Addendum #2 Complete - Bid #25-3 Royal Oak High School Boiler Replacement and Royal Oak Middle School Chilled Water Piping (3).pdf
PDF 6 MB Posted
- Solicitation number
- RFP-ROY-250000000225-5
- Issued by
- Macomb County, Michigan
About this file
This document is an addendum to the contract documents for a bid issued by the Royal Oak Public Schools for work at the Royal Oak High School and Royal Oak Middle School. The addendum clarifies and updates details related to the Royal Oak High School boiler replacement and the Royal Oak Middle School chilled water piping modification projects.
The addendum provides answers to questions from bidders, including scheduling an additional site visit and confirming that ASME welded joints are acceptable. It also adds several new specification sections, re-issues drawings for the high school project, and provides general notes for the mechanical work. The bid due date was previously revised in Addendum #1 to Thursday, November 21, 2024 at 2:00 PM local time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 2
Project: Royal Oak Schools – Bid #25-3 Royal Oak High School Boiler Replacement and Royal Oak
Middle School Chilled Water Piping
Bid Due date: Thursday, November 21, 2024 at 2:00 PM Local Time (REVISED in ADDENDUM #1)
I. General Information
1. For questions contact Mark Paulus at mark.paulus@royaloakschools.org or (248) 880-6791.
2. Any bidder wanting to visit the site, contact Mark Paulus at mark.paulus@royalschools.org or (248) 880-6791 to schedule a time. Bidders are not allowed to visit the building without an appointment.
3. Addendum #2 dated November 11, 2024, as prepared by Larkin Engineering LLC
II. Questions and Answers
Q1. Can you schedule an additional site visit?
A1. An additional site visit has been scheduled for Tuesday, November 12, 2024, at Noon at
Royal Oak High School 1500 Lexington Blvd, Royal Oak, MI 48073 at Lexington Blvd Door 1.
Q2. Will ASME welded joints be acceptable instead of Victaulic?
A2. Yes, welded joints are acceptable.
Q3. Are additional valves necessary to separate the heating and domestic hot water boiler to complete the work in phase 1?
A3. Existing valves will be used.
END
LARKIN ENGINEERING, LLC
3224 Rowley Rd, Williamston, MI 48895 Ph. (517) 290-7116
November 11, 2024
ADDENDUM NO. 2
TO THE CONTRACT DOCUMENTS FOR
ROYAL OAK PUBLIC SCHOOLS
ROYAL OAK HIGH SCHOOL BOILER REPLACEMENTS
ROYAL OAK MIDDLE SCHOOL CHILLED WATER PIPING MODIFICATIONS
ENGINEER: OWNER:
Jim Larkin Mark Paulus Larkin Engineering, LLC Owners Representative 3224 Rowley Road Royal Oak Public Schools Williamston, MI 48895 800 DeVillen Ave.
(517)290-7116 Royal Oak, MI 48073 jim@larkineng.org (248) 880-6791 mark.paulus@royaloakschools.org
PURPOSE:
This addendum is issued as a change to the original Contract Documents. Incorporate these changes into your bid pricing.
DESCRIPTION
SPECIFICATIONS
ITEM 1: Section 223000 – PLUMBING EQUIPMENT (Re-Issued)
A. Add specification for high efficiency, tank type, gas fired water heaters. See attached.
ITEM 2: Section 230900 – HVAC CONTROLS (Not Re-Issued)
A. Add paragraph 2.1 DDC Equipment, A. System Description, 6. As follows:
“6. The new water heaters (2) will be provided with a BacNet IP interface. The controls contractor shall connect to the water heater controller and provide a water heater graphic. Owner shall have the capability to start/stop each water heater, monitor all alarms, monitor and change the set point temperatures, and monitor firing rate.”
mailto:jim@larkineng.org
ITEM 3: NEW SPECIFICATION SECTIONS
A. Add the following specification section to the bid documents.
a. 220523.12 – Ball Valves for Plumbing Piping
b. 220523.14 – Check Valves for Plumbing Piping
c. 220529 – Hangers and Supports for Plumbing Piping and Equipment
d. 220553 – Identification for Plumbing Piping and Equipment
e. 220719 – Plumbing Piping Insulation
f. 221005 - Plumbing Piping
g. 232513 – Water Treatment for Closed Loop Hydronic Systems
DRAWINGS
ITEM 4: HIGH SCHOOL DRAWING SET (Re-Issued)
A. Drawings are being re-issued due to a change in the domestic water heating system.
B. Clarifications on the draining and refill of the heating hot water system are addressed.
C. System isolation valves were added to the heating hot water system.
END OF ADDENDUM N0. 2
GENERAL NOTES - MECHANICAL
1. ALL WORK SHALL COMPLY WITH APPLICABLE REQUIREMENTS OF THE STATE OF MICHIGAN AND THE 2015 MICHIGAN MECHANICAL CODE.
2. ALL PERMITS SHALL BE TAKEN OUT AND PAID FOR BY THE CONTRACTOR DIRECTLY RESPONSIBLE.
3. NO SUBSTITUTION SHALL BE MADE WITHOUT THE OWNERS AND ENGINEER'S WRITTEN APPROVAL.
4. THE OWNER MAY ORDER EXTRA WORK OR MAKE CHANGES BY ALTERING, ADDING TO, OR DEDUCTING FROM THE WORK, THE CONTRACT SUM BEING ADJUSTED ACCORDINGLY
5. ALL TRADES SHALL DO THEIR OWN CUTTING, FILLING, PATCHING, ETC. TO MAKE THE PARTS COME TOGETHER PROPERLY AND FIT TO RECEIVE OR BE RECEIVED BY WORK OF OTHER
TRADES.
6. ALL TRADES SHALL FURNISH ALL LABOR, EQUIPMENT, MATERIALS, AND PERFORM ALL WORK NECESSARY, INDICATED, REASONABLE, INFERRED OR REQUIRED BY ANY SCOPE OF WORK
FOR A COMPLETE PROPERLY FINISHED AND FULLY FUNCTIONAL JOB.
7. ALL TRADES SHALL, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR RUBBISH CAUSED BY THEIR WORK.
8. CONTRACTOR SHALL VERIFY ALL CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ENGINEER BEFORE PROCEEDING WITH THE WORK.
9. THE ENGINEERS APPROVAL OF SHOP DRAWINGS SHALL NOT RELIEVE THE GENERAL CONTRACTOR OR SUBCONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM THE DRAWINGS
OR SPECIFICATIONS UNLESS HE HAS, IN WRITING, CALLED THE ENGINEERS ATTENTION TO SUCH DEVIATIONS AT THE TIME OF SUBMISSIONS, NOR SHALL IT RELIEVE HIM FROM THE
RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE SHOP DRAWINGS.
10. SHOULD THE CONTRACTOR ENCOUNTER CONFLICT BETWEEN THESE PLANS AND SPECIFICATIONS, EITHER AMONG THEMSELVES OR WITH THE REQUIREMENTS OF ANY AND ALL
REVIEWING AND PERMIT-ISSUING AGENCIES, HE/SHE SHALL SEEK CLARIFICATION IN WRITING FROM THIS ENGINEER BEFORE COMMENCEMENT OF CONSTRUCTION. FAILURE TO DO SO
SHALL BE AT THE SOLE EXPENSE TO THE CONTRACTOR.
11. UNLESS OTHERWISE NOTED THE CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS INDICTING ALL CHANGES AND DEVIATIONS FROM APPROVED DRAWINGS.
12. THE ENGINEER WILL NOT BE RESPONSIBLE FOR FIELD DESIGN CHANGES MADE BY THE CONTRACTOR WHERE THE ENGINEER HAS NOT APPROVED THESE DESIGN CHANGES.
13. ALL WORK SHALL BE IN STRICT ACCORDANCE WITH FEDERAL, STATE, AND LOCAL CODES.
14. APPLY AND CONSTRUCT ALL SYSTEMS AND MATERIALS ACCORDING TO EACH MANUFACTURERS' WRITTEN SPECIFICATIONS, INSTRUCTIONS AND RECOMMENDATIONS.
