This document is an Addendum No. 1 issued by the City of Hillsdale, Michigan for the Monroe Street Reconstruction project, dated March 25, 2025. The addendum modifies the bid documents with a revision to the Special Provisions Page SP-2, specifically addressing the Mobilization pay item. The project involves 0.22 miles of road reconstruction on Monroe Street between Hillsdale Street and N. West Street, including concrete curb and gutter, sidewalk replacement, ADA ramp replacement, drive approaches, site restoration, and 800 linear feet of storm sewer construction. The bid submittal date is set for 2:00 pm on March 27, 2025, with anticipated City Council contract award on April 7, 2025, and planned construction start after the award and completion by August 1, 2025.

The addendum clarifies the Mobilization pay item, which is limited to a maximum of 10% of the bid amount. Payment for Mobilization will be made in two 50% installments: the first after 10% of the original contract amount is earned and billed, and the final 50% after 25% of the contract amount is earned and billed. The work includes preparatory operations such as transporting materials and personnel, establishing temporary construction facilities, providing insurance and bonds, coordinating with property owners, and submitting required documentation. The special provision follows the Michigan Department of Transportation (MDOT) 2020 Standard Specifications for Construction, Section 150.

View the file

Other files

File Type Posted
Addednum #1 3-19-25.pdf PDF
Monroe Street-Drawings-3-5-25.pdf PDF
Monroe Street-Specifications-3-5-25.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

97 NORTH BROAD STREET, HILLSDALE, MI 49242 TEL. 517.437.6440 www.cityofhillsdale.org

Date: March 25, 2025

PROJECT: Monroe Street Reconstruction

SUBMITTAL DATE: 2:00 pm on March 27, 2025

ADDENDUM NO. 1: Bid Documents for this project are being modified, supplemented, clarified or augmented as follows as part of this addendum. All revisions will hereby be made a part of the proposed

Contract Documents.

The following attachments are issued with this addendum.

Drawings: None

Specifications: Special Provisions Page SP-2 – Revised and Reissued

MODIFICATION NO. SUMMARY _______

1 Special Provision Page SP-2 shall be replaced with the attached revised SP-2 Add 2 page. This was revised due to a discrepancy in the maximum percentage listed in the proposal section, page 9, versus the Special Provision page SP-2. The maximum amount should be 10% maximum as listed on the Proposal on page 9.

Sincerely, Kristin L. Bauer, P.E.

City Engineer – 517-437-6479 http://www.cityofhillsdale.org/

CITY OF HILLSDALE

SPECIAL PROVISION

FOR

MOBILIZATION

SP-2 Add 2

DESCRIPTION

This work shall be done in accordance with Section 150 of the MDOT 2020 Standard Specifications for Construction and as specified herein.

CONSTRUCTION

Work shall include the preparatory work and operations including, but not limited to, the following:

Preparatory work and expenses incurred prior to beginning work onsite.

Transport materials, personnel, and equipment to the job site.

Establishment of temporary onsite construction facilities, if required.

Provided insurance, bonds, and other costs associated with the project in general and not included in other pay items.

Coordination with property owners.

All required submittals.

MEASUREMENT AND PAYMENT

This pay item as listed for Mobilization (Max. 10% of Bid Amount) will be paid for at the contract Lump Sum (LS) amount as follows:

PAY ITEM PAY UNIT

Mobilization (Max. 10% of Bid Amount) Lump Sum (LS)

50% of the Mobilization payment will be made after 10% of the original contract amount is earned and billed.

Final 50% payment will be made after 25% of the contract amount is earned and billed.