Addendum #1~5.pdf

PDF 164 KB Posted

Attached to
EWEB BID 25-015-PW DANEBO CONSTRUCTION
Solicitation number
S-P00140-00012623
Issued by
Lane County, Oregon

About this file

This is Addendum #1 for EWEB (Eugene Water & Electric Board) Bid #25-015-PW for the Danebo Substation Foundation Construction project in Lane County, Oregon. The addendum addresses a key operational question regarding the substation's power status during construction work. During demolition work, the entire substation will be de-energized. However, due to distribution system limitations, the west half of the yard will need to be re-energized while new foundations are being poured and conduit installed, while the east half of the yard (where most work will occur) will remain de-energized throughout the contractor's work period. EWEB will provide safety watch staff to ensure proper clearances are maintained.

The addendum constitutes a material change to the bid and must be acknowledged by bidders either through signature and return of the addendum or by circling the addendum number on the bid form. The closing date and time for the bid remain unchanged from the original solicitation.

View the file

Other files

File Type Posted
Notice of Intent to Award-all bidders~5.pdf PDF
Addendum 4~13.pdf PDF
25-015-PW ITB rev 1-30-25.pdf PDF
RFP_Attachment_F_Sample_Contract~2.pdf PDF
Addendum 3~13.pdf PDF
Addendum 5~6.pdf PDF
25-015-PW Danebo Foundation Construction.pdf PDF
Addendum 2~18.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev 4-21-20

January 24, 2025

ADDENDUM # 1

Danebo Substation Foundation Construction

ITB #25-015-PW

This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.

QUESTION & ANSWER

1. Will the Danebo substation be de-energized for this project?

During the demo work the station will be de-energized. However, due to EWEB distribution system limitations the west half of the yard will be returned to service while the new foundations are being poured and conduit installed. The east half of the yard (where the bulk of the work is) will be de-energized for the duration of the contractor’s work. EWEB will be providing safety watch staff to ensure clearances are met.

CLOSING DATE AND TIME

Remains unchanged.

This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR

BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.

Addendum prepared by:

Sandra Hahn, Purchasing Contact

The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.

Company Name: ________________________________

Signature: ______________________________________

Date __________________________

End of Addendum