15. CONTRACTOR SHALL WARRANT ALL WORK FOR ONE (1) YEAR AGAINST DEFECTS IN MATERIALS AND LABOR. PROVIDED WRITTEN WARRANTIES AT WORK COMPLETION.
16. THESE DRAWINGS ARE DIAGRAMMATIC & INDICATE THE GENERAL EXTENT OF THE WORK. PROVIDE PLUMBING AND HVAC SYSTEMS COMPLETE PER SPECIFICATION, SMACNA STANDARDS, AND PER APPLICABLE CODES INCLUDING ALL NECESSARY OFFSETS, FITTINGS, SPECIAL RADIUS OR MITERED ELBOWS WHICH ARE REQUIRED DUE TO SPACE CONSTRAINTS OR OTHER
STRUCTURAL CONDITIONS.
17. CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES. VERIFY ALL CLEARANCES PRIOR TO THE FABRICATION OF ANY WORK.
18. DUCTWORK/PIPING SHALL NOT BE LOCATED OVER ELECTRICAL EQUIPMENT/PANELS. PROVIDE REQUIRED CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT. DUCTWORK/PIPING SHALL
NOT INTERFERE WITH ELECTRICAL EQUIPMENT CLEARANCE.
19. THE CONTRACTOR SHALL PROVIDE ALL MISCELLANEOUS SUPPORTING STEEL, ETC. FOR THE PROPER INSTALLATION OF ALL MECHANICAL SYSTEMS.
20. PIPING SHALL NOT BE INSTALLED IN A LOCATION THAT RESTRICTS THE ACCESS TO MECHANICAL DEVICES REQUIRING ACCESS.
21. FOR EQUIPMENT VALVING, COMPONENT, AND PIPING ARRANGEMENT, REFER TO PIPING DIAGRAMS AND DETAILS.
22. NOTIFY OWNER OF ANY PIPING OR DUCTWORK DEMOLITION THAT MAY AFFECT NORMAL OPERATION OF OTHER AREAS.
23. FIELD VERIFY LOCATIONS OF EXISTING PIPING THAT MAY CONFLICT WITH NEW CONSTRUCTION AND RELOCATE AS NEEDED
24. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER DISCIPLINES PRIOR TO CONSTRUCTION TO AVOID CONFLICTS.
25. PROVIDE MANUAL AIR VENTS WITH 3/4” HOSE CONNECTION AT ALL HIGH POINTS.
26. OFFSET PIPING TO ACCOMMODATE LARGE DUCTWORK.
27. THE CONTRACTOR SHALL FIELD VERIFY THE SIZES, LOCATION, ELEVATIONS, AND DETAILS OF ALL EXISTING CONDITIONS THAT MAY AFFECT THE WORK.
28. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTAINING THE INTEGRITY OF ALL EQUIPMENT AND MATERIALS IN A “NEW” CONDITION DURING CONSTRUCTION.
29. ALL WORK SHALL BE PERFORMED BY LICENSED CONTRACTORS AND SUBCONTRACTORS AS REQUIRED BY LAW.
30. DRAWING INDICATE REQUIRED SIZES AND POINTS OF TERMINATION OF PIPES AND DUCTS AND SUGGESTED ROUTES. IT IS NOT INTENTION OF DRAWINGS TO INDICATE ALL NECESSARY
OFFSETS. INSTALL WORK IN MANNER TO CONFORM TO STRUCTURE, AVOID OBSTRUCTIONS, PRESERVE HEADROOM AND KEEP OPENINGS AND PASSAGEWAYS CLEAR. DO NOT SCALE
FROM DRAWINGS.
31. ANY INFORMATION FOUND ON THE DRAWINGS AND NOT IN THE SPECIFICATIONS, OR FOUND IN THE SPECIFICATIONS AND NOT IN THE DRAWINGS, SHALL BE CONSTRUED AS TO BE
INCLUDED IN BOTH THE SPECIFICATIONS AND THE DRAWINGS. ANY CONFLICT BETWEEN THE PLANS AND THE SPECIFICATIONS WILL BE INTERPRETED BY THE ENGINEER. IN THE EVENT OF
CONFLICT, FOR THE PURPOSE OF BIDDING, THE CONTRACTOR SHALL PRESUME THE MOST EXPENSIVE COMBINATION OF QUALITY AND QUANTITY OF WORK SHALL PREVAIL.
3224 ROWLEY RD. WILLIAMSTON MI 48895
EMAIL: JIM@LARKINENG.ORG
PH. (517) 290-7116
ROYAL OAK HIGH SCHOOL
BOILER REPLACEMENTS
1500 LEXINGTON BLVD.
ROYAL OAK, MI 48073
10/25/2024
CJL
JDL
TITLE SHEET
NTS
T-1
ROYAL OAK HIGH SCHOOL
1500 LEXINGTON BLVD, ROYAL OAK MI, 48073
INDEX OF DRAWINGS
T-1 TITLE SHEET
MD-1 ENLARGED BOILER ROOM - DEMOLITION PLAN
M-1 ENLARGED BOILER ROOM - NEW WORK PLAN
M-2 DOMESTIC HOT WATER PIPING DIAGRAMS
M-3 SCHEDULES & DETAILS
M-4 CONTROL SEQUENCE OF OPERATION
BOILER REPLACEMENTS
LOCATION MAP
AERIAL VIEW
BOILER ROOM
2 ADDENDUM #2 11/11/2024
AutoCAD SHX Text
MISCELLANEOUS NOTES
AutoCAD SHX Text
POINT OF CONNECTION BETWEEN NEW AND EXISTING
AutoCAD SHX Text
POINT OF EXISTING TO REMAIN AND EXISTING TO BE REMOVED
AutoCAD SHX Text
INDICATES PLAN NOTE
AutoCAD SHX Text
INDICATES DEMOLITION NOTE
AutoCAD SHX Text
DETAIL BUBBLE DETAIL NUMBER PAGE LOCATION
AutoCAD SHX Text
INDICATES DIRECTION OF DETAIL SECTION
AutoCAD SHX Text
TEMPERATURE CONTROL SYMBOLS
AutoCAD SHX Text
TEMPERATURE SENSOR
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
PROGRAMMABLE THERMOSTAT
AutoCAD SHX Text
THERMOSTAT (W/ NIGHT SETBACK)
AutoCAD SHX Text
ROOM SENSOR
AutoCAD SHX Text
HUMIDSTAT
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
DAMPER (ELECTRIC OPERATION)
AutoCAD SHX Text
DAMPER (PNEUMATIC OPERATION)
AutoCAD SHX Text
DAMPER BLADES
AutoCAD SHX Text
TEMPERATURE SENSOR WITH SUN SHEILD
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text P
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text S
AutoCAD SHX Text
HVAC PIPING
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHWS
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
CHWR
AutoCAD SHX Text
HEATING WATER SUPPLY
AutoCAD SHX Text
HS
AutoCAD SHX Text
HEATING WATER RETURN
AutoCAD SHX Text
HR
AutoCAD SHX Text
CONDENSATE DRAIN
AutoCAD SHX Text
CD
AutoCAD SHX Text
HVAC PIPING
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
PIPING DROP
AutoCAD SHX Text
PIPING RISE
AutoCAD SHX Text
INLINE PIPING DROP
AutoCAD SHX Text
INLINE PIPING DROP
AutoCAD SHX Text
PIPING TEE
AutoCAD SHX Text
PIPING ELBOW
AutoCAD SHX Text
THERMOMETER
AutoCAD SHX Text
INLINE PIPING DROP
AutoCAD SHX Text
UNION
AutoCAD SHX Text
PIPE ANCHOR
AutoCAD SHX Text
PIPE GUIDE
AutoCAD SHX Text
BACK FLOW PREVENTER
AutoCAD SHX Text
PIPE CAP
AutoCAD SHX Text
PIPE BREAK
AutoCAD SHX Text
THERMOMETER WELL
AutoCAD SHX Text
EXPANSION LOOP
AutoCAD SHX Text
HVAC PIPING VALVES
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
GAS COCK
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BALANCE COCK
AutoCAD SHX Text
CIRCUIT SETTER
AutoCAD SHX Text
TWO WAY CONTROL VALVE
AutoCAD SHX Text
THREE WAY CONTROL VALVE
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
EXPANSION VALVE WITH THERMOSTATIC BULB
AutoCAD SHX Text
PLUG VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
RELIEF VALVE
AutoCAD SHX Text
HOSE & DRAIN END VALVE
AutoCAD SHX Text
PRESSURE RELIEF VALVE
AutoCAD SHX Text
PRESSURE REDUCING VALVE
AutoCAD SHX Text
TRIPLE DUTY VALVE
AutoCAD SHX Text
BALANCE COCK
AutoCAD SHX Text
STRAINER (BLOW OFF)
AutoCAD SHX Text
MECHANICAL SYMBOLS
AutoCAD SHX Text
ABBREVIATIONS
AutoCAD SHX Text B BOILER BOILER CA COMBUSTION AIR COMBUSTION AIR CW COLD WATER COLD WATER DWH DOMESTIC WATER HEATER DOMESTIC WATER HEATER EX EXISTING EXISTING EXP EXPANSION EXPANSION G GAS GAS HS HEATING WATER SUPPLY HEATING WATER SUPPLY HR HEATING WATER RETURN HEATING WATER RETURN HW HOT WATER HOT WATER HWR HOT WATER RETURN HOT WATER RETURN V VENT VENT VFD VARIABLE FREQUENCY DRIVEVARIABLE FREQUENCY DRIVE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NO.
