This Addendum 1 document pertains to a State of Michigan design and construction project for the Hartwick Pines State Park Grayling Sign Shop located at 4216 Ranger Road, Grayling, Michigan 49738, managed by the Department of Technology, Management & Budget in collaboration with OHM Advisors as the design consultant and Intertek as the prime Professional Services Consultant. The project involves renovation and expansion of an existing sign shop facility, including structural modifications, foundation and framing work, roof replacement with standing seam metal roofing, mechanical and electrical system upgrades, and associated site work. The addendum, issued February 10, 2025, reissues all project bid drawings for the project number 7461-24-0020 with a For Bid status dated February 10, 2025. The drawing set comprises comprehensive architectural, structural, civil, mechanical, and electrical plans prepared by OHM Advisors' interdisciplinary team, including specifications for demolition, new construction, and systems installation. The project includes scope items such as concrete foundations and slabs, masonry and wood framing, new pre-engineered roof trusses, MEP systems including HVAC with energy recovery ventilation and electric heating, lighting, and power distribution throughout the facility.
The bid drawings establish construction specifications and technical requirements for contractors, including structural loads (40 psf snow load, 115 mph wind speed, seismic design category D), material standards (4,000 psi concrete, Grade 60 reinforcing steel, pressure-treated lumber), and special inspection requirements for soil, foundations, concrete, masonry, and wood construction in accordance with the 2015 Michigan Building Code. The project incorporates life safety provisions for occupancy categories with calculated occupant loads ranging from 2 to 21 persons across various functional spaces including the main sign shop, storage, break room, and office areas. All mechanical and electrical systems are designed for integration with existing building infrastructure, including coordination with existing compressed air lines, refrigerant linesets, and electrical distribution. The design documentation includes detailed specifications for ductwork, HVAC equipment scheduling, electrical panel configurations, fire alarm and safety systems, and accessibility compliance with ADA standards. This comprehensive bid package establishes all technical and performance requirements necessary for competitive bidding and construction execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION MAP
PROJECT LOCATION
HARTWICK PINES STATE PARK
GRAYLING SIGN SHOP
ISSUED: 2025/02/10
FOR BID
OHM PROJECT NO. 7461-24-0020
4216 Ranger Rd, Grayling, MI 49738
DRAWING INDEX
N U
M B
E R
SHEET NAME F
O
R B
ID
/0
/1
GENERAL
G-000 COVER & DRAWING INDEX •
CIVIL
C-110 EXISTING CONDITIONS •
C-120 REMOVAL PLAN •
C-130 SITE LAYOUT PLAN •
C-170 SITE GRADING PLAN •
C-501 CIVIL DETAILS •
STRUCTURAL
S-001 STRUCTURAL SYMBOLS AND SPECIAL INSPECTIONS •
S-002 STRUCTURAL NOTES & LOADS •
S-101 FOUNDATION AND FRAMING PLANS •
S-501 STRUCTURAL DETAILS •
ARCHITECTURAL
A-001 ARCHITECTURAL NOTES & SYMBOLS •
AD101 DEMOLITION PLAN •
A-101 FIRST FLOOR PLAN •
A-201 ELEVATIONS & SECTIONS •
A-301 SECTIONS, DETAILS •
A-601 DOOR SCHEDULE & TYPICAL DETAILS •
MECHANICAL
M-001 MECHANICAL NOTES AND SYMBOLS •
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN •
M-101 FIRST FLOOR MECHANICAL PLAN •
ELECTRICAL
E-001 ELECTRICAL NOTES AND SYMBOLS •
EDP101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN •
EP101 ELECTRICAL POWER/LIGHTING PLAN •
E-501 ELECTRICAL ONE LINES •
E-601 ELECTRICAL SCHEDULES •
MICHAEL SIGNORELLO
STATE OF MICHIGAN - HARTWICK PINES STATE PARK
4216 RANGER RD
GRAYLING, MI 49738
989-348-5293
SIGNORELLOM@MICHIGAN.GOV
OWNER
I Certify That The Structural Plans Were Prepared Under My Direct Supervision
I Certify That The Architectural Plans Were Prepared Under My Direct Supervision
I Certify That The Electrical Plans Were Prepared Under My Direct Supervision
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
CONSULTANTS FOR INTERTEK
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
CO
PY
RI
GH
T
O
HM
A
LL
D
RA
W
IN
GS
A
ND
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
GI
NA
L A
ND
U
NP
UB
LIS
HE
D W
OR
K
OF
O
HM
A
ND
T
HE
S
AM
E
MA
Y
NO
T
BE
D
UP
LIC
AT
ED
, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
OR
W
RI
TT
EN
C
ON
SE
NT
O F
OH
M
IS
SU
ED
F
OR
PR
OJ
EC
T
NU
MB
ER
PM
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
1/1 5/2
6 2
:21 :54
P M
Au tod es k D oc s:/
/74
-2 4-
H
PS
P
- G ra yli ng S ign S ho p/7
0_
SA
_H
SP
S_ Gr ay lin gS ign
Sh op
_2
3_
CE
N.
rvt
G-000
CO
VE
R
DR
AW
IN
G
IN
DE
X
R an ge r R d, Gr ay lin g, MI
HA
RT
W
IC
K
PI
NE
S
ST
AT
E
PA
RK
GR
AY
LIN
G
SI
GN
S
HO
P
FO
R
BI
D
-2 4-
ST
/02
/10
1/2
.H
JD
DT
MB
F ile N o.
STRUCTURAL ENGINEER ARCHITECT ELECTRICAL ENGINEER
I Certify That The Civil Plans Were Prepared Under My Direct Supervision
CIVIL ENGINEER
I Certify That The Mechanical Plans Were Prepared Under My Direct Supervision
MECHANICAL ENGINEER
HEATHER J. DeCORTE, R.A., DESIGN AND CONSTRUCTION DIVISION - PROJECT DIRECTOR
STATE OF MICHIGAN - DEPARTMENT OF TECHNOLOGY, MANAGMENT & BUDGET
STATE FACILITIES ADMINISTRATION - DESIGN & CONSTRUCTION DIVISION
517.243.7248 dekorteh@michigan.gov
OWNER CONTACT INFORMATION
SCOTT COOK
STATE OF MICHIGAN - DEPARTMENT OF NATURAL RESOURCES
CookS10@michigan.gov
DTMB FILE No. 751/20042.HJD
INTERTEK - BUILDING SCIENCE SOLUTION - BUILDING & CONSTRUCTION
CHRISTOPHER B. COGAN, CDT, SENIOR MANAGER
45000 HELM ST., SUITE 200
PLYMOUTH, MI 48170
248.228.7917 christopher.cogan@intertek.com
PRIME PSC
OHM ADVISORS
SEAN TABACSKO
201 E ELLSWORTH ST. SUITE 100
MIDLAND, MICHIGAN 48640
(989) 393-1717 Sean.Tabacsko@ohm-advisors.com
CONSULTANT TO INTERTEK
Eric Spitler, P.E.
Senior Project Engineer, Site Design - OHM Advisors Eric.Spitler@ohm-advisors.com
Alice Roache, P.E.
Project Engineer, Transportation (Structural) - OHM Advisors Alice.Roache@ohm-advisors.com
Lily Auguston, P.E.
Project Engineer MEP - OHM Advisors Lily.Auguston@ohm-advisors.com
Theodore M. Cogswell, P.E.
Engineer MEP - OHM Advisors Ted.Cogswell@ohm-advisors.com
Harvey Schwager, R.A., NCARB Principal, Architecture - OHM Advisors Harvey.Schwager@ohm-advisors.com
ISSUED: 2025/02/25
/0 2/
ADDENDUM 1, ALL DRAWINGS REISSUED: 2026/03/09
DeKorteH Polygon
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
DR
AW
IN
G
PA
TH
P
:\7
1_
\74
_H ar tw ick
Pi ne sS tat eP ar k\D ra wi ng s\S ite
\S he ets \24
SU
R.
dw g
F eb ru ar y 1 0, 3:0
0 P M
CO
PY
RI
G
HT
O
HM
. A
LL
D
RA
W
IN
G S
AN
D
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W O
RK
O
F O
HM
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
RE
VI
SI
ON
DA
TE
DE
SC
RI
PT
IO
N
PM
PR
OJ
EC
T
NU
MB
ER
IS
SU
ED
F
OR
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
H
AR
TW
IC
K
PI
N
ES
S
TA
TE
P
AR
K
G R
AY
LI
N G
S
IG
N S
H O
P
R an ge r R d.
Gr ay lin g, MI
EX
IS
TI
NG
C
ON
DI
TI
ON
S
C-110
-2 4-
XX
/02
/10
FO
R
BI
D
1/2
.G
AC
DT
MB
F ile
N o.
A cc ou nti ng T em p
NOTES:
Know what'sbelow.
before you dig.Call
R feetGRAPHIC SCALE: FULL feetHALF
60402010
LEGEND - EXISTING
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
ST
1/2
.H
JD
/0 2/
Know what'sbelow.
before you dig.Call
R
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
DR
AW
IN
G
PA
TH
P
:\7
1_
\74
_H ar tw ick
Pi ne sS tat eP ar k\D ra wi ng s\S ite
\S he ets \24
RE
M.
dw g
F eb ru ar y 1 0, 3:0
0 P M
CO
PY
RI
O
HM
. A
LL
D
RA
W
IN
G S
AN
D
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W O
RK
O
F O
HM
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
RE
VI
SI
ON
DA
TE
DE
SC
RI
PT
IO
N
PM
PR
OJ
EC
T
NU
MB
ER
IS
SU
ED
F
OR
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
H
AR
TW
IC
K
PI
N
ES
S
TA
TE
P
AR
K
G R
AY
LI
N G
S
IG
N S
H O
P
R an ge r R d.
Gr ay lin g, MI
RE
MO
VA
L P
LA
N
C-120
-2 4-
XX
/02
/10
FO
R
BI
D
1/2
.G
AC
DT
MB
F ile ou nti ng T em p feetGRAPHIC SCALE: FULL feetHALF
60402010
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
ST
1/2
.H
JD
/0
R
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
DR
AW
IN
G
PA
TH
P
:\7
1_
\74
_H ar tw ick
Pi ne sS tat eP ar k\D ra wi ng s\S ite
\S he ets \24
ST
E.
dw g
F eb ru ar y 1 0, 3:0
1 P M
CO
PY
RI
O
HM
. A
LL
D
RA
W
IN
G S
AN
D
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W O
RK
O
F O
HM
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
RE
VI
SI
ON
DA
TE
DE
SC
RI
PT
IO
N
PM
PR
OJ
EC
T
NU
MB
ER
IS
SU
ED
F
OR
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
H
AR
TW
IC
K
PI
N
ES
S
TA
TE
P
AR
K
G R
AY
LI
N G
S
IG
N S
H O
P
R an ge r R d.
