Addendum 1 16382.pdf

PDF 256 KB Posted

Attached to
472/16382. TAP Kinross CF - Roof Replacements
Solicitation number
RFQ-171-190000000484-3
Issued by
Clare County, Michigan

About this file

This document is Addendum No. 1 for the Kinross Correctional Facility Roof Replacement project, issued by the State of Michigan's Department of Technology, Management, and Budget (DTMB) on June 18, 2019. The addendum modifies the original contract documents dated May 31, 2019, for a roof replacement project at the Kinross Correctional Facility. The bid date is set for Wednesday, June 26, 2019, with a revised contract completion date of October 15, 2020. Key modifications include changes to the contract time, substantial completion date, and updates to specifications for metal roof panels, including extended warranty periods and additional approved manufacturers.

The addendum includes several technical specifications updates, such as removing cast-in-place concrete testing requirements and adding new manufacturers for metal roof panels, including Metal Sales Manufacturing Corporation and Petersen Aluminum. The warranty period for material and workmanship has been extended to 20 years, and a specific insulation requirement (R38) is clarified to only apply to the connector area between two sections of the Administration Building. A prebid meeting attendance record is also attached to the addendum, providing additional documentation for the project's procurement process.

View the file

Other files

File Type Posted
LEIN Request.pdf PDF
472_16382.TAP_Advertisement.pdf PDF
472_16382.TAP_Plans_Pt_B.pdf PDF
Addendum #2.pdf PDF
472_16382.TAP_Plans_Pt_A.pdf PDF
472_16382.TAP_Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1 Page 1 of 1

ADDENDUM NO. 1

DATE: June 18, 2019

PROJECT: Kinross Correctional Facility Roof Replacement

OWNER: State of Michigan

DTMB FILE #: 472/16382.TAP

BID DATE: Wednesday, June 26, 2019

The following shall be incorporated into the Contract Documents dated 31 MAY 2019.

GENERAL

Prebid Meeting Attendance Record is attached.

PROJECT MANUAL

SECTION 00300 – BID SUMMARY

Contract Time shall be Revised to October 15, 2020.

SECTION 00500 – AGREEMENT

4.1.1 – Revise date for work to be substantially complete to October 15, 2020.

SECTION 01400 QUALITY CONTROL

1. Testing Laboratory Services

Delete the following: Cast-in-Place Concrete testing

07 41 13.16 STANDING-SEAM METAL ROOF PANELS

1.10.A.1 Add the following:

Material and workmanship warranty period shall be 20 years.

2.2.B.1 Add the following manufacturers:

Metal Sales Manufacturing Corporation – Magna-Loc 180 Petersen Aluminum – Tite-Loc Plus Panel

2.3.A.3 Add the following manufacturer: Protecto Wrap – Jiffy Seal Ice & Water Guard HT

DRAWINGS

A301 – ROOF DETAILS

Detail 1 – R38 insulation requirement only applies to the connector area between the two sections of the Administration Building.

End of Addendum No. 1

ADDENDUM NO. 1
GENERAL
PROJECT MANUAL
DRAWINGS

File details come from the government source that posted it. Updated .