About this file
This is Addendum No. 2 to an Invitation for Price Quote (IFPQ) issued by the California Department of Transportation (Caltrans) for window replacement services in San Bernardino County. The project involves the removal and legal disposal of 19 existing windows and the furnishing and installation of 19 new dual-paned retrofit windows at the Caltrans Equipment Headquarters Office Building located at 320 S Sierra Way. The scope includes removal of existing windows and hardware, installation of new Milgard Model A250 Thermal Break Windows (or Caltrans-approved equivalent), replacement of approximately 330 linear feet of exterior aluminum trim in Duranodic Bronze finish, installation of polyurethane sealant, and restoration of interior finishes including drywall, paint, and trim. All windows must meet Title 24 energy standards and include T24 glass packages, dual-pane tempered glass, Low-E coating, argon gas fill, and a minimum 10-year warranty. The mandatory site inspection was held on March 10, 2026, with a written question submittal deadline of March 11, 2026. The original proposal due date of March 18, 2026, has been extended to 3:00 p.m. on April 3, 2026, with a proposed award date estimate of April 10, 2026. The addendum updates the Price Quote Proposal (Attachment 1) and revises Exhibit A, Section 6 to clarify window specifications, locations, types, and sizes for all 19 windows scheduled for replacement.
The pricing structure utilizes line items for removal and installation of windows by size and type, with an hourly rate of $16 per hour for unforeseen and unanticipated work, plus a maximum allowable expenditure for parts, materials, supplies, fees, and permits equal to 10 percent of the actual subtotal amount reimbursed based on submitted original receipts. The procurement is restricted to certified Small Businesses (SB), including Minority-Owned Businesses (MB), Small Business-Public Works (SB-PW) contractors, or Disabled Veteran Business Enterprises (DVBE). The addendum clarifies contractor responsibilities for permit acquisition from San Bernardino County, de-energizing and re-routing electrical conduits, coordination with the Caltrans Contract Manager, protection of windows during installation, final cleaning and inspection, and management of discovered hazardous materials including asbestos and lead-based paint, with work suspension and immediate notification required if such materials are encountered. Contractor shall use the back of Building A for temporary equipment and material storage, with responsibility for securing all materials and equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum_1_32A0701.pdf | ||
| Solicitation_Package_32A0701.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
DEPARTMENT OF TRANSPORTATION
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30th STREET, MS-65
SACRAMENTO, CA 95816
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
March 26, 2026
Addendum No. 2 Invitation for Price Quote (IFPQ) 32A0701
Window Replacements in San Bernardino County
NOTICE TO ALL PROSPECTIVE BIDDERS:
Addendum No. 2 is issued for the above-referenced IFPQ. Bids for this work shall be with the full understanding of this Addendum.
The following changes have been made for this IFPQ:
1. Attachment 1, Price Quote Proposal has been updated and is attached. You must use the updated Attachment 1 when submitting your bid; otherwise, your bid may be rejected.
2. The price quote submittal due date has been extended and is now 3:00 p.m., April 3, 2026.
Please refer to the revised IFPQ Timeline below:
Event Date Time (Pacific Time)
IFPQ available to prospective bidders 02/25/2026
Mandatory Site Inspection 03/10/2026 8:30 a.m.
Written Question Submittal 03/11/2026 3:00 p.m.
Final Date for Quote Submission 03/18/2026 03/30/2026 04/03/2026
3:00 p.m.
Proposed Award Date (estimate) 03/25/2026 04/10/2026
3. IFPQ, Attachment 3, Exhibit A, Section 6 has been replaced with the following to read:
A. Contractor shall furnish and provide all labor, materials, tools, equipment, vehicles, travel, permits, window hardware and components, and incidentals necessary to retrofit 19 existing exterior windows at the Caltrans Equipment Headquarters Office Building. Please see at Attachment A – Windows. Caltrans does not have to obtain building permits for work done on State-owned or leased facilities as per California Streets and Highway Code, Section 83. All work must still meet State, County, and City requirements.
