made in the manner and at the times indicated in the Contract Documents.
It is understood and agreed that the compensation paid by the State to the Contractor shall include all expenses incurred by the Contractor for all loss or damage arising out of the nature of the work, from the action of the elements, or from any delay or unforeseen obstruction or difficulty encountered in the prosecution of the work; for all risks of every description connected with the work; and for all expenses incurred by or in consequence of the suspension or discontinuation of the work, except as set forth in the General Conditions.
It is further agreed by the parties that any portion of the Contract price payable to the Contractor out of federal funds shall be paid to the Contractor only when such federal funds are received, and this contract shall not be construed as binding the State to pay said portion out of any fund other than those which are received from the Federal government.
I. GUARANTY OF WORK
The Contractor agrees to guaranty all work under this Contract for the period(s) stipulated in the Contract Documents from the project acceptance date.
If any unsatisfactory condition or damage develops within the time of this guaranty due to materials or workmanship that are deficient, inferior, or not in accordance with the contract, the Contractor shall, when notified by the State, immediately place such guaranteed work in a condition satisfactory to the State and make repairs of all damage to the buildings, equipment and grounds made necessary in fulfillment of the guaranty. Everything necessary for the fulfillment of any guaranty shall be done without any expense to the State. It is understood that the performance and payment bond furnished by the Contractor under this Contract may be used to secure performance of Contractor’s guaranty.
J. CONTRACT DOCUMENTS
It is understood and agreed that the following documents, and any amendments or addenda thereto, comprise this contract and are fully a part of this Contract as though attached hereto or set forth at length herein: (1) Contractor’s accepted proposal; (2) General Conditions; (3) Drawings; (4) Specifications, including the Notice to Bidders, Instructions to Bidders, Addenda, Bid Clarifications, if any; (5) Combination Performance and Labor and Material Payment Bond; and (6) this Contract Agreement.
Job No. DCR 24-WCCC-0016 00410 - 12
K. ENTIRE AGREEMENT
This Contract is the entire agreement between parties, and no alterations, changes, or additions thereto shall be made, except in writing approved by the parties.
L. ATTACHMENTS TO BE PROVIDED BY OFFER AS APPLICABLE
Corporate Resolution Certificate of Vendor Compliance (HCE) Surety Bid Bond
Power of Attorney
END OF SECTION
WO39 WCCC New Access Road Allowances Job No. DCR 24-WCCC-0016 01210 - 1
SECTION 01210 - ALLOWANCES
PART 1 - GENERAL
1.01 SUMMARY
A. This Section includes administrative and procedural requirements governing allowances.
1. Certain services are specified in the Contract Documents by allowance. The allowance has been established where the final extent of the Work will depend on field conditions, arborist recommendations, and Department direction.
B. Types of allowances include the following:
1. Lump sum allowances.
C. Related Sections include the following:
1. General Conditions - Article 4 SCOPE OF WORK for procedures for submitting and handling Change Orders.
1.02 COORDINATION
A. At the earliest practical date after award of the Contract, coordinate the arborist services required by the allowance so the Work does not delay construction or restrict required access.
B. Do not begin pruning, root-zone work, or other activity that may affect an exceptional tree until the Arborist Work Plan has been reviewed by the Department and required permits or approvals have been obtained.
1.03 SUBMITTALS
A. Submit proposals for purchase of services included in allowances.
B. Arborist Qualifications: Submit documentation of the arborist’s current professional certification and experience with exceptional trees, construction-phase tree protection, pruning oversight, and root-impact evaluation.
C. Arborist Work Plan: Submit an informational Work Plan prepared by the certified arborist before beginning pruning, excavation, or other Work that may affect existing trees.
Include, at a minimum:
1. Identification of exceptional trees and other trees within or adjacent to the Work Area that may be affected by construction.
2. Tree-protection measures and limits, including measures to avoid unauthorized alteration or damage to exceptional trees.
3. Recommended pruning required for safe construction access and clearance near the new access road.
4. Procedures for work near the infiltration trench, including observation of excavation, evaluation of encountered roots, and direction for root protection or pruning.
5. Required sequence, hold points, arborist observation periods, access restrictions, and protective measures.
Job No. DCR 24-WCCC-0016 01210 - 2
6. Identification of permits or approvals required for work affecting exceptional trees, including supporting documentation to be prepared by the arborist
D. Field Reports: Submit written arborist reports documenting site observations, directions given, pruning and root work performed, protective measures installed, and recommended corrective actions.
E. Cost Documentation: Submit proposals, invoices, receipts, time records, and other documentation necessary to substantiate amounts charged to the allowance.
1.04 LUMP SUM ALLOWANCES
A. Use the lump sum allowance only as directed by the Department for the purpose scheduled in Part 3 below, and only by Change Orders that indicate amounts to be charged to the allowance.
1. Lump sum allowances to cover lump sum payments to another party shall not include Contractor’s overhead, profit, and related costs. These costs include delivery, installation, taxes, insurance, equipment rental, and similar costs. These shall be included in the Total Lump Sum Bid Price.
2. Contractor’s overhead, profit, and related costs for products, equipment and services ordered by State under the lump sum allowance are included in the allowance and are not part of the Total Lump Sum Bid Price. These costs include delivery, installation, taxes, insurance, equipment rental, and similar costs.
3. At project closeout, credit unused amounts remaining in the lump sum allowance to
State by Change Order.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.01 PREPARATION
A. Coordinate services for each allowance with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.
B. Verify existing conditions, access clearances, tree locations, canopy conflicts, and proposed excavation limits before preparing the Arborist Work Plan or performing tree work.
