Addendum 2 23312.pdf
PDF 4 MB Posted
- Solicitation number
- RFQ 171 240000000567 7
- Issued by
- Livingston County, Michigan
About this file
This is an Addendum No. 2 issued by the State of Michigan Department of Technology, Management and Budget, Design and Construction Division, for the Newberry Correctional Facility Emergency Circuit Expansion project (File #472/23312.LWM). The addendum modifies and clarifies the original contract documents for propane-powered emergency generator systems and related electrical infrastructure upgrades. Key clarifications include that new generators shall be propane-powered rather than natural gas, with the owner responsible for propane tanks while the contractor runs gas piping from the tank regulator to the generator. Additional modifications address transformer installation between panels "DPD" and "QMB," preventative maintenance on primary switchgear, disconnection of existing automatic transfer switch (ATS) controls with conversion to manual operation for trailer-mounted generator connections, and provision of a new ASCO 300 Dual Purpose Quick Connect Panel with breakers for 2400V temporary generator operations. The addendum provides enhanced specifications for multiple electrical panels (LPE1, PPF, LPL1, PPA, D, and LPB1), the Motor Control Center, and revised wire sizes across the facility's powerhouse systems.
The specification section 263213A details comprehensive requirements for LP gas engine generators, including performance standards, testing protocols, and equipment qualifications from manufacturers such as Cummins, Caterpillar, Kohler, or Generac. Generators must comply with NFPA, ASME, UL, and EPA Tier 2 emission standards, operate in ambient temperatures from minus 15 to plus 40 degrees Celsius, and include sophisticated control and monitoring systems with multiple safety shutdown devices. The manufacturer's warranty extends for five years from the date of substantial completion, with initial maintenance service provided for twelve months including quarterly exercising and routine preventative maintenance. All work must be coordinated with facility operations, and contractors are required to obtain an arc flash coordination study and coordinate with the Northern Regional Physical Plant regarding temporary generator use. The addendum was issued on July 18, 2024, with a bid date of June 28, 2024, and includes detailed electrical drawings and specifications reflecting the one-for-one replacement nature of the system expansion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1601 E. CÉSAR E. CHÁVEZ AVENUE, LANSING, MI 48906
PHONE: (517) 487-2511
FAX: (517) 487-2544
ADDENDUM NO. 2
Date: 07/18/2024
Project Name: Newberry Correctional Facility – Emergency Circuit Expansion
File # 472/23312.LWM
Funding Code # ______
This Addendum is issued for the purpose of modifying and/or clarifying the original Contract
Documents and shall take precedence over them.
All work included herein shall be in accordance with the original drawings and specifications except as specifically noted herein. All incidental items required to provide the following modifications shall be included even though not specifically described.
This addendum is being sent to all bidders receiving plans and specifications. Receipt of this
Addendum shall be noted on the Bid Summary in the appropriate location.
Clarification and Questions:
A1.1 Attachments: Attached pictures of existing panels on the first floor of the powerhouse.
A1.2 Attachments: Attached specification section 263213A – LP Gas Engine Generators.
A1.3 Clarification: New generators shall be propane generators, not natural gas. Specification section 263213A has been altered for LP gas generators.
A1.4 Clarification: Owner shall be responsible for the propane tanks. Contractor shall run gas piping from tank regulator to the generator.
A1.5 Clarification: A transformer shall be installed between panels “DPD” and “QMB” to support the change in voltage. Refer to sheet E601.
A1.6 Clarification: Preventative maintenance shall be performed on the primary switchgear in the generator building. Refer to sheet E601.
A1.7 Clarification: ATS and associated electronics in switchgear in generator building shall be disconnected. Contractor shall convert switch to manual operation for trailer mount connection. Contractor shall provide new ASCO 300 Dual Purpose Quick Connect Panel with Breakers for 2400V temporary generator. Refer to sheets E302, E502, E600, and
E601.
ADDENDUM NO. 1
A1.8 Clarification: Primary switchgear in Powerhouse shall have the option to be powered via
(2) interlocked breakers instead of one main breaker with an ATS. Refer to sheet E601, item 2: “Alternate Primary Switchgear Configuration”.
A1.9 Clarification: More information has been provided for the following panels: LPE1, PPF, LPL1, PPA, D, and LPB1. Refer to sheets E302 and E502.
A1.10 Clarification: More information has been provided for the Motor Control Center. Refer to sheets E302 and E502.
A1.11 Clarification: Wire sizes have been revised. Refer to sheet E601.
End of Addendum #2
State of Michigan Matrix Consulting Engineers, Inc.
Department of Technology, Management and Budget Project Number: 23352.00
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
File No: 472/23312.LWM
Funding Code No.: 472NCFMaintProj
LP GAS ENGINE GENERATORS 263213A - 1
SECTION 263213A – LP GAS ENGINE GENERATORS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes packaged engine-generator sets for emergency power supply with the following features:
1. Propane engine.
2. Unit-mounted cooling system.
3. Unit-mounted control and monitoring.
4. Performance requirements for sensitive loads.
1.2 DEFINITIONS
A. Operational Bandwidth: The total variation from the lowest to highest value of a parameter over the range of conditions indicated, expressed as a percentage of the nominal value of the parameter.
B. EPS: Emergency power supply.
C. EPSS: Emergency power supply system.
D. LP: Liquefied petroleum
1.3 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include rated capacities, operating characteristics, electrical characteristics, and furnished specialties and accessories.
2. Include thermal damage curve for generator.
3. Include time-current characteristic curves for generator protective device.
4. Include fuel consumption in gallons per hour at 0.8 power factor at 0.5, 0.75 and 1.0 times generator capacity.
5. Include generator efficiency at 0.8 power factor at 0.5, 0.75 and 1.0 times generator capacity.
6. Include generator characteristics, including, but not limited to kw rating, efficiency, reactances, and short-circuit current capability.
B. Shop Drawings:
1. Include plans and elevations for engine-generator set and other components specified.
2. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 2
connection.
3. Identify fluid drain ports and clearance requirements for proper fluid drain.
4. Design vibration isolators and seismic restraints to comply with ISO8285-5 standard, IBC seismic and OSHPD.
5. Vibration Isolation Base Details: Detail fabrication including anchorages and attachments to structure and to supported equipment. Include base weights.
6. Include diagrams for power, signal, and control wiring. Complete schematic, wiring, and interconnection diagrams showing terminal markings for EPS equipment and functional relationship between all electrical components.
1.4 INFORMATIONAL SUBMITTALS
A. Qualification Data: For manufacturer and testing agency.
B. Source quality-control reports, including, but not limited to the following:
1. Certified summary of prototype-unit test report.
2. Certified Test Reports: For components and accessories that are equivalent, but not identical, to those tested on prototype unit.
3. Report of factory test on units to be shipped for this Project, showing evidence of compliance with specified requirements.