Gr ay lin g, MI
SI
TE
LA
YO
UT
P
LA
N
C-130
-2 4-
XX
/02
/10
FO
R
BI
D
1/2
.G
AC
DT
MB
F ile ou nti ng T em p feetGRAPHIC SCALE: FULL feetHALF
60402010
LEGEND
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
ST
1/2
.H
JD
/0
R
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
DR
AW
IN
G
PA
TH
P
:\7
1_
\74
_H ar tw ick
Pi ne sS tat eP ar k\D ra wi ng s\S ite
\S he ets \24
GR
D.
dw g
F eb ru ar y 1 0, 3:0
1 P M
CO
PY
RI
O
HM
. A
LL
D
RA
W
IN
G S
AN
D
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W O
RK
O
F O
HM
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
RE
VI
SI
ON
DA
TE
DE
SC
RI
PT
IO
N
PM
PR
OJ
EC
T
NU
MB
ER
IS
SU
ED
F
OR
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
H
AR
TW
IC
K
PI
N
ES
S
TA
TE
P
AR
K
G R
AY
LI
N G
S
IG
N S
H O
P
R an ge r R d.
Gr ay lin g, MI
SI
TE
G
RA
DI
NG
P
LA
N
C-170
-2 4-
XX
/02
/10
FO
R
BI
D
1/2
.G
AC
DT
MB
F ile ou nti ng T em p feetGRAPHIC SCALE: FULL feetHALF
60402010
LEGEND
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
ST
1/2
.H
JD
/0
PRELIM
INARY - N
OT
FOR CONSTRUCTIO
N
CONCRETE PAVEMENT (HEAVY DUTY)
DR
AW
IN
G
PA
TH
P
:\7
1_
\74
_H ar tw ick
Pi ne sS tat eP ar k\D ra wi ng s\S ite
\S he ets \24
DE
T.
dw g
F eb ru ar y 1 0, 3:0
1 P M
CO
PY
RI
O
HM
. A
LL
D
RA
W
IN
G S
AN
D
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
G
IN
AL
A
ND
U
NP
UB
LI
SH
ED
W O
RK
O
F O
HM
A
ND
T
HE
S
AM
E
M
AY
N O
T
BE
D
UP
LI
CA
TE
D, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
O
R W
RI
TT
EN
C
O
NS
EN
T
O F
O
HM
RE
VI
SI
ON
DA
TE
DE
SC
RI
PT
IO
N
PM
PR
OJ
EC
T
NU
MB
ER
IS
SU
ED
F
OR
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
H
AR
TW
IC
K
PI
N
ES
S
TA
TE
P
AR
K
G R
AY
LI
N G
S
IG
N S
H O
P
R an ge r R d.
Gr ay lin g, MI
CI
VI
L D
ET
AI
LS
C-501
-2 4-
XX
/02
/10
FO
R
BI
D
1/2
.G
AC
DT
MB
F ile
N o.
Ac co un tin g T em p
CONCRETE PAVEMENT (LIGHT DUTY)
EXISTING GRADE,
TYP.
STAKING, TYP. (4'
HT., ±8' O.C.)
4' HT. SAFETY
FENCING
(ORANGE SNOW
FENCE, CHAIN
LINK, OR WOOD)
TREE
PROTECTION
FENCING TO BE
LOCATED
OUTSIDE OF TREE
DRIP LINE
EXISTING TREE,
TYP.
4' HT. TREE PROTECTION FENCING, TYP.
WHERE PROPOSED WALKS, CURBS,
OR BUILDINGS ENCROACH IN THE
DRIP LINES OF TREES, INSTALL
FENCING 3' BACK OF ENCROACHMENT
(OTHERWISE, ENCIRCLE ENTIRE DRIP
LINE)
NOTES:
1. ALL TREE PROTECTION SHALL BE INSTALLED PRIOR TO
CONSTRUCTION ACTIVITIES. INSPECTION SHALL BE AT THE
DISCRETION OF THE ENGINEER.
2. NO CONSTRUCTION ACTIVITY SHALL TAKE PLACE WITHIN
THE DRIP LINE OF ANY TREE TO REMAIN (GRADING,
DIGGING, MATERIAL STORAGE, ETC.).
3. ANY REQUIRED SEDIMENT AND EROSION CONTROL
MEASURES SHALL BE LOCATED OUTSIDE THE TREE
PROTECTION FENCING.
4. CONTRACTOR SHALL PROTECT EXISTING TREES
IDENTIFIED TO REMAIN AND BE RESPONSIBLE FOR
DAMAGE FROM CONSTRUCTION ACTIVITIES.
5. DAMAGE TO EXISTING TREES TO REMAIN SHALL BE
REPORTED TO THE ENGINEER IMMEDIATELY.
3' MIN.
2' T
O
TY
P.
TREE PROTECTION DETAIL
RIVER ROCK
LANDSCAPE
(FILTER) FABRIC
COMPACTED
SUBGRADE
STONE BED
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
ST
1/2
.H
JD
/0
CLCL
X-XXX
SIM
1 / X-XXX
X-XXX
SIM
(100'-0") (100'-8")
ROOM NAME
150 SF
INDICATES EXISTING
SHEET KEYNOTE INDICATOR
REFERENCE KEYNOTE INDICATOR
REVISION INDICATOR
ROOM IDENTIFIER
NORTH INDICATOR
(E) WF10
COLUMN INDICATOR
PIER INDICATOR
FOOTING INDICATOR
TOP OF FOOTING
ELEVATION
(E )W
F1
SPREAD FOOTING WALL FOOTING
F S
FOOTING STEP
LOCATION
FOOTING INDICATOR
WM1
(E) (E)
MC1
WALL COLUMN
(REFER TO SCHEDULES)
C1
(E) P1
EXISTING
EXISTING
HEADER INDICATOR SHEAR WALL INDICATOR
JACKS AND KINGS AT HEADERS CONNECTOR SYMBOL
WOOD TYPE
(S=SPF, M=MSR, L=LVL)
NOMINAL DEPTH
# OF NOMINAL
2X PLIES FLUSH-FRAMED
(WHERE APPLICABLE)
(EX. H (3)12-S-F)
(SEE SCHEDULE)
M6PSW1 M6PSWAOR
H (_) __-[S or M or L]-F
(WHERE
APPLICABLE)
H = HURRICANE
C = CONNECTOR
HD = HOLD DOWN
HD1 (T
YP)
0 / 0
# JACKS # KINGS
BEAM
INDICATES EXISTING
STRUCTURAL SYMBOLS LEGEND
SYSTEM SPECIFIC SYMBOLS
ROOM NUMBER
ROOM AREA
PLAN NORTH
TRUE NORTH
N
SLAB STEP LOCATION WITH
ELEVATIONS
SLAB STEP LOCATION
CHANGE IN SLAB SLOPE
(UP OR DOWN)
CHANGE IN SLAB THICKNESS
APPROXIMATE LOCATION OF
UTILITY PIPE PENETRATION
THROUGH FOUNDATION WALL
APPROXIMATE LOCATION OF
DRAIN TILE
SPAN DIRECTION OF ELEMENT
EXTENT OF ELEMENT
CONTINUOUS EXTENT OF
ELEMENT
WELDED WIRE FABRIC
REINFORCING
DETAIL INDICATOR
SECTION DETAIL
INDICATOR
ALTERNATE DETAIL /
SECTION DETAIL
INDICATOR
WALL SECTION INDICATION
BUILDING SECTION
INDICATOR
EXTERIOR ELEVATION
INDICATOR
INTERIOR ELEVATION
INDICATOR
?00 00 00.A
(E)
XX
CENTER LINE
ELEVATION MARK
MATCHLINE
EXISTING GRID LINE
NEW GRID LINE
NEW BUILDING LINE
INDICATOR OF APPROXIMATE
LOCATION OF SOIL BORING
INDICATOR OF APPROXIMATE
LOCATION OF MONUMENT
INDICATOR OF FINISH ELEVATION
1BL1
NEW CONSTRUCTION
NEW MASONRY CONSTRUCTION
EXISTING TO REMAIN
EXISTING TO BE REMOVED
BOLTED
BOTTOM FLANGE BRACING
CANTILEVER
CANTILEVER MOMENT
COLLECTOR
DOUBLE SHEAR TAB
FULL DEPTH WELD
MOMENT
MOMENT FRAME
SPLICE
TOP FLANGE WELD
OR
X-XXX
SIM
X-XXX
SIM
X-XXX
SIM
MATCHLINE
SEE 1 / A101
LEVEL
XXX' - XX"
e1
X-XXX
SIM
X-XXX
1 SIM
SI
M
1 SIM
SI
M
WOOD FRAMING SYSTEM FOUNDATION SYSTEM
INDICATOR LINES & POINTS
NOTES & ANNOTATIONS
BUILDING ELEMENTS
CONNECTION TYPESVIEW REFERENCES
MASONRY SYSTEM
DO
1. SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE 2015 MICHIGAN BUILDING CODE (MBC) CHAPTER 17 AND AS MODIFIED HEREIN.
2. DESIGNATIONS:
SI SPECIAL INSPECTOR QUALIFIED WITH DEMONSTRATED COMPETENCE DOCUMENTED BY CERTIFICATIONS FROM RECOGNIZED AGENCIES SUCH AS AWS, ACI, INTERNATIONAL CODE COUNCIL (IBC), MASONRY INSTITUTE OF MAY BE A FIRM WITH MULTIPLE SPECIALISTS AND A PROJECT MANAGER PROVIDING REPORTS.
TA TESTING AGENCY QUALIFIED TO TEST AND INSPECT MATERIALS AND ASSEMBLIES TESTING.
GE GEOTECHNICAL ENGINEER WHO PROVIDED THE ORIGINAL PROJECT GEOTECHNICAL SOILS INVESTIGATION REPORT.
SE SPECIALTY ENGINEER RESPONSIBLE FOR DESIGNING ASSEMBLIES SUCH AS PRECAST CONCRETE, STEEL JOISTS, COLD FORMED FRAMING ASSEMBLIES, ETC. SPECIALTY ENGINEER SHALL PROVIDE OBSERVATION OF FABRICATED AND INSTALLED ITEMS OF THEIR DESIGN IN ADDITION TO THE SPECIAL INSPECTION.
3. TA, GE AND SE SHALL SUBMIT RECORDS OF THE INSPECTION RESULTS TO THE SI. THE SI SHALL COMPILE AND SUBMIT INSPECTION RECORDS TO THE ARCHITECT/ENGINEER AND BUILDING OFFICIAL RECORDS SHALL INCLUDE STATEMENTS OF TESTS, WHETHER INSTALLED/FABRICATED ITEM COMPLIES WITH CONTRACT DOCUMENTS, REMEDIAL WORK PERFORMED, RETESTS.