C. Install tree-protection measures identified in the Arborist Work Plan before construction activity begins within the affected tree-protection area.
3.02 SCHEDULE OF ALLOWANCES
A. Allowance A - Arborist Services: Include a lump sum allowance of $8,000 for the professional services of a certified arborist required in connection with construction of the new access road and associated infiltration trench, as indicated on the Drawings.
Physical tree pruning, installation and maintenance of tree-protection measures, construction access, excavation, and other construction work shall be included in the Total Lump Sum Bid Price and shall not be charged to this allowance. Arborist services include, but are not necessarily limited to, the following:
Job No. DCR 24-WCCC-0016 01210 - 3
1. Perform site inspection and field verification.
2. Prepare the Arborist Work Plan required by Article 1.03.
3. Identify exceptional trees and other trees that may be affected by the Work.
4. Recommend tree-protection measures for exceptional trees within or adjacent to the Work Area.
5. Identify required construction clearances and recommend pruning necessary to accommodate construction access.
6. Evaluate anticipated impacts to non-exceptional trees, including canopy and root impacts associated with the infiltration trench, and recommend appropriate protection, pruning, or treatment.
7. Identify permits or approvals required for work affecting exceptional trees and provide supporting technical information required for permit applications.
8. Observe pruning, excavation, and other construction activities identified in the Arborist Work Plan, and provide direction regarding protection, pruning, or treatment of encountered roots.
9. Submit field reports documenting observations and recommendations.
B. The lump sum allowance is an estimate only and is subject to increase or decrease depending on the actual scope of work and costs. Additional charges by the Contractor for overhead, coordination, profit, insurance, and other incidental expenses shall not be allowed or added to this lump sum allowance.
END OF SECTION
LIMITS OF GRADING/DISTURBED
AREA
MI
N
30'
MIN
EXIST
BWS BOOSTER
STATION
26' 2'
MIN.
15' 2'
MIN.
KALANIANA'OLE HIGHWAY (STATE)
TO WAIMANALO
2'
TO KAILUA ROAD
PROPERTY
LINE
EXIST ELEC BOX
TO REMAIN
EXIST UP/GW
TO REMAIN
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE/EXIT
SEE DETAIL
PROPERTY
LINE
ROW LINE
ROW LINE
INSTALL PERIMETER CONTROL
TEMPORARY FILTER SOCK
SEE DETAIL
INSTALL PERIMETER CONTROL
TEMPORARY FILTER SOCKS
SEE DET
EXIST WMH
TO REMAIN AND
PROTECT-IN-PLACE
EXIST UTILITY POLE W/
GUY WIRE
TO BE RELOCATED
(BY OTHERS)
REMOVE 16± SF OF AC
REMOVE 87± SF
OF AC
REMOVE PORTION OF
EXIST CHAIN-LINK FENCE
L=55± LF
INSTALL FILTER SOCKS ON EXIST
GRASS SWALE SPACED @ 25' O.C.
AS CHECK DAMS
EXISTING MONKEYPOD TREE TO REMAIN AND
PROTECT-IN-PLACE. PROVIDE TREE PROTECTION ZONE
(TPZ), FENCING, AND SIGN. SEE TREE PROTECTION DETAIL
AND NOTES.
LIMITS OF
GRADING/DISTURBED
AREA
CL NEW ACCESS ROAD
INSTALL FILTER SOCKS ON EXIST
GRASS SWALE SPACED @ 25'-0" O.C.
AS CHECK DAMS
STA 0+00
BEGIN NEW ACCESS ROAD
STA 2+08.55±
END NEW ACCESS ROAD
LIMITS OF
GRADING/DISTURBED
AREA
PROTECTION FOR NEW INFILTRATION TRENCH
TEMPORARY FILTER SOCKS
SEE DET
REVISION
NO SYM DESCRIPTION
SHT.____
OF______
APPROVED:DATE
DEPT. OF CORRECTIONS AND REHABILITATION
ADMINISTRATIVE SERVICE OFFICE
STATE OF HAWAIʻI
DCR JOB NO.
DATE
DRAWING NO.
SHEET
.................................................... OF...........................SHTS.