B. Contractor shall remove and legally dispose of all existing windows.
C. Contractor shall furnish and install new retrofit Milgard Model A250 Thermal Break Windows or Caltrans-approved or equivalent. Retrofit window installation is a process http://www.dot.ca.gov/dpac/ http://www.dot.ca.gov/dpac/
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability” where a new, complete window unit is installed inside the existing, structurally sound window frame, without removing the surrounding exterior materials like brickwork, siding, or stucco.
D. Contractor shall replace 19 windows in the Administration Building with retrofit replacement windows.
E. All windows shall include:
1) T24 glass package
2) Dual-pane tempered glass
3) Low-E coating
4) Argon gas-filled
5) Minimum 3mm glass thickness
6) Screens where applicable
7) Minimum 10-year warranty on windows and labor.
F. Contractor shall verify all window measurements prior to ordering materials.
G. Contractor shall replace like-for-like windows, considering picture and sliding portions of the windows. The window for the Utility Room shall be changed from a ‘hopper’ style to a ‘XO’ style sliding window.
H. Contractor shall remove and retain all blinds and window coverings to be reinstalled by Contractor when window work is completed.
I. Window Locations, Types, and Approximate Sizes Contractor shall install new windows in accordance with the following:
Window No.
Location Quantity Type Width (in.)
Height (in.)
1 Front Admin Office
Reception Area
2 clear PW glass ¼ inch thick
38 94
2 Front Admin Office
Reception and
DPEC FOM
Manager Office
3 clear PW glass
80 19
3 Side Admin Office DPEC
FOM Manager Office
1 clear XO style
42 42
4 Admin Office Restrooms
3 XO style with obscure or frosted glass
50 19
5 Back Admin Office Utility
Room
1 XO style 50 19
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
6 Back Admin Office
3 XOX style 80 40
7 Front Admin Breakroom
4 XOX style 80 40
8 Front Admin Staff Analyst
Office
1 XOX style 80 40
9 Side Admin Office
1 XOX style 80 40
J. Contractor shall install windows per manufacturer’s specifications and industry standards.
K. Contractor and Caltrans Contract Manager shall choose the level of tinting to be used on clear windows (prior to placing the order with the manufacturer).
L. Contractor shall be responsible for de-energizing and re-routing conduits required for window installation. Contractor shall be responsible for re-energizing and testing electrical connections after installations. Contractor shall be responsible for any and all finish work including drywall, paint and trim removed or damaged while re-routing electrical conduits.
M. Contractor shall replace approximately 330 feet of exterior aluminum trim in a Duranodic Bronze finish or equivalent that shall be of a sufficient width to cover window edges and siding to prevent leaks and weather damage.
N. Contractor shall install polyurethane sealant to match the color of surrounding interior or exterior trim.
O. Contractor shall protect all windows from damage during installation; replace or restore any damaged units at no additional cost to Caltrans.
P. Contractor shall clean all window surfaces and remove all labels (except etched labels), stains, and debris prior to final inspection.
Q. Contractor shall coordinate construction activities with Caltrans Contract Manager to minimize disruption to building operations.
R. Price Quote Proposal (Attachment 1), Line Items 2-7, includes the cost of parts, materials, supplies, and equipment referenced within this Exhibit A, Sections 6. If applicable, other parts, materials, and supplies shall be in accordance with Exhibit A, Item 13.
4. IFPQ, Attachment 3, Exhibit A, Section 20 has been added:
20. Discovery of Asbestos, Lead-Based Paint, or Other Hazardous Substances/Materials
A. If Contractor discovers or suspects asbestos, lead-based paint, or other known hazardous substances/materials in the area affected by the Agreement, Contractor shall STOP WORK IMMEDIATELY. Contractor shall verbally notify Caltrans
Contract Manager of these findings immediately and confirm verbal notification in writing within 24 hours. No hazardous materials or waste shall be handled by
Contractor, and Contractor is not responsible for any work related to clean up or disposal of these substances.
B. Continuation of work shall not commence until Contractor has been authorized to
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability” do so in writing by Caltrans Contract Manager.