4. SI SHALL PROVIDE A DAILY REPORT OF ANY DISCREPANCIES FROM THE CONTRACT DOCUMENTS FOUND ON THE SAME DAY OF THE INSPECTION TO THE ENGINEER OF RECORD. FORMAL REPORTS OF COMPLIANCE CAN FOLLOW BY A MAXIMUM OF 2 WEEKS. SI SHALL PROVIDE AND SIGN FINAL REPORT WITH A SUMMARY OF ALL TESTS PERFORMED AND RESULTS TO THE ENGINEER OF RECORD AND
BUILDING OFFICIAL, IN ACCORDANCE WITH SECTION 1704.2.4.
5. SI, TA & GE SHALL BE ENGAGED BY THE OWNER IN COMPLIANCE WITH THE MICHIGAN BUILDING CODE.
6. WHERE FABRICATION OF STRUCTURAL, LOAD-BEARING OR LATERAL LOAD-RESISTING MEMBERS OR ASSEMBLIES IS BEING CONDUCTED ON THE PREMISES OF A FABRICATOR’S SHOP, SPECIAL INSPECTIONS OF THE FABRICATED ITEMS SHALL BE PERFORMED DURING FABRICATION. SPECIAL INSPECTIONS DURING FABRICATION ARE NOT REQUIRED WHERE THE FABRICATOR MAINTAINS APPROVED DETAILED FABRICATION AND QUALITY CONTROL PROCEDURES THAT PROVIDE A BASIS FOR CONTROL OF THE WORKMANSHIP AND THE FABRICATOR'S ABILITY TO CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND THE GOVERNING BUILDING CODE. APPROVAL SHALL BE BASED UPON REVIEW OF FABRICATION AND QUALITY CONTROL PROCEDURES AND PERIODIC INSPECTION OF FABRICATION PRACTICES BY THE
BUILDING.
7. REFER TO SPECIAL INSPECTION SCHEDULES AND GENERAL STRUCTURAL NOTES FOR ADDITIONAL QUALITY CONTROL TESTING AND INSPECTIONS.
STATEMENT OF SPECIAL INSPECTIONS
CONTINUOUS
INSPECTION TASK
3. VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN
BEARING CAPACITY.
INSPECTION TYPE REFERENCED
STANDARD
MBC
REFERENCE
RESPONSIBLE
AGENTPERIODIC
GEOTECHNICAL REPORT
2. VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER MATERIAL.
1. PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS.
5. VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES DURING PLACEMENT
AND COMPACTION OF COMPACTED FILL.
4. PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY THAT SITE HAS
BEEN PREPARED PROPERLY.
GEOTECHNICAL REPORT
GEOTECHNICAL REPORT
GEOTECHNICAL REPORT
GEOTECHNICAL REPORT
X
X
X
X
X
1705.6
1705.6
1705.6
1705.6
1705.6
SI/GE
SI/GE
SI/GE/TA
SI/GE/TA
SI/GE/TA
SPECIAL INSPECTION REQUIREMENTS - SOIL AND FOUNDATIONS
SPECIFICATION
CONTINUOUS
INSPECTION TASK
1. INSPECT REINFORCEMENT AND VERIFY PLACEMENT.
INSPECTION TYPE REFERENCED
STANDARD
MBC
REFERENCE
RESPONSIBLE
AGENTPERIODIC
ACI 318: CH 20, 25.2, 25.3,
26.6.1-26.6.3
4. INSPECT ANCHORS AND EMBEDMENTS CAST IN CONCRETE.
2. INSPECT FORMWORK FOR SHAPE, LOCATION, AND DIMENSIONS OF THE CONCRETE MEMBER
BEING FORMED.
3. INSPECT FORMWORK FOR PROPER PREPARATION AND CLEANLINESS PRIOR TO CONCRETE
PLACEMENT.
5. VERIFY USE OF REQUIRED DESIGN MIX.
6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM
SLUMP AND AIR CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
7. INSPECT CONCRETE PLACEMENT FOR PROPER PLACEMENT TECHNIQUES.
8. VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES.
9. VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO REMOVAL OF SHORES AND FORMS FROM
BEAMS AND STRUCTURAL SLABS.
10. INSPECT ANCHORS POST-INSTALLED IN HARDENED MEMBERS.
A. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.
B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED IN 10. A.
X
X
X
X
X
X
X
X
X
X
X
ACI 318: 26.11.1.2(b)
ACI 318: 26.5.2
ACI 318: 17.8.2
ACI 318: CH 19, 26.4.3, 26.4.4
ASTM C172
ASTM C31
ACI 318: 26.4, 26.12
ACI 318: 26.5
ACI 318: 26.5.3-26.5.5
ACI 318: CH 26.11.2
ACI 318: 17.8.2.4
ACI 318: 17.8.2
SI
SI/SE/TA
SI/TA
SI/TA
SI/TA
SI/TA
SI
SI
SI/SE/TA
SI/TA
SPECIAL INSPECTION REQUIREMENTS - CONCRETE CONSTRUCTION
SPECIFICATION
CONTINUOUS
INSPECTION TASK
INSPECTION TYPE
RESPONSIBLE
AGENTPERIODIC
2. AS MASONRY CONSTRUCTION BEGINS, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
A. PROPORTIONS OF SITE-PREPARED MORTAR.
B. CONSTRUCTION OF MORTAR JOINTS.
C. LOCATION AND CONDITION OF REINFORCEMENT, CONNECTORS, REINFORCEMENT POSITIONERS
AND CONTROL JOINTS.
3. PRIOR TO GROUTING, VERIFY THAT THE FOLLOWING ARE IN COMPLIANCE:
A. GROUT SPACE.
B. GRADE, TYPE, SIZE AND CONDITION OF REINFORCEMENT AND ANCHOR RODS.
C. PLACEMENT OF REINFORCEMENT, CONNECTORS, AND REINFORCEMENT POSITIONERS.
D. PROPORTIONS OF SITE-PREPARED GROUT.
E. CONSTRUCTION OF MORTAR JOINTS.
MINIMUM PRECONSTRUCTION VERIFICATION
VERIFICATION OF f'm IN ACCORDANCE WITH SPECIFICATION ARTICLE 1.4 B PRIOR TO CONSTRUCTION, EXCEPT WHERE SPECIFICALLY EXEMPTED BY THIS CODE.
MINIMUM SPECIAL INSPECTION
REFERENCE CRITERIA
TMS 402
ACI 530
ASCE 5
TMS 602
ACI 530.1
ASCE 6
1. VERIFY COMPLIANCE WITH THE APPROVED SUBMITTALS.
4. VERIFY DURING CONSTRUCTION:
A. SIZE, LOCATION AND ENDING PATTERN OF STRUCTURAL ELEMENTS AND CONTROL JOINT LAYOUT.
B. TYPE, SIZE, AND LOCATION OF ANCHORS, INCLUDING OTHER DETAILS OF ANCHORAGE OF
MASONRY TO STRUCTURAL MEMBERS, FRAMES, OR OTHER CONSTRUCTION.
D. PREPARATION, CONSTRUCTION, AND PROTECTION OF MASONRY DURING
COLD WEATHER (TEMPERATURE BELOW 40°F) OR HOT WEATHER (TEMPERATURE ABOVE 90°F).
MBC REFERENCE SECTION 1705.4 AND TABLE 3.1.2 TMS 402/ACI1530/ASCE 5.
SIX
X
X
X
X
X
X
X
X
X
X
X
SEC 6.1
SEC 6.1, 6.2.1,
6.2.2, 6.2.7
SEC 1.2.1(e), 6.1.4.3, 6.2.1
SI
SI/TA
SI/TA
ART 1.5
ART 2.1, 2.6A
ART 3.2B, 3.3B
ART 3.2A, 3.4
ART 3.2D, 3.2F
ART 2.4, 3.2A,
3.2E, 3.4
ART 3.2E, 3.4
ART 2.6B
ART 3.3B
ART 3.3F
ART 3.4
ART 1.8C, 1.8D
SPECIAL INSPECTION REQUIREMENTS - MASONRY: LEVEL B QUALITY ASSURANCE
SPECIFICATION
CONTINUOUS
INSPECTION TASK
1. VERIFY FRAMING MEMBER SIZE, SPACING AND GRADE COMPLY WITH PROJECT REQUIREMENTS.
INSPECTION TYPE REFERENCED
STANDARD
IBC
REFERENCE
RESPONSIBLE
AGENTPERIODIC
2. VERIFY PREFABRICATED TRUSSES HAVE BEEN INSTALLED AT SPACINGS INDICATED AND THAT
TRUSSES HAVE NOT BEEN DAMAGED DURING INSTALLATION.
3. VERIFY THAT PERMANENT BRACING FOR TRUSSES HAS BEEN INSTALLED IN ACCORDANCE
WITH PROJECT REQUIREMENTS.
4. VERIFY THAT TRUSS ANCHORAGE COMPLIES WITH PROJECT REQUIREMENTS.
5. VERIFY THAT DIAPHRAGM AND SHEAR WALL SHEATHING THICKNESS, GRADE AND FASTENING
COMPLY WITH PROJECT REQUIREMENTS.
X
X
X
X
X
SI
SI
SI
SI
SI
SPECIAL INSPECTION REQUIREMENTS - WOOD CONSTRUCTION
SPECIFICATION
061753
061753
061753
061753
061753
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
CO
PY
RI
GH
T
O
HM
A
LL
D
RA
W
IN
GS
A
ND
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
GI
NA
L A
ND
U
NP
UB
LIS
HE
D W
OR
K
OF
O
HM
A
ND
T
HE
S
AM
E
MA
Y
NO
T
BE
D
UP
LIC
AT
ED
, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
OR
W
RI
TT
EN
C
ON
SE
NT
O F
OH
M
IS
SU
ED
F
OR
PR
OJ
EC
T
NU
MB
ER
PM
2/7 /20
:04 :42
A M
Au tod es k D oc s:/
/74
-2 4-
H
PS
P
- G ra yli ng S ign S ho p/7
0_
SA
_H
SP
S_ Gr ay lin gS ign
Sh op
_2
3_
CE
N.
rvt
S-001
ST
RU
CT
UR
AL
S
YM
BO
LS
A
ND
S
PE
CI
AL
IN
SP
EC
TI
ON
S
R an ge r R d, Gr ay lin g, MI
HA
RT
W
IC
K
PI
NE
S
ST
AT
E
PA
RK
GR
AY
LIN
G
SI
GN
S
HO
P
FO
R
BI
D
-2 4-
ST
/02
/10
1/2
.G
AG
DT
MB
F ile N o.
STRUC. ABBR.
A
& AND
@ AT
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL (ARCHITECT)
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
B
BF BOTH FACES
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BOF BOTTOM OF FOOTING
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BTWN BETWEEN
C
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
D
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIST DISTANCE
DL DEAD LOAD
E
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ENG ENGINEER
ENTR ENTRANCE
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EXP EXPANSION (EXPOSED)
EXST EXISTING
F
FD FLOOR DRAIN
FF FINISHED FLOOR
FIN FINISH / FINISHED
FT FOOT / FEET
FTG FOOTING
G
GA GAGE
GALV GALVANIZED
GB GYPSUM BOARD
GYP GYPSUM
H
HDR HEADER
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
I
IN INCH / INCHES
INSUL INSULATION
J
JST JOIST
JT JOINT
L
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
STRUC. ABBR.
