Addendum 2 23320.pdf
PDF 158 KB Posted
- Attached to
- 751/23320. JLM; Musketawa Trail - Reconstruction
- Solicitation number
- RFP - 171 - 230000002424
- Issued by
- Kent County, Muskegon City, Michigan
About this file
This document is an Addendum to a Request for Proposal (RFP) issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division for the Musketawa Trail Reconstruction project. The project is located in Kent County and Muskegon City, Michigan. The addendum provides a sign-in sheet from the Pre-Proposal Meeting and responses to Requests for Information (RFIs) received at the meeting. The key RFI responses indicate a preference for prefabricated bridges over in-kind timber bridges, a requirement to design for H10 AASHTO loading to accommodate snow grooming vehicles, and a need for the selected Professional Services Contractor (PSC) to analyze the existing bridge load limits. The RFP has a proposal due date of July 20, 2023.
The contract opportunity does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information. The document focuses on technical requirements and clarifications for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAMPLE Billable Rate Contract (Rev 221207).pdf | ||
| Addendum 1 23320.pdf | ||
| Addendum 3 23320.pdf | ||
| Addendum 4 23320.pdf | ||
| Project Statement 23320.pdf | ||
| RFP Billable Rate 23320.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 RFP (Rev 2/22)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
REQUEST FOR PROPOSAL
ADDENDUM NO. 02
This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.
Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.
TO:
ALL PROPOSERS
DATE ISSUED
June 29, 2023
PROJECT NAME
Musketawa Trail Reconstruction
FILE NUMBER
751/23320.JLM
PROJECT DIRECTOR
Josiah L. Meyers
PROPOSAL DUE DATE:
Thursday, July 20, 2023
ADDENDUM ITEMS: (attach additional sheets and drawings if required)
Please note the following:
1. This addendum provides a copy of the sign-in sheet for the PSC Pre-Proposal Meeting on June 29, 2023
(attached).
2. This addendum provides the following responses to RFI’s received at the pre-proposal meeting.
RFI questions and answers:
Q1: Do you want the 11 timber bridges replaced in-kind with timber or install more modern prefabricated bridges?
A1: Prefabricated bridges or similar are preferred. They do not need to be timber. Please include bridge type recommendation & selection as part of the Phase 100 Study.
Q2: Should we plan on H10 loading for the bridge design, or just pedestrian traffic?
A2: Design for H10 AASHTO loading. Snow grooming vehicles will/may be utilizing the bridges.
Q3: Will the current bridges support the loading of a soil boring/drill rig?
A3: DNR & DTMB do not have that information. A PSC must analyze the bridges to determine load limits if you plan to utilize the bridges for trail access for soil boring vehicles.
APPROVED BY:
PROJECT DIRECTOR : Josiah L. Meyers DATE: June 29, 2023
MEETING ATTENDANCE RECORD
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
DESIGN & CONSTRUCTION DIVISION
DATE – TIME
June 29, 2023 at 9:00 a.m. EST
FILE NUMBER
751/23320.JLM
PROJECT AND MEETING PURPOSE
Musketawa Trail Reconstruction
Professional Services Contractor (PSC) Pre-Proposal Meeting
LOCATION
Meeting: Microsoft Teams (virtual) Project: Musketawa Trail (Muskegon to Marne)
PLEASE PRINT YOUR NAME REPRESENTING PHONE NO. E-MAIL ADDRESS
Meyers, Josiah MI-DTMB 269-213-6241 MeyersJ11@michigan.gov
Sell, Jill (DNR) DNR SellJ1@michigan.gov Sherburn, Gregory (DNR) DNR SherburnG@michigan.gov Whalen, Patrick (DNR) DNR WHALENP1@michigan.gov
Krzesicki, Steve (DNR) DNR KrzesickiS@michigan.gov
Carrie Rivette Short Elliott Hendrickson Inc. crivette@sehinc.com Allen Abrahams Short Elliott Hendrickson Inc. aabrahams@sehinc.com
Andrea Riegler Short Elliott Hendrickson Inc. ariegler@sehinc.com Erik Allore Short Elliott Hendrickson Inc. eallore@sehinc.com Glenn Peterson Short Elliott Hendrickson Inc. gpeterson@sehinc.com Ryan McEnhill Eng. mcenhillr@engdot.com Jess Howard Progressive AE howardj@progressiveae.com Mike Oezer Progressive AE oezerm@progressiveae.com Chelsea Warne (LRE) Land and Resource Engineering Dan (LRE) Land and Resource Engineering fredricks@lremi.com John McCann Viridis Design Group john@virdg.com Wilcox, Randall V Hubbell, Roth & Clark, Inc. RWilcox@hrcengr.com Scott Post Prein&Newhof SPost@preinnewhof.com Tiffany Smith MCSA Group, Inc. tas@mcsagroup.com Jon Erickson Soils & Structures Inc jerickson@soilsandstructures.com Vysoky, Mark Fishbeck mvysoky@fishbeck.com
Dava Lakatos DLZ dlakatos@dlz.com Kathryn Maki DLZ kmaki@dlz.com Todd Munger Materials Testing Consultants tmunger@mtc-test.com Bryan Jennings TEG Engineering, LLC bjennings@tegcivil.com Jeffrey Huhta Nowak & Fraus Engineers jhuhta@nfe-engr.com Steven Sutton Nowak & Fraus Engineers swsutton@nfe-engr.com