AutoCAD SHX Text
LARKIN ENGINEERING, LLC.
UP
MEZZANINE
ABOVE
VFDVFDVFDVFDVFD
HSP-1 HSP-1A HSP-2 HSP-3 HSP-3A
99999
H
S
H
R
H
S
EX. AIR
SEPARATOR
8"HS
8"CA
TO ROOF
8"CA
TO ROOF
B-1 B-2 B-3
8"CA
TO ROOF
B-4 B-5 B-6
8"CA
TO ROOF
8"CA
TO ROOF
8"CA
TO ROOF
EX. EXP TANK
H W
R
H W
R
C
W
H
W
0°)
EXP TANK
STORAGE
TANK
V
T
O
R
O
F
DWH-2
10"0 CA
TO ROOF
10"0 CA
TO ROOF
G
2" G
V
O
F
6" G
G
4" G
M
EX. NATURAL GAS
METER
O
F
O
F
2" G
2" G
10101010
2" G2" G
O
F
O
F
2" G
2" G
O
F
O
F
6 6 6 6
DWH-1
MECHANICAL DEMOLITION NOTES
1. REMOVE DOMESTIC WATER HEATER AND ALL
ASSOCIATED PIPING, VENTING, CONTROLS AND
ELECTRICAL.
2. DOMESTIC HOT WATER RETURN PIPING, PUMPS AND
CONTROLS SHALL REMAIN.
3. REMOVE THE DOMESTIC HOT WATER STORAGE
TANK, EXPANSION TANK AND ALL ASSOCIATED
PIPING.
4. EXISTING CONCRETE PAD TO REMAIN.
5. REMOVE 3-WAY VALVE AND PIPING AS INDICATED.
6. REMOVE BOILER, BOILER PUMP, ASSOCIATED PIPING,
CONTROLS AND ELECTRICAL.
7. THE EXISTING HOT WATER HEATING SYSTEM
CONTAINS A 30% PROPYLENE GLYCOL SOLUTION.
VERIFY THE EXISTING CONCENTRATION PRIOR TO
DRAINING SYSTEM INTO "TOTES" FOR REUSE.
ESTIMATED SYSTEM VOLUME IS 10,000 GALLONS.
8. REMOVE VENT OR COMBUSTION AIR DUCT FROM THE
BOILER TO TERMINATION ABOVE THE ROOF. UTILIZE
EXISTING ROOF OPENING FOR NEW BOILERS.
9. REMOVE THE BASE MOUNTED PUMP SUCTION
DIFFUSER, VIBRATION ISOLATOR, TRIPLE DUTY
VALVE, SHUT-OFF VALVES AND VFDs. REUSE
CONTROL AND POWER WIRING AT NEW PUMPS.
10. REMOVE GAS PIPING AS INDICATED. CAP UNUSED
PIPING, REMOVE VENT PIPING FROM REMOVED
PRESSURE REGULATORS.
11. REMOVE AIR SEPARATOR AND ALL SUCTION SIDE
PIPING TO PUMPS.
3224 ROWLEY RD. WILLIAMSTON MI 48895
EMAIL: JIM@LARKINENG.ORG
PH. (517) 290-7116
ROYAL OAK HIGH SCHOOL
BOILER REPLACEMENTS
1500 LEXINGTON BLVD.
ROYAL OAK, MI 48073
10/25/2024
CJL
JDL
ENLARGED BOILER ROOM
- DEMOLITION PLAN
"=1'0"
MD-1
ENLARGED BOILER ROOM - DEMOLITION PLAN
SCALE: 1/4"=1'0"1
2 ADDENDUM #2 11/11/2024
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NO.
MEZZANINE
ABOVE
VFDVFDVFDVFDVFD
HSP-1 HSP-1A HSP-2 HSP-3 HSP-3A
H
S
H
R
H
S
EX. AIR
SEPARATOR
8"HS
EX. EXP TANK
H W
R
H W
R
C
W
H
W
0°)
6" G
G
M
EX. NATURAL GAS
METER
44444
ET-1
H
R
8"HS
8"HR
6"HS
10"CA
3 3 3
V
V
V
B-3B-2B-1
3"G
3 3 3
3"G
3"G
6"HR 6"HR
EX FD
8"HS
1" DRAIN
H
W
C
W
H
W
C
W
C
W
H
W
C
A
C
A
DWH-2
6" V
G
G
2"G
DWH-1
MECHANICAL DEMOLITION NOTES
1. EXISTING CONCRETE PAD TO REMAIN.
2. TEMPORARILY REMOVE ALUMINUM FRAMED,
WINDOW SYSTEM FOR INSTALLATION OF BOILERS
AND DOMESTIC HOT WATER STORAGE TANK.
3. VENT OR COMBUSTION AIR DUCT UP THROUGH
EXISTING ROOF OPENING. TERMINATE ABOVE IN
ACCORDANCE WITH BOILER MANUFACTURERS
INSTALLATION REQUIREMENTS.
4. NEW PUMP AND VFD. PROVIDE NEW SUCTION
DIFFUSER, VIBRATION ISOLATION, TRIPLE DUTY
VALVE AND SHUT-OFF VALVES. RECONNECT TO
EXISTING POWER AND CONTROLS.
5. NEW GAS SHUT-OFF VALVE AND PRESSURE
REGULATOR. REGULATOR SHALL BE SIZED FOR 4000
CFH, 2 PSI INLET AND 12" W.C. OUTLET FOR EACH
BOILER AND 1500 CFH, 2 PSI INLET, 12"WC OUTLET
FOR THE WATER HEATERS.
6. NEW GAS HEADER.
7. REPLACE THE BLADDER AT THE EXISTING BELL &
GOSSETT B-3000 EXPANSION TANK.
8. NEW BOILER AND BOILER PUMP. CONNECT TO
EXISTING BOILER AND PUMP ELECTRICAL CIRCUITS.
9. PROVIDE AN EMERGENCY STOP BUTTON AT EACH
BOILER ROOM EXIT. WIRE "E-STOP" BUTTON TO
SHUT-DOWN BOILERS WHEN ACTIVATED.