LP LOW POINT
LT LEFT
M
MAX MAXIMUM
MBC MICHIGAN BUILDING CODE
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
No. NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OBC OHIO BUILDING CODE
OC ON CENTER
OH OVERHEAD
P
PCF POUNDS PER CUBIC FOOT
PL PLATE
PLMB PLUMBING
PLYWD PLYWOOD
PREFAB PREFABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHLORIDE
Q
QTY QUANTITY
R
REINF REINFORCE
REQD REQUIRED
REV REVISE / REVISION
RO ROUGH OPENING
RS ROUGH SAWN
RT RIGHT
S
SIM SIMILAR
SOG SLAB ON GRADE
SQ FT SQUARE FOOT / FEET
SQ IN SQUARE INCH / INCHES
STL STEEL
T
T&B TOP & BOTTOM
T&G TONGUE & GROOVE
TEMP TEMPERATURE / TEMPERED
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V
VERT VERTICAL
VIF VERIFY IN FIELD
W
W/ WITH
W/O WITHOUT
WD WOOD
WF WIDE FLANGE
WT WEIGHT
WWF WELDED WIRE FABRIC
Y Y
YD YARD
/02 /10
/0
SOILS AND EARTHWORK
1. SOIL INVESTIGATIONS HAVE BEEN PERFORMED FOR THIS PROJECT BY McDOWELL & ASSOCIATES, BORINGS DRILLED 11/16/24.
2. OHM UTILIZED DATA CONTAINED IN BORING LOGS TO DETERMINE DESIGN LOAD BEARING CAPACITY
AND OTHER DESIGN PARAMETERS.
3. CONTRACTOR SHALL VERIFY SOIL BEARING CAPACITY PRIOR TO CONSTRUCTION.
4. INCLUDE IN THE WORK PROVIDING ALL EQUIPMENT, MATERIAL, AND QUALIFIED LABOR NECESSARY FOR EXCAVATION, SHORING, DEWATERING SYSTEMS, BACKFILL, AND COMPACTION OF SOILS, AS
REQUIRED TO CONSTRUCT STRUCTURES TO THE LINE AND GRADE AS SHOWN ON THE PLANS.
5. FOR PROTECTION OF UNDERGROUND UTILITIES, THE CONTRACTOR SHALL TELEPHONE (800)
482-7171 NOT LATER THAN THREE BUSINESS DAYS PRIOR TO EXCAVATING IN THE VICINITY OF UTILITY LINES. ALL "MISS DIG" PARTICIPATING MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING OWNERS WHO MAY
NOT BE PART OF THE "MISS DIG" ALERT SYSTEM.
6. EXCAVATE TO ELEVATIONS AND DIMENSIONS SHOWN ON THE PLANS WITHIN A TOLERANCE OF +/-
0.10 FEET. EXCAVATE BY HAND TO FINAL GRADE FOR FOOTINGS.
7. NOTIFY THE ENGINEER FOR AN INSPECTION WHEN THE EXCAVATION HAS REACHED SUB-GRADE ELEVATION. IF UNSUITABLE BEARING MATERIALS ARE ENCOUNTERED AT SUB-GRADE ELEVATION, EXCAVATE AND REPLACE SUCH MATERIALS AS DIRECTED BY ENGINEER.
8. SATISFACTORY SOIL MATERIALS ARE DEFINED AS GRANULAR MATERIALS CLASSIFIED AS GW, GP, GM, SW, SP, SW-SM, SP-SM OR SM BY THE UNIFIED SOILS CLASSIFICATION SYSTEM, ASTM D2487.
LIMIT AMOUNT OF FINE MATERIAL PASSING NO. 200 SIEVE TO LESS THAN 5% MAXIMUM.
9. UNSATISFACTORY SOIL MATERIALS ARE DEFINED AS SOILS CLASSIFIED AS GC, SW-SC, SP-SC, SC, ML, MH, CL, CH, OL, OH, AND PT BY THE UNIFIED SOIL CLASSIFICATION SYSTEM, OR ANY ORGANIC
MATERIAL. "MARL" IS AN UNSATISFACTORY SOIL MATERIAL.
10. BACKFILL ALL STRUCTURAL WORK WITH SATISFACTORY SOIL MATERIALS AND ENGINEERED FILL AS
SHOWN ON PLANS. DO NOT BACKFILL WITH FROZEN MATERIALS. DO NOT PLACE ROCKS LARGER
THAN 3" DIAMETER IN BACKFILL.
11. COMPACT SOILS BELOW FOOTINGS T0 A MINIMUM OF 95% OF THE MAXIMUM DENSITY AS
DETERMINED BY MODIFIED PROCTOR, ASTM D1557.
12. COMPACT BACKFILL IN LAYERS TO MINIMUM 95% MAXIMUM DENSITY AS DETERMINED BY MODIFIED
PROCTOR, OR MICHIGAN CONE TEST.
1. PROVIDE MINIMUM 28-DAY CONCRETE COMPRESSIVE STRENGTH OF 4,000 PSI (f'c = 4,000 PSI).
PROVIDE NORMAL WEIGHT CONCRETE, WITH 6% ± 1.5% ENTRAINED AIR FOR EXTERIOR
APPLICATIONS , MAXIMUM W/C RATIO < 0.45, AND MAXIMUM 4" SLUMP, UNLESS SUPER-
PLASTICIZERS ARE USED. USE OF SUPER-PLASTICIZERS IS SUBJECT TO PRIOR APPROVAL BY THE ENGINEER. DO NOT PROVIDE AIR CONTENT > 3% FOR TROWEL FINISHED SLABS. DO NOT PROVIDE
AIRE CONTENT >3% FOR TROWEL FINISHED SLABS.
2. PROVIDE READY-MIX CONCRETE CONFORMING TO ASTM C-94.
3. CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 117 301, 305R, 306.1, AND 308.1, LATEST
APPLICABLE EDITION.
4. PLACE ANCHOR RODS SET IN CONCRETE TO RECEIVE STRUCTURAL STEEL WITHIN TOLERANCES SPECIFIED IN THE LATEST APPLICABLE AISC "CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS
AND BRIDGES" IN LIEU OF TOLERANCES SPECIFIED IN ACI "STANDARD SPECIFICATIONS FOR
TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS".
5. REINFORCING STEEL CONFORMING TO ASTM A-615, GRADE 60 IS REQUIRED. PLACE REINFORCING
STEEL IN CONFORMANCE WITH CRSI MANUAL OF STANDARD PRACTICE.
6. REINFORCING STEEL SHALL NOT BE WELDED.
7. POST INSTALLED ANCHORS OR REBAR SHALL BE ANCHORED INTO CONCRETE WITH DEWALT AC100+
VINYLESTER INJECTION ADHESIVE, OR AN APPROVED EQUAL. REFER TO MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLATION INSTRUCTIONS. SEE DETAILS FOR MINIMUM EMBEDMENT.
8. REINFORCING STEEL SHALL HAVE A MINIMUM CONCRETE COVER AS LISTED BELOW UNLESS
OTHERWISE NOTED.
A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED EARTH: 3"
B. CONCRETE CAST AGAINST FORMS BUT EXPOSED TO EARTH OR WEATHER
1. NO. 5 OR SMALLER 1 1/2"
2. GREATER THAN NO. 5 2"
C. SLAB ON GRADE: 2" FROM T/SLAB
CONCRETE NOTES
BAR
SIZE ALL OTHER BARS
#3 #4 #5 #6 #7 #8
28" 37" 47" 56" 81" 93"
TOP BARS* ALL OTHER BARS TOP BARS* ALL OTHER BARSTOP BARS*
f'c = 3,000 psi f'c = 4,000 psi f'c = 5,000 psi
24" 33" 40" 49" 70" 81"
22" 29" 36" 44" 63" 72"
REINFORCEMENT LAP SPLICE LENGTH+
19" 25" 31" 38" 54" 62"
22" 29" 36" 43" 63" 72"
17" 23" 28" 34" 49" 56"
* TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF FRESH CONCRETE
BELOW BAR.
+ LAP SPLICE LENGTHS SHOWN ARE CLASS B SPLICE LENGTHS FOR UNCOATED OR
GALVANIZED BARS WITH CLEAR COVER OF db OR MORE AND WITH CLEAR SPACING OF 2db OR MORE. INCREASE LAP LENGTHS BY 50% FOR EPOXY COATED OR DUAL ZINC- EPOXY COATED BARS WITH CLEAR COVER LESS THAN 3db OR WITH CLEAR SPACING LESS THAN 6db. INCREASE LAP LENGTHS BY 20% FOR EPOXY COATED OR DUAL ZINC- EPOXY COATED BARS WITH CLEAR COVER OF 3db OR MORE AND WITH CLEAR SPACING OF 6db OR MORE. SPLICE LENGTHS SHOWN ARE FOR NORMAL WEIGHT CONCRETE AND
REINFORCEMENT WITH A YIELD STRENGTH OF 60,000 PSI (60 KSI).
1. CONSTRUCT MASONRY IN ACCORDANCE WITH ACI 530.1/ASCE 6-CURRENT EDITION.
2. PROVIDE NORMAL WEIGHT CONCRETE UNIT MASONRY UNITS MANUFACTURED IN ACCORDANCE
WITH ASTM C90, F'm = 2,000 PSI.
3. GROUT VOIDS AS INDICATED ON THE DRAWINGS, WITH GROUT CONFORMING TO ASTM C476.
GROUT BLOCK CORES UNDER BEAM BEARINGS AND AT LEAST 8'' EACH SIDE OF BEARING. PROVIDE
SLUMP BETWEEN 8 AND 11 INCHES.
4. LAY UNIT MASONRY IN A RUNNING BOND PATTERN UNLESS SPECIFICALLY SHOWN OTHERWISE ON
THE PLANS. TOOLS ALL JOINTS, ALL SURFACES.
5. MORTAR SHALL BE TYPE S COMPLYING WITH ASTM C270 IS REQUIRED.
6. PROTECT MASONRY BY COVERING TOP OF WALLS WITH WATERPROOF SHEETING AT THE END OF EACH DAY. DO NOT LAY WET OR FROZEN BRICK, STONE, OR BLOCK. PROVIDE TEMPORARY HEAT WHEN AMBIENT TEMPERATURE IS BELOW 40 DEGREES FAHRENHEIT. MAINTAIN MINIMUM 50 DEGREE
TEMPERATURE FOR 48 HOURS AFTER PLACING MASONRY.
