About this file

This is Addendum No. 2 to the contract documents for the Kinross Correctional Facility Roof Replacement project issued by the State of Michigan Department of Technology, Management and Budget (DTMB). The addendum, dated June 21, 2019, modifies the original contract documents dated May 31, 2019, and is effective prior to the bid due date of Wednesday, June 26, 2019. The project involves the replacement of the roof at Kinross Correctional Facility and requires bidders to meet specifications outlined in the project manual for standing seam metal roof panels, specifically section 07 41 13.16.

The addendum makes three substantive modifications to the project specifications: it adds McElroy to the list of approved manufacturers for standing seam metal roof panels; it deletes the requirement for a 1-inch rib specification; and it clarifies that 24-gauge material is allowable provided the panels meet all other requirements outlined in the specifications. Photographs of existing conditions are attached to support bidders' understanding of the current facility conditions. No pricing information, set-asides, incumbents, or funding details are provided in this addendum document.

View the file

Other files

File Type Posted
472_16382.TAP_Specifications.pdf PDF
LEIN Request.pdf PDF
472_16382.TAP_Plans_Pt_A.pdf PDF
Addendum 1 16382.pdf PDF
472_16382.TAP_Plans_Pt_B.pdf PDF
472_16382.TAP_Advertisement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #2 Page 1 of 1

ADDENDUM NO. 2

DATE: June 21, 2019

PROJECT: Kinross Correctional Facility Roof Replacement

OWNER: State of Michigan

DTMB FILE #: 472/16382.TAP

BID DATE: Wednesday, June 26, 2019

The following shall be incorporated into the Contract Documents dated 31 MAY 2019.

GENERAL

Photos of existing conditions are attached.

PROJECT MANUAL

07 41 13.16 Standing Seam Metal Roof Panels Add the following to the list of approved manufacturers: 2.2.B.1.I. McElroy Delete the following: 2.2.B.6 (The requirement for a1” rib shall be deleted.)

Clarification of 2.2.B.2.a. 24 gauge shall be allowable provided the panel meets the requirements of the specifications.

End of Addendum No. 2