4. Report of sound generation from prototype data.
5. Report of exhaust emissions showing compliance with applicable regulations and EPA
T2 Certification.
6. Certified Torsional Vibration Compatibility: Comply with NFPA 110. C. Field quality- control reports.
D. Warranty: Standard warranty, 5 years after substantial completion.
1.5 CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data: For packaged engine generators to include in emergency, operation, and maintenance manuals.
1. Include the following:
a. List of tools and replacement items recommended to be stored at Project for ready access. Include part and drawing numbers, current unit prices, and source of supply.
b. Operating instructions laminated and mounted adjacent to generator location.
c. Training plan.
1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 3
1. Fuses: One for every 10 of each type and rating but no fewer than one of each.
2. Indicator Lamps: Two for every six of each type used, but no fewer than two of each.
3. Filters: One set each of lubricating oil, fuel, and combustion-air filters.
4. Tools: Each tool listed by part number in operations and maintenance manual.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: Manufacturer's authorized representative who is trained and approved by manufacturer.
B. Testing Agency Qualifications: Member company of NETA or an NRTL.
1. Testing Agency's Field Supervisor: Certified by NETA to supervise on-site testing.
1.8 PARTS & LABOR WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace components of packaged engine generators and associated auxiliary components that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 5 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Cummins
2. Caterpillar
3. Kohler
4. Generac
B. Source Limitations: Obtain packaged generator sets and auxiliary components through one source from a single manufacturer.
2.2
PERFORMANCE REQUIREMENTS
A. ASME Compliance: Comply with ASME B15.1.
B. NFPA Compliance:
1. Comply with NFPA 37.
2. Comply with NFPA 70.
3. Comply with NFPA 110 requirements for Level 1 emergency power supply system.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 4
C. UL Compliance: Comply with UL 2200.
D. Engine Exhaust Emissions: Comply with EPA Tier 2 requirements and applicable state and local government requirements.
E. Environmental Conditions: Engine-generator system shall withstand the following environmental conditions without mechanical or electrical damage or degradation of performance capability:
1. Ambient Temperature: Minus 15 to plus 40 deg C.
2.3 ASSEMBLY DESCRIPTION
A. Factory-assembled and -tested, water-cooled engine, with brushless generator and accessories.
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a testing agency acceptable to authorities having jurisdiction, and marked for intended location and application.
C. EPSS Class: Engine-generator set shall be classified as a Class 24 in accordance with NFPA
110.
D. Induction Method: Turbocharged.
E. Governor: Adjustable isochronous, with speed sensing.
F. Mounting Frame: Structural steel framework to maintain alignment of mounted components without depending on concrete foundation. Provide lifting attachments sized and spaced to prevent deflection of base during lifting and moving.
1. Rigging Diagram: Provided in owners operation and installation manual.
G. Capacities and Characteristics:
1. Power Output Ratings: Nominal ratings as indicated at 0.8 power factor excluding power required for the continued and repeated operation of the unit and auxiliaries, with capacity as required to operate as a unit as evidenced by records of prototype testing.
2. Output Connections: Three-phase, four wire.
3. Nameplates: For each major system component to identify manufacturer's name and address, and model and serial number of components.
H. Generator-Set Performance for Sensitive Loads:
1. Oversizing generator compared with the rated power output of the engine is permissible to meet specified performance.
2. Nameplate Data for Oversized Generator: Show ratings required by the Contract
Documents rather than ratings that would normally be applied to generator size installed.
3. Steady-State Voltage Operational Bandwidth: 1 percent of rated output voltage from no load to full load.
4. Transient Voltage Performance: Per ISO8528.
5. Steady-State Frequency Operational Bandwidth: Plus or minus 0.25 percent of rated
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 5
frequency from no load to full load.
6. Steady-State Frequency Stability: When system is operating at any constant load within the rated load, there shall be no random speed variations outside the steady-state operational band and no hunting or surging of speed.
7. Transient Frequency Performance: Per ISO8528.
8. Output Waveform: At no load, harmonic content measured line to neutral shall not exceed 2 percent total with no slot ripple. Telephone influence factor, determined according to NEMA MG 1, shall not exceed 50 percent.
9. Sustained Short-Circuit Current: For a three-phase, bolted short circuit at system output terminals, system shall supply a minimum of 300 percent of rated full-load current for not less than 10 seconds and then clear the fault automatically, without damage to winding insulation or other generator system components.
10. Excitation System: Performance shall be unaffected by voltage distortion caused by nonlinear load.
a. Provide permanent magnet excitation for power source to voltage regulator.
11. Start Time: Comply with NFPA 110, Type 10, system requirements.
I. Generator Enclosure:
1. NEMA 3R.
2. Internal-mounted critical silencer with rain cap and flexible.
3. exhaust connector.
4. Skid-mounted, steel construction with hinged doors.
5. Fade-, scratch-, and corrosion-resistant.
6. Power Armort automotive-grade textured finish.
7. Enclosure has six large access doors which allow for easy maintenance.
8. Lockable, flush-mounted door latches.
9. Louvered air inlets on alternator end and roof outlet to redirect air and reduce noise.
10. Automatic door holders keep doors open during maintenance.
11. Sound attenuation material and intake baffles.
12. Skid-mounted, steel or aluminum construction with hinged doors. Aluminum enclosures are recommended for high humidity and/or high salt/coastal regions.
13. humidity and/or high salt/coastal regions.
14. Acoustic insulation that meets UL 94 HF1 flammability classification and repels moisture absorption.
15. Steel sound enclosure is analyzed to 150 mph (241 kph) wind load rating.
2.4 LP GAS ENGINE
A. Fuel: LP gas.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 6
B. Rated Engine Speed: 1800 rpm.
C. Lubrication System: The following items are mounted on engine or skid:
1. Filter and Strainer: Rated to remove 90 percent of particles 5 micrometers and smaller while passing full flow.
2. Thermostatic Control Valve: Control flow in system to maintain optimum oil temperature. Unit shall be capable of full flow and is designed to be fail-safe.
3. Crankcase Drain: Arranged for complete gravity drainage to an easily removable container with no disassembly and without use of pumps, siphons, special tools, or appliances.
D. Jacket Coolant Heater: Tank type, factory installed in coolant jacket system. Comply with
NFPA 110 requirements for Level 1 equipment for heater capacity.
E. Cooling System: Closed loop, liquid cooled, with radiator factory mounted on engine-generator set mounting frame and integral engine-driven coolant pump.
1. Coolant: Solution of 50 percent ethylene-glycol-based antifreeze and 50 percent water, with anticorrosion additives as recommended by engine manufacturer.
2. Size of Radiator: Adequate to contain expansion of total system coolant from cold start to 110 percent load condition.
3. Expansion Tank: Constructed of welded steel plate and rated to withstand maximum closed-loop coolant system pressure for engine used. Equip with gage glass and petcock.