10. EXTEND THE EXISTING 4" HOUSEKEEPING PAD TO
SUPPORT THE NEW WATER HEATERS.
11. EXTEND A 120V, 15A CIRCUIT FROM THE NEAREST
PANEL TO THE WATER HEATER CONTROLLER.
12. NEW AIR/DIRT SEPARATOR WITH MAGNET. B&G
MODEL CRS-8F-HVMAG. PROVIDE AN AIR VENT, SKIM
VALVE AND BLOW DOWN VALVE. BOTTOM AT 6'-0" AFF
MINIMUM.
13. DRAIN AND REFILL THE HOT WATER HEATING
SYSTEM AS REQUIRED. PROVIDE ADDITIONAL
PROPYLENE GLYCOL AS REQUIRED TO MAINTAIN A
30% SOLUTION. PRIOR TO BOILER AND BOILER PUMP
OPERATION, FLUSH THE SYSTEM AND RUN MAIN
PUMPS THROUGH THE EXISTING SIDESTREAM FILTER
FOR 48 HOURS.
14. NEW BUTTERFLY SYSTEM ISOLATION VALVE.
3224 ROWLEY RD. WILLIAMSTON MI 48895
EMAIL: JIM@LARKINENG.ORG
PH. (517) 290-7116
ROYAL OAK HIGH SCHOOL
BOILER REPLACEMENTS
1500 LEXINGTON BLVD.
ROYAL OAK, MI 48073
10/25/2024
CJL
JDL
ENLARGED BOILER ROOM
- NEW WORK PLAN
"=1'0"
M-1
ENLARGED BOILER ROOM - NEW WORK PLAN
SCALE: 1/4"=1'0"1
2 ADDENDUM #2 11/11/2024
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NO.
1. REMOVE WATER HEATER AND ASSOCIATED POWER,
CONTROLS, PUMP, PIPING, NATURAL GAS, VENTING
AND COMBUSTION AIR.
2. REMOVE PIPING AS INDICATED.
3. REMOVE THE STORAGE TANK, EXPANSION TANK AND
ASSOCIATED PIPING.
4. EXISTING HOT WATER RETURN PUMPS AND PIPING TO
REMAIN.
5. EXISTING CONCRETE PAD TO REMAIN.
DEMOLITION NOTES
1. RELIEF VALVE DRAIN. EXTEND TO NEAREST FLOOR
DRAIN.
2. HOSE END DRAIN.
3. NEW EXPANSION TANK "ET-1" EQUAL TO B&G PT-60V, 34
GAL TANK VOLUME, 6 GAL ACCEPTANCE VOLUME.
4. CONDENSATE NEUTRALIZATION KIT. TYPICAL OF 2.
DRAIN TO NEAREST FLOOR DRAIN.
NEW WORK NOTES
3224 ROWLEY RD. WILLIAMSTON MI 48895
EMAIL: JIM@LARKINENG.ORG
PH. (517) 290-7116
ROYAL OAK HIGH SCHOOL
BOILER REPLACEMENTS
1500 LEXINGTON BLVD.
ROYAL OAK, MI 48073
10/25/2024
CJL
JDL
DOMESTIC HOT WATER
PIPING DIAGRAMS
NTS
M-2
DOMESTIC WATER HEATERS PIPING DIAGRAM - DEMOLITION
SCALE: NTS1
DOMESTIC WATER HEATERS PIPING DIAGRAM - NEW WORK
SCALE: NTS1
2 ADDENDUM #2 11/11/2024
AutoCAD SHX Text
EXISTING DWH-1
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING DWH-2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2 " HWR12" HWR
AutoCAD SHX Text
2 " HWS12" HWS
AutoCAD SHX Text
2 " HWR12" HWR
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING STORAGE TANK
AutoCAD SHX Text
EX EXPANSION TANK
AutoCAD SHX Text
EX HWR PUMP(2)
AutoCAD SHX Text
HWR
AutoCAD SHX Text
140 HWR
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
3"HW
AutoCAD SHX Text
140 HWR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
HWR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
HWR
AutoCAD SHX Text
140 HWR
AutoCAD SHX Text
3"CW
AutoCAD SHX Text
AutoCAD SHX Text
DWH-2
AutoCAD SHX Text
AutoCAD SHX Text
THERMOMETER(TYP)
AutoCAD SHX Text
140 HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
ET-1
AutoCAD SHX Text
DWH-1
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2"CW
AutoCAD SHX Text
AutoCAD SHX Text
3"HW
AutoCAD SHX Text
2"HW
AutoCAD SHX Text
2"HW
AutoCAD SHX Text
3"HW
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NO.
1. SENSOR WIRED TO NEW BOILER CONTROLS.
2. PUMP "START-STOP" WIRED TO NEW BOILER
CONTROLS. PUMPS SHALL OPERATE IN PARALLEL.
PUMP SPEED AND STAGING SHALL BE CONTROLLED
FROM EXISTING BMS. CONNECT EXISTING CONTROLS
TO NEW PUMPS.
3. BOILER PUMP CONTROLLED BY NEW BOILER
CONTROLS.
4. REPLACE BLADDER AT EXISTING B&G B-3000
EXPANSION TANK.
5. PROVIDE AND INSTALL ALL SENSOR, PUMP, AND
BOILER CONTROL WIRING TO ENABLE THE NEW BOILER
SYSTEM TO OPERATE AS A STAND ALONE SYSTEM.
ALL CONTROL WIRING SHALL BE IN CONDUIT.
6. INSTALL AN OUTDOOR AIR TEMPERATURE SENSOR ON
THE NORTH WALL OF THE BUILDING. WIRE TO BOILER
CONTROLS.
7. NOT USED
8. NOT USED
9. EXTEND A DRAIN LINE FROM THE RELIEF VALVE TO THE
NEAREST FLOOR DRAIN.
10. LOCATE ALL FITTINGS AND CONNECTIONS (IE. UNIONS ,
ELBOWS, ELECTRICAL) A MINIMUM OF 6" AWAY FROM
REMOVABLE BOILER SIDE PANELS.
BOILER ROOM NOTES
BOILER SCHEDULE
NOTES:
1. MODEL NUMBERS BASED ON AERCO
2. PROVIDE AND INSTALL CONDENSATE NEUTRALIZATION KIT.
3. PROVIDE AND INSTALL 12" DIAMETER VENT. VENT MATERIAL SHALL BE
IN ACCORDANCE WITH BOILER MANUFACTURER'S REQUIREMENTS.
4. PROVIDE AND INSTALL 10" DIAMETER PVC COMBUSTION AIR INTAKE.
5. PROVIDE AND INSTALL SUPPLY WATER AND OUTSIDE AIR
TEMPERATURE SENSORS AND WIRING.
6. PROVIDE A BACNET / IP INTERFACE.
7. PROVIDE A BOILER SEQUENCING PANEL THAT SHALL INITIATE
OPERATION OF BOILERS, BOILER PUMPS, SYSTEM PUMPS, DHW HEAT
EXCHANGER PUMP AND DHW STORAGE TANK PUMP.
TAG QUANTITY
INPUT
MBH
EWT (F)
FLOW RATE
(GPM)
MODEL LOCATION TYPE
FLUE
SIZE
OUTPUT
MBH
LWT (F)
INTERNAL
PRESSURE DROP
ELECTRICAL
VOLTS PHASE MCA
NOTES
PUMP SCHEDULE
NOTES:
1. BASED ON BELL & GOSSETT.
2. BASED ON GRUNDFOS.
3. FLUID IS 30% PROPYLENE GLYCOL.
TAG
BP-1, BP-2, BP-3 BOILER
SERVES SIZE
45-375TPE3 80-180
MODEL
BOILER RM
LOCATION TYPE
IN-LINE
PUMP
GPM HEAD(FT)
270 22'
NOTES
2,3
MOTOR
RPM HP VOLTAGE
2700 3.0 208
PHASE
DISC.
E.C.
STRTR.
E.C.
