Addendum 1 to IFB FR-2026-02.pdf

PDF 235 KB Posted

Attached to
Arc Flash Coordination Study
Solicitation number
2138244
Issued by
Genesee County, New York

About this file

This Addendum #1 to Invitation for Bid (IFB) FR-2026-02 is issued by the New York Department of Corrections and Community Supervision for an Arc Flash/Coordination Study at Franklin Correctional Facility. The addendum addresses fifteen questions and answers submitted by potential bidders regarding the scope and execution of the arc flash and protective device coordination study. Key project details include that the last arc flash study was completed in June 2017, the facility comprises 16 identical dormitory buildings, and a comprehensive facility map and equipment list will be provided to bidders during on-site work. Proposers must submit bids by September 30, 2026, and all on-site work requires 48 hours' notice for any new employees, with background checks processed in advance and security escorts provided throughout the facility. The consultant is responsible for providing qualified electricians to open all energized electrical equipment during the site survey, and thermal imaging is required on all equipment. Notably, photographs of Building #20 switchgear located outside the fence are prohibited, and one-line diagrams will not be distributed to potential bidders prior to award.

The study must comply with the 2024 NFPA 70E standard and IEEE 1584, with previous arc flash studies, protective device coordination studies, short-circuit studies, and electronic single-line diagrams available for review by the successful bidder. While the Government will provide access to previous analysis testing reports and existing power system models, editable or native model files are not available. A Service-Disabled Veteran-Owned Business (SDVOB) contracting goal of 6.00% applies to this procurement; Minority Business Enterprise (MBE), Women Business Enterprise (WBE), and Disadvantaged Business Enterprise (DBE) goals are each 0.00%. No business has been awarded an identical or substantially similar contract within the past five years. This addendum must be signed and returned with the bid submission, and applicants should monitor the New York State Contract Reporter website for any additional updates or information.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KATHY HOCHUL

Governor

DANIEL F. MARTUSCELLO III

Commissioner

Addendum #1 to IFB FR-2026-01

Addendum #1

September 14, 2026 IFB #FR-2026-02 – Arc Flash / Coordination Study

QUESTIONS & ANSWERS

IFB FR-2026-02

ARC FLASH / COORDINATION STUDY

1. When was the last Arc Flash done?

Answer: June 2017

2. How many dorms do you have?

Answer: 16 identical dorms

3. Can we have a copy of the facility map?

Answer: No, but one will be provided when you are on site.

4. Can we have a list of all buildings and equipment to be checked in each building?

Answer: Yes, see Addendum # 2.

5. What is the process for getting in and out of the facility?

Answer: Background checks will be processed ahead of time. A security escort will be provided on site. Please provide 48 hours’ notice if any new employee is coming to work at the facility.

6. Do you want thermal imaging on everything?

Answer: Yes

7. Can we take pictures of the Building #20 switchgear that is located outside of the fence?

Answer: No.

8. Can you send a picture of the one-line diagram to potential bidders?

9. Can multiple utility sources, transformers, or generators operate in parallel?

Answer: When doing a routine generator test the switch gear will parallel with grid power before it takes the grid offline for no power disruption. That is the only thing that parallels.

10. Have any electrical equipment or loads been added or modified recently?

11. Are the electrical one-line diagrams up to date?

Answer: Yes.

12. Are there any planned future changes or additions to the electrical system?

Addendum #1 to IFB FR-2026-01

13. Will the Government provide existing SKM or other power system models for the facility?

Answer: Yes, we can show you previous analysis testing reports done here in the past.

14. If available, will the editable/native model files be provided to the awarded consultant?

Answer: We do not have them.

15. Are previous Arc Flash Studies, Protective Device Coordination Studies, Short-Circuit Studies, and electronic single-line diagrams available for review?

Answer: Yes

16. Will qualified Government personnel/electricians be responsible for opening all energized electrical equipment, including switchgear, switchboards, panelboards, MCCs, ATSs, transformers, and other equipment, during the site survey? Or is the consultant expected to provide qualified electricians to perform this work?

Answer: The consultant will provide qualified electricians to perform this work.

All other terms and conditions remain the same.

IMPORTANT NOTE: This addendum must be signed and returned with bid.

Signature

Print Name and Title

Date

Applicants should monitor the following web site for posted updates or information:

NYS Contract Reporter: http://www.nyscr.ny.gov http://www.nyscr.ny.gov/

File details come from the government source that posted it. Updated .