7. ALL MASONRY BELOW GRADE SHALL HAVE INTEGRAL WATER REPELLANT.
8. GROUT ALL CORES CONTAINING REBAR AND VOIDS WHERE INDICATED. ALL CORES BELOW GRADE
SHALL BE GROUTED SOLID UP TO FINISHED FLOOR ELEVATION.
9. CORES CONTAINING EXPANSION OR ADHESIVE ANCHORS SHALL BE GROUTED SOLID.
10. ALL VERTICAL REINFORCEMENT SHALL BE CONTINUOUS THROUGH BOND BEAMS. ALL HORIZONTAL
REINFORCEMENT IN BOND BEAMS SHALL BE CONTINUOUS AROUND CORNERS OR HAVE BENT BARS
OF THE SAME SIZE AND NUMBER WITH A LAP OF 48 BAR DIAMETERS (12" MINIMUM).
11. COORDINATE WALL OPENINGS AND OTHER WALL CONFIGURATIONS WITH ARCHITECTURAL,
MECHANICAL, ELECTRICAL, PLUMBING, CIVIL, AND OTHER DISCIPLINES.
12. POST INSTALLED ANCHORS OR REBAR SHALL BE ANCHORED INTO MASONRY WITH DEWALT AC100+
VINYLESTER INJECTION ADHESIVE, OR AN APPROVED EQUAL. REFER TO MANUFACTURER'S
RECOMMENDATIONS FOR INSTALLED INSTRUCTIONS. SEE DETAILS FOR MINIMUM EMBEDMENT.
13. PROVIDE HORIZONTAL JOINT REINFORCEMENT IN ALTERNATE COURSES (16" OC) USING 9 GAUGE
DURATRUSS OR EQUAL.
MASONRY NOTES
BAR SIZE MINIMUM LAP SPLICE
f'm = 1,900 psi COMMENTS
#3 #4 #5 #6 #7 #8
18" 24" 35" 66" 89" 135"
MIN 8" CMU
MIN 8" CMU
MIN 12" CMU
MIN 12" CMU
MINIMUM LAP SPLICE
f'm = 1,500 psi
18" 26" 40" 74" 101" 151"
* LAP SPLICE LENGTHS SHOWN ARE FOR UNCOATED BARS WITH
2" MINIMUM CLEAR COVER AND 2" MINIMUM CLEAR SPACING.
INCREASE LAP LENGTH BY 50% IF USING EPOXY COATED BARS.
LAP LENGTHS SHOWN ARE FOR REINFORCEMENT WITH A YIELD
STRENGTH OF 60,000 PSI (60 KSI).
WOOD FRAMING NOTES
6d 6d 8d
10d 8d
10d 12d 12d 16d 16d
BOX
DESIGNATIONSIZE MIN SIZE
2" x 0.099" DIA
COMMON
BOX
COMMON
BOX
COMMON
BOX
COMMON
BOX
COMMON
2" x 0.113" DIA 2 1/2" x 0.113" DIA 2 1/2" x 0.131" DIA
3" x 0.128" DIA 3" x 0.148" DIA
3 1/4" x 0.128" DIA 3 1/4" x 0.148" DIA 3 1/2" x 0.135" DIA 3 1/2" x 0.162" DIA
1. ALL FRAMING SHALL BE SPRUCE-PINE-FIR (S.P.F.) NO. 2 OR BETTER; Fb=875 PSI; E=1.4X10^6 PSI; Fv= 135 PSI; Fcperp =425 PSI. ALL WOOD LABELED "PT" SHALL BE S.P.F. NO.2 OR BETTER AND BE
PRESSURE TREATED FOR GROUND CONTACT. PRESSURE-TREATED (PT) WOOD SHALL BE
PREPARED IN ACCORDANCE WITH ASTM D1760 USING WATERBORNE PRESERVATIVES AND OBTAIN
0.25 PCF PENETRATION FOR ABOVE GRADE AND 0.40 PENETRATION FOR GROUND CONTACT.
2. HANGERS/CONNECTORS SHALL BE 18 GA GALVANIZED, SIMPSON STRONG-TIE OR EQUAL. USE
HANGERS FOR THE USE AS RECOMMENDED BY THE MANUFACTURER.
3. SHEATHING SHALL BE APA GRADED AS FOLLOWS:
A. ROOF SHEATHING: 5/8' MIN, 40/20 EXPOSURE 1 PLYWOOD WITH 2-SPANS MINIMUM
CONTINUIOUS APPLIED IN A STAGGERED PANEL LAYOUT WITH THE STRENGTH AXIS
PERPENDICULAR TO THE SUPPORTING MEMBERS. FASTEN FIELD OF PANELS TO SUPPORTING
MEMBERS WITH 10D COMMON NAILS AT 12" O.C.
B. WALL SHEATHING: 1/2" MIN, 32/16 EXPOSURE 1, 5-PLY PLYWOOD SHEATHING WITH MINIMUM
2 SPANS CONTINUOUS APPLIED IN AN ALIGNED PANEL LAYOUT WITH THE STRENGTH AXIS
PERPENDICULAR TO THE SUPPORTING MEMBERS. FASTEN FIELD OF PANELS TO SUPPORTING
MEMBERS WITH 10D COMMON NAILS AT 6" O.C.
4. DESIGN ROOF TRUSSES TO CONFORM WITH LOCAL CODES AND THE DESIGN LOADS STATED
HEREIN. SUBMIT SHOP DRAWINGS FOR APPROVAL, PRIOR TO FABRICATION.
5. "WD COL" DENOTES SOLID OR BUILT-UP WOOD COLUMNS, GLUE AND NAIL STUDS TOGETHER TO
FORM BUILT-UP WOOD COLUMNS. USE NUMBER OF STUDS FOR EACH COLUMN SUCH THAT THE
COLUMN WIDTH EQUALS OR EXCEEDS THE WIDTH OF THE SUPPORTED MEMBER, BUT IN NO CASE
LESS THAN THREE STUDS. SOLID BLOCK ALL FLOORS DIRECTLY UNDER WOOD COL, THEN
CONTINUE WOOD COL TO SUPPORT (BEAM, FOOTING OR FOUNDATION WALL).
6. WHERE HEADERS ARE NOT SPECIFIED OVER DOORS, WINDOWS OR OTHER OPENINGS WITHIN
BEARING OR EXTERIOR WALLS PROVIDE A MINIMUM (3) 2X12 HEADER. U.N.O. ALL WINDOW
PENETRATIONS SHALL HAVE MINIMUM (2) SILL PLATES.
7. STEEL PLATES OR FASTENERS IN CONTACT WITH PRESSURE TREATED LUMBER AND PROTECTED
WITHIN THE BUILDING ENVELOPE (ADEQUATELY SHIELDED FROM DIRECT CONTACT WITH
MOISTURE) SHALL BE STAINLESS STEEL OR GALVANIZED TO G60 PER ASTM A924 REQUIREMENTS.
STEEL PLATES OR FASTENERS IN CONTACT WITH PRESSURE TREATED LUMBER LOCATED OUTSIDE
OF THE BUILDING ENVELOPE OR EXPOSED TO MOISTURE SHALL BE STAINLESS STEEL OR
GALVANIZED TO G90 PER ASTM 924.
8. FASTEN MEMBERS IN ACCORDANCE WITH MICHIGAN BUILDING CODE TABLE 2304.10.1, UNLESS
OTHERWISE NOTED.
9. WHERE NOTED, NAIL SIZES ARE BASED ON THE FOLLOWING MINIMUM SIZES
1. CONTRACTOR SHALL PROVIDE AND INSTALL METAL-PLATE CONNECTED WOOD TRUSSES DESIGNED
TO SUPPORT THE LOADS INDICATED ON THE PLANS. TRUSSES SHALL HAVE A MAXIMUM
DEFLECTION OF L/360 AND SHALL BE SPACED AT 2'-0" OC MAX.
2. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS SEALED BY A STRUCTURAL ENGINEER LICENSED IN
THE STATE OF MICHIGAN. SHOP DRAWINGS FOR EACH TRUSS SHALL SHOW SIZE, SPECIES AND
STRESS GRADES OF ALL LUMBER, METAL PLATE TYPE, ORIENTATION AND SIZES, BEARING AND
UPLIFT REQUIREMENTS. ALL LOAD CASES INVESTIGATED AND MAXIMUM STRESSES IN EACH
MEMBER SHALL ALSO BE INCLUDED.
3. TRUSS MANUFACTURER SHALL DESIGN TRUSSES FOR WIND LOADS PER ASCE 7-10. WOOD TRUSS
FABRICATION SHALL COMPLY WITH TPI 1-95, "NATIONAL DESIGN".
4. CONTRACTOR SHALL SUPPLY, INSTALL, AND REMOVE ALL NECESSARY TEMPORARY BRACING
REQUIRED FOR INSTALLATION OF WOOD TRUSSES AND MEMBERS IN ACCORDANCE WITH DSB-89,
"RECOMMENDED DESIGN SPECIFICATION FOR TEMPORARY BRACING OF METAL PLATE CONNECTED
WOOD TRUSSES".
5. METAL PLATE CONNECTORS SHALL COMPLY WITH TPI 1, HOT-DIP GALVANIZED STEEL SHEET: ASTM A653/A653 M, G60 COATING DESIGNATION; DESIGNATION SS, GRADE 33, AND NOT LESS THAN 0.036
IN. THICK.
6. PROVIDE DIMENSIONAL LUMBER OF ANY SPECIES FOR TRUSS CHORD AND WEB MEMBERS,
CAPABLE OF SUPPORTING THE REQUIRED LOADS WITHOUT EXCEEDING ALLOWABLE DESIGN
VALUES ACCORDING TO AFPA'S "NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION"
AND ITS "SUPPLEMENT".
7. CONTRACTOR SHALL INSTALL (2) SIMPSON STRONG-TIE MODEL H3 TIE-DOWNS UNLESS NOTED
OTHERWISE, AT ALL BEARING LOCATIONS OF ALL TRUSSES. TRUSSES SHALL BE HANDLED AND
INSTALLED PER WTCA BCS1 1-03.
8. INSTALL AND FASTEN PERMANENT BRACING DURING TRUSS ERECTION AND BEFORE
CONSTRUCTION LOADS ARE APPLIED. ANCHOR ENDS OF PERMANENT BRACING WHERE
TERMINATING AT WALLS OR BEAMS.8. PER TPI HIB-91 "COMMENTARY AND RECOMMENDATIONS FOR
HANDLING, INSTALLING & BRACING METAL PLATE CONNECTED WOOD TRUSSES".