HSP-1, HSP-1A,
HSP-2
HEATING 3GBe-1510BOILER RM BASE 420 115' 1,31800 20 208 3 E.C. E.C.
B-1,B-2,B-3 3 4000 110 270BMK BOILER RMCONDENSING 12" 3760 140 7 FT 208 3 1-723
WATER HEATER SCHEDULE
NOTES:
1. PROVIDE ACID NEUTRALIZATION KIT.
2. PROVIDE BACNET MSTP FOR CONNECTION TO THE EXISTING BUILDING
AUTOMATION SYSTEM
TAG
DWH-1 PV1
MANUF.
75L225A-PVX
MODEL
ELECTRICAL
120V / 1PH / 11A
HSP-3, HSP-3A HEATING e-1510BOILER RM BASE 550 140' 1,31800 20 208 3 E.C. E.C.
3GB
INPUT
(MBH)
TANK SIZE
(GAL)
EWT
LWT
1, 2
NOTES
RECOVERY (GPH) @
40 EWT AND 140 LWT
DWH-2 PV1 75L225A-PVX 120V / 1PH / 11A750 40 140 1, 2225873
3224 ROWLEY RD. WILLIAMSTON MI 48895
EMAIL: JIM@LARKINENG.ORG
PH. (517) 290-7116
ROYAL OAK HIGH SCHOOL
BOILER REPLACEMENTS
1500 LEXINGTON BLVD.
ROYAL OAK, MI 48073
10/25/2024
CJL
JDL
SCHEDULES &
DETAILS
NTS
M-3
BOILER PIPING SCHEMATIC
SCALE: NTS3
INLINE PUMP DETAIL
SCALE: NTS2
VENTING/COMBUSTION
(VERIFY WITH BOILER MANUFACTURER)1
AIR TERMINATION DETAIL
2 ADDENDUM #2 11/11/2024
AutoCAD SHX Text
AutoCAD SHX Text B-1
AutoCAD SHX Text B-2
AutoCAD SHX Text
EXISTING EXPANSION TANK
AutoCAD SHX Text
HSP-1
AutoCAD SHX Text
HSP-1A
AutoCAD SHX Text
SHOT FEEDER
AutoCAD SHX Text
CONDENSATE NEUTRALIZATION KIT (TYP. 3)
AutoCAD SHX Text
X-4" CONCRETE PAD
AutoCAD SHX Text
BP-2
AutoCAD SHX Text
BP-1
AutoCAD SHX Text
6" HS
AutoCAD SHX Text 8"
AutoCAD SHX Text 1"
AutoCAD SHX Text
NEW AIR/DIRT SEPARATOR
AutoCAD SHX Text
NEW AUTO AIR VENT
AutoCAD SHX Text
EXISTING PRESSURE REDUCING VALVE
AutoCAD SHX Text
EXISTING REDUCED PRESSURE BACKFLOW PREVENTOR
AutoCAD SHX Text
1" CW
AutoCAD SHX Text
X-FD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
P & T RELIEF VALVE (TYP.)
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
TRIPPLE DUTY VALVE (TYP.)
AutoCAD SHX Text
THERMOSTAT (TYP.)
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
FLEX CONNECTOR (TYP.)
AutoCAD SHX Text
PRESSURE GUAGE (TYP.)
AutoCAD SHX Text
VARIABLE SPEED PUMP BY BOILER MANUFACTURER (TYP.)
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text
NORTH FACING WALL
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text B-3
AutoCAD SHX Text
BP-3
AutoCAD SHX Text
AutoCAD SHX Text
P & T RELIEF VALVE (TYP.)
AutoCAD SHX Text
HSP-2
AutoCAD SHX Text
AutoCAD SHX Text
TRIPPLE DUTY VALVE (TYP.)
AutoCAD SHX Text P
AutoCAD SHX Text
HSP-3
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
FLEX CONNECTOR (TYP.)
AutoCAD SHX Text
PRESSURE GUAGE (TYP.)
AutoCAD SHX Text
EXISTING PUMPS
AutoCAD SHX Text
6" HS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
8" HR
AutoCAD SHX Text
AutoCAD SHX Text
PETE'S PLUG (TYP.)
AutoCAD SHX Text 4"
AutoCAD SHX Text
8"HR
AutoCAD SHX Text
8"HS
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
HSP-3A
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text
FLEX CONNECTOR (TYP.)
AutoCAD SHX Text
PRESSURE GUAGE (TYP.)
AutoCAD SHX Text
AutoCAD SHX Text
CHECK VALVE (TYP.)
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 3'-0"
AutoCAD SHX Text
2'-0" MAX
AutoCAD SHX Text
CONE FLASHING SECURED TO CHIMNEY CAP (TYP) (TYP)
AutoCAD SHX Text
VENT
AutoCAD SHX Text
BIRD SCREEN
AutoCAD SHX Text
STORM COLLAR (TYP)
AutoCAD SHX Text
PVC COMBUSTION AIR INTAKE
AutoCAD SHX Text
NO LOSS VENT CAP
AutoCAD SHX Text
ALUMINUM CHIMNEY CAP
AutoCAD SHX Text
CHIMNEY WALL
AutoCAD SHX Text
SUPPORT CAP AS NEEDED
AutoCAD SHX Text
TRIPLE DUTY VALVE
AutoCAD SHX Text
UNION (TYP)
AutoCAD SHX Text
REDUCER (AS REQUIRED)
AutoCAD SHX Text
PRESSURE GAGE (0-50 PSI)
AutoCAD SHX Text
14" COCK
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
PUMP
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NO.
GENERAL NOTES - CONTROLS
1. THESE GENERAL NOTES SHALL BE APPLICABLE FOR ALL DRAWINGS.
2. THE TEMPERATURE CONTROLS (TC) CONTRACTOR SHALL BE RESPONSIBLE TO COMPLY TO ALL APPLICABLE CODES AND STANDARDS.
3. "PROVIDE' IS DEFINED AS “FURNISH AND INSTALL”.
4. TC CONTRACTOR SHALL BE RESPONSIBLE FOR A COMPLETE WORKING SYSTEM, INCLUDING FUNCTIONAL TESTING FOLLOWING THE REPLACEMENT OF
CONTROLLERS, SENSORS, AND MOTORIZED OPERATORS OF DAMPERS AND VALVES.
5. ALL CONTROL SCHEMATICS AND WIRING DIAGRAMS ARE FOR THE CLARIFICATION OF EQUIPMENT INTERLOCKING FUNCTIONS AND THE INTERFACE OF
VARIOUS CONTRACTORS WORK AND SHALL NOT BE MISTAKEN AS SHOP DRAWINGS FOR ACTUAL INSTALLATION.
6. TC CONTRACTOR SHALL PROVIDE DDC CONTROLLERS AS REQUIRED TO MEET INTENT OF DESIGN DOCUMENTS. REFER TO THE PLANS FOR THE DDC
FUNCTIONS THAT APPLY TO EACH MECHANICAL SYSTEM.
7. ALL TC PROVIDED COMPONENTS, AND ALL TC CONTRACTOR INSTALLED WIRING AND INSTRUMENTATION SHALL BE LABELED PER SPECIFICATIONS.
8. TC CONTRACTOR SHALL REMOVE ALL EXISTING CONTROL COMPONENTS, INCLUDING INSTRUMENTATION, TUBING, AND WIRING ABANDONED DUE TO
INSTALLATION OF NEW SYSTEMS AND ASSOCIATED CONTROLS.
9. ALL WIRING AND SYSTEM CONTROL VOLTAGES SHALL BE IN ACCORDANCE WITH THE EQUIPMENT MANUFACTURER'S RECOMMENDATION AND THE
SPECIFICATIONS,
10. ALL DDC AND CONTROL INTERLOCK WIRING SHALL BE BY TC CONTRACTOR. TC CONTRACTOR SHALL FIELD VERIFY EXISTING MOTOR STARTERS FOR
INTERFACE WIRING REQUIREMENTS AND TERMINATION POINTS AS REQUIRED.