DESIGN BY:
DRAWN BY: APPROVED BY:
CHECKED BY:
FILE........................DRAWER........................FOLDER
AS NOTED
HC/MNL
DCR 24-WCCC-0016
SEPTEMBER 2026 14
FI
LE
:\\E gn yte Dr ive \C ivi l\W
CC
C
DC
R
Pr oje cts \21
A7
8.0 0_
W O3
9 W
CC
C Ac ce ss
R oa d\0 3G ra ph ics \C
AD
\S he ets
\04 _P er mi t D ra wi ng s\C
D em oli tio n a nd
E ro sio n a nd S ed im en t C on tro l P lan
_b +k
_A
DD
EN
DU
M 2.d wg
DA
TE
:O cto be r 2 0, BOWERS + KUBOTA CONSULTING
WOMEN'S COMMUNITY CORRECTIONAL CENTER
WO39 WCCC NEW ACCESS ROAD
KAILUA OAHU
TMK: (1) 4-2-003:004
42-477 KALANIANAʻOLE HIGHWAY, KAILUA, HAWAIʻI 96734
B+K PROJ. NO.: .....................21A7438.00
HAWAIʻI
HC/CP
HRP
HRP
SCALE:
THE WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY
OBSERVATION. ("OBSERVATION OF CONSTRUCTION" SHALL BE
DEFINED IN CHAPTER 115, HAWAII ADMINISTRATIVE RULES FOR
PROFESSIONAL ARCHITECTS, ENGINEERS, SURVEYORS AND
LANDSCAPE ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,
SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)
04/30/2028 Signature Expiration Date of the License0' 40'20' 60'10'
1" = 20'-0"
NORTH
DEMOLITION AND EROSION AND SEDIMENT
CONTROL PLAN (CATEGORY 1B)
DEMOLITION AND EROSION AND SEDIMENT CONTROL PLAN (CATEGORY 1B) C06
LEGEND:
x159.57
CONSTRUCTION BMPS AT DEVELOPMENT
STAGES:
NOTES:
WAHIAWĀ
HALE‘IWA
WAIALUA
WAI‘ANAE MOUNTAIN
RANGE
WAI‘ANAE
‘EWA
WAIPAHU
PEARL CITY
ʻAIEA
KĀNE‘OHE
HONOLULU
WAIMĀNALO
KAILUA
KAHALU‘U
KO‘OLAU
M
O
UNTAIN
RANG
E
L‘IE
KAHUKU
MILILANI
TOWN
PROJECT SITE
RECEIVING WATER:
CLASSIFICATION: CLASS A
MARINE
DISCHARGE POINT:
KAILUA BAY, PACIFIC OCEAN
21.3976°N 157.7258°W
PROPERTY LINE
LIMITS OF GRADING/DISTURBED AREA
EXIST GROUND ELEVATION
EXIST GROUND ELEVATION
EXIST GROUND CONTOUR
FINISH GRADE CONTOUR
TEMPORARY FILTER SOCK
SILT FENCE
TEMPORARY STABILIZED CONSTRUCTION AREA
DIRECTION OF RUNOFF FLOW
1 ADDENDUM NO. 21 10/20/261
STA 2+07.55
LIMIT OF NEW ACCESS ROAD
MATCH EXIST PAV'T ELEV
PROVIDE SMOOTH RIDING CONN
STA 2+17.43
END NEW ACCESS ROAD
(EDGE EXIST PAV'T)
TEMP BENCHMARK:
STA CP-10
"Y CUT"
ELEV=157.37
16'
1°
' 2
4"
.91 (S
TA
0+
T
O
PC
BEGIN INTERCOM DUCTLINE
PROVIDE STUBOUT MARKER
SEE DETAILS
STA O+00
REFERENCE POINT
NEW DRIVEWAY ACCESS ROAD "A"
10'
8' 8'
PT STA 0+90.09
R=100'
PC STA 0+62.91
PT STA 0+98.43
R=42'
PT STA 0+71.91
R=42'
STA 0+41.28±
BEGIN NEW ACCESS ROAD
SAWCUT LINE
MATCH EXIST PAV'T ELEV
PROVIDE SMOOTH RIDING CONN
LIMIT OF DISTURBED AREA
SEE DET SHT
5°
' 0
0"
7.3
(P T T
O
EN
D) 8'
PROPERTY
LINE
PROPERTY
LINE
STA 0+54.37± (o/s 1.93' RT)
EXIST UTILITY POLE W/
GUY WIRE
TO BE RELOCATED
(BY OTHERS)
STA 0+54.05± (o/s 43.93' RT)
PROPOSED LOCATION OF
EXIST UTILITY POLE W/ GUY WIRE
TO BE RELOCATED (BY HECO PRIOR
TO THE START OF CONSTRUCTION)
ROW LINE
EXIST UP/GUY WIRE
TO REMAIN
EXIST ELECT BOX
TO REMAIN
ROW LINE
CH
3°
'12
.10
TIE 121° 02' 44" 364.14
(STA CP-10 "Y CUT" TO STA 0+00)
TIE 328° 54' 40" 454.54
(END TO STA CP-10 "Y CUT")
EXIST AC PAVT
TO REMAIN
(BWS ACCESS ROAD)
STA 1+96.73 (o/s 7.57 Rt)
ADJUST WMH TOP ELEV
TO NEW GRADE
NEW ACCESS ROAD "A"
NEW 3.5" THK AC PAV'T
NEW 6" THK AGGREGATE BASE COURSE
SEE DET
NEW INTERCOM DUCTLINE
2'
EXIST AC PAV'T , GATE & SIGN
TO REMAIN
(BWS ACCESS ROAD)
EXIST WV
TO REMAIN (PROTECT IN
PLACE)
EXISTING MONKEYPOD TREE TO REMAIN AND
PROTECT-IN-PLACE. PROVIDE TREE PROTECTION ZONE
(TPZ), FENCING, AND SIGN. SEE TREE PROTECTION DETAIL
AND NOTES.
KALANIANA'OLE HIGHWAY (STATE)
TO WAIMANALO
TO KAILUA ROAD
6:00 AM TO
8:30 AM
R3-1 36"x36"
EXIST
S1-1 36"x36"
EXIST
EXIST
R3-4 36"x36"
KALANIANA'OLE HIGHWAY (STATE)
CL NEW ACCESS ROAD "A"
SEE PROFILE SHT
159.19±
E/TP
159.38±
E/TP
159.56±
E/TP
159.45±
E/TP
159.36
SWALE
INV159.83
TP/TB
159.99
TP
159.41±
SAWCUT
LINE
CL & EOP CURVE DATA
A B C
R
T
CH
Lc
15° 34' 22''
7° 47' 11''
13.67
27.10
27.18
73° 45' 40''
36° 52' 50''
31.51
50.41
54.07
104° 48' 36''
36° 52' 50''
A
B
C
54.54
66.55
76.83 159.69
TP
160.10
TP
160.10TP
9.