C. Should it become necessary to terminate a service request, Contractor shall be compensated only for work completed to Caltrans Contract Manager's satisfaction.
No payment shall be made for delay or lost profits anticipated for uncompleted work.
D. Failure to notify Caltrans Contract Manager of the discovery of asbestos, lead-based paint, or other hazardous substances/materials may result in immediate termination of the Agreement for default. Contractor shall be responsible for all damages arising from failure to disclose the discovery of any hazardous substances.
The following represents questions submitted for this IFPQ and the Department’s responses:
Question 1: What operation do you want the windows? (i.e sliding with center stationary, casements with center stationary? As currently there is a mixture of both)
Answer 1: Please reference the revision 6.I. above.
Question 2: The large 80 x 92 window that has a divider bar currently, how do you want this quoted?
This is typically a sliding door size, not a single window size. Can we use storefront metal and keep stationary for this opening or does this need to be a retrofit window?
Answer 2: Please reference the revision 6.I. above.
Question 3: What type of obscure glass?
Answer 3: Please reference the revision 6.I. above.
Question 4: Is there a specific callout for the type of Low E required or will any that meet title 24 be ok?
Answer 4: Any that meet title 24.
Question 5: Currently, some glass is clear and some is grey. How should we quote this? Will you be going with all 1 color or a mixture?
Answer 5: One color, clear with a light tint. Please reference the revision 6.K. above.
Question 6: Do you want to keep the hopper window as a hopper or change the operation to a slider?
Answer 6: Please reference the revision 6. above.
Question 7: Do we need to add tint to any of the windows? Currently, some of the windows have tint.
Answer 7: Please reference the revision 6.K. above
Question 8: Certain windows observed at the site extend floor-to-ceiling and cannot accommodate a retrofit insert without full removal of the existing aluminum frame assembly. Will Caltrans accept full commercial frame application in lieu of retrofit for floor-to-ceiling window locations?
Answer 8: Yes.
Question 9: Per Milgard, the specified A250 window is not made in a retrofit application. Our options are to custom fabricate each window with a retrofit application or to provide a different product with an already included retrofit application. Will Caltrans accept a 1) different manufacturer that produces the same bronze aluminum thermally broken frame to the specifications requested in a retrofit application or 2) custom fabricated window made to the same technical specification?
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
Answer 9: Caltrans will accept custom-fabricated windows made to the same technical specification.
Question 10: Workspace Partition Modification and Electrical Conduit at Floor-to-Ceiling Window Locations. At floor-to-ceiling window locations, an interior workspace partition is attached to the existing window frame, and an electrical conduit runs through the frame and into the partition. Full frame removal (RFI-001) requires shortening the partition and re-routing the conduit through the building wall instead of the window frame, followed by finish restoration of the exposed partition end.
a. Will Caltrans authorize Contractor to shorten the affected partition as needed, with proper finish restoration upon completion to properly remove floor-to-ceiling windows?
b. Who is responsible for de-energizing and re-routing electrical conduit running through floor-to-ceiling window frame — Contractor or Caltrans?
c. Is this additional scope compensable under the unforeseen labor provisions of Exhibit A, Section 14 / Line Item 3 or should it be estimated as project costs in our proposal?
Answer 10a.: Yes
Answer 10b.: Contractor
Answer 10c.: It would fall under Sections 13 and 14 in Exhibit A.
Question 11: Exterior Aluminum Trim Color – Match to Existing Required?
a. Must the new exterior aluminum trim (~330 LF) match the existing building aluminum color/finish?
b. If yes, please provide the required color designation or standard (e.g., Duranodic Bronze, painted color code) so Bidder can price accordingly.
Answer 11a.: Yes.
Answer 11b.: Please reference the revision 6.M. above.
Question 12: If deteriorated or rotted framing is found during removal that prevents safe retrofitting, is frame repair/replacement the Contractor's or Caltrans' responsibility?
a. If Contractor's responsibility, is this compensable as unforeseen labor under Exhibit A, Section 14 / Line Item 3 with prior written approval?
b. Has any prior frame condition assessment been performed? If so, please provide results to bidders.
