Addendum #1~5.pdf
PDF 164 KB Posted
- Attached to
- EWEB BID 25-015-PW DANEBO CONSTRUCTION
- Solicitation number
- S-P00140-00012623
- Issued by
- Lane County, Oregon
About this file
This is Addendum #1 for EWEB (Eugene Water & Electric Board) Bid #25-015-PW for the Danebo Substation Foundation Construction project in Lane County, Oregon. The addendum addresses a key operational question regarding the substation's power status during construction work. During demolition work, the entire substation will be de-energized. However, due to distribution system limitations, the west half of the yard will need to be re-energized while new foundations are being poured and conduit installed, while the east half of the yard (where most work will occur) will remain de-energized throughout the contractor's work period. EWEB will provide safety watch staff to ensure proper clearances are maintained.
The addendum constitutes a material change to the bid and must be acknowledged by bidders either through signature and return of the addendum or by circling the addendum number on the bid form. The closing date and time for the bid remain unchanged from the original solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice of Intent to Award-all bidders~5.pdf | ||
| Addendum 4~13.pdf | ||
| 25-015-PW ITB rev 1-30-25.pdf | ||
| RFP_Attachment_F_Sample_Contract~2.pdf | ||
| Addendum 3~13.pdf | ||
| Addendum 5~6.pdf | ||
| 25-015-PW Danebo Foundation Construction.pdf | ||
| Addendum 2~18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 4-21-20
January 24, 2025
ADDENDUM # 1
Danebo Substation Foundation Construction
ITB #25-015-PW
This addendum modifies the bidding document(s) for work only to the extent indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force. This addendum shall be added as a part of the original bidding document and shall become part of the work required.
QUESTION & ANSWER
1. Will the Danebo substation be de-energized for this project?
During the demo work the station will be de-energized. However, due to EWEB distribution system limitations the west half of the yard will be returned to service while the new foundations are being poured and conduit installed. The east half of the yard (where the bulk of the work is) will be de-energized for the duration of the contractor’s work. EWEB will be providing safety watch staff to ensure clearances are met.
CLOSING DATE AND TIME
Remains unchanged.
This addendum constitutes a MATERIAL CHANGE to the bid. ITS RECEIPT BY THE BIDDER IS TO BE ACKNOWLEDGED BY A SIGNATURE AND RETURNING A COPY OF THE ADDENDUM WITH ITS RESPONSE OR
BY CIRCLING THE ADDENDUM NUMBER IN THE APPROPRIATE AREA ON THE BID FORM.
Addendum prepared by:
Sandra Hahn, Purchasing Contact
The undersigned hereby acknowledges receipt of this Addendum and agrees to be bound by the conditions therein.
Company Name: ________________________________
Signature: ______________________________________
Date __________________________
End of Addendum
File details come from the government source that posted it. Updated .