11. ALL DDC SIGNAL WIRING BETWEEN COMPONENTS SHALL BE INSTALLED WITHOUT INTERMEDIATE STOPS, UNLESS IT IS PART OF THE SYSTEM
INTEGRATION. NO DATA COMMUNICATIONS WIRE SPLICING IS ALLOWED.
12. ALL ELECTRICAL WIRING AND RACEWAY SYSTEMS SHALL COMPLY WITH SPECIFICATION REQUIREMENTS. WHERE RACEWAY IS REQUIRED, TWO
SEPARATE ELECTRICAL RACEWAY SYSTEMS SHALL BE PR0VIDED: ONE FOR A.C. WIRING AND THE OTHER FOR D.C. WIRING.
13. ALL 24V CONTROL WIRING SHALL BE CONCEALED IN WALLS AND ABOVE CEILING IN FINISHED AREA WHERE POSSIBLE. EXPOSED WORK IN
NON-MECHANICAL ROOM AREAS SHALL BE INSTALLED IN SURFACE METAL RACEWAY PERPENDICULAR OR PARALLEL TO WALLS, CEILINGS, OR
STRUCTURAL MEMBERS. WIRING ABOVE CEILINGS SHALL BE SECURED WITH WIRE TIES EVERY FIVE FEET. EXISTING RACEWAYS MAY BE REUSED WITH
OWNER'S APPROVAL.
14. ALL 24V CONTROL WIRING IN MECHANICAL ROOMS SHALL BE INSTALLED IN CONDUIT OR EMT TO THE EIGHT FOOT LENGTH. CONDUIT SLEEVES OR
ENDS ARE TO BE FITTED WITH PLASTIC BUSHINGS TO PREVENT DAMAGE TO CONDUCTORS.
15. ALL 120V WRING SHALL BE INSTALLED IN CONDUIT OR EMT. SIZE SHALL BE L” MINIMUM.
16. CONDUIT OR EMT SHALL BE EXPOSED ONLY IN MECHANICAL AND ELECTRICAL ROOMS.
17. SIZE CONDUIT OR EMT TO BE FILLED AT 40% CAPACITY.
18. TC CONTRACTOR SHALL BE RESPONSIBLE FOR ALL POWER SUPPLIES REQUIRED FOR TC SYSTEM UNLESS OTHERWISE NOTED.
19. POWER SUPPLIES (120VAC) REQUIRED FOR NEW TC COMPONENTS SHALL BE FROM EXISTING PANELBOARDS. SPARE CIRCUIT BREAKERS MAY BE
USED WHEN AVAILABLE. IN PANELBOARDS THAT DO NOT HAVE. SPARE CIRCUIT BREAKERS, NEW BREAKERS TO MATCH EXISTING SHALL BE INSTALLED
IN BLANKED OUT SPACES PROVIDED. CIRCUIT BREAKERS SHALL BE BOLT ON TYPE WITH PROPER INTERRUPTING RATING.
20. TC CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL FIELD MOUNTED COMPONENTS.
21. ANY NEW SPACE TEMPERATURE SENSORS SHALL BE MOUNTED 4'-0” ABOVE FINISHED FLOOR. FOR EXISTING THERMOSTAT AND TEMPERATURE
SENSOR REPLACEMENTS, TC CONTRACTOR SHALL MOUNT NEW SENSORS AT SAME LOCATION REGARDLESS OF HEIGHT REQUIREMENT.
22. TC CONTRACTOR SHALL PROVIDE AUXILIARY PANELS FOR REQUIRED PANEL MOUNTED EQUIPMENT SUCH AS RELAYS, EP'S, TRANSDUCERS, CONTROL
TRANSFORMERS. ETC. AUXILIARY PANELS SHALL BE LOCATED NEXT TO ASSOCIATED DDC PANEL.
23. NEW REMOTELY MOUNTED FIELD DEVICES SUCH AS RELAYS, CONTROL TRANSFORMERS, ETC. SHALL BE HOUSED IN AN ENCLOSURE PROVIDED BY
THE TC CONTRACTOR.
24. CONTROL TRANSFORMERS WHEN REQUIRED SHALL BE SIZED FOR 150% OF AC1UAL LOAD.
25. FREEZE-STATS, WHERE REQUIRED, SHALL BE MOUNTED ON UPSTREAM FACE OF COOLING COILS. FREEZESTAT QUANTITY SHALL BE ONE PER 20 SQ.
FT. OF CROSS SECTIONAL AREA.
26. CURRENT SWITCHES/SENSORS USED FOR OPERATIONAL STATUS SHALL HAVE CURRENT THRESHOLD SETPOINT ADJUSTED TO INDICATE BELT OR
DRIVE FAILURE.
27. ALL NEW CONTROL VALVES IDENTIFIED ON TC DRAWINGS SHALL BE FURNISHED BY TC CONTRACTOR.
28. TC CONTRACTOR SHALL REUSE THERMOWELLS FOR EXISTING DDC SYSTEM COMPONENTS REPLACEMENTS. TC CONTRACTOR SHALL FIELD VERIFY
EXISTING SIZES AND THREADED CONNECTIONS AS REQUIRED. STRAP-ON TEMPERATURE SENSOR MAY BE USED FOR PRIMARY HEATING OR COOLING
LOOP SUPPLY AND RETURN TEMPS.
29. ALL INSTRUMENTATION TUBING THAT MAY BE REQUIRED FOR DPS AND DPT COMPONENT INSTALLATIONS SHALL BE PROVIDED BY TC CONTRACTOR.
30. TCC SHALL BE RESPONSIBLE FOR INTERFACING STAND-ALONE BOILER AND PUMP CONTROLS TO EXISTING BUILDING CONTROL SYSTEM.
BUILDING HEATING SYSTEM
SEQUENCE OF OPERATION
BOILER OPERATING CONTROLS SHALL INCLUDE THE FOLLOWING DEVICES AND FEATURES:
1. SEQUENCE OF OPERATION (HIGH-EFFICIENCY CONDENSING BOILER SYSTEM WITH SMART ON-BOARD CONTROLS): SEE MANUFACTURERS
INTERNAL BOILER OPERATING CONTROLS AND SEQUENCE OF OPERATION. BOILERS SHALL HAVE INTERNAL VARIABLE FLOW CONTROLS WHICH
WILL MANAGE THE FLOW OF THE BOILER PRIMARY CIRCULATING PUMP.
2. THE NEW HIGH EFFICIENCY CONDENSING BOILERS SHALL BE CONTROLLED BY INTERNAL RESET CONTROLS. A COMMUNICATIONS CONTROL CARD
PROVIDED BY THE MANUFACTURER AND MOUNTED IN THE BOILER SHALL PROVIDE DIGITAL COMMUNICATIONS WITH THE BMS AND ACTIVATE THE
BOILER THROUGH A DIGITAL ENABLE/DISABLE COMMAND, WITH BOILER STATUS, OPERATIONS, AND ALARMS OF THE BOILER READ BY THE BMS
THROUGH DDC OUTPUT FROM THE BOILER.
BOILER AND HEATING CONTROL: THE HI-EFFICIENCY CONDENSING BOILER SHALL BE EQUIPPED WITH STAND-ALONE BOILER SYSTEM OA START-UP, HOT
WATER TEMPERATURE RESET, AND START/STOP CONTROL OF BOILER CIRCULATING PUMPS. WHEN THE BOILER OA START-UP SETPOINT IS REACHED, AS
PROVIDED THRU THE DEDICATED BOILER SYSTEM OA SENSOR, THE INTERNAL PRIMARY BOILER CONTROLLER AT THE PRIMARY BOILER CONTROL PANEL
INITIATES THE BOILER START-UP SEQUENCE FOR THE BOILER (PROVIDED BY THE MANUFACTURER).