14 TP
8.
TP
159.37
TP
159.67
TP
159.86
TP
159.98
TP
9.7
TP
9.
TP
9.
TP
9.
TP
9.3
0 TP
160.28TP
160.05
TP
9.
TP
9.8
TP
1+
2+
7.58' 8'
STA 1+83 (o/s 17.08' Rt)
END INFILTRATION TRENCH
SEE DET SHT
TOP = 157.59
INV = 150.59
STA 1+38 (o/s 15.58' Rt)
BEGIN INFILTRATION TRENCH
SEE DET SHT C11 AND CONSTRUCTION NOTES
TOP = 157.59
INV = 150.59
8.7
TP
8.7
TP
9.5
TP
9.1
TP
8.6
TP
7.7
SW
AL
E
IN
V
8.3
SW
AL
E
IN
V
LIMITS OF GRADING & DISTURBED AREA
SEE CONSTRUCTION NOTE 1
LIMITS OF GRADING &
DISTURBED AREA
8.8
7± E/
TP
8.7
5± E/
TP
8.6
4± E/
TP
2%
2%
2% 2%
2%
2%
2% 2%
END INTERCOM DUCTLINE
PROVIDE STUBOUT MARKER SEE DETAILS
NEW DOUBLE SWING
CHAIN LINK FENCE GATE SEE DETAIL
NEW CHAIN LINK FENCE (62 LF)
SEE DPW STD DET R-18 &
DET SHT
NEW CHAIN LINK FENCE (39-LF)
SEE DPW STD DET R-18 & DET SHT
X X
X X
X
X X
X X
X
158.65 TP1+75.97 (LP)
/4 /4
NEW GRASS SWALE
SLOPED @ S=0.95%
SEE SECTION SHT C10 AND CONSTRUCTION NOTES
NEW GRASS SWALE
SLOPED @ S=1%
SEE DET SHT C08A
2'
3'
INFILTRATION TRENCH
OVERFLOW TO EXISTING SWALE
EXIST
BWS BOOSTER
STATION
PROTECT INTERCOM (BY OTHERS) WITH
STEEL BOLLARD SEE DETAIL
8' CL
R
12" WIDE STOP BAR
PRE-FORM
RETROREFLECTIVE
THERMOPLASTIC TAPE
9.08'
NEW SIGN AND POSTS
SEE DETAIL
NEW SIGN AND POST
SEE DETAIL
R1-1 36"x36"
R3-1(L) 36"x36"
STOP
R3-1(L) 24"x24"
REVISION
NO SYM DESCRIPTION
SHT.____
OF______
APPROVED:DATE
DEPT. OF CORRECTIONS AND REHABILITATION
ADMINISTRATIVE SERVICE OFFICE
STATE OF HAWAIʻI
DCR JOB NO.
DATE
DRAWING NO.
SHEET
.................................................... OF...........................SHTS.
DESIGN BY:
DRAWN BY: APPROVED BY:
CHECKED BY:
FILE........................DRAWER........................FOLDER
AS NOTED
HC/MNL
DCR 24-WCCC-0016
SEPTEMBER 2026 14
FI
LE
:\\E gn yte Dr ive \C ivi l\W
CC
C
DC
R
Pr oje cts \21
A7
8.0 0_
W O3
9 W
CC
C Ac ce ss
R oa d\0 3G ra ph ics \C
AD
\S he ets
\04 _P er mi t D ra wi ng s\C
S ite
, G ra din g &
D ra ina ge
P lan
_b +k
_F
IN
AL
_A
DD
EN
DU
M
2.d wg
DA
TE
:O cto be r 2
0, BOWERS + KUBOTA CONSULTING
WOMEN'S COMMUNITY CORRECTIONAL CENTER
WO39 WCCC NEW ACCESS ROAD
KAILUA OAHU
TMK: (1) 4-2-003:004
42-477 KALANIANAʻOLE HIGHWAY, KAILUA, HAWAIʻI 96734
B+K PROJ. NO.: .....................21A7438.00
HAWAIʻI
HC/CP
HRP
HRP
SCALE:
THE WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY
OBSERVATION. ("OBSERVATION OF CONSTRUCTION" SHALL BE
DEFINED IN CHAPTER 115, HAWAII ADMINISTRATIVE RULES FOR
PROFESSIONAL ARCHITECTS, ENGINEERS, SURVEYORS AND
LANDSCAPE ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,
SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)
04/30/2028 Signature Expiration Date of the License0' 40'20' 60'10'
1" = 20'-0"
NORTH
SITE, GRADING AND DRAINAGE PLAN
SITE, GRADING AND DRAINAGE PLAN C08
LEGEND
AC PAVT
EXIST SPOT GRADE
EXIST TOPO MAJOR
FINISH SPOT GRADE
TOPO MAJOR
TOPO MINOR
GRASS SWALE CENTERLINE
LIMITS OF GRADING & DISTURBED AREA
DRAINAGE MANAGEMENT AREA
DELINEATION
PROPERTY LINE
EASEMENT BOUNDARY
SAWCUT LINE
EDGE OF PAVT
INFILTRATION TRENCH
0.0
FG
EARTHWORK SUMMARY:
(CATEGORY 1B)
EXCAVATION = 190 CY
EMBANKMENT = 25 CY
GRADED & DISTURBED AREA = 0.19 ACS
FOR GRADING PERMIT ONLY
CONSTRUCTION NOTES:
1. ALL DISTURBED LANDSCAPE AREAS SHALL BE PERMANENTLY
STABILIZED USING GRASS COVER. THE FOLLOWING METHODS ARE
ACCEPTABLE:
A. HYDROMULCH
B. PLANTING OF GRASS SPRIGS
2. PRUNE EXISTING BRANCHES TO CLEAR PROPOSED TRAFFIC. THE
EXPECTED MAXIMUM VEHICLE HEIGHT IS 13'-6". TREE PRUNING SHALL
BE CONDUCTED BY PERSONNEL QUALIFIED IN ARBORICULTURAL WORK
AND OVERSEEN BY A QUALIFIED ARBORIST.
