This is Construction Bid Addendum No. 2 issued by the Department of Technology, Management and Budget, State Facilities Administration Design and Construction Division for the Bay City State Park Campground Improvements project (File Number 751/22413.CTS). The addendum, issued on November 9, 2026, provides clarifications and modifications to the bidding documents for this campground improvement project. The bid opening date is November 18, 2026, with a project completion deadline of July 4. The professional is Beckett & Raeder, Inc., with Project Director Chris Schanbeck, PE overseeing the work. Key clarifications address hydrant locations, installation methods for electrical and water services, restoration responsibilities, and equipment delivery timelines.
The addendum specifies that electrical duct and water service at road crossings shall be installed by directional boring with open excavations limited to protect existing pavements, roadways, and trees. Restoration of turf, asphalt, and concrete disturbances is to be performed by separate specialty contractors—one landscape contractor, one asphalt contractor, and one concrete contractor—each responsible for restoration of their respective work areas. Regarding the third hydrant location, it is clarified to be located approximately 80 feet north of the northeast corner of the east bathroom building on sheet C3.2. The owner will not grant extensions or phased completion for delayed equipment delivery; therefore, bidders must include any premium costs necessary for timely delivery of distribution equipment to meet the July 4 project completion deadline. Acknowledgement of this addendum is required in the bid submission, and failure to acknowledge may result in bid rejection.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 12/17)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration Design and Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
11/9/2026
PROJECT NAME
Bay City State Park Campground Improvements
FILE NUMBER
751/22413.CTS
PROFESSIONAL
Beckett & Raeder, Inc.
PROJECT DIRECTOR
Chris Schanbeck, PE
BID OPENING DATE:
11/18/2026
ADDENDUM ITEMS:
Bidder Questions and PSC Responses:
1. Q: Hydrants - Only two new hydrants are clearly shown on C3.1. Where is the third hydrant located?
A: See sheet C3.2, on the left side of the sheet there is another new hydrant approximately 80’ north of the northeast corner of the east bathroom building.
2. Q: Road crossings - At the campground road crossings, may the electrical duct and water service be directionally bored, or is open cut with concrete-encased PVC required? If both are allowed, which does the owner prefer?
A: The electrical and water service shall be installed by directional boring with open excavations limited to the greatest extent possible to limit damage to existing pavements, roadway or trees. This is the owner’s preferred installation method.
3. Q: Restoration - Who is responsible for restoring the turf, asphalt and concrete disturbed by the electrical and boring work? Is the general contractor responsible for all restoration, or does each trade restore its own disturbance?
A: There should be one landscape contractor, one asphalt contractor, and one concrete contractor to restore all disturbances.
4. Q: Panels and breakers - Given the long lead times on panels and breakers and the July 4 completion, will the owner allow an extension or a phased completion if the gear can't be delivered in time?
A: No, the Owner will not allow an extension or phased completion. The Contractor should include in their bid any added cost premium necessary for the distribution equipment to be delivered to the project site for completion of the project per the schedule indicated in the bid documents.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Kristofer Enlow, P.E., Beckett & Raeder, Inc. DATE: 11/9/2026
APPROVED BY:
PROJECT DIRECTOR: DATE: 11/9/2026