Answer 12: Contractor shall replace it.
Answer 12a.: This would be unforeseen, as we do not know.
Answer 12b.: No assessment has been performed.
Question 13: Is removal and disposal of existing interior window coverings (blinds, shades, hardware) included in Line Item 1?
a. If Caltrans wishes to retain any coverings, please identify those locations and provide disposition instructions.
Answer 13: Please reference the revision 6.H. above.
Answer 13a.: Please reference the revision 6.H. above.
Question 14: Will area(s) be available at 320 S Sierra Way for Contractor's temporary equipment and material storage? Are there any restrictions (covered/uncovered, proximity to building, security requirements) to be aware of? Exhibit A, Section 10 states no area is available for Contractor's exclusive use and directs Contractor to arrange storage with the Contract Manager. Bidder needs this information prior to bid submission to plan delivery logistics and price material handling.
“Provide a safe, sustainable, integrated and efficient transportation system to enhance California’s economy and livability”
Answer 14: *Contractor may use back of building A. Pictures of area have been attached to this addendum as Contractors Parking Temp Storage Uncovered. *Contractors shall be responsible for securing their equipment and materials; covered ensuring security of their equipment and materials.
Question 15: May Contractor use Equipment Lot 8 for vehicle parking, material deliveries, and equipment access during the work?
Answer 15: Please reference answer to question 14 above.
Question 16: Will the Administration Building remain occupied during window replacement work?
a. If yes, are there specific areas or workstations requiring advance notice or phased scheduling?
b. Will Caltrans designate an on-site point of contact for daily coordination with building occupants?
Answer 16: No.
Answer 16a.: N/A
Answer 16b.: Caltrans Contractor Manager or designated delegates Shop Supervisors: Contractor will be provided with a contact list at pre-start of work meeting.
Question 17: Does Caltrans have any knowledge of lead-based paint, asbestos-containing-materials, or other hazardous materials at or adjacent to the existing window frames? Please provide any available inspection or testing reports if available.
Answer 17: There is no knowledge, inspection, or testing reports.
Question 18: Has a certified hazardous materials assessment been completed for the window locations at 320 S Sierra Way? Bidder cannot accurately price this work without knowing whether a certified lead and asbestos assessment exists for this facility. Disturbance of lead paint and ACMs without prior testing is regulated under Cal/OSHA Title 8, CCR §§1532.1 and 1529.
a. If yes, please provide the report to all bidders.
b. If no assessment has been completed, will one be provided prior to the March 18, 2026 bid deadline?
Answer 18: No assessment.
Answer 18a.: There is no assessment to provide.
Answer 18b.: Please reference the revision Section 20. above
Question 19: Has Caltrans already acquired a building permit from San Bernardino County for the work to be completed?
Answer 19: No. Contractor shall obtain building permits. Please reference IFPQ, Attachment 3, Exhibit A, Item 13 and Bid Proposal, Line Item 9.
Question 20: Will a City of San Bernardino building inspector sign-off be required in addition to Caltrans Contract Manager acceptance?
a. If yes, is the Contractor responsible for scheduling City inspections?
Answer 20: Please reference the revision 6.A. above.
Answer 20a.: Please reference the revision 6.A. above.
All other terms and conditions set forth in the IFPQ remain in full force and effect.
Sincerely, John Leyva, Contract Analyst
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
PRICE QUOTE PROPOSAL
Attachment 1 - REVISED
Agreement Number 32A0701
ADM-1412 (REV. 9/2025)
Item Number
Estimated Quantity
Unit Of Measure
Item
Unit Price (Price Per
Unit of Measure)
Total (Estimated Quantity X Unit Price)
Each
Contractor shall provide all labor, tools, materials, parts, supplies, vehicles, equipment, travel, and incidentals necessary to remove and legally dispose of existing windows and related hardware and components per STD 213, Exhibit A, Scope of Work.