4. Temperature Control: Self-contained, thermostatic-control valve modulates coolant flow automatically to maintain optimum constant coolant temperature as recommended by engine manufacturer.
5. Coolant Hose: Flexible assembly with inside surface of nonporous rubber and outer covering of abrasion-resistant fabric.
a. Rating: 50-psig maximum working pressure with coolant at 210 deg F, and non-collapsible under vacuum.
b. End Fittings: Flanges or steel pipe nipples with clamps to suit piping and equipment connections.
c. Air-Intake Filter: Heavy-duty, engine-mounted air cleaner with replaceable dry-filter element and "blocked filter" indicator.
d. Starting System: 24-V electric, with negative ground.
6. Components: Sized so they are not damaged during a full engine-cranking cycle with ambient temperature at maximum specified in "Performance Requirements"
Article.
7. Cranking Motor: Heavy-duty unit that automatically engages and releases from engine flywheel without binding.
8. Cranking Cycle: As required by NFPA 110 for system level specified.
9. Battery: Lead acid, with capacity within ambient temperature range specified in
"Performance Requirements" Article to provide specified cranking cycle at least three
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 7
times without recharging.
10. Battery Cable: Size as recommended by engine manufacturer for cable length indicated.
Include required interconnecting conductors and connection accessories.
11. Battery Compartment: Factory fabricated of metal with powder coated steel finish and battery blanket. Thermostatically controlled heater shall be arranged to maintain battery above 10 deg C regardless of external ambient temperature within range specified in
"Performance Requirements" Article. Include accessories required to support and fasten batteries in place. Provide ventilation to exhaust battery gases.
12. Battery Stand: Factory-fabricated, with acid-resistant finish designed to hold the quantity of battery cells required and to maintain the arrangement to minimize lengths of battery interconnections.
13. Battery-Charging Alternator: Factory mounted on engine with solid-state voltage regulation and 35 A minimum continuous rating.
14. Battery Charger: Current-limiting, automatic-equalizing and float-charging type designed for lead-acid batteries. Unit shall comply with UL 1236 and include the following features:
a. Operation: Equalizing-charging rate of 10 A shall be initiated automatically after battery has lost charge until an adjustable equalizing voltage is achieved at battery terminals. Unit shall then be automatically switched to a lower float-charging mode and shall continue to operate in that mode until battery is discharged again.
b. Automatic Temperature Compensation: Adjust float and equalize voltages for variations in ambient temperature from minus 40 deg F to 140 deg F to prevent overcharging at high temperatures and undercharging at low temperatures.
c. Automatic Voltage Regulation: Maintain constant output voltage regardless of input voltage variations up to plus or minus 10 percent.
d. Ammeter and Voltmeter: Mounted on engine/generator control panel. Meters shall indicate charging rates.
e. Safety Functions: Sense abnormally low battery voltage and close contacts providing low battery voltage indication on control and monitoring panel. Sense high battery voltage and loss of ac input or dc output of battery charger. Either condition shall close contacts that provide a battery-charger malfunction indication at system control and monitoring panel.
f. Enclosure and Mounting: NEMA 250, Type 1, wall-mounted cabinet.
F. Muffler/Silencer: Critical type, sized as recommended by engine manufacturer and selected with exhaust piping system to not exceed engine manufacturer's engine backpressure requirements.
1. Minimum sound attenuation of 25 dB at full octave band.
2. Sound level measured at a distance of 23 feet from exhaust discharge after installation is complete shall be 78 dBA or less.
2.5 LP GAS TURBINE ENGINE
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 8
A. Fuel: Stroke Otto: Gas Engine (lean burn option)
B. Rated Engine Speed: 1800 rpm.
1. No. of cylinders / type of construction: 8 / V-type (90 degrees).
2. No. of valves per cylinder: 4.
3. Flywheel housing: SAE 1.
4. Ring gear with number of teeth: 137.
5. Compression ratio: 12:1.
6. Piston: Aluminum piston with compression ratio 12:1.
7. Cylinder liners: Wet cylinder liners.
8. Camshaft: Forged crankshaft with balancing weights.
9. Crankshaft: Forged crankshaft with balancing weights.
10. Exhaust pipes: Dry exhaust pipes with heat insulation cover and cover against direct contact.
11. Turbocharging: Pressure oil lubricated turbocharger with water cooled bearing block and water-cooled turbine housing.
12. Mixture cooling / engine cooling: Double-stage mixture cooler without cooling water pump or engine water pump; for LT - coolant circuit and for HT- and engine coolant circuit each necessary a cooling water pump with mixture temperature regulation for 50
°C (122 °F).
13. Lubrication: Forced oil lubrication with two oil pumps; two exchangeable lubrication filters in the main circuit and lubrication cooler in engine coolant circuit.
14. Oil pan / Oil capacity: Oil pan with capacity 95 l (25 Imp. gal.).
15. Spark plugs: Spark plug M18 for industrial engines.
16. Starter: Electric starter 24 V - 7 kW.
17. Required capacity of starter battery: 140 / 225 Ah (min./max.) / 24 V.
18. Engine monitoring acc. to scope of delivery: Dataloggerbox with CAN - Interface J1939.
Coordinate installation of interface with Camp Grayling IT.
19. Air-Intake Filter: Heavy-duty, engine-mounted air cleaner with replaceable dry-filter element and "blocked filter" indicator.
20. Muffler/Silencer: Critical type, sized as recommended by engine manufacturer and selected with exhaust piping system to not exceed engine manufacturer's engine backpressure requirements.
a. Minimum sound attenuation of 25 dB at full octave band.
b. Sound level measured at a distance of 23 feet from exhaust discharge after installation is complete shall be 78 dBA or less.
2.6 FUEL SYSTEM
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 9
A. LP Gas Piping: Comply with requirements in Section 231126 "Facility Liquefied-Petroleum
Gas Piping."
B. LP Gas Pressure: Shall be 5-14” water column.
C. Operating Fuel Pressure: 5-14” Water Column/9-26 mm HG.
D. Gas Train: Comply with NFPA 37.
E. Engine Fuel System:
F. LP Gas, Vapor-Withdrawal System:
1. Carburetor.
2. Secondary Gas Regulators: One for each fuel type, with atmospheric vents piped to building exterior.
3. Fuel-Shutoff Solenoid Valves: NRTL-listed, normally closed, safety shutoff valves;
one for each fuel source.
4. Fuel Filters: One for each fuel type.
5. Manual Fuel Shutoff Valves: One for each fuel type.
6. Flexible Fuel Connectors: Minimum one for each fuel connection.
7. LP gas flow adjusting valve.
8. Fuel change gas pressure switch.
2.7 CONTROL AND MONITORING
A. Automatic Starting System Sequence of Operation: When mode-selector switch on the control and monitoring panel is in the automatic position, remote-control contacts in one or more separate automatic transfer switches initiate starting and stopping of generator set. When mode selector switch is switched to the on position, generator set starts. The off position of same switch initiates generator-set shutdown. When generator set is running, specified system or equipment failures or derangements automatically shut down generator set and initiate alarms.
