Addendum 1 16382.pdf

PDF 256 KB Posted

Attached to
472/16382. TAP Kinross CF - Roof Replacements
Solicitation number
RFQ 171 190000000484 3
Issued by
Cass County, Kincheloe CDP, Michigan

About this file

This is an addendum to the contract documents for the Kinross Correctional Facility Roof Replacement project issued by the State of Michigan Department of Technology, Management and Budget (DTMB). The addendum, dated June 18, 2019, modifies the original contract documents dated May 31, 2019, and was incorporated prior to the bid date of Wednesday, June 26, 2019. The project involves roof replacement services, with the contract time revised to October 15, 2020, as the date for substantial completion. A prebid meeting was held, with an attendance record attached to the addendum. The addendum includes modifications to quality control requirements by deleting cast-in-place concrete testing and revising specifications for standing-seam metal roof panels.

The addendum specifies that standing-seam metal roof panels shall carry a 20-year material and workmanship warranty. Additional approved manufacturers were added, including Metal Sales Manufacturing Corporation for Magna-Loc 180 panels, Petersen Aluminum for Tite-Loc Plus panels, and Protecto Wrap for Jiffy Seal Ice & Water Guard HT underlayment. Roof detail revisions clarified that R38 insulation requirements apply only to the connector area between the two sections of the Administration Building. No pricing information, set-asides, or funding sources are specified in this addendum document.

View the file

Other files

File Type Posted
472_16382.TAP_Specifications.pdf PDF
LEIN Request.pdf PDF
472_16382.TAP_Plans_Pt_A.pdf PDF
Addendum #2.pdf PDF
472_16382.TAP_Plans_Pt_B.pdf PDF
472_16382.TAP_Advertisement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1 Page 1 of 1

ADDENDUM NO. 1

DATE: June 18, 2019

PROJECT: Kinross Correctional Facility Roof Replacement

OWNER: State of Michigan

DTMB FILE #: 472/16382.TAP

BID DATE: Wednesday, June 26, 2019

The following shall be incorporated into the Contract Documents dated 31 MAY 2019.

GENERAL

Prebid Meeting Attendance Record is attached.

PROJECT MANUAL

SECTION 00300 – BID SUMMARY

Contract Time shall be Revised to October 15, 2020.

SECTION 00500 – AGREEMENT

4.1.1 – Revise date for work to be substantially complete to October 15, 2020.

SECTION 01400 QUALITY CONTROL

1. Testing Laboratory Services

Delete the following: Cast-in-Place Concrete testing

07 41 13.16 STANDING-SEAM METAL ROOF PANELS

1.10.A.1 Add the following:

Material and workmanship warranty period shall be 20 years.

2.2.B.1 Add the following manufacturers:

Metal Sales Manufacturing Corporation – Magna-Loc 180 Petersen Aluminum – Tite-Loc Plus Panel

2.3.A.3 Add the following manufacturer: Protecto Wrap – Jiffy Seal Ice & Water Guard HT

DRAWINGS

A301 – ROOF DETAILS

Detail 1 – R38 insulation requirement only applies to the connector area between the two sections of the Administration Building.

End of Addendum No. 1

ADDENDUM NO. 1
GENERAL
PROJECT MANUAL
DRAWINGS

File details come from the government source that posted it. Updated .