equipment, travel, and incidentals necessary to furnish and install new dual-paned, 38x94 clear PW Glass, ¼ inch thick windows and related hardware and components per STD 213, Exhibit A, Scope of Work.
equipment, travel, and incidentals necessary to furnish and install new dual-paned, 80x19 clear PW Glass windows and related hardware and components per STD 213, Exhibit A, Scope of Work.
equipment, travel, and incidentals necessary to furnish and install new dual-paned, 42x42 clear XO style Glass windows and related hardware and equipment, travel, and incidentals necessary to furnish and install new dual-paned, 50x19, obscure or frosted glass, XO style Glass windows and related hardware and components per STD 213, Exhibit A, Scope of Work.
STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION
PRICE QUOTE PROPOSAL
Attachment 1 - REVISED
Agreement Number 32A0701
ADM-1412 (REV. 9/2025)
equipment, travel, and incidentals necessary to furnish and install new dual-paned, 50x19, clear, XO style Glass windows and related hardware and equipment, travel, and incidentals necessary to furnish and install new dual-paned, 80x40, clear, XOX style Glass windows and related hardware and
Per Hour
Hourly rate to include all labor, tools, equipment, travel, and any incidentals necessary to effectuate unforeseen unanticipated work needed to complete services (not included in items 1-7 above), per STD 213, Exhibit A, Scope of Work.
Subtotal:
(Lines 1-8)
Maximum allowable expenditure for all parts, materials, supplies, fees, and permits per Exhibit A, Item 13. Actual cost will be reimbursed based on submitted original receipts. This Amount Shall be 10 percent (10%) of the Actual Subtotal Amount (0.10 x Subtotal). Enter 10% in Total column.
1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.
3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.
Total This Proposal (Subtotal + Line 9)
Side of Building 1- Window
Total of 19 Windows
DPEC/FOM Manager Office
Break-Room 2 -front windows 1 - side window
4 Windows
Utility /Custodian Supply Room 1 Window
Supervisor Office 1 Back Window
= 3 WINDOWS
Window
2 Stall Restroom 2 Windows
1 Stall Restroom 1 Window
Window not in picture
Superintendent Office 2 - Back Windows
Front Office Receptionist Area 3 Windows Staff Analyst Office
1 - Front Window 1 - Side Window
= 2 WINDOWS
Total Windows Counted 7
Page 1 Pages 2 - 3 Window - by Item Numbers Locations of Blinds
Front of Building_Total Window Counted 12 11 Front view windows _ 2 Side Windows
X X X
3 Windows have BLINDS
- X=BLINDS
15 - BLINDS
X X X X X XXXXX
12 Windows X = BLINDS
X
Window
X not in picture Side of Building
Attachment A - Windows s135933 Line s135933 Line s135933 Line s135933 Line s135933 Line s135933 Line s135933 Line s135933 Line
Front – Left Side View of Building A
Right Side of Building A
Left Side of Building A
Front – Right Side View of Building A
Front Office Receptionist Area
ITEM 101
ITEM 102
DPEC/FOM Manager Office
Item 103 Item 105Item 104
Staff Analyst Office 1 - Side Window
DPEC/FOM Manager Office
Item 106
1- SIDE WINDOW
Item 119
Item 114 Item 115 Item 116 Item 117 Item 118
Blinds Blinds
Item 103, 104, 105,101, 102 Blinds
Item, 114, 115, 116, 117, 118 Blinds
4-Windows Break-Room-1-office 1 Front Admin Staff Office
Attachment A - Windows s135933 Oval s135933 Oval s135933 Line s135933 Line s135933 Line
View of Back of Building A Superintendent Office 2 - Back Windows
Restrooms 3 Windows
Item 110 Item 109
Item 108
Utility /Custodian Supply Room 1 Window
Item 107
Supervisor Office 1 Back Window
Item 111
Item 113Item 112
Blinds
Blinds Blinds
Attachment A - Windows
Contractors Parking Temp Storage Uncovered Behind Building A
Current.View.
In.Use.by.Another.Contractor.
Will.be.cleared
File details come from the government source that posted it. Updated .