This document is an addendum to an Invitation to Bid (ITB) issued by the Florida Department of Agriculture and Consumer Services (FDACS) for the Chiefland Greenhouse Roof Panel Replacement Project #1093. The project involves the removal of existing Lexan panels and installation of new Lexan roof panels on four greenhouses located at the Chiefland Florida Budwood facility. The addendum provides answers to questions received regarding the project, including the applicability of prevailing wage rates, the process for removing and reinstalling bar caps, the number of greenhouses to be awarded, bond requirements, the original construction timeline of the greenhouses, the provision of canker spray and tarps, work hours, the construction timeline, the need for a temporary portlet, and requirements for tools and ladders. The contract period is 120 calendar days, with 90 days for substantial completion and 30 days for project close-out.
The addendum notes that the funding for this project will be provided by a federal grant, and therefore Davis Bacon Wage reporting and wage rates will apply. The Department plans to award as many greenhouses as the budget will fund. No bid bond/guarantee is required, but a performance bond is. The contractor will need to provide a temporary portlet outside the greenhouse, and any tools or ladders taken into the greenhouse will need to be sprayed to prevent canker.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-bid Sign In Sheet (002)_Redacted.pdf | ||
| APPENDIX I.pdf | ||
| Addendum 1.pdf | ||
| Chiefland Greenhouse Roof Panel Replacement.pdf | ||
| APPENDIX II- Construction Agreement-Draft.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 20, 2023
ADDENDUM 2
TO: VENDORS
FROM: CARMELITA GRAHAM, PURCHASING OFFICER
RE: INVITATION TO BID NO. ITB DOA 23 24 22
CHIEFLAND GREENHOUSE ROOF PANEL
REPLACEMENT PROJECT # 1093
This addendum is to provide answers to questions received in reference to this invitation to bid.
Question / Answer
1. Will prevailing wage rates apply?
The funding for this project will be provide by a federal grant; therefore, Davis Bacon
Wage reporting and wage rates will apply.
2. The bid says to remove glazing bars (appendix I #5).
a. Was the intention to remove ‘bar caps’? These go on top of the glazing panels.
No. The Contractor shall remove the bar caps as needed and be reinstalled.
3. If bar caps are the intended item to be replaced, they do not appear to be gasketed. The drawings do not supply detail on the caps.
a. Are the bar caps gasketed?
We are not aware that the bar caps are gasketed.
4. Can the existing bar caps be re-used? Often times they do not need to be replaced.
There would be cost savings to re-using them.
Yes, the existing bar caps can be reused.
5. Is the intent to award all four greenhouses?
The Department plans to award as many greenhouses as the budget will fund.
6. Is a ‘bid bond/guarantee’ required?
I see there is a performance bond.
Please review page 9, Bond Requirements of the Bid Specification document.
7. When were the greenhouses originally built?
Greenhouses 1,2,3 & 4 were built during the period of 2006-2007 by Greenhouse Specialties. Greenhouse Extension 3 was built by Decker Greenhouse Construction in 2010. Greenhouse Extension 4 was built by Imperial Builders and Supply in 2019
8. Is canker spray provided?
Canker Spray is provided by the Department/ DPI.
9. What is require for (daily afternoon) rains?
The Department/ DPI will provide plastic tarps so that no water is permitted in the greenhouse.
10. What are the hours of work?
The Department/ DPI will work to accommodate earlier hours however business hours are 7 am to 3:30 pm.
11. Can the number of days be extended?
Yes. Construction shall be substantially complete within 90 calendar days after issuance of the Notice to Proceed. The contract period shall be a total of 120 calendar days, which shall consist of 90 calendar days to substantial completion of work after issuance of the Notice to Proceed and 30 calendar days beyond the substantial completion for the project close-out process.
12. Will the contractor need to provide a temporary portlet? Where can it be located inside or outside of the greenhouse?
Yes, the Contractor will need to provide a temporary portlet outside of the greenhouse.
13. Do we need to spray tools or ladders outside the greenhouse?
Anything taken inside the greenhouse will need to be sprayed to prevent canker.
14. Do the fans need to be running at all times?
The fans must run while the panels are being replaced to keep bugs out and to help cool the greenhouse. However, the fans can be turned off in phases throttled down or turned off for limited amounts of time. The vendor will coordinate with the facility manager to do this.
This Addendum is hereby incorporated into and made a part of the above noted Invitation to Bid. All other terms, conditions and specifications of this Invitation to Bid will remain the same. For questions regarding this Addendum, please contact the Purchasing Office at (850) 617-7181 or email at Bids@FDACS.gov mailto:Bids@FDACS.gov