9. IN ADDITION TO THE ANY LATERAL BRACING WHICH IS REQUIRED BY THE TRUSS
MANUFACTURER/SUPPLIER, THE CONTRACTOR SHALL PROVIDE AND INSTALL PERMANENT
DIAGONAL STABILITY BRACING FOR ALL COMPRESSION WEBS AND PRIMARY TOP CHORDS OF
PIGGY BACK TRUSSES OR OTHER MEMBERS WHICH REQUIRE BRACING TO REDUCE THEIR BUCKING LENGTH. THIS BRACING SHALL CONSIST OF 2X4's ATTACHED TO EACH WEB MEMBER WITH NOT LESS THEN 2 - 16d NAILS. BRACING SHALL EXTEND ON A 45 DEGREE DIAGONAL FROM THE TOP TO
BOTTOM OF THE WEBS. FOR EACH BRACED MEMBER, DIAGONALS SHALL BE INSTALLED IN
CHEVRON PAIRS WITH ONE PAIR OF DIAGONALS AT EACH END OF THE SERIES OF TRUSSES AND
NOT MORE THAN 20 FEET BETWEEN PAIRS.
PRE-ENGINEERED WOOD TRUSS NOTES
1. THE GENERAL STRUCTURAL NOTES ARE INTENDED TO AUGMENT THE DRAWINGS AND
SPECIFICATIONS. SHOULD CONFLICTS OCCUR BETWEEN DOCUMENTS, THE STRICTEST PROVISION
SHALL GOVERN.
2. THE CONTRACTOR SHALL LIMIT THE AMOUNT OF LOAD IMPOSED UPON THE STRUCTURAL FRAMING
SYSTEM DURING CONSTRUCTION. LOADS, INCLUDING CONSTRUCTION LOADS, MUST NOT EXCEED
THE DESIGN CAPACITY OF THE FRAMING AT THE TIME THE LOADS ARE IMPOSED. THE CONTRACTOR SHALL INFORM THE ENGINEER OF POTENTIAL CONSTRUCTION LOADS DEEMED EXCESSIVE BY THE
CONTRACTOR.
3. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED SELF SUPPORTING, STABLE STRUCTURE UNLESS OTHERWISE INDICATED. THEY DO NOT INDICATE THE
MEANS OR METHOD OF CONSTRUCTION. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO
DETERMINE ERECTION PROCEDURE, CONSTRUCTION SEQUENCE AND PROVIDE ALL MEASURES OR
TEMPORARY BRACING NECESSARY TO ENSURE THE STABILITY AND SAFETY OF THE STRUCTURE
AND ITS COMPONENTS. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR CONSTRUCTION EQUIPMENT, SHORING FOR THE BUILDING, SHORING FOR EARTH BANKS, FORMS, SCAFFOLDING, PLANKING, SAFETY NETS, SUPPORT AND BRACING FOR CRANES AND GIN POLES, ETC.
4. ALL MATERIALS AND WORKMANSHIP SHALL MEET OR EXCEED THE MINIMUM REQUIREMENTS OF
THE GOVERNING BUILDING CODE: MICHIGAN BUILDING CODE, 2015.
5. ALL SHOP DRAWINGS PREPARED BY SUPPLIERS, SUBCONTRACTORS, ETC. SHALL BE REVIEWED BY
THE ARCHITECT/ENGINEER FOR CONFORMANCE WITH DESIGN INTENT ONLY. SHOP DRAWINGS
SHALL BE SUBMITTED FOR APPROVAL PRIOR TO FABRICATION. ENGINEERS APPROVAL OF SHOP
DRAWINGS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY FOR FIT, QUANTITY AND
CONSTRUCTION QUALITY CONTROL.
6. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH ARCHITECTURAL, ELECTRICAL AND
MECHANICAL DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL RELEVANT
DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS AGAINST APPROVED
MANUFACTURERS CERTIFIED EQUIPMENT DRAWINGS AND COORDINATING ANY REQUIREMENTS
WITH SHOP DRAWINGS AND WORK.
7. MECHANICAL FRAMING LOADS, OPENINGS AND SUPPORT STRUCTURE ARE SHOWN FOR BIDDING
PURPOSES ONLY. CONTRACTOR SHALL COORDINATE WITH MECHANICAL AND OTHER TRADES TO
VERIFY EQUIPMENT SIZE AND LOCATIONS. ANY CHANGES IN EQUIPMENT SHALL BE BROUGHT TO
THE ATTENTION OF THE ENGINEER OF RECORD.
8. THE CONTRACTOR SHALL INFORM THE ENGINEER/ARCHITECT OF ANY DEVIATIONS FROM THE
DRAWINGS. DO NOT CUT OR MODIFY STRUCTURAL MEMBERS WITHOUT PRIOR WRITTEN APPROVAL
FROM THE ENGINEER.
9. DRAWINGS ARE INTENDED TO BE PRINTED PER THE SCALE PROVIDED. THE CONTRACTOR SHALL
CONTACT THE ENGINEER IF ADDITIONAL DIMENSIONS ARE REQUIRED.
10. CONTRACTOR SHALL NOT MIX GALVANIZED AND STAINLESS STEEL AT ANY TIME. ANY METAL PARTS
IN CONTACT WITH OTHER METAL PARTS SHALL BE OF A SIMILAR METAL.
11. CONTRACTOR SHALL RECOGNIZE EFFECTS OF THERMAL MOVEMENTS AND MOISTURE CONTENT
CHANGES OF STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD AND CONSIDER THESE
EFFECTS DURING CONSTRUCTION AND/OR ERECTION SEQUENCES.
12. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING COMPLETE AND FUNCTIONING SYSTEMS, INCLUDING BUT NOT LIMITED TO, PROVIDING (AT NO ADDITIONAL COST) ITEMS NOT SPECIFICALLY
SHOWN IN THESE DRAWINGS WHICH ARE NORMALLY CONSIDERED NECESSARY.
GENERAL NOTES - STRUCTURAL
40 psf
SNOW LOAD DIAGRAM
40 psf
40 psf 63 psf
EXISTING ROOF EXISTING ROOFNEW ROOF
9'-0" MIN
BALANCED SNOW
SNOW LOADS
LIVE LOADS
WIND LOADS
1. UNIFORM FLOOR LIVE LOAD
2. ROOF LOAD - SEE SNOW LOAD
3. INTERIOR WALL LATERAL LIVE LOAD
EARTHQUAKE DESIGN DATA
1. GROUND SNOW LOAD, PG
2. FLAT-ROOF SNOW LOAD, PF
3. SNOW EXPOSURE FACTOR, CE
4. RISK CATEGORY
5. SNOW LOAD IMPORTANCE FACTOR, IS
6. ROOF THERMAL FACTOR, CT
7. SLOPED ROOF FACTOR, CSU
8. SLOPED ROOF SNOW LOAD, PS
UNBALANCED SNOW
1. WINDWARD
2. LEEWARD SURCHARGE (11.1')
DRIFT SNOW
LOAD OR VARIABLE
1. ULTIMATE DESIGN WIND SPEED (3-SECOND GUST)
2. RISK CATEGORY
3. WIND EXPOSURE CATEGORY
4. INTERNAL PRESSURE COEFFICIENT (ENCLOSED BUILDING)
5. MAIN WIND FORCE RESISTING SYSTEM (MAX ROOF UPLIFT AT OVERHANG)
6. MAIN WIND FORCE RESISTING SYSTEM (MAX WALL)
7. COMPONENTS & CLADDING DESIGN PRESSURE (ZONE 1)
8. COMPONENTS & CLADDING DESIGN PRESSURE (ZONE 2)
9. COMPONENTS & CLADDING DESIGN PRESSURE (ZONE 3)
10. COMPONENTS & CLADDING DESIGN PRESSURE (ZONE 4)
11. COMPONENTS & CLADDING DESIGN PRESSURE (ZONE 5)
LOAD VARIABLE
1. RISK CATEGORY
2. SEISMIC IMPORTANCE FACTOR, IE
3. MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETER, SS
4. MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETER, S1
5. SITE CLASS
6. SEISMIC DESIGN CATEGORY
7. BASIC SEISMIC FORCE RESISTING SYSTEM: LIGHT-FRAME WOOD WALLS
8. SEISMIC RESPONSE COEFFICIENT(S), CS (SECTION 12.8.1.1)
9. RESPONSE MODIFICATION COEFFICIENT(S), R(SECTION 12.2-1)
10. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE, SECTION 12.8
MISCELLANEOUS DESIGN DATA
ASSUMED SOIL BEARING STRENGTH
CONTRACTOR SHALL VERIFY SOIL BEARING CAPACITY PRIOR TO CONSTRUCTION
NOTES
BUILDING CLASSIFICATION II
VASD=VULT(0.6)1/2 QASD=QULT(0.6)
1. APPLICABLE CODE IS 2015 MICHIGAN BUILDING CODE.
2. APPLICABLE TECHNICAL CODE IS ASCE/ SEI 7-10.
3. WIND LOAD BASED ON ASCE 7-10
A. MWFS: CHAPTER 28, PART 2, METHOD 2
B. C&C: CHAPTER 30, PART 1, METHOD 1
4. LOADS ARE BASED ON SECTION 16 OF MBC 2015 UNLESS OTHERWISE NOTED.
40 psf 20 psf 5 psf
50 psf 40 psf 1.0
II
1.0 1.1 1.0 40 psf
12 psf 15 psf
115 mph
II
B ± 0.18 22 psf 19 psf +16, -32 psf +16, -38 psf +16, -56 psf +24, -26 psf +24, -32 psf
II
1.0
0.051 g
0.032 g D A
0.008 6.5
2500 psf
BUILDING LOADS - FOR ADDITION ONLY
DEAD LOADS
1. MATERIAL DEAD LOAD
2. MECHANICAL DEAD LOAD
15 psf 5 psf
MAX DRIFT SURCHARGE = Pd = 23 psf DRIFT WIDTH = W = 9'
40 psf
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
CO
PY
RI
GH
T
O
HM
A
LL
D
RA
W
IN
GS
A
ND
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
GI
NA
L A
ND
U
NP
UB
LIS
HE
D W
OR
K
OF
O
HM
A
ND
T
HE
S
AM
E
MA
Y
NO
T
BE
D
UP
LIC
AT
ED
, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
OR
W
RI
TT
EN
C
ON
SE
NT
O F
OH
M
IS
SU
ED
F
OR
PR
OJ
EC
T
NU
MB
ER
PM
2/7 /20
:04 :43
A M
Au tod es k D oc s:/
/74
-2 4-
H
PS
P
- G ra yli ng S ign S ho p/7
0_
SA
_H
SP
S_ Gr ay lin gS ign
Sh op
_2
3_
CE
N.
rvt
S-002
ST
RU
CT
UR
AL
N
OT
ES
LO
AD
S
R an ge r R d, Gr ay lin g, MI
HA
RT
W
IC
K
PI
NE
S
ST
AT
E
PA
RK
GR
AY
LIN
G
SI
GN
S
HO
P
FO
R
BI
D
-2 4-
ST
/02
/10
1/2
.G
AG
DT
MB
F ile N o.
