Addendum 2 21-269-Q.pdf
PDF 114 KB Posted
- Solicitation number
- S-P00140-00001695
- Issued by
- Lane County, Oregon
About this file
This document is an Addendum to Request for Proposal (RFP) #21-269-Q for a Part 12D Safety Inspection for the Leaburg-Walterville Project, issued by Lane County and the City of Eugene, Oregon. The addendum revises the minimum requirements for the consultant by allowing licensure from any U.S. state, and extending the timeframe for the consultant to have successfully completed and submitted Part 12 Safety Inspection Reports that have been accepted by the Federal Energy Regulatory Commission (FERC) from 7 years to 15 years. The closing date for responses remains unchanged at February 10, 2022.
The contract opportunity involves conducting a Part 12D Safety Inspection for the Leaburg-Walterville Project. No other details about pricing, set asides, incumbents, funding, or other salient information are provided in the addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LB-WV 2022 Part 12 Inspection Pre-Proposal Meeting.pdf | ||
| 2022200038_G1_Notice of Intent to Award.pdf | ||
| 21-269-Q LB-WV Insp Report.pdf | ||
| Addendum 1 21-269-Q.pdf | ||
| NDA Form 21-269-Q~1.docx | DOCX document | |
| NDA Form 21-269-Q~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 18, 2022
ADDENDUM # 2
Title: Part 12D Safety Inspection for Leaburg-Walterville Project A&E
RFP # 21-269-Q
This addendum adds additional information to the original ITB document.
CHANGES TO ITB DOCUMENT:
#1. Section 6.1 Minimum Requirements
A. Preparation of work products shall be completed or overseen by an engineer(s) of the appropriate discipline licensed with the Oregon State Board of Examiners for Engineering and Land Surveying.
Revised – Licensure may be accepted from an appropriate licensee from either state of Oregon or any other state within the United States.
B. Consultant shall have completed and submitted a minimum of three (3) previous Part 12 Safety Inspection Reports that have been successfully accepted by FERC within the last 7 years.
Revised – Reports may have been successfully accepted by FERC within the last 15 years, rather than 7.
CLOSING DATE AND TIME
February 10, 2022. Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the Request for Proposals.
Addendum prepared by:
Sandra Hahn Purchasing Analyst