B. Manual Starting System Sequence of Operation: Switching on-off switch on the generator control panel to the on position starts generator set. The off position of same switch initiates generator- set shutdown. When generator set is running, specified system or equipment failures or derangements automatically shut down generator set and initiate alarms.
C. Provide minimum run time control set for 5 minutes unloaded operation with override only by operation of a remote emergency-stop switch. D. Comply with UL 508A.
E. Configuration: Operating and safety indications, protective devices, basic system controls, and engine gages shall be grouped in a common control and monitoring panel mounted on the generator set. Mounting method shall isolate the control panel from generator-set vibration.
Panel shall be powered from the engine-generator set battery.
F. Indicating Devices: As required by NFPA 110 for Level 1 system, including the following:
1. AC voltmeter.
2. AC ammeter.
3. AC frequency meter.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 10
4. Ammeter and voltmeter phase-selector switches.
5. DC voltmeter (alternator battery charging).
6. Engine-coolant temperature gage.
7. Engine lubricating-oil pressure gage.
8. Running-time meter.
9. Current and Potential Transformers: Instrument accuracy class.
G. Protective Devices and Controls in Local Control Panel: Shutdown devices and common visual alarm indication as required by NFPA 110 for Level 1 system, including the following:
1. Not-in-auto alarm.
2. Overcrank shutdown device.
3. Overspeed shutdown device.
4. Coolant high-temperature shutdown device.
5. Coolant low-level shutdown device.
6. Low lube oil pressure shutdown device.
7. Overcrank alarm.
8. Overspeed alarm.
9. Coolant high-temperature alarm.
10. Coolant low-temperature alarm.
11. Coolant low-level alarm.
12. Low lube oil pressure alarm.
13. Lamp test.
14. Contacts for local and remote common alarm.
15. Coolant high-temperature pre-alarm.
16. Generator-voltage adjusting raise lower-switch.
18. Run-Off-Auto switch.
19. Control switch not in automatic position alarm.
20. Low cranking voltage alarm.
21. Battery-charger malfunction alarm.
22. Battery low-voltage alarm.
23. Battery high-voltage alarm.
24. Generator overcurrent protective device not closed alarm.
H. Supporting Items: Include sensors, transducers, terminals, relays, and other devices and include wiring required to support specified items. Locate sensors and other supporting items on engine or generator, unless otherwise indicated.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 11
I. Remote Alarm Annunciator: Comply with NFPA 99. An LED labeled with proper alarm conditions shall identify each alarm event, and a common audible signal shall sound for each alarm condition. Silencing switch in face of panel shall silence signal without altering visual indication. Connect so that after an alarm is silenced, clearing of initiating condition will reactivate alarm until silencing switch is reset. Cabinet and faceplate are surface- or flush mounting type to suit mounting conditions indicated.
1. Overcrank alarm.
2. Coolant low-temperature alarm.
3. High engine temperature pre-alarm.
4. High engine temperature alarm.
5. Low lube oil pressure alarm.
6. Overspeed alarm.
7. Low coolant level alarm.
8. Low cranking voltage alarm.
9. Contacts for local and remote common alarm.
10. Audible-alarm silencing switch.
11. Control switch not in automatic position alarm.
12. Lamp test.
13. Generator overcurrent protective device not closed.
J. Remote Emergency-Stop Switch: Lock-out/Tag-out switch; wall mounted, unless otherwise indicated; and labeled. Push button shall be protected from accidental operation.
2.8 GENERATOR OVERCURRENT AND FAULT PROTECTION
G. Overcurrent protective devices for the entire EPSS shall be coordinated to optimize selective tripping when a short circuit occurs. Coordination of protective devices shall consider both utility and EPSS as the voltage source.
1. Overcurrent protective devices for the EPSS shall be accessible only to authorized personnel.
H. Generator Circuit Breaker: Molded case or Insulated-case, electronic-trip type; 100 percent rated; complying with UL 489.
1. Tripping Characteristics: Adjustable long-time and short-time delay and instantaneous.
2. Trip Settings: Selected to coordinate with generator thermal damage curve.
3. Shunt Trip: Connected to trip breaker when generator set is shut down by other protective devices.
4. Mounting: Adjacent to or integrated with control and monitoring panel.
I. Generator Protector: Microprocessor-based unit shall continuously monitor current level in each phase of generator output, integrate generator heating effect over time, and predict when thermal damage of alternator will occur. When signaled by generator protector or other
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 12
generator-set protective devices, a shunt-trip device in the generator disconnect switch shall open the switch to disconnect the generator from load circuits. Protector performs the following functions:
1. Initiates a generator overload alarm when generator has operated at an overload equivalent to 110 percent of full-rated load for 60 seconds. Indication for this alarm is integrated with other generator-set malfunction alarms. Contacts shall be available for load shed functions.
2. Under single or three-phase fault conditions, regulates generator to 300 percent of rated full-load current for up to 10 seconds.
3. As overcurrent heating effect on the generator approaches the thermal damage point of the unit, protector switches the excitation system off, opens the generator disconnect device, and shuts down the generator set.
4. Senses clearing of a fault by other overcurrent devices and controls recovery of rated voltage to avoid overshoot.
J. Ground-Fault Indication: Comply with NFPA 70, "Emergency System" signals for ground fault.
1. Indicate ground fault with other generator-set alarm indications.
2. Trip generator protective device on ground fault.
2.9 GENERATOR, EXCITER, AND VOLTAGE REGULATOR
A. Comply with NEMA MG 1.
B. Drive: Generator shaft shall be directly connected to engine shaft. Exciter shall be rotated integrally with generator rotor.
C. Electrical Insulation: Class H or Class F.
D. Stator-Winding Leads: Brought out to terminal box to permit future reconnection for other voltages if required. Provide 4 lead dedicated voltage alternator.
E. Range: Provide broad range of output voltage by adjusting the excitation level.
F. Construction shall prevent mechanical, electrical, and thermal damage due to vibration, overspeed up to 125 percent of rating, and heat during operation at 110 percent of rated capacity.
G. Enclosure: Drip proof.
H. Instrument Transformers: Mounted within generator enclosure.
I. Voltage Regulator: Solid-state type, separate from exciter, providing performance as specified and as required by NFPA 110.
1. Adjusting raise/lower switch on Control and Monitoring Panel: Provide plus or minus
5 percent adjustment of output-voltage operating band.