WALL SCHEDULE
MARK WIDTH REINFORCING NOTES
WM1 5 5/8" #5s @ 48" OC W/W1.7 WIRE LADDER
JOINT REINF @ 16" OC
TYPICAL FOUNDATION WALL
WW1 9 5/8" 2x6s @ 16" OC TYPICAL WOOD WALL
1. PROVIDE HORIZ HOOKS ON ALL VERTICAL BARS, TURNED OUT AWAY FROM CENTERLINE.
(#5 = 12", #8 = 24")
2. PROVIDE "L" 30"x30" FOR #5 HORIZONTAL LAP BARS AT ALL CORNERS.
3. PROVIDE #5 BARS @ 36" OC PERPENDICULAR TO BOTTOM FOOTING BARS FOR WALL
FOOTINGS.
4. REFER TO PLANS FOR STRIP FOOTING LENGTHS.
SCHEDULE NOTES:
FOOTING SCHEDULE
MARK
FOOTING SIZE
REINFORCING NOTESL W D
F1 239 1/2" 24" 12" (3) #5 BARS CONTINUOUS
/02 /10
/0
UPDN
S-
CJCJ CJ CJCJ
CJCJ CJ CJCJ
CJ
CJ
CJ
CJ
CJ
F1
F1
CONC FTG EL @ TOP: 96'-4" TYP
CONC FTG EL @ BOT: 95'-4" TYP
4" CONCRETE SLAB ON GRADE WITH
TROWELED FINISH REINFORCED WITH 6x6
W2.9xW2.9 ON VAPOR BARRIER ON 8"
COMPACTED DRAINAGE FILL. FF: 100'-0"
SEE DETAIL 4/S-501
6" CONCRETE SLAB ON GRADE REINFORCED WITH
6x6 W2.9xW2.9 ON 8" COMPACTED DRAINAGE FILL.
SLAB TO BE SEPARATED FROM BUILDING WITH
1/2" EXPANSION JOINT. SEE DETAIL 6/S-501
4'- 6 1
/2"
6'-0" 7'-6"
WM1
CONCRETE RAMP - SEE ARCH
19'-10 1/2" VIF
WM1
APPROXIMATE LOCATION OF MECHANICAL UNIT
PROVIDE 1/2" EXP. JOINT BETWEEN NEW AND EXISTING SLABS
PROVIDE 1/2" EXP. JOINT BETWEEN
NEW AND EXISTING SLABS
SEE DETAIL 1/S-501 FOR FOUNDATION CONNECTION TO EXISTING
SEE DETAIL 5/S-501 FOR MASONRY CONNECTION TO EXISTING
PRE-ENGINEERED
TRUSSES AT 24" OC
WW1
WW1
AREA OF SNOW DRIFT, SEE NOTES
(3) 2x12 (3) 2x12 2 / 22 / 22 / 2 2 / 2(2
)2 x1
(2 )2 x1
2 / 2
2 / 2
2 / 2
2 / 2
2x6 FRAMING AROUND ATTIC ACCESS
SEE ARCH FOR LOCATION
APPROXIMATE LOCATIONS OF WALL OPENINGS FOR DUCTS RE: MECHANICAL
ENSURE DUCT OPENINGS ARE CENTERED BETWEEN STUDS
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
CO
PY
RI
GH
T
O
HM
A
LL
D
RA
W
IN
GS
A
ND
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
GI
NA
L A
ND
U
NP
UB
LIS
HE
D W
OR
K
OF
O
HM
A
ND
T
HE
S
AM
E
MA
Y
NO
T
BE
D
UP
LIC
AT
ED
, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
OR
W
RI
TT
EN
C
ON
SE
NT
O F
OH
M
IS
SU
ED
F
OR
PR
OJ
EC
T
NU
MB
ER
PM
2/7 /20
:04 :43
A M
Au tod es k D oc s:/
/74
-2 4-
H
PS
P
- G ra yli ng S ign S ho p/7
0_
SA
_H
SP
S_ Gr ay lin gS ign
Sh op
_2
3_
CE
N.
rvt
S-101
FO
UN
DA
TI
ON
A
ND
F
RA
MI
NG
P
LA
NS
R an ge r R d, Gr ay lin g, MI
HA
RT
W
IC
K
PI
NE
S
ST
AT
E
PA
RK
GR
AY
LIN
G
SI
GN
S
HO
P
FO
R
BI
D
-2 4-
ST
/02
/10
1/2
.G
AG
DT
MB
F ile N o.
N
3/16" = 1'-0"1 FIRST FLOOR FOUNDATION PLAN
3/16" = 1'-0"2 ROOF FRAMING PLAN 20
/02 /10
/0
CONCRETE FTG (SEE SCHEDULE). MATCH
BOTTOM OF EXISTING FOOTING
(MIN 42" BELOW FINISHED GRADE) EXISTING CONCRETE FOOTING. G.C.
TO VERIFY IN FIELD AND NOTIFY
STRUCTURAL ENGINEER IF ACTUAL
CONDITIONS VARY
(2) #5 x 12" LONG DRILLED & GROUTED INTO
EXISTING CONC FOOTING W/ 6" MIN EMBED
EXISTING MASONRY FOUNDATION
WALL. G.C. TO VERIFY IN FIELD AND
NOTIFY STRUCTURAL ENGINEER IF
ACTUAL CONDITIONS VARY
MASONRY FOUNDATION WALL:
SEE PLAN & SCHEDULE
CONCRETE FTG: SEE PLAN &
SCHEDULE
SEE ARCH FOR WALL
INSULATION AND FINISH 4" CONCRETE FLR SLAB WITH 6x6
W1.4xW1.4 WWF ON VAPOR
BARRIER ON 8" COMPACTED
DRAINAGE FILL
1/2" EXP JOINT (TYP)
GRADE VARIES
1'- 0"
3'- 4"
1/2" DIA. ANCHORS WITH 7" EMBEDMENT
INTO FOUNDATION WALL AND 3" SQUARE
PLATE WASHERS AT 6'-0" MAX SPACING
DI
A
DI
A x
DI
A
4 x DIA - #3 THRU #84 x DIA OR 2 12" MIN
5 x DIA - #5 THRU #11
6 x DIA - #14 THRU #18
6"x6" WWF, SEE PLAN
VAPOR RETARDER
MDOT 2NS SAND CUSHION
FIN FLOOR
SEE PLAN
MDOT CLASS II SAND SUBBASE
2"
CONCRETE SLAB-ON-GRADE
6" 4"
SE
E
PL
AN
COMPETENT SUBGRADE
SEALANT & BACKER
ROD @ JOINT (TYP)
EX CMU FOUNDATION WALL
L4x4x5/16" ANCHORED W/ 3/4"x5"
EMBEDMENT, EPOXY OR EXP BOLTS @
24" OC, GROUT BLOCK CORES SOLID
NEW CMU FOUNDATION WALL
NOTCH CMU END BLOCK & INSTALL #6
VERT REINF @ GROUT FILLED CORE
CORNER EXPANSION COVER
SEE SPECIFICATIONS
SEE PLAN
#5 REBAR AROUND ENTIRE
THICKENED PERIMETER
FIN GRADE
SEE CIVIL
6" CONCRETE SLAB ON GRADE
WITH 6"x6" W2.9xW2.9 WWF
3" C
LR
(T
YP
)1'-
4" 6" 10"
2X4 CONTINUOUS LATERAL RESTRAINT (CLR)
BRACE AT MIDPOINT OF TRUSS WEB MEMBER
REQUIRING BRACING. FASTEN TO EACH TRUSS WEB
MEMBER WITH (2) 16d COMMON NAILS. PROVIDE (2)
ROWS 2X4 LONGITUDINAL BRACES EQUALLY
SPACED WHERE REQUIRED BY TRUSS DESIGNER.
(1) TRUSS SPACING
OVERLAP AT SPLICES
2X4 CHEVRON BRACES CONT
ALONG CLR BRACE. FASTEN TO
EACH TRUSS WEB MEMBER WITH
(2) 16d COMMON NAILS.
A P
P R
O X
45° TY
P
TRUSSES AT 2'-0" OC, TYP
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
CO
PY
RI
GH
T
O
HM
A
LL
D
RA
W
IN
GS
A
ND
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
GI
NA
L A
ND
U
NP
UB
LIS
HE
D W
OR
K
OF
O
HM
A
ND
T
HE
S
AM
E
MA
Y
NO
T
BE
D
UP
LIC
AT
ED
, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
OR
W
RI
TT
EN
C
ON
SE
NT
O F
OH
M
IS
SU
ED
F
OR
PR
OJ
EC
T
NU
MB
ER
PM
2/7 /20
:04 :43
A M
Au tod es k D oc s:/
/74
-2 4-
H
PS
P
- G ra yli ng S ign S ho p/7
0_
SA
_H
SP
S_ Gr ay lin gS ign
Sh op
_2
3_
CE
N.
rvt
S-501
ST
RU
CT
UR
AL
D
ET
AI
LS
R an ge r R d, Gr ay lin g, MI
HA
RT
W
IC
K
PI
NE
S
ST
AT
E
PA
RK
GR
AY
LIN
G
SI
GN
S
HO
P
FO
R
BI
D
-2 4-
ST
/02
/10
1/2
.G
AG
DT
MB
F ile N o.
3/4" = 1'-0"1 FOUNDATION CONNECTION AT EXISTING
3/8" = 1'-0"2 FOUNDATION WALL SECTION
3/4" = 1'-0"3 TYP REBAR HOOK RADIUS
3/4" = 1'-0"4 TYP SLAB-ON-GRADE
1" = 1'-0"5 CMU WALL CONNECTION TO EXISTING
3/4" = 1'-0"6 MECHANICAL EQUIPMENT PAD DETAIL
1/2" = 1'-0"7 TYPICAL TRUSS WEB MEMBER LATERAL BRACING
/02 /10
/0
CLCL
PT-2
X-XXX
SIM
X-XXX
SIM
1 / X-XXX
FE
FE
ALUMINUM
CONCRETE
BATT INSULATION
WOOD
ROUGH WOOD
RIGID INSULATION
SHIM
ACOUSTICAL TILE
EARTH / COMPACT FILL
POROUS FILL
CONCRETE MASONRY
UNITS
FACE BRICK
PLYWOOD
STEEL
GYPSUM WALL BOARD
8x8 TILE
12x12 TILEWOOD BOARD
SIDING NARROW
WOOD BOARD
SIDING WIDE
4x4 TILE
MATERIAL SYMBOL LEGEND
NATURAL STONE
CAST STONE
MINERAL WOOL
INSULATION
1. DO NOT SCALE DRAWINGS. IF DIMENSIONS CANNOT BE DETERMINED OR DOCUMENTS ARE IN CONFLICT, THE CONTRACTOR SHALL OBTAIN CLARIFICATION