PRIMARY HYDRONIC HEATING SYSTEM CONTROL- FACTORY START-UP AND INITIAL SET-UP
1. INITIAL PRIMARY RESET SCHEDULE TO BE 110° TO 160° F HOT WATER SUPPLY TEMPERATURE AS OUTSIDE AIR VARIES FROM 60° F TO 10° F
(ADJUSTABLE)
MAIN CIRCULATING PUMPS: MAIN CIRCULATION PUMPS HSP-1, HSP-1A, HSP-2, HSP-3 AND HSP-3A, SHALL BE RECONNECTED TO THE EXISTING CONTROLS.
THE SEQUENCE OF OPERATION AND GRAPHICS SHALL NOT CHANGE.
MAIN HEATING PUMP CONTROL: HOT-WATER HEATING PUMPS SHALL BE STARTED BY THE BAS BASED ON OUTSIDE AIR TEMPERATURE. THE HOT WATER
PUMPS SHALL START AT 60° F OUTSIDE AIR TEMPERATURE (ADJUSTABLE). PUMP SPEED SHALL BE CONTROLLED THROUGH THEIR RESPECTIVE VFD'S.
THE LEAD (MASTER) BOILER, ON MANUFACTURER SUPPLIED BOILER CONTROL PANEL, WILL CONTROL THE FIRING RATE OF EACH BOILER, FLOW RATE
THROUGH THE BOILER WITH THE VARIABLE SPEED BOILER PUMPS, AND SEQUENCE OF ALL BOILERS ON THE SYSTEM FROM THE MASTER BOILER
ON-BOARD CONTROLS.
BURNER OPERATING CONTROLS: TO MAINTAIN SAFE OPERATING CONDITIONS, INTERNAL BURNER SAFETY CONTROLS LIMIT BURNER OPERATING.
BUILDING AUTOMATION SYSTEM INTERFACE: FACTORY SHALL PROVIDE/ INSTALL ALL HARDWARE AND SOFTWARE TO ENABLE BUILDING AUTOMATION
SYSTEM TO MONITOR, CONTROL, AND DISPLAY BOILER STATUS AND ALARMS THROUGH BOILER DDC INTERFACE COMMUNICATIONS CARD.
A COMMUNICATION INTERFACE WITH BUILDING AUTOMATION SYSTEM SHALL ENABLE BUILDING AUTOMATION SYSTEM OPERATOR TO REMOTELY
CONTROL AND MONITOR THE BOILER FROM AN OPERATOR WORKSTATION. CONTROL FEATURES AVAILABLE, AND MONITORING POINTS DISPLAYED, LOCALLY AT BOILER CONTROL PANEL SHALL BE AVAILABLE THROUGH BUILDING AUTOMATION SYSTEM.
MONITORING POINTS, INCLUDING, BUT NOT LIMITED TO:
1. BOILER STATUS, ENABLE/DISABLE
2. BOILER ENABLE TEMPERATURE
3. BOILER ALARM OR FAULT STATUS
4. BOILER SUPPLY TEMPERATURE FOR EACH BOILER
5. PERCENT(%) BURNER OPERATION FOR EACH BOILER
6. BOILER EXHAUST AIR TEMPERATURE
7. BP-1 VSD ALARM
8. BP-2 VSD ALARM
9. BP-3 VSD ALARM
10. VSD / MOTOR SPEED FOR EACH PRIMARY AND SECONDARY HWH PUMP
11. HOT WATER SUPPLY TEMPERATURE AND RETURN WATER TEMPERATURE FOR MAIN HOT WATER LOOP.
12. WATER DIFFERENTIAL TEMPERATURE BETWEEN SUPPLY AND RETURN.
PRIMARY RESET SCHEDULE
OA TEMP HOT WATER SUPPLY TEMP
60 ° 110 °
10 ° 160 °
3224 ROWLEY RD. WILLIAMSTON MI 48895
EMAIL: JIM@LARKINENG.ORG
PH. (517) 290-7116
ROYAL OAK HIGH SCHOOL
BOILER REPLACEMENTS
1500 LEXINGTON BLVD.
ROYAL OAK, MI 48073
10/25/2024
CJL
JDL
CONTROL
SEQUENCE OF
OPERATION
NTS
M-4
2 ADDENDUM #2 11/11/2024
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SCALE
AutoCAD SHX Text
DRAWING TITLE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
CAD FILE NO.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
NO.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
HIGH SCHOOL BOILER REPLACEMENTS
220523.12-1
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Brass ball valves.
2. Bronze ball valves.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of valve.
1. Certification that products comply with NSF 61 Annex G and NSF 372.
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS FOR VALVES
A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.
B. ASME Compliance:
1. ASME B1.20.1 for threads for threaded end valves.
2. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
3. ASME B16.18 for solder-joint connections.
4. ASME B31.9 for building services piping valves.
C. NSF Compliance: NSF 61 Annex G and NSF 372 for valve materials for potable-water service.
D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.
E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.
F. Valve Sizes: Same as upstream piping unless otherwise indicated.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.12-2
G. Valve Actuator Types:
1. Gear Actuator: For quarter-turn valves NPS 4and larger.
2. Handlever: For quarter-turn valves smaller than NPS 4.
H. Valves in Insulated Piping:
1. Include 2-inch stem extensions.
2. Extended operating handles of nonthermal-conductive material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.
3. Memory stops that are fully adjustable after insulation is applied.
2.2 BRASS BALL VALVES
A. Brass Ball Valves, One-Piece:
1. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 400 psig.
c. Body Design: One piece.
d. Body Material: Forged brass or bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass or stainless steel.
h. Ball: Chrome-plated brass or stainless steel.
i. Port: Reduced.
B. Brass Ball Valves, Two-Piece with Full Port and Brass Trim:
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass.
h. Ball: Chrome-plated brass.
i. Port: Full.
C. Brass Ball Valves, Two-Piece with Regular Port and Brass Trim:
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.12-3
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Forged brass.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Brass.
h. Ball: Chrome-plated brass.
i. Port: Regular.
2.3 BRONZE BALL VALVES
A. Bronze Ball Valves, One-Piece:
b. CWP Rating: 400 psig.
c. Body Design: One piece.
d. Body Material: Bronze.
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Bronze.
h. Ball: Chrome-plated brass.
i. Port: Reduced.
B. Bronze Ball Valves, Two-Piece with Full Port, and Bronze or Brass Trim
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Bronze or brass.
h. Ball: Chrome-plated brass.
i. Port: Full.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.12-4
C. Bronze Ball Valves, Two-Piece with Regular Port and Bronze or Brass Trim:
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Bronze.
e. Ends: Threaded.
f. Seats: PTFE.
g. Stem: Bronze or brass.
h. Ball: Chrome-plated brass.
i. Port: Regular.
PART 3 - EXECUTION
3.1 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
B. Locate valves for easy access and provide separate support where necessary.
C. Install valves in horizontal piping with stem at or above center of pipe.
D. Install valves in position to allow full stem movement.
3.2 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
B. Select valves with the following end connections:
1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.
2. For Steel Piping, NPS 2 and Smaller: Threaded ends.
3.3 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller:
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.12-5
1. Bronze and Brass Valves: May be provided with solder-joint ends instead of threaded ends.
2. Brass ball valve, one piece.
3. Bronze ball valve, one piece with bronze trim.
4. Brass ball valves, two-piece with full port and brass trim.
5. Bronze ball valves, two-piece with full port and bronze or brass trim.
END OF SECTION 220523.12
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.14-1
SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING
1.1 SUMMARY
A. Section Includes:
1. Bronze swing check valves.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of valve.
1. Certification that products comply with NSF 61 and NSF 372.
PART 2 - PRODUCTS
2.1 GENERAL REQUIREMENTS FOR VALVES
A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.
B. ASME Compliance:
1. ASME B1.20.1 for threads for threaded end valves.
2. ASME B16.1 for flanges on iron valves.
3. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
4. ASME B16.18 for solder joint.
5. ASME B31.9 for building services piping valves.
C. Drinking Water System Components - Health Effects and Drinking Water System Components
- Lead Content Compliance: NSF 61 and NSF 372.