3. CONSTRUCTION ACTIVITIES WILL OCCUR WITHIN THE DRIPLINE OF THE
TREE. CONTRACTOR SHALL CONSULT A QUALIFIED ARBORIST ON
POSSIBLE IMPACTS TO THE TREE. ANY PRUNING OF THE ROOT SYSTEM
SHALL BE CONDUCTED BY PERSONNEL QUALIFIED IN ARBORICULTURAL
WORK AND OVERSEEN BY A QUALIFIED ARBORIST.
1 ADDENDUM NO. 21 10/20/262
REVISION
NO SYM DESCRIPTION
SHT.____
OF______
APPROVED:DATE
DEPT. OF CORRECTIONS AND REHABILITATION
ADMINISTRATIVE SERVICE OFFICE
STATE OF HAWAIʻI
DCR JOB NO.
DATE
DRAWING NO.
SHEET
.................................................... OF...........................SHTS.
DESIGN BY:
DRAWN BY: APPROVED BY:
CHECKED BY:
FILE........................DRAWER........................FOLDER
AS NOTED
HC/MNL
DCR 24-WCCC-0016
SEPTEMBER 2026 14
FI
LE
:\\E gn yte Dr ive \C ivi l\W
CC
C
DC
R
Pr oje cts \21
A7
8.0 0_
W O3
9 W
CC
C Ac ce ss
R oa d\0 3G ra ph ics \C
AD
\S he ets
\04 _P er mi t D ra wi ng s\C
-C
A Pr ofi le an d T yp ica l S ec tio ns
_b +k
_F
IN
AL
_0
6_
AD
DE
ND
UM
2.
dw g
DA
TE
:O cto be r 2
0, BOWERS + KUBOTA CONSULTING
WOMEN'S COMMUNITY CORRECTIONAL CENTER
WO39 WCCC NEW ACCESS ROAD
KAILUA OAHU
TMK: (1) 4-2-003:004
42-477 KALANIANAʻOLE HIGHWAY, KAILUA, HAWAIʻI 96734
B+K PROJ. NO.: .....................21A7438.00
HAWAIʻI
HC/CP
HRP
HRP
SCALE:
THE WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY
OBSERVATION. ("OBSERVATION OF CONSTRUCTION" SHALL BE
DEFINED IN CHAPTER 115, HAWAII ADMINISTRATIVE RULES FOR
PROFESSIONAL ARCHITECTS, ENGINEERS, SURVEYORS AND
LANDSCAPE ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,
SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)
04/30/2028 Signature Expiration Date of the License
TYPICAL SECTION - DWY ACCESS ROAD "A"
TYPICAL SECTIONS - DRIVEWAY ACCESS ROAD "A"
C10
0' 40'20' 60'10'
1" = 20'-0"
0' 8'4' 12'2'
1" = 4'-0"
(STA 0+41.28± TO STA 0+60.89)
TYPICAL SECTION - DWY ACCESS ROAD "A"
(STA 0+60.89 TO STA 0+83)
TYPICAL SECTION - DWY ACCESS ROAD "A"
(STA 0+83 TO STA 1+38)
TYPICAL SECTION - DWY ACCESS ROAD "A"
(STA 1+38 TO STA 1+83)
TYPICAL SECTION - DWY ACCESS ROAD "A"
(STA 1+83 TO STA 2+00)
TYPICAL SECTION - DWY ACCESS ROAD "A"
(STA 2+00 TO STA 2+07.55±)
1 ADDENDUM NO. 21 10/20/263
REVISION
NO SYM DESCRIPTION
SHT.____
OF______
APPROVED:DATE
DEPT. OF CORRECTIONS AND REHABILITATION
ADMINISTRATIVE SERVICE OFFICE
STATE OF HAWAIʻI
DCR JOB NO.
DATE
DRAWING NO.
SHEET
.................................................... OF...........................SHTS.