FROM THE ARCHITECT PRIOR TO CONTINUATION OF WORK
2. ALL WALL DIMENSIONS ARE TO FACE OF STUD OR MASONRY, UNO.
3. FIELD VERIFY ALL PROJECT CONDITIONS PRIOR TO THE START OF WORK, AND AS NEEDED THROUGHOUT THE DURATION OF CONSTRUCTION. BRING ANY
DISCREPANCIES WHICH MAY SIGNIFICANTLY AFFECT NEW CONSTRUCTION WORK TO THE ATTENTION OF THE ARCHITECT FOR REVIEW
4. WHERE NEW WALL CONSTRUCTION ABUTS EXISTING, IN-LINE, AND/OR ON PLANS, DIRECTLY ALIGN NEW FINISH WALL SURFACE(S) WITH EXISTING
5. INFORMATION SHOWN IN ONE LOCATION ON THE DRAWINGS IS THE SAME AS IF SHOWN ON MULTIPLE LOCATIONS
6. TYPICAL CONDITIONS ARE NOTED ONLY ONCE
7. COORDINATE OPENINGS AND PENETRATIONS BETWEEN TRADES
8. FLOOR LEVELS BETWEEN ADJACENT MATERIALS MUST NOT EXCEED 1/4". PROVIDE APPROPRIATE TRANSITION STRIPS OR LEVEL FLOORS AS REQUIRED
9. PROVIDE REQUIRED FILLERS, SEALANT, OR TRIM AS NECESSARY TO CLOSE GAPS BETWEEN ADJACENT MATERIALS
GENERAL NOTES - ARCHITECTURAL
EXISTINGPROPOSED
W1
(E)MB
24'-0"
CB = CHALKBOARD
MB = MARKER BOARD
TB = TACK BOARD
TS = TACK STRIP
LENGTH
DETAIL INDICATOR
SECTION DETAIL
INDICATOR
ALTERNATE DETAIL /
SECTION DETAIL
INDICATOR
WALL SECTION INDICATOR
BUILDING SECTION
INDICATOR
EXTERIOR ELEVATION
INDICATOR
INTERIOR ELEVATION
INDICATOR
3D VIEW INDICATOR
X-XXX
SIM
PLAN NORTH
TRUE NORTH
MATCHLINE
SEE 1 / A101
X-XXX
SIM
N
_________________1
X-XXX
SIM
?00 00 00.A
M6P
PLPL
100' - 0" N/S 90.00 E/W
EXISTING CORNER PROPOSED CORNER
NEW CONSTRUCTION
NEW MASONRY CONSTRUCTION
EXISTING TO REMAIN
EXISTING TO BE REMOVED
DOORS
CENTER LINE
ELEVATION MARK
MATCHLINE
EXISTING GRID LINE
PROPOSED GRID LINE
BUILDING LINE
SEPARATION INDICATOR
PROPERTY LINE INDICATOR
INDICATES EXISTING
SHEET KEYNOTE INDICATOR
REFERENCE KEYNOTE INDICATOR
REVISION INDICATOR
ROOM IDENTIFIER
WALL TYPE INDICATOR
WINDOW / LOUVER INDICATOR
(REFER TO WINDOW SCHEDULE)
DOOR INDICATOR
(REFER TO DOOR SCHEDULE)
GLAZING INDICATOR
(REFER TO PROJECT MANUAL)
GLAZING MODIFIER
(REFER TO STOREFRONT
ELEVATIONS)
NORTH INDICATOR
60" DIAMETER WHEELCHAIR
TURNING SPACE
ICC A117.1 - 304.3
T-SHAPED WHEELCHAIR
TURNING SPACE
ICC A117.1 - 304.3
CLEAR FLOOR SPACE
ICC A117.1 - 305.3
INTERNATIONAL SYMBOL OF
ACCESSIBILITY
ICC A117.1 - 703.6.3.1
e
CLEARANCE LINES
XX
? XXX
ARCHITECTURAL SYMBOLS LEGEND
BL1
101A
GL-1
T
TC-1
ROOM NAME
150 SF
1,254 Occ
ROOM NUMBER
ROOM AREA
OCC. COUNT
LEVEL
XXX' - XX"
e1
S2436-12-RF CASEWORK INDICATOR
(REFER TO INTERIOR ELEVATIONS)
VISUAL DISPLAY BOARD INDICATOR
ACCESSORY, FURNITURE, FIXTURE,
AND EQUIPMENT INDICATOR
SIGNAGE INDICATOR
(REFER TO SCHEDULE)
ROOM NUMBER
WALL FINISH
BASE
FLOOR FINISH
VB-1
CPT-P_
PT-2
ROOM NAME
6'-4"
ROOM FINISH INDICATOR
FINISH INDICATOR
FINISH EXTENT INDICATOR
TRANSITION STRIP INDICATOR
X-XXX
LVTCT
[TS-1]
X-XXX
1 SIM
SI
M
1 SIM
SI
M
_________________1
X-XXX
FF&E
FINISHES
INDICATOR LINES
BUILDING ELEMENTS
ACCESSIBILITY
NOTES & ANNOTATIONSVIEW REFERENCES
68' EGRESS PATH
OCCUPANCY
B
F-1
S-1
1,997 SF
21 Occ
SIGN SHOP
583 SF
2 Occ
SIGN SHOP - STORAGE
537 SF
6 Occ
SHOP ADDITION
926 SF
10 Occ
SIGN SHOP
282 SF
17 Occ
BREAK ROOM
136 SF
2 Occ
OFFICE
TOILET
INDUSTRIAL: 100 GROSS SF/PERSON
BUSINESS/BREAK ROOM: 100 GROSS
SF/PERSON / 15 SF NET/PERSON
STORAGE: 300 GROSS SF/PERSON
EXISTING BUILDING ADDITION EXISTING BUILDING
FUNCTION OF SPACE:
(X'-X")
Path Label
XXX CALCULATED
XXX CAPACITY
MULTI-PURPOSE CHEMICAL
(CLASS ABC)
PORTABLE FIRE EXTINGUISHERS
FIRE
EXTINGUISHERS
ROOM NAME
ROOM NUMBER
ROOM AREA
NUMBER OF OCCUPANTS
CALCULATED OCCUPANT LOAD AT EGRESS COMPONENT
CAPACITY OF EGRESS COMPONENT
TRAVEL DISTANCE TO NEAREST EXIT
PATH OF EGRESS TRAVEL
TRAVEL DISTANCE TO EXITS = 200 FT MAX
COMMON PATH OF TRAVEL = 75' MAX
DEAD ENDS = 20' MAX
CODE PLAN LEGEND
ROOM NAME
150 SF
1,254 Occ
1/16" = 1'-0"1 LIFE SAFETY/OCCUPANCY PLAN
ARCHITECTS ENGINEERS PLANNERS
OHM-ADVISORS.COM
R
CONSULTANTS FOR INTERTEK
ST
AT
E
OF
M
IC
HI
GA
N
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
DI
VI
SI
ON
DE
PA
RT
ME
NT
O
F
TE
CH
NO
LO
GY
, M
AN
AG
EM
EN
T
AN
D
BU
DG
ET
S
TA
TE
F
AC
ILI
TI
ES
A
DM
IN
IS
TR
AT
IO
N
CO
PY
RI
GH
T
O
HM
A
LL
D
RA
W
IN
GS
A
ND
W
RI
TT
EN
M
AT
ER
IA
LS
A
PP
EA
RI
NG
H
ER
EI
N
CO
NS
TI
TU
TE
T
HE
O
RI
GI
NA
L A
ND
U
NP
UB
LIS
HE
D W
OR
K
OF
O
HM
A
ND
T
HE
S
AM
E
MA
Y
NO
T
BE
D
UP
LIC
AT
ED
, D
IS
TR
IB
UT
ED
, O R
DI
SC
LO
SE
D W
IT
HO
UT
P
RI
OR
W
RI
TT
EN
C
ON
SE
NT
O F
OH
M
IS
SU
ED
F
OR
PR
OJ
EC
T
NU
MB
ER
PM
AD
AM
P . L
AC
H, R A, D
IR
EC
TO
R
PR
IM
E
PS
C
1/1 5/2
6 2
:21 :55
P M
Au tod es k D oc s:/
/74
-2 4-
H
PS
P
- G ra yli ng S ign S ho p/7
0_
SA
_H
SP
S_ Gr ay lin gS ign
Sh op
_2
3_
CE
N.
rvt
A-001
AR
CH
IT
EC
TU
RA
L N
OT
ES
S
YM
BO
LS
R an ge r R d, Gr ay lin g, MI
HA
RT
W
IC
K
PI
NE
S
ST
AT
E
PA
RK
GR
AY
LIN
G
SI
GN
S
HO
P
FO
R
BI
D
-2 4-
ST
/02
/10
1/2
.H
JD
DT
MB
F ile N o.
SEE LEGENDS ON A-002 FOR ACCESSORY
ABBREVIATIONS
ABBREVIATIONS
A
& AND
@ AT
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
B
BOT BOTTOM
BRK BRICK
BSMT BASEMENT
C
CJ CONTROL JOINT
CL CENTER LINE
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
D
DN DOWN
DS DOWNSPOUT
E
EA EACH
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
ELEC ELECTRICAL
SEE LEGENDS ON A-002 FOR ACCESSORY
ABBREVIATIONS
ABBREVIATIONS
I
IN INCH / INCHES
L
LB POUND
LDG LANDING LEVEL
M
MAX MAXIMUM
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
N
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
No. NUMBER
NTS NOT TO SCALE
O
OC ON CENTER
OPP OPPOSITE
OPP HND OPPOSITE HAND
P
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
SEE LEGENDS ON A-002 FOR ACCESSORY
ABBREVIATIONS
ABBREVIATIONS
Q
QTY QUANTITY
R
R RISER
RD ROOF DRAIN
RO ROUGH OPENING
S
SAB SOUND ATTENUATION BLANKET
INSULATION
SD SMOKE DETECTOR
SF SQUARE FOOT
SIM SIMILAR
SQ IN SQUARE INCH
T
T TREAD
T&B TOP & BOTTOM
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
V
VIF VERIFY IN FIELD
W
W/ WITH
W/O WITHOUT
WWF WELDED WIRE FABRIC
SEE LEGENDS ON A-002 FOR ACCESSORY
ABBREVIATIONS
ABBREVIATIONS
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EXST EXISTING
F
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FHC FIRE HOSE CABINET
FO FACE OF
FRTW FIRE RETARDANT TREATED WOOD
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
G
GB GYPSUM BOARD
GYP GYPSUM
H
HD HEAD
HDW HARDWARE
HVAC HEATING-VENTILATING-AIR
CONDITIONING
HW HOT WATER
/0
CUT AND REMOVE
EXISTING WOOD T1-11
SIDING AND SHEATHING
BELOW NEW ROOF DECK;
REF: SECTIONS ON A-201.
REMOVE STUDS, SILL
PLATE, SHEATHING, &
MASONRY FOR NEW
DOORS: REF: A-101
FOR LOCATION
REMOV…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .