This is Addendum 2 to RFP 25-131-G for Three Phase Network Transformers issued by the Eugene Water & Electric Board (EWEB). The addendum constitutes a material change to the original bidding documents and modifies the bid submission closing date and time. The new deadline for bid submission is 2:00 p.m. Pacific Standard Time on Friday, August 22, 2025. This represents a change from the originally scheduled closing date, and bidders must ensure compliance with this updated deadline to have their proposals considered. The addendum was prepared by Kristin Kokkeler, Purchasing Analyst, and does not require signatures or return documentation from bidders.
The addendum does not introduce pricing modifications, set-asides, or other substantive changes to the procurement terms beyond the closing date extension. All other provisions of the original RFP 25-131-G remain in full force and effect. Bidders should refer to the original solicitation documents for complete information regarding specifications, evaluation criteria, pricing requirements, and contract terms for the Three Phase Network Transformers procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 25-131-G Three Phase Network Transformers – Addendum #2
July 21, 2025
ADDENDUM #2
Three Phase Network Transformers
RFP 25-131-G
This addendum modifies the bidding document(s) for work only to the extent indicated herein.
All other areas not specifically mentioned or affected by this addendum shall remain in full force.
CLOSING DATE AND TIME
All references to the closing date and time are changed to the following:
Bid Submission no later than: 2:00 p.m. (PST); Friday, August 22, 2025
This addendum constitutes a MATERIAL CHANGE to the bid, but does not need to be signed or returned.
Addendum prepared by:
Kristin Kokkeler, Purchasing Analyst Cc: Tom Ossowski
End of Addendum