DESIGN BY:
DRAWN BY: APPROVED BY:
CHECKED BY:
FILE........................DRAWER........................FOLDER
AS NOTED
HC/MNL
DCR 24-WCCC-0016
SEPTEMBER 2026 14
FI
LE
:\\E gn yte Dr ive \C ivi l\W
CC
C
DC
R
Pr oje cts \21
A7
8.0 0_
W O3
9 W
CC
C Ac ce ss
R oa d\0 3G ra ph ics \C
AD
\S he ets
\04 _P er mi t D ra wi ng s\C
M isc ell an eo us
D eta ils
1_ b+ k_
AD
DE
ND
UM
2.
dw g
DA
TE
:O cto be r 2
0, BOWERS + KUBOTA CONSULTING
WOMEN'S COMMUNITY CORRECTIONAL CENTER
WO39 WCCC NEW ACCESS ROAD
KAILUA OAHU
TMK: (1) 4-2-003:004
42-477 KALANIANAʻOLE HIGHWAY, KAILUA, HAWAIʻI 96734
B+K PROJ. NO.: .....................21A7438.00
HAWAIʻI
HC/CP
HRP
HRP
SCALE:
THE WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY
OBSERVATION. ("OBSERVATION OF CONSTRUCTION" SHALL BE
DEFINED IN CHAPTER 115, HAWAII ADMINISTRATIVE RULES FOR
PROFESSIONAL ARCHITECTS, ENGINEERS, SURVEYORS AND
LANDSCAPE ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,
SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)
04/30/2028 Signature Expiration Date of the License
2'- 0"
2'- 6" 3"
3"
9"
DIA
9"
DIA
4'- 0"
10'-0"
MAX
2" M
AX
TO
G
RA
DE2'-
0" 3"
9"
DIA
FIRST
LINE POST SLOPE, CORNER, END OR PULL POST FIRST
LINE POST
TWISTED AND BARBED
SELVAGE
NOTES:
4'- 0"
3'- 0"
3"
12"
DIA
ASPHALT PAVEMENT SECTION (WCCC)1
EXIST AC PAVEMENT NEW AC PAVEMENT
AC PAVEMENT CONNECTION DETAIL (STATE)2
TYPICAL DOUBLE SWING GATE4
TYPICAL CHAIN-LINK FENCE 3
12"
MISCELLANEOUS DETAILS - 1
C11
1. POSTS, BRACES, AND GATE FRAMES SHALL BE SCHEDULE 40 (STANDARD
WEIGHT) PIPE. SIZES SPECIFIED ARE OUTSIDE DIAMETER.
2. ALL FENCING MATERIAL INCLUDING GATE HARDWARE SHALL BE GALVANIZED
STEEL.
3. TOP RAIL COUPLINGS SHALL BE LOCATED WITHIN 6" OF LINE POST.
4. TOP OF CONCRETE FOOTING SHALL BE CROWNED TO SHED WATER.
5. CORNER FITTINGS FOR GATE FRAMES MAY BE USED IN LIEU OF WELDING.
20'-0" MIN
NOTE:
PRIOR TO PLACEMENT OF THE AGGREGATE BASE COURSE, THE
EXPOSED SUBGRADE SHOULD BE SCARIFIED TO A MINIMUM DEPTH OF
6 INCHES, MOISTURE CONDITIONED TO ABOUT 2 PERCENT ABOVE THE
OPTIMUM MOISTURE CONTENT, AND COMPACTED TO A MINIMUM 95
PERCENT COMPACTION AS DETERMINED BY ASTM D1557.
LC INFILTRATION
TRENCH
LIMITS OF GRADING
& DISTURBED AREA
INV
TOP 3
1 12"ØFILTERSOCK
12"Ø
FILTER
SOCK
6" MA
X
S=2% S=2%
H= 7'-
0" (M
AX
W= 5'-0" (MAX)WIDTH VARIES
SEE GRADING PLAN
2'-0"
INFILTRATION TRENCH DETAIL5
KNUCKLED SELVAGE
3/8" Ø ROD WITH
TURNBUCKLE
POST CAP
TOP RAIL 1 3/8" OD PIPE
(1.68 LB/FT)
RAIL END
1/4" X 3/4" STRETCHER
BAR WITH STRETCHER BAR
BAND @ 14" OC MAX
1 7/8" OD PIPE
(2.72 LB/FT)
1/2" CONC CROWN
(TROWEL FIN)
7 GAGE GALV TENSION
WIRE WITH GALV STEEL
WIRE TIES @ 24" OC
CONC FOOTING - CLASS "B" CONC,
NEAT EXCAVATION
1/4" X 3/4" STRETCHER BAR
WITH STRETCHER BAR BAND
AT 14" OC MAX
3/8" Ø TRUSS ROD
WITH TURNBUCKLE
EMBED 1" Ø PIPE
SLEEVE IN 6" X 6" X 6"
CONCRETE ANCHOR
14 GA GALV STEEL WIRE
TIES @ 16" OC
POST CAP
RAIL END
2" MESH, 11 GAGE
CHAIN-LINK FABRIC
14 GA GALV STEEL WIRE
TIES @ 16" OC
1 7/8" OD PIPE GATE FRAME
AND BRACE (2.72 LB/FT)
2" MESH, 11 GAGE
CHAIN-LINK FABRIC
1" X 1/4" GATE STOP
TOP AND BOTTOM
2 1/2" AC PAVEMENT
3/8" Ø TRUSS ROD
WITH TURNBUCKLE
4" OD PIPE (9.11 LB/FT) FOR
GATES OVER 12' 3 1/2" OD
PIPE (7.58 LB/FT) FOR GATES
12' OR LESS
FITTINGS AS SHOWN
ON END POST DETAIL
PRIME COAT
NEW 3.5" THICK AC PAVEMENT
NEW 6" THICK AGGREGATE BASE COURSE TO
BE COMPACTED TO 95% (MIN.) RELATIVE
COMPACTION AS DETERMINED BY ASTM D1557
COMPACTED SUBGRADE
(SEE NOTE)
EXIST AGGREGATE SUBBASE
COURSE MATERIAL TO REMAIN
EXIST AC PAV'T
TO REMAIN
SA
W
CU
T
LIN
EMATCH EXIST PAV'T ELEV
PROVIDE SMOOTH RIDING CONN
APPLY TACK COAT TO EDGE OF
EXIST PAV'T
SLOPE
PER PLAN
FLOW
DIRECTION
CL
CONC FOOTING - CLASS "B" CONC,
NEAT EXCAVATION
EXIST
EDGE OF PAV'T
SLOPE
PER PLAN
EXIST BASE COURSE
TO REMAIN
NEW 3.5" THK AC PAV'T OR
MATCH EXIST PAV'T THICKNESS
WHICHEVER IS GREATER
NEW 6" THK. BASE COURSE OR
MATCH EXIST THICKNESS
WHICHEVER IS GREATER
PRIME COAT
TOP BACKFILL FILTER LAYER
FILTER FABRIC
(TOP AND SIDES TO
RESTRICT MOVEMENT OF
SOIL INTO THE TRENCH)
TRENCH ROCK
SAND FILTER LAYER
OBSERVATION WELL
(4" PERFORATED
PVC PIPE)
#3 FINE-CRUSHED
ROCK
1- 18" LENGTH, 1/2" DIA
REBAR ANCHOR
REMOVABLE WELL
CAP WITH LOCK
(4" DIA CAST IRON
SCREW TOP LID)
PROVIDE TEMP SANDBAGS
+ FILTER SOCK
MIN LENGTH =18"
MIN WIDTH =12"
MIN THICKNESS=3"
PLACE EVERY 6' TYP
FOR SEDIMENT CONTROL (TYP)
TO BE REMOVED AFTER
PERMANENT STABILIZATION
IS IN PLACE FIN GRADE
EXIST GROUND
NEW 6" THK AGGREGATE
BASE COURSE
(CBR - 85 MINIMUM)
NEW 3-1/2" THK AC
PAVEMENT CITY
MIX IV, (TYP)
NOTES:
1. INSTALLATION OF THE INFILTRATION TRENCH MAY OCCUR WITHIN
THE DRIPLINE OF THE TREE. CONTRACTOR SHALL CONSULT A
QUALIFIED ARBORIST ON POSSIBLE IMPACTS TO THE TREE.
2. ANY PRUNING OF THE ROOT SYSTEM SHALL BE CONDUCTED BY
PERSONNEL QUALIFIED IN ARBORICULTURAL WORK AND OVERSEEN
BY A QUALIFIED ARBORIST.
3. INSTALL ROOT CONTROL BARRIERS FOR ANY PRUNED ROOTS IN THE
VICINITY OF THE INFILTRATION TRENCH.
7' -0
" M
IN
'-0
" M
AX
12"
MIN
3' -0
13 4"'
2-1/4" SQUARE TUBE
ANCHOR POST
FINISHED
GRADE
EXIST. EDGE OF
PAVEMENT
SIGN POST DETAIL6
1 ADDENDUM NO. 21 10/20/264
INSTALL ROOT CONTROL BARRIER FACING
THE EXISTING MONKEYPOD TREE
4" DIA STEEL PIPE
FILLED WITH CONCRETE
CROWN CONCRETE
TO SHED WATER
CONCRETE FOOTING
15"
MIN
3'- 0"
M
IN
3'- 0"
M
IN
FINISHED GRADE
REVISION
NO SYM DESCRIPTION
SHT.____
OF______
APPROVED:DATE
DEPT. OF CORRECTIONS AND REHABILITATION
ADMINISTRATIVE SERVICE OFFICE
STATE OF HAWAIʻI
DCR JOB NO.
DATE
DRAWING NO.
SHEET
.................................................... OF...........................SHTS.
DESIGN BY:
DRAWN BY: APPROVED BY:
CHECKED BY:
FILE........................DRAWER........................FOLDER
AS NOTED
HC/MNL
DCR 24-WCCC-0016
SEPTEMBER 2026 14
FI
LE
:\\E gn yte Dr ive \C ivi l\W
CC
C
DC
R
Pr oje cts \21
A7
8.0 0_
W O3
9 W
CC
C Ac ce ss
R oa d\0 3G ra ph ics \C
AD
\S he ets
\04 _P er mi t D ra wi ng s\C
M isc ell an eo us
D eta ils
2_ Ad de nd um 2.
dw g
DA
TE
:O cto be r 2
0, BOWERS + KUBOTA CONSULTING
WOMEN'S COMMUNITY CORRECTIONAL CENTER
WO39 WCCC NEW ACCESS ROAD
KAILUA OAHU
TMK: (1) 4-2-003:004
42-477 KALANIANAʻOLE HIGHWAY, KAILUA, HAWAIʻI 96734
B+K PROJ. NO.: .....................21A7438.00
HAWAIʻI
HC/CP
HRP
HRP
SCALE:
THE WORK WAS PREPARED BY ME OR UNDER MY SUPERVISION
AND CONSTRUCTION OF THIS PROJECT WILL BE UNDER MY
OBSERVATION. ("OBSERVATION OF CONSTRUCTION" SHALL BE
DEFINED IN CHAPTER 115, HAWAII ADMINISTRATIVE RULES FOR
PROFESSIONAL ARCHITECTS, ENGINEERS, SURVEYORS AND
LANDSCAPE ARCHITECTS STATE OF HAWAII, SUBCHAPTER 1,
SECTION 16-115-2 DEFINITIONS, EFFECTIVE 8/29/94.)