2. Maintain voltage per transient performance requirements.
3. Provide anti-hunt provision to stabilize voltage.
4. Maintain frequency per transient performance requirements.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 13
J. Strip Heater: Thermostatically controlled unit arranged to maintain stator windings above dew point.
K. Windings: Two-thirds pitch stator winding and fully linked amortisseur winding.
L. Subtransient Reactance: 12 percent, maximum.
2.10 VIBRATION ISOLATION DEVICES
A. Restrained Spring Isolators: Standard freestanding, steel, open-spring isolators.
B. Vibration isolation devices shall not be used to accommodate misalignments or to make bends.
2.11 SOURCE QUALITY CONTROL
A. Prototype Testing: Factory test engine-generator set using same engine model, constructed of identical or equivalent components and equipped with identical or equivalent accessories.
1. Tests: Comply with NFPA 110, Level 1 Energy Converters and with IEEE 115.
B. Project-Specific Equipment Tests: Before shipment, factory test engine-generator set and other system components and accessories manufactured specifically for this Project. Perform tests at rated load and power factor. Include the following tests:
1. Test components and accessories furnished with installed unit that are not identical to those on tested prototype to demonstrate compatibility and reliability.
2. Test generator, exciter, and voltage regulator as a unit.
3. Full load run.
4. Maximum power.
5. Voltage regulation.
6. Transient and steady-state governing.
7. Single-step load pickup.
8. Safety shutdown.
9. Report factory test results within 10 days of completion of test.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas, equipment bases, and conditions, with Installer present, for compliance with requirements for installation and other conditions affecting packaged engine-generator performance.
B. Examine roughing-in for piping systems and electrical connections. Verify actual locations of connections before packaged engine-generator installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 14
3.2 PREPARATION
A. Interruption of Existing Electrical Service: Do not interrupt electrical service to facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary electrical service according to requirements indicated:
1. Notify Owner no fewer than 14 working days in advance of proposed interruption of electrical service.
2. Do not proceed with interruption of electrical service without Owner's written permission.
3.3 INSTALLATION
A. Comply with packaged engine-generator manufacturers' written installation and alignment instructions and with NFPA 110.
B. Equipment Mounting:
1. Install packaged engine generators on cast-in-place concrete equipment bases.
2. Coordinate size and location of concrete bases for packaged engine generators. Cast anchor- bolt inserts into bases. Concrete, reinforcement, and formwork requirements are specified with concrete.
C. Install packaged engine-generator to provide access, without removing connections or accessories, for periodic maintenance.
D. Install packaged engine-generator with restrained spring isolators having a minimum deflection of 1 inch on 4-inch-high concrete base. Secure sets enclosure to anchor bolts installed in concrete bases.
E. Integral condensate drain piping to muffler drain outlet full size of drain connection with a shutoff valve, stainless-steel flexible connector, and Schedule 40, black steel pipe with welded joints.
F. Copper and galvanized steel shall not be used in the fuel-oil piping system.
G. Electrical Wiring: Install electrical devices furnished by equipment manufacturers but not specified to be factory mounted.
3.4 CONNECTIONS
A. Ground equipment according to Section 260526 "Grounding and Bonding for
Electrical Systems."
B. Provide a minimum of one 90-degree bend in flexible conduit routed to the generator set from a stationary element.
3.5 IDENTIFICATION
A. Identify system components according to Section 260553 "Identification for Electrical
Systems."
3.6 FIELD QUALITY CONTROL
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 15
A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect, test, and adjust components, assemblies, and equipment installations, including connections.
B. Perform tests and inspections.
1. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect components, assemblies, and equipment installations, including connections.
C. Tests and Inspections:
1. Perform tests recommended by manufacturer and each visual and mechanical inspection and electrical and mechanical test listed in the first two subparagraphs as specified in NETA Acceptance Testing Specification. Certify compliance with test parameters.
a. Visual and Mechanical Inspection
1) Compare equipment nameplate data with drawings and specifications.
2) Inspect physical and mechanical condition.
3) Inspect anchorage, alignment, and grounding.
4) Verify the unit is clean.
b. Electrical and Mechanical Tests
1) Perform insulation-resistance tests in accordance with IEEE 43.
a) Machines larger than 200 horsepower. Test duration shall be
10 minutes. Calculate polarization index.
b) Machines 200 horsepower or less. Test duration shall be one minute. Calculate the dielectric-absorption ratio.
2) Test protective relay devices.
3) Verify phase rotation, phasing, and synchronized operation as required by the application.
4) Functionally test engine shutdown for low oil pressure, overtemperature, overspeed, and other protection features as applicable.
5) Conduct performance test in accordance with NFPA 110 or as required by owner.
6) Verify correct functioning of the governor and regulator.
2. NFPA 110 Acceptance Tests: Perform tests required by NFPA 110 that are additional to those specified here including, but not limited to, single-step full-load pickup test.
3. Battery Tests: Equalize charging of battery cells according to manufacturer's written instructions. Record individual cell voltages.
a. Measure charging voltage and voltages between available battery terminals for full- charging and float-charging conditions. Check electrolyte level and specific gravity under both conditions.
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 16
b. Test for contact integrity of all connectors. Perform an integrity load test and a capacity load test for the battery.
c. Verify acceptance of charge for each element of the battery after discharge.
d. Verify that measurements are within manufacturer's specifications.
4. Battery-Charger Tests: Verify specified rates of charge for both equalizing and float charging conditions.
5. System Integrity Tests: Methodically verify proper installation, connection, and integrity of each element of engine-generator system before and during system operation. Check for air, exhaust, and fluid leaks.
6. Exhaust Emissions Test: Comply with applicable government test criteria.
D. Coordinate tests with tests for transfer switches and run them concurrently.
E. Test instruments shall have been calibrated within the last 12 months, traceable to NIST
Calibration Services, and adequate for making positive observation of test results. Make calibration records available for examination on request.
F. Leak Test: After installation, charge exhaust, coolant, and fuel systems and test for leaks.
Repair leaks and retest until no leaks exist.
G. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation for generator and associated equipment.
H. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
I. Remove and replace malfunctioning units and retest as specified above.
J. Retest: Correct deficiencies identified by tests and observations and retest until specified requirements are met.
K. Report results of tests and inspections in writing. Record adjustable relay settings and measured insulation resistances, time delays, and other values and observations. Attach a label or tag to each tested component indicating satisfactory completion of tests.
L. Infrared Scanning: After Substantial Completion, but not more than 60 days after final acceptance, perform an infrared scan of each power wiring termination and each bus connection while running with maximum load. Remove all access panels so terminations and connections are accessible to portable scanner.
1. Follow-up Infrared Scanning: Perform an additional follow-up infrared scan 11 months after date of Substantial Completion.
2. Instrument: Use an infrared scanning device designed to measure temperature or to detect significant deviations from normal values. Provide calibration record for device.
3. Record of Infrared Scanning: Prepare a certified report that identifies terminations and connections checked and that describes scanning results. Include notation of deficiencies detected, remedial action taken, and observations after remedial action.
3.7 MAINTENANCE SERVICE
A. Initial Maintenance Service: Beginning at Substantial Completion, provide 12 months' full
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 17
maintenance by skilled employees of manufacturer's designated service organization. Include quarterly exercising to check for proper starting, load transfer, and running under load. Include routine preventive maintenance as recommended by manufacturer and adjusting as required for proper operation. Provide parts and supplies same as those used in the manufacture and installation of original equipment.
3.8 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain packaged engine generators.
END OF SECTION 263213
Design and Construction Division
Newberry Correctional Facility
Electrical Infrastructure Assessment
LP GAS ENGINE GENERATORS 263213A - 18
THIS PAGE IS LEFT BLANK INTENTIONALLY
EXISTING
PULL BOX
EXISTING EAST
PRIMARY SWITCHGEAR
EXISTING WEST
SWITCH GEAR
700KW
GEN
500KW
GEN
DAY
TANK
XFRM
TS
MAIN
343.75KVA
GEN
500KW GEN
EXCITER
700KW GEN
EXCITER
STN PWR
1MW GEN
EXCITER
BRKR
RELAY
CNTRL PNL
GEN
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT & REMOVE EXISTING EQUIPMENT. REMOVE ASSOCIATED
CONDUIT & WIRE.
DISCONNECT & REPLACE EXISTING EQUIPMENT. ASSOCIATED CONDUIT &
WIRE TO REMAIN FOR NEW EQUIPMENT.
DISCONNECT & REMOVE EXISTING STACK. REMOVE ASSOCIATED CONDUIT &
WIRE. PATCH ROOF AS REQUIRED.
DISCONNECT EXISTING GENERATOR. CONTRACTOR SHALL PROVIDE
ADEQUATE FRAMING NEEDED TO PATCH HOLE IN CONCRETE FLOOR.
CONTRACTOR SHALL INFILL FLOOR WITH NEW STRUCTURE AND CONCRETE.
DISCONNECT & REPLACE EXISTING PANEL. REMOVE ASSOCIATED CONDUIT
AND WIRE.
DISCONNECT & REPLACE EXISTING EXHAUST FAN MOTOR & MOTOR
CONTROLLER. ASSOCIATED CONDUIT AND WIRE TO REMAIN FOR
REPLACEMENT.
DISCONNECT & REPLACE EXISTING CAPACITOR BANKS. ASSOCIATED
CONDUIT AND WIRE TO REMAIN FOR REPLACEMENT.
DISCONNECT EXISTING ATS CONTROLS AND ASSOCIATED ELECTRONICS.
CONTRACTOR SHALL CONVERT SWITCH TO MANUAL OPERATION FOR
TRAILER MOUNT CONNECTION.
DEMOLITION NOTES
TEX
CAPACITOR
BANKS
PANEL
"QMB"
1 1
EXHAUST
FAN
PANEL "LPE1"
120/208V-3Ø, 4W, 100A
PANEL "PPF"
120/208V-3Ø, 4W, 200A
PANEL
"LPL1"
PANEL "PPA"
120/208V-3Ø, 4W, 200A
PANEL "LPB1"
120/208V-3Ø, 4W, 100A
6 6
PANEL
"DPD"
650KW
GEN
"DP-1"
SWITCH
"DP-2"
SWITCH
ATS
"T-1"
"M-1"
SWITCH
1 1 9 1
MCC
480V-3Ø, 4W, 800A
PANEL "D"
277/480V-3Ø, 4W, 400A
E-302 file no.
checked by drawn by consultant issue date index no.
contract order no.
Y 23461 consultant job no.
23352.00
M a t r ix
472/23312.LWM
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
N ELECTRICAL - POWER DEMO
POWER HOUSE FIRST FLOOR
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N ELECTRICAL - POWER DEMO
POWER HOUSE BASEMENT
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N ELECTRICAL - POWER DEMO
POWER HOUSE MEZZANINE
SCALE: 1/8" = 1'-0"
0 1 5 10 20
KPM
JFS
FOR BID: 06/28/2024
ADDENDUM #2:07/30/2024
EXISTING
PULL BOX TEX
NEW CAPACITOR
BANKS
ELECTRICAL KEY NOTES
REPLACED EQUIPMENT.
CONTRACTOR SHALL CONVERT SWITCH TO MANUAL OPERATION FOR
TRAILER MOUNT CONNECTION.
T
NEW TRANSFORMER
500KVA
PRIM: 2400V
SEC: 480V
MAIN
ATS
TO PANEL
"DPD"
FROM POWER
HOUSE DISC.
SPARE
TO WAREHOUSE
TO M-11 TO M-8
SPARE2
3 4
5 6
FROM NEW
SUBSTATION
TRANSFORMER
PANEL
"LPL1"
PANEL "D"
277/480V-3Ø, 4W, 400A
PANEL
"QMB"
PANEL
"DPD"
EX
650KW
GEN
EX
"DP-1"
SWITCH
EX
"DP-2"
SWITCH
MTS
"T-1"
EX
"M-1"
SWITCH
PANEL "LPE1"
120/208V-3Ø, 4W, 100A
PANEL "PPF"
120/208V-3Ø, 4W, 200A
PANEL "PPA"
120/208V-3Ø, 4W, 200A
PANEL "LPB1"
120/208V-3Ø, 4W, 100A
MCC
480V-3Ø, 4W, 800A
T
NEW TRANSFORMER
50KVA
PRIM: 480V
SEC: 240/120V
CAM-LOCK
PANEL
240V-30A L15-30R
RECEPTACLE FOR
TRAILER SHORE
POWER
TO 240V-30A
CKT IN
POWERHOUSE
E-502 file no.
checked by drawn by consultant issue date index no.
contract order no.
Y 23461 consultant job no.
23352.00
M a t r ix
472/23312.LWM
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
N ELECTRICAL - POWER - NEW
POWER HOUSE FIRST FLOOR
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N ELECTRICAL - POWER - NEW
POWER HOUSE BASEMENT
SCALE: 1/8" = 1'-0"
0 1 5 10 20
N ELECTRICAL - POWER - NEW
POWER HOUSE MEZZANINE
SCALE: 1/8" = 1'-0"
0 1 5 10 20
KPM
JFS
J
#1
QUAD
#2
ADMIN/
#3
BDLG.
#4
FARM
#5
MAIN
GEN
EXISTING
PRIMARY DISTRIBUTION PANEL (WEST GEAR)
EX
CLOVERLAND POWER
PRIM: 34,000V-Y
SEC: 2400V
PANEL
EXIST.
KITCHEN
PANEL
EXIST.
PDP8-3
PANEL
EXIST.
PDP10-2
PANEL
EXIST.
PDP9-1
MEDIUM VOLT SWITCHES
2400V-3Ø
PRIMARY SW. M-4
EXISTING
2/0 XLP PRIMARY
5KV WIRE
EXISTING
PULL BOX IN
POWER HOUSE BASEMENT
PANEL
EXIST.
240V 3Ø, 3W
PANEL
EXIST.
120/240V 1Ø
PANEL
EXIST.
480/277V 3Ø, 4W 400A
GENERATOR BUILDING
POWER HOUSE
NC NO
EXISTING
TRANSFORMER
1000KVA
EXISTING
SWITCH
EXISTING
TRANSFORMER
250KVA
2400V 240V
EXISTING
TRANSFORMER
100KVA
2400V 120/240V
EXISTING
TRANSFORMER
100KVA
2400V 277/480V
EXISTING
TRANSFORMER
100KVA
2400V 277/480V
EXISTING
TRANSFORMER
100KVA
2400V 277/480V
PRIMARY SW. M-10
EXIST.
DISC.
PRIMARY SW. M-8
PRIMARY SW. M-11
EXISTING
TRANSFORMER
8-1
500KVA
2400V 480V
EXISTING
TRANSFORMER
8-2
500KVA
2400V 480V
EXISTING
TRANSFORMER
TXA
500KVA
2400V 480V
EXISTING
TRANSFORMER
TXB
500KVA
2400V 480V
EXISTING
TRANSFORMER
9-1
500KVA
2400V 480V
EXISTING
TRANSFORMER
9-2
500KVA
2400V 480V
PANEL
EXIST.
PDP8-2
PANEL
EXIST.
PDP10-1
PANEL
EXIST.
PDP9-2
EXISTING
(NOT ENERGIZED)
TRANSFORMER
500KVA
2400V 480V
EXIST.
DISC.
EXIST.
DISC. EXIST.
DISC.
EXIST.
DISC.
EXIST.
DISC.
EXIST.
GENERATOR FEED
TO WAREHOUSE
NC NC NC NC NC
SERVICE AREA
DEPUTY SUITE
Q-UNIT
HU-1
HU-2
HU-11
SERVICE AREA
SCHOOL
HU-9
HU-10
SERVICE AREA
KITCHEN
HU-3
HU-4
HU-5
HU-6
HU-7
HU-8
EXISTING
TRANSFORMER
8-3
500KVA
2400V 480V
EXIST.
DISC.
SERVICE AREA
WAREHOUSE
SERVICE AREA
HOSPITAL
NONO
EXISTING
100 KVAR
CAPACITOR
EXISTING
SWITCH
EXISTING
100 KVAR
CAPACITOR
EXISTING
SWITCH
MAIN LEVEL
BASEMENT LEVEL
NC NC NCNO
NONO
NC
M
ATS
"T-1"
G
KW
GENERATOR
500 KW
GEN
NC NC
EXCITER 700 KW
GEN
S1EXCITER S2 S3 S4 S5CLOSED
G
KW
GENERATOR
J
NOT FUNCTIONAL
G
KW
GENERATOR
NOT FUNCTIONAL
G
KW
GENERATOR
NOT FUNCTIONAL
ELECTRICAL EXISTING ONE LINE RISER DIAGRAM
SCALE:nts
343.75
G
KVA
GENERATOR
PANEL
"DPD"
800A
500 KVA
MV
SWITCH
STA
PWR
OLD ADMIN
NO
EM BRKR
500 KVA
GEN BRKR
J
NC
NO
NC NC
NC NC
NC NO
EXISTING
SWITCH
EXISTING EQUIPMENT TO REMAIN.
DISCONNECT & REMOVE EXISTING EQUIPMENT. REMOVE ASSOCIATED
CONDUIT & WIRE.
REFURBISH PRIMARY SWITCH.
REFURBISH EXISTING TRANSFORMER
DISCONNECT & REMOVE EXISTING TRANSFORMER. ASSOCIATED CONDUIT &
WIRE TO REMAIN FOR REPLACEMENT.
DISCONNECT & REMOVE EXISTING EQUIPMENT. ASSOCIATED CONDUIT &
WIRE TO REMAIN.
DISCONNECT & REMOVE EXISTING TRANSFORMER ONLY AFTER NEW
TRANSFORMER HAS BEEN INSTALLED. REMOVE ASSOCIATED CONDUIT &
WIRE.
DISCONNECT & REMOVE MEDIUM VOLTAGE CABLE. CONDUIT SHALL REMAIN
FOR REUSE.
EXTEND CONDUIT & WIRE AS NEEDED.
DISCONNECT & REPLACE EXISTING EQUIPMENT. ASSOCIATED CONDUIT AND
WIRE TO REMAIN.
DISCONNECT & REMOVE MEDIUM VOLTAGE CABLE. CONDUIT SHALL REMAIN
AND BE ABANDONED. CONDUIT SHALL BE CAPPED AT WALL IN WAREHOUSE.
DISCONNECT & REMOVE MEDIUM VOLTAGE CABLE & CONDUIT.
DISCONNECT EXISTING ATS CONTROLS AND ASSOCIATED ELECTRONICS.
CONTRACTOR SHALL CONVERT SWITCH TO MANUAL OPERATION FOR
TRAILER MOUNT CONNECTION.
DEMOLITION NOTES
5 5
4 4444
3 3
6 6
6 6 6 6 6
1 1 1
1 1
1 1
2 2
6 6
8 8 8 8
1 113
"DP-1"
SWITCH
"DP-2"
SWITCH
"M-1"
SWITCH
T
PANEL
EXISTING
120/208V
EX. TRANSFORMER
PRIM: 480V
SEC: 208/120V
E-600 file no.
checked by drawn by consultant issue date index no.
contract order no.
Y 23461 consultant job no.
23352.00
M a t r ix
472/23312.LWM
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
A D
A M
P L
A C
H R
A D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
KPM
JFS
FROM
PANEL
EXIST.
KITCHEN
PANEL
EXIST.
PDP8-3
PANEL
EXIST.
PDP10-2
PANEL
EXIST.
PDP9-1
MEDIUM VOLT SWITCHES
2400V-3Ø
EXISTING PRIMARY SW. M-4
PANEL
EXIST.
120/240V 3Ø, 3W
PANEL
EXIST.
120/240V 1Ø,3W
PANEL
EXIST.
480/277V 3Ø, 4W 400A
GENERATOR BUILDING
POWER HOUSE
NEW
TRANSFORMER
1000KVA
EXISTING PRIMARY SW. M-10
EXISTING PRIMARY SW. M-8
NC
NO
EXISTING PRIMARY SW. M-11
EXISTING
TRANSFORMER
8-1
500KVA
2400V 480V
EXISTING
TRANSFORMER
8-2
500KVA
2400V 480V
EXISTING
TRANSFORMER
TXA
500KVA
2400V 480V
EXISTING
TRANSFORMER
TXB
500KVA
2400V 480V
EXISTING
TRANSFORMER
9-1
500KVA
2400V 480V
EXISTING
TRANSFORMER
9-2
500KVA
2400V 480V
PANEL
EXIST.
