Addendum #2.pdf
PDF 1 MB Posted
- Attached to
- 472/16382. TAP Kinross CF - Roof Replacements
- Solicitation number
- RFQ-171-190000000484-3
- Issued by
- Clare County, Michigan
About this file
This document is Addendum #2 for the Kinross Correctional Facility Roof Replacement project, issued by the State of Michigan's Department of Technology, Management, and Budget (DTMB) on June 21, 2019. The addendum modifies the original contract documents dated May 31, 2019, with the bid date set for Wednesday, June 26, 2019. The addendum includes photos of existing conditions and updates to the project manual, specifically for Section 07 41 13.16 Standing Seam Metal Roof Panels. Key modifications include adding McElroy to the list of approved manufacturers, deleting a requirement for a 1" rib, and clarifying that 24 gauge panels are acceptable provided they meet the specification requirements.
The addendum appears to be part of a competitive bidding process for a roof replacement project at a correctional facility. The attached photographs show the existing facility, including exterior views of metal-clad buildings with multiple windows, roof vents, and a secured perimeter with chain-link fencing and razor wire. The images document the current condition of the facility as of June 14, 2019, and provide visual context for potential bidders to assess the scope of the roof replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LEIN Request.pdf | ||
| 472_16382.TAP_Advertisement.pdf | ||
| 472_16382.TAP_Plans_Pt_B.pdf | ||
| 472_16382.TAP_Plans_Pt_A.pdf | ||
| 472_16382.TAP_Specifications.pdf | ||
| Addendum 1 16382.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #2 Page 1 of 1
ADDENDUM NO. 2
DATE: June 21, 2019
PROJECT: Kinross Correctional Facility Roof Replacement
OWNER: State of Michigan
DTMB FILE #: 472/16382.TAP
BID DATE: Wednesday, June 26, 2019
The following shall be incorporated into the Contract Documents dated 31 MAY 2019.
GENERAL
Photos of existing conditions are attached.
PROJECT MANUAL
07 41 13.16 Standing Seam Metal Roof Panels Add the following to the list of approved manufacturers: 2.2.B.1.I. McElroy Delete the following: 2.2.B.6 (The requirement for a1” rib shall be deleted.)
Clarification of 2.2.B.2.a. 24 gauge shall be allowable provided the panel meets the requirements of the specifications.
End of Addendum No. 2
| ADDENDUM NO. 2 |
| GENERAL |
| PROJECT MANUAL |
File details come from the government source that posted it. Updated .