04/30/2028 Signature Expiration Date of the License
MISCELLANEOUS DETAILS - 2
C12
CONCRETE MARKER
CENTERED ABOVE
STUBBED & CAPPED
RACEWAY
1"
SECTION ISOMETRIC
IC = INTERCOM
CONCRETE IN ONE
GALLON CAN.
REMOVE CAN PRIOR TO
INSTALLATION
ENGRAVE OR CAST IN 2"
HIGH LETTER IN CONCRETE
CONCRETE MARKER DETAIL1
NOTES:
1. BACKFILL MATERIAL TYPE "A"
BLACK OR BEACH SAND, EARTH AND GRAVEL MIXTURE. IF
EARTH AND GRAVEL MIXTURE, ROCK SIZE SHALL BE 1 INCH
OR SMALLER AND SHALL NOT CONTAIN MORE THAN 50%
ROCK PARTICLES BY VOLUME. THIS FILL SHALL BE USED
OVER CONCRETE ENCASED DUCTS IN ACCORDANCE WITH
DRAWINGS.
2. ALL DUCTS SHALL BE PVC SCHEDULE 40.
3. PROVIDE DETECTABLE DUCT WARNING TAPE 12" BELOW
FINISH GRADE OR PAVEMENT DIRECTLY ABOVE DUCTS.
4. PROVIDE A MINIMUM OF 4" TOPSOIL AND GRASS TO
RESTORE THE NON-PAVED AREA. GRASS SHALL BE FULLY
ESTABLISHED AT COMPLETION OF PROJECT.
DUCT SECTION DETAIL2
CONDITION AT
FINISH GRADE
WARNING TAPE
3" CONC JACKET
ALL AROUND, MIN
2,500 PSI IN 28 DAYS 1-1/2" CONDUIT (EMPTY)
(FOR INTERCOM LINE BY OTHERS)
1'- 0"
1'- 6"
M
IN
IM
UM
COMPACTED
BACKFILL TYPE "A"
STUBBED & CAPPED
RACEWAY WITH 128 LF
NYLON PULL LINE
6 1/2"
7 1 /2"
BOLLARD DETAIL3
1 ADDENDUM NO. 2
1 10/20/265
TREE PROTECTION NOTES:
1. INSTALL TREE PROTECTION FENCING AT LIMITS SHOWN
PRIOR TO COMMENCEMENT OF CONSTRUCTION
ACTIVITIES IN THE VICINITY OF THE TREE. MAINTAIN TREE
PROTECTION FENCING FOR THE DURATION OF
CONSTRUCTION.
2. DO NOT PARK OR OPERATE VEHICLES OR EQUIPMENT,
STOCKPILE MATERIALS, STORE CONSTRUCTION DEBRIS,
OR PLACE TEMPORARY CONSTRUCTION FACILITIES WITHIN
THE TREE PROTECTION ZONE (TPZ).
3. PROTECT EXISTING TREE TRUNK, BRANCHES, AND ROOT
SYSTEM FROM DAMAGE DURING CONSTRUCTION.
4. CONTRACTOR SHALL ENGAGE A CERTIFIED ARBORIST
UNDER THE CONTRACTOR'S CONTRACT TO PREPARE A
TREE PROTECTION PLAN. THE TREE PROTECTION PLAN
SHALL ADDRESS TREE PROTECTION MEASURES, TREE
PROTECTION ZONE (TPZ), ROOT PROTECTION AND
PRUNING, CANOPY PRUNING, AND ARBORIST OVERSIGHT
DURING CONSTRUCTION. TREE PROTECTION PLAN SHALL
BE CONSISTENT WITH THE CONTRACT DOCUMENTS.
5. PRIOR TO COMMENCEMENT OF CONSTRUCTION
ACTIVITIES WITHIN OR ADJACENT TO THE TPZ, THE
CERTIFIED ARBORIST SHALL DOCUMENT THE EXISTING
CONDITION OF THE TREE AND INCORPORATE THE
ASSESSMENT INTO THE TREE PROTECTION PLAN.
6. ROOT AND CANOPY PRUNING REQUIRED TO
ACCOMMODATE THE WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE TREE PROTECTION PLAN
PREPARED BY THE CERTIFIED ARBORIST.
7. DO NOT EXCAVATE, TRENCH, GRADE, COMPACT SOIL, OR
OTHERWISE DISTURB THE TREE PROTECTION ZONE
EXCEPT AS REQUIRED BY THE CONTRACT DOCUMENTS
AND TREE PROTECTION PLAN.
8. IMMEDIATELY NOTIFY THE CONTRACTING OFFICER OF
UNANTICIPATED TREE ROOTS ENCOUNTERED DURING
CONSTRUCTION THAT CONFLICT WITH THE WORK. DO NOT
CUT OR DAMAGE SUCH ROOTS UNTIL REVIEWED BY THE
CERTIFIED ARBORIST AND DIRECTION IS PROVIDED.
TREE PROTECTION FENCE AND NOTES4
| WO39 Addendum 2 Narrative |
| 00410 Solicitation, Offer, and Contract Form |
| 01210 Allowances |
| C06 - DEMOLITION AND EROSION AND SEDIMENT CONTROL PLAN (CATEGORY 1B) |
| C08 - SITE, GRADING AND DRAINAGE PLAN |
| C10 - TYPICAL SECTIONS - DRIVEWAY ACCESS ROAD "A |
| C11 - MISCELLANEOUS DETAILS - 1 |
| C12 - MISCELLANEOUS DETAILS - 2 |
File details come from the government source that posted it. Updated .