PDP8-2
PANEL
EXIST.
PDP10-1
PANEL
EXIST.
PDP9-2
EXIST.
DISC.
EXIST.
DISC. EXIST.
DISC.
EXIST.
DISC.
EXIST.
DISC.
EXIST.
GENERATOR FEED
TO WAREHOUSE
SERVICE AREA
DEPUTY SUITE, Q-UNIT, HU-1, HU-2, AND HU-11
SERVICE AREA
SCHOOL, HU-9, AND HU-10
SERVICE AREA
KITCHEN, HU-3, HU-4, HU-5, HU-6,
HU-7, AND HU-8
EXISTING
TRANSFORMER
8-3
500KVA
2400V 480V
EXIST.
DISC.
NC NC
NC NC
WAREHOUSE
NCNC
NEW
100 KVAR
CAPACITOR
NEW
100 KVAR
CAPACITOR
MAIN LEVEL
BASEMENT LEVEL
G
KW
GENERATOR
ELECTRICAL NEW ONE LINE RISER DIAGRAM
SCALE: N.T.S.
PANEL
NEW
"DPD"
277/480V 3Ø, 4W 800A
STA
PWR
OLD ADMIN
NC
800A
EXISTING
TRANSFORMER
M
UTILITY CO.
C.T.
CABINET
PANEL
NEW
SERVICE
120/208 3Ø, 4W
200A MCB
480/277V
SECONDARY
SWITCH
T
2 2 2 2 2
NEW TRANSFORMER
500KVA
PRIM: 2400V
SEC: 480V
NEW TRANSFORMER
300KVA
PRIM: 2400V
SEC: 480V
EXISTING
M
M
M60 0A
F
0A T
M
M
SW. M-8
M
M60 0A
F
0A F
SW. M-11
MAIN
PRIMARY SWITCHGEAR
2400V-3PH, 1200A
CONCRETE PAD
PRIM: 34,000V-Y
SEC: 2400V
NEW 2400V PRIMARY SWITCH
NC
NEMA 3R
BY EC BY EC
NEW TRANSFORMER
225KVA
PRIM: 480V
SEC: 240/120V
400A
FUSED
2 2
EXISTING
JUNCTION
BOX
NEMA 3R
NEMA 3R
WARE-
HOUSE
SPARE
SPARE
CLOVERLAND
POWER
A
B
B
A
A
B
B
B
A
A
A
B B
B B B B
B B
ELECTRICAL KEY NOTES
CONTRACTOR SHALL PROVIDE PREVENTATIVE MAINTENANCE AND REFURBISH EXISTING
PRIMARY SWITCH. CONTRACTOR SHALL REFER TO PREVENTATIVE MAINTENANCE
SPECIFICATION 261390.
CONTRACTOR SHALL PROVIDE PREVENTATIVE MAINTENANCE AND REFURBISH EXISTING
TRANSFORMER. CONTRACTOR SHALL REFER TO PREVENTATIVE MAINTENANCE
SPECIFICATION 261390.
CONTRACTOR SHALL PROVIDE AND INSTALL NEW 480V POWERSIDE POWERCAP AUTO.
PREVENTATIVE MAINTENANCE TO BE PERFORMED ON THE EQUIPMENT
LISTED BELOW:
• MV TRANSFORMERS.
• MV SWITCHES; INCLUDING SPARES AND TRANSFER SWITCHES.
• MV CABLES.
• ALL WORK WILL NEED TO BE COORDINATED AND SCHEDULED WITH
THE FACILITY.
• SEE SPECIFICATION FOR MORE INFORMATION.
GENERAL ELECTRICAL NOTES
1. NO ADDITIONAL LOAD IS BEING ADDED TO THE SYSTEM; THIS IS A ONE
FOR ONE REPLACEMENT OF THE EXISTING SYSTEM.
2. ALL UNDERGROUND WORK MUST BE HYDRO EXCAVATED. REFER TO
SPECIFICATION 023200 HYDRO EXCAVATED.
3. CONTRACTOR SHALL CONTACT KIP JONES WITH ORION ENGINEERING
CO., INC. (KJONES@ORION-US.COM; PHONE: 517-782-7777 EXT. 112)
FOR AN ARC FLASH COORDINATION STUDY QUOTE.
4. IF A TEMPORARY GENERATOR IS REQUIRED, THE CONTRACTOR SHALL
COORDINATE WITH THE NORTHERN REGIONAL PHYSICAL PLANT TO
USE THE TRAILER MOUNT TEMPORARY GENERATOR.
PREVENTATIVE MAINTENANCE
REQUIREMENTS
CONDUIT & WIRE SCHEDULE
-#2 MV-105105
TAG
KCMIL
AWG °C TEMP.
SIZE
CONDUIT GND
RATED
TYPE REMARKS
A
-B
C
(3) 350KCMIL REUSE EX.
(3) #1 REUSE EX. #6
MV-105105
(3) SETS OF (3) 300KCMIL -
0A
F
0A T
0A
F
0A T
0A
F
0A T
D
E (3) 500KCMIL
2" #2/0
THWN
-3" #3 75
D
E E
F
SPARE
EXTEND EXISTING CONDUIT
AND WIRE AS REQUIRED
PANEL
EXISTING
PULL BOX
EXISTING
SWITCH
EXISTING
SWITCH
NONO
EXTEND EXISTING CONDUIT
AND WIRE AS REQUIRED
EXTEND EXISTING CONDUIT
AND WIRE AS REQUIRED
NEW
"QMB"
200A
T
PANEL
EXISTING
120/208V 120/240V
EX. TRANSFORMER
PRIM: 480V
SEC: 208/120V
EXIST. SITE LIGHTS
2400V
NEW MTS
"T-1"
"DP-1"
SWITCH
"DP-2"
SWITCH
"M-1"
SWITCH
F
G
H
IJF
A
THWN
650G KW
GENERATOR
2400V
TEMPORARY
C
T
NEW TRANSFORMER
50KVA
PRIM: 480V
SEC: 240/120V
H
3Ø, 3W
BY EC
CAM-LOCK PANELC
F (3) #3/0 THWN -1-1/2" #6 75
-(3) #1 1-1/4" #6 MV-105105
G (3) #4/0 THWN -2" #4 75
H (3) #2 THWN -1-1/4" #8 75
I (3) 300KCMIL THWN -2-1/2" #4 75
J (2) SETS OF (3) 300KCMIL THWN -2-1/2" #1/0 75
A F
0A
T
M
M
M60 0A
F
0A T
M
M
SW. M-8
M
M60 0A
F
0A F
SW. M-11
MAIN
WARE-
HOUSE
SPARE
SPARE
0A
F
0A T
0A
F
0A T
0A
F
0A T
A F
0A
T
A F
0A
T
N E
ASCO
ATS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .