Addendum 2.doc
DOC document 52 KB Posted
- Solicitation number
- PE-51200-RFQC-2026-000000031
- Issued by
- Richmond County, Georgia
About this file
This is an Addendum 2 to a Request for Quotation/Construction (RFQC) issued by Augusta University for renovations to the Interdisciplinary Research Building. The RFX number is PE-51200-RFQC-2026-000000031, with Sharlene Redd serving as the issuing officer. Four suppliers have advanced to the next phase: Clifton Construction, Garbutt Construction Company, Sheridan Construction, and Ajax Building Company. A mandatory walk-through is scheduled for February 4, 2026, from 10:00 A.M. to 12:00 P.M. at 1462 Laney Walker Boulevard, Augusta, Georgia 30912. Todd Peeler is designated as the emergency contact for location information and can be reached at 706-726-8796. All suppliers must provide a signed acknowledgment of this addendum attached to their RFX response.
This addendum clarifies that in the event of any conflict between previously released information and the information contained in this addendum, the latter shall control. Additional inquiries regarding the project can be directed to the issuing officer, Sharlene Redd, at shredd@augusta.edu or 706-721-4555. No pricing terms, set-asides, funding sources, or contract duration information is specified in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SIGN IN SHEET.pdf | ||
| Exhibit_A___Certification_Form_1 (1).docx | DOCX document | |
| J_430 CM RFQ_RFP_.pdf | ||
| Exhibit_B___Contractor_Affidavit (2).docx | DOCX document | |
| Exhibit_C___CM_GC_Fee_Proposal.docx | DOCX document | |
| Exhibit_E___General_Conditions_Breakdown.xlsx | XLSX spreadsheet | |
| Exhibit_F___Project_Cost_Matrix.xlsx | XLSX spreadsheet | |
| Addendum 1.doc | DOC document | |
| Exhibit_G___Proposer_s_Disclosure_Statement.doc | DOC document | |
| NOIA.docx | DOCX document | |
| Addendum 3.doc | DOC document | |
| Score Sheets.pdf | ||
| Exhibit_D___Preconstruction_Cost___Expenses_B.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFX Addendum Form
| RFX Number: PE-51200-RFQC-2026-000000031 |
| RFX Title: Renovations to Interdisciplinary Research Building |
Requesting State Entity: Augusta University
| Issuing Officer: Sharlene Redd |
| RFX Initially Posted to Internet: |
| eMail Address: shredd@augusta.edu |
| Telephone: 706-721-4555 |
| Addendum Number: 11-13-2025 |
| Date: 2-03-2026 |
The following suppliers are moving forward:
1. Clifton Construction
2. Garbutt Construction Company
3. Sheridan Construction
4. Ajax Building Company Mandatory Walk thru:
February 4, 2026 @ 10:00A.M. to 12:00 P.M 1462 Laney Walker Boulevard Augusta, GA 30912 Emergency contact for information on the location of the building:
Name: Todd Peeler
Phone Number: 706-726-8796
Note: In the event of a conflict between previously released information and the information contained herein, the latter shall control.
A signed acknowledgment of this addendum (this page) should be attached to your RFX response.
Supplier’s Name
Signature
Printed Name and Title
Revised 02/11/11
SPD-SPR013
File details come from the government source that posted it. Updated .