D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.
E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.
F. Valve Sizes: Same as upstream piping unless otherwise indicated.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.14-2
G. Valve Bypass and Drain Connections: MSS SP-45.
2.2 BRONZE SWING CHECK VALVES
A. Bronze Swing Check Valves with Bronze Disc, Class 125:
a. Standard: MSS SP-80, Type 3.
b. CWP Rating: 200 psig.
c. Body Design: Horizontal flow.
d. Body Material: ASTM B 62, bronze.
e. Ends: Threaded or soldered. See valve schedule articles.
f. Disc: Bronze.
B. Bronze Swing Check Valves with Nonmetallic Disc, Class 125:
a. Standard: MSS SP-80, Type 4.
b. CWP Rating: 200 psig.
c. Body Design: Horizontal flow.
d. Body Material: ASTM B 62, bronze.
e. Ends: Threaded or soldered. See valve schedule articles.
f. Disc: PTFE.
PART 3 - EXECUTION
3.1 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
B. Locate valves for easy access and provide separate support where necessary.
C. Install valves in horizontal piping with stem at or above center of pipe.
D. Install valves in position to allow full stem movement.
E. Install swing check valves for proper direction of flow in horizontal position with hinge pin level.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220523.14-3
3.2 ADJUSTING
A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.
3.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valve applications are not indicated, use the following:
1. Pump-Discharge Check Valves:
a. NPS 2 and Smaller: Bronze swing check valves with bronze or nonmetallic disc.
b. NPS 2-1/2 and Larger for Domestic Water: Iron swing check valves with lever and weight or spring; metal-seat or resilient-seat check valves.
c. NPS 2-1/2 and Larger for Sanitary Waste and Storm Drainage: Iron swing check valves with lever and weight or spring.
B. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
C. End Connections:
1. For Copper Tubing, NPS 2 and Smaller: Threaded or soldered.
2. For Copper Tubing, NPS 2-1/2 to NPS 4: Flanged or threaded.
3. For Copper Tubing, NPS 5 and Larger: Flanged.
4. For Steel Piping, NPS 2 and Smaller: Threaded.
5. For Steel Piping, NPS 2-1/2 to NPS 4: Flanged or threaded.
6. For Steel Piping, NPS 5 and Larger: Flanged.
3.4 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller: Bronze swing check valves bronze nonmetallic disc, Class 125, with soldered or threaded end connections.
B. Pipe NPS 2-1/2 and Larger:
1. Iron swing check valves with metal nonmetallic-to-metal seats, Class 125, with threaded or flanged end connections.
2. Iron swing check valves with closure control, lever and spring, Class 125, with threaded or flanged end connections.
END OF SECTION 220523.14
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220529-1
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
1.1 SUMMARY
A. Section Includes:
1. Metal pipe hangers and supports.
2. Trapeze pipe hangers.
3. Thermal hanger-shield inserts.
4. Fastener systems.
5. Pipe-positioning systems.
6. Equipment supports.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Show fabrication and installation details and include calculations.
1.3 INFORMATIONAL SUBMITTALS
A. Welding certificates.
1.4 QUALITY ASSURANCE
A. Structural-Steel Welding Qualifications: Qualify procedures and personnel according to
AWS D1.1/D1.1M.
B. Pipe Welding Qualifications: Qualify procedures and operators according to "2015 ASME Boiler and Pressure Vessel Code, Section IX."
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220529-2
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Structural Performance: Hangers and supports for plumbing piping and equipment shall withstand the effects of gravity loads and stresses within limits and under conditions indicated according to ASCE/SEI 7.
1. Design supports for multiple pipes, including pipe stands, capable of supporting combined weight of supported systems, system contents, and test water.
2. Design equipment supports capable of supporting combined operating weight of supported equipment and connected systems and components.
3. Design seismic-restraint hangers and supports for piping and equipment and obtain approval from authorities having jurisdiction.
2.2 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Galvanized Metallic Coatings: Pregalvanized, hot-dip galvanized, or electro-galvanized.
3. Nonmetallic Coatings: Plastic coated or epoxy powder coated.
4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
5. Hanger Rods: Continuous-thread rod, nuts, and washer made of carbon steel.
B. Stainless-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
3. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
C. Copper Pipe and Tube Hangers:
1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.
2. Hanger Rods: Continuous-thread rod, nuts, and washer made of copper-coated steel .
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220529-3
2.3 TRAPEZE PIPE HANGERS
A. Description: MSS SP-58, Type 59, shop- or field-fabricated pipe-support assembly, made from structural-carbon-steel shapes, with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.
2.4 THERMAL HANGER-SHIELD INSERTS
A. Insulation-Insert Material for Cold Piping: ASTM C 552, Type II cellular glass with 100-psig or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig minimum compressive strength and vapor barrier.
B. Insulation-Insert Material for Hot Piping: Water-repellent-treated, ASTM C 533, Type I calcium silicate with 100-psig ASTM C 552, Type II cellular glass with 100-psig or ASTM C 591, Type VI, Grade 1 polyisocyanurate with 125-psig minimum compressive strength.
C. For Trapeze or Clamped Systems: Insert and shield shall cover entire circumference of pipe.
D. For Clevis or Band Hangers: Insert and shield shall cover lower 180 degrees of pipe.
E. Insert Length: Extend 2 inches beyond sheet metal shield for piping operating below ambient air temperature.
2.5 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete, with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
B. Mechanical-Expansion Anchors: Insert-wedge-type anchors, for use in hardened portland cement concrete, with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
1. Indoor Applications: Zinc-coated or stainless steel.
2. Outdoor Applications: Stainless steel.
2.6 PIPE-POSITIONING SYSTEMS
A. Description: IAPMO PS 42 positioning system composed of metal brackets, clips, and straps for positioning piping in pipe spaces; for plumbing fixtures in commercial applications.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220529-4
2.7 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural-carbon-steel shapes.
2.8 MATERIALS
A. Aluminum: ASTM B 221.
B. Carbon Steel: ASTM A 1011/A 1011M.
C. Structural Steel: ASTM A 36/A 36M carbon-steel plates, shapes, and bars; black and galvanized.
D. Stainless Steel: ASTM A 240/A 240M.
E. Grout: ASTM C 1107/C 1107M, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.
1. Properties: Nonstaining, noncorrosive, and nongaseous.
2. Design Mix: 5000-psi, 28-day compressive strength.
PART 3 - EXECUTION
3.1 APPLICATION
A. Comply with requirements in Section 078413 "Penetration Firestopping" for firestopping materials and installation, for penetrations through fire-rated walls, ceilings, and assemblies.
B. Strength of Support Assemblies: Where not indicated, select sizes of components, so strength will be adequate to carry present and future static loads within specified loading limits.
Minimum static design load used for strength determination shall be weight of supported components plus 200 lb.
3.2 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-58. Install hangers, supports, clamps, and attachments as required to properly support piping from building structure.
B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-58. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.
ROYAL OAK PUBLIC SCHOOLS MIDDLE SCHOOL CHILLED WATER PIPING
220529-5
1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size, or install intermediate supports for smaller-diameter pipes as specified for individual pipe hangers.
2. Field fabricate from ASTM A 36/A 36M carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.
C. Thermal Hanger-Shield Installation: Install in pipe hanger or shield for insulated piping.
D. Fastener System Installation:
1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete, after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.
2. Install mechanical-expansion anchors in concrete, after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
E. Pipe-Positioning-System Installation: Install support devices to make rigid supply and waste piping connections to each plumbing fixture.
F. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
G. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
H. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
I. Install lateral bracing with pipe hangers and supports to prevent swaying.
J. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms, and install reinforcing bars through openings at top of inserts.
K. Load Distribution: Install hangers and supports, so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
L. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to…