OWEN SUMMERS READINESS CENTER SESMIC UPGRADE
Solicitation number
S-24800-00009058
Issued by
Marion County, Oregon

About this file

This document is Addendum 2 to a Request for Proposals (RFP) issued by the Oregon Military Department (OMD) for architectural design services related to a seismic upgrade project at the Owen Summers Readiness Center. The addendum provides clarification on the RFP requirements, specifically that any proposers who wish to use a different structural firm than the one already under contract with OMD must include the cost of redesign in their proposal. The RFP is for architectural services to address the architectural changes needed due to the seismic upgrade work, which OMD has already completed the engineering design for. The project is located in Marion County and the City of Salem, Oregon.

The addendum states that a cost proposal is not required as part of the initial proposal submission, and that this would likely be required in a subsequent negotiation stage. Proposers are required to acknowledge receipt of this addendum as part of their proposal submission. Protests of any changes made by this addendum must be submitted by a specific deadline.

View the file

Other files

File Type Posted
STARC_E1_Electrical_Site_Plan.pdf PDF
09_Sections.pdf PDF
STARC_14_RCP_Flr2.pdf PDF
08_Sections.pdf PDF
E4_Lighting_Flr2_N.pdf PDF
STARC_17_Interior_Details.pdf PDF
RFP 200020A003 Final DOJ approved for Posting.pdf PDF
03_Roof_Plan.pdf PDF
p3_Plumbing_Plan_Flr1_N.pdf PDF
s13_Framing_Details.pdf PDF
k2_Kitchen_Elev.pdf PDF
15_Finishes.pdf PDF
STARC_RE2_Partition_Connection_Flr1_S.pdf PDF
E13_Roof_Boiler_Rm_Power_Plan.pdf PDF
ITA 200020A003 LRS signed RW.pdf PDF
04_Floor1_S.pdf PDF
STARC_P1_Plumbing.pdf PDF
01b_Site_Plan_N.pdf PDF
E7_Power_Flr1_N (2).pdf PDF
06_Floor2.pdf PDF
STARC_S1_Foundation_S.pdf PDF
20_Arch_Details.pdf PDF
12_RCP_Flr1_S.pdf PDF
11_Sections_.pdf PDF
E6_Power_Flr1_S.pdf PDF
s15_Structural_Details.pdf PDF
E8_Power_Flr2_N.pdf PDF
Addendum 1 200020A003 EXHIBIT A EXHIBIT B Final for Posting.pdf PDF
STARC_M4_HVAC_Plans.pdf PDF
RFP 2023-105 Bear Creek Shoulders- Final~3.pdf PDF
07_Elevations.pdf PDF
s2_Foundation_Plan.pdf PDF
exhibit_c_Responder Additional Proposed Products_0.xlsx XLSX spreadsheet
19_Arch_Details.pdf PDF
E2_Lighting_Flr1_S.pdf PDF
01_Site_Plan_List.pdf PDF
s8_Framing_Details.pdf PDF
STARC_S2_Foundation_N.pdf PDF
14_RCP_Flr2_.pdf PDF
Proposal Name Read Sheet 200020A003.pdf PDF
RE3_Flr2_N_Partition_Connection.pdf PDF
E11_Signal_Plan_Flr2_N.pdf PDF
STARC_13_RCP_Flr1_N.pdf PDF
s11_Truss_Details.pdf PDF
m3_HVAC_Flr2_N.pdf PDF
s5_Flr2_&_Low_Roof_Framing_Plan.pdf PDF
s9_Roof_Joists.pdf PDF
Addendum 1 200020A003 final for posting.pdf PDF
p2_Plumbing_Plan_Flr1_S.pdf PDF
L2_Irrigation_Plan_N.pdf PDF
Show 40 more

Latest 50 of 85 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 2 200020A003 Page 1 of 1

OREGON MILITARY DEPARTMENT

JOINT FORCE HEADQUARTERS, OREGON NATIONAL GUARD

INSTALLATIONS DIVISION

1776 MILITIA WAY

P.O. BOX 14350

SALEM, OREGON 97309-5047

February 2, 2023

Installations Division

SUBJECT: Addendum 2 to RFP 200020A003 OWEN SUMMERS READINESS CENTER (“OS”)

ARCHITECHTURAL DESIGN EFFORT RELATED TO SESMIC UPGRADE

TO ALL PROSPECTIVE PROPOSERS AND ALL OTHERS CONCERNED

1. The changes, clarifications, omissions, additions, and alterations in, on, and to the proposal information and specifications shall apply to the proposals submitted for and to the project indicated above. Except as modified by this Addendum, all of the terms and provisions of the Request for Proposals (“RFP”) for the above listed project remain in full force and effect. This Addendum Number 1 supersedes all previous instructions pertaining to the items listed:

CHANGES TO RFP

2. Changes to RFP: The following changes are made to the RFP. (Where applicable, additions are indicated with bold and underlined and deletions are indicated by strikethroughs).

Responses to questions received.

1) My firm received the addendum(s) published on OregonBuys yesterday related to RFP 200020A003 for the

Owen Summers Readiness Center Seismic Upgrade, including the Q&A responses. Although the initial question window has passed, I wondered if you would be able to clarify the answer provided to Question 1 in Addendum 1 (snippet below): The response notes that any teams proposing a different structural firm would need to include the cost of redesign in their cost proposal. Since a cost proposal is not listed in the

(2.2) Administrative or (2.3) Technical Proposal Requirements or mentioned in the proposal evaluation breakdown in RFP section 4, we hoped to confirm that we are not to provide a cost proposal at this stage in our responses to RFP 200020A003? We assume that this would be required in the next stage of procurement/negotiation. Is this correct, or does OMD expect to see a cost proposal as part of our upcoming submission??

Response: Miller, under contract with OMD, has completed a seismic study and the design of the changes need to upgrade the building. If the Proposer doesn’t want to use this already completed work and desires to redesign the structural elements, The Proposer would need to cover the cost of the redesign (not billable to the project) and divulge their intent to do so in their Proposal.

3. This addendum must be acknowledged and submitted for this project. By acknowledging this addendum on RFP

Attachment A, Representations, Attestations, and Certifications, the proposer agrees they have read and understood the above mentioned changes, and have incorporated those changes into their proposal.

PROTEST OF ANY CHANGES TO THE RFP MADE BY THIS ADDENDUM MUST BE SUBMITTED IN

WRITTEN FORM VIA EMAIL TO SAM GOFF at SAM.A.GOFF@OMD.OREGON.GOV BY 10:00 am

ON FEBRUARY 5, 2024.

Sam Goff - CPPB

Procurement & Contract Specialist mailto:SAM.A.GOFF@OMD.OREGON.GOV

File details come from the government source that posted it. Updated .