Addendum _1 RFP _480_25 On Call Right of Way .pdf

PDF 206 KB Posted

Attached to
RFP #480-25 On-Call Right of Way Land Acquisition Services
Solicitation number
PE-64200-NONST-2025-000000058
Issued by
Douglas County, Georgia

About this file

This is an addendum to Request for Proposal #480-25 for On Call Right of Way Land Acquisition Services issued by a county government entity. The RFP was issued on June 10, 2025, with Addendum #1 issued on June 26, 2025. The RFP closing date is July 2, 2025, at 10:30 a.m. The addendum clarifies that the County has removed several requirements from the original RFP, including the necessity for an assigned engineer, a surveyor, and references to a design consultant and intersection improvement samples. The services requested include right of way land acquisition consultation with expertise in title services, negotiation, and code compliance navigation. The contract will be on an on-call basis, with the County retaining the right to withhold payment for work not completed as contracted within agreed timeframes.

The consultant must meet specific qualification requirements, including GDOT certification for the firm and all assigned employees, minimum experience of three to five years in preparing title reports, and a demonstrated understanding of local code compliance. The consultant must provide a team that includes at least two appraisers with general certified level 3 and level 2 credentials. Proposers must submit three references as a whole for assigned individuals and list all Georgia licenses held by the consultant and employees. The pricing structure should clearly display all costs, including sub-consultant fees. This addendum removes numerous general contract terms related to construction scheduling, material specifications, payment procedures, and liquidated damages, reflecting the service-based nature of the engagement rather than traditional construction work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP #480-25 ON CALL RIGHT OF WAY LAND ACQUISITON SERVICES

ADDENDUM #1

RFP Closing Date: July 2, 2025, at 10:30 a.m.

RFP Issue Date: June 10, 2025

RFP Addendum Issue Date: June 26, 2025

By: Melissa Hawk, Purchasing Manager

The following are amendments to the RFP #480-25 On Call Right of Way Land Acquisition

Services:

1. The following General Terms are not applicable to a contract as a result of this RFP.

05 – Lands of Work Not applicable to this RFP Contract.

06 - General Warranty and Guarantee Against Defective Work

07 - Bonds

Not applicable to this RFP Contract

15 – Responsibilities of the Contractor G. Cooperation with the Construction Inspector

21 – Division of Specifications and Drawings

24 - Survey Information

25 - Project Completion

26 - Inspection and Testing of Materials

27 - Substantial Completion

32 - Construction Schedule and Procedures

33 - Project Management

34 - Entry

36 - Completion of "Punch List" Items

40 – Interpretation of Specifications and Drawings

41 - Discrepancies in Specifications and Drawings

42 - Material, Equipment and Workmanship

43 – Demonstration of Compliance with Contract Requirements Inspection

45 - Overtime and Shift Work Not Application to this RFP Contract

46 - Construction Schedule

Scope This section specifies reports and schedules for planning and monitoring the progress of the work.

The construction schedule shall reflect the Contract Time stated in the Request for Proposal.

Description

Submittal Procedures Not Applicable for this RFP Contract.

Schedule Revisions

48 - Material and Equipment Specified By Name Not applicable for this RFP Contract.

49 – Submittal Procedure General

Not applicable to this RFP Contract.

Proposer Responsibilities

Transmittal Procedure

General

50 - Requests for Substitution

Not applicable for this RFP Contract.

51 - Manufacturer's Directions

52 - Product Data

53 - Operation and Maintenance Information

54 - Record Drawings

55 - Protection of the Public and Property

56 – Protection of the Owner’s Property

57 - Maintenance of Traffic and Sequence of Operation

58 - Lot Corners

59 – Existing Utilities

61 - Material Delivery, Handling, and Storage

62 - Maintenance During Construction

67 - Load Limits

68 – Sanitary Provisions

69 - Construction Buildings

71 - Electrical Energy

72 - Water Supply

73 - Environmental Impact

74 - Progress Payments

77 – Payments Withheld Prior to Final Acceptance

78 - Payments Withheld

79 - Contract Time

General

Construction Schedule

83 - Force Account and Extra Work

84 - Claims for Extra Cost

85 - Correction of Work Before Final Payment

86 - Liquidated Damages

91 - Removal of Equipment

93 – Quantity Variance Reserve

2. The County is removing the requirement for an assigned engineer.

3. The County is removing the requirement for a surveyor.

4. The County is removing all reference to a design consultant and intersection improvement samples.

5. All dates, other specifications, terms and conditions remain the same as posted in the RFP document.

RFP #480-25 On Call Right of Way Land Acquisition Services:

QUESTION: On Page 11, the RFP states that the Consultant will meet with County Attorney for

Title Services but on Page 15, we need 3-5 years’ experience in preparing title reports

ANSWER: Although the labor to perform title services are not required for this contract, the

Consultant must have experience to understand the process.

QUESTION: Auto Requirement – Page 18 (Tab C) – As R/W negotiators, are we required to have identification on our vehicles?

ANSWER: The County can come to an agreement for a work around to this requirement with the awarded Consultant.

QUESTION: Code Officials – Page 19 (Tab E, 8th point) – Identification of code compliance concerns, special inspection issues, and plan for interaction with code officials. Can you further define what your expectations are for the R/W Negotiator in this role of code compliance?

ANSWER: A right of way negotiator needs to have knowledge of local code compliance if it is necessary to navigate legal and regulatory challenges during the acquisition process. The County staff can assist the Consultant, if necessary.

QUESTION: Has the County assigned liquidated damages to a right of way consulting firm on past projects?

ANSWER: Yes. However, the County has opted to remove this term and will instead institute a term that the County will have the right to withhold a payment for work that has not been completed as contracted. This will include the time frame of the work.

QUESTION: Does the Consultant need to provide one or more Appraisers on its team?

ANSWER: The Consultant will need to have at least two appraisers. A general certified level 3 and a general certified level 2.

QUESTION: For sub-consultant services that do not bill hourly, how does the County want us to display their per parcel fees?

ANSWER: The County is not contracting with others outside of the company submitting the offer and cannot suggest to a company how to account for their subcontractor’s pricing.

QUESTION: Page 15 Minimum Proposer’s Qualification Section – This section references

“accredited land consultant”. Does this mean the consultant must be GDOT pre-qualified?

ANSWER: Yes.

QUESTION: Requests all GA licenses held by consultant and/or Consultant’s employees. Does the County require GDOT pre-qualifications as well?

ANSWER: The County does not have a pre-qualification list or requirements; however, the

County does require the Consultant and/or employees to be GDOT certified.

QUESTION: Requires three (3) references for persons that the individual/firm will assign. For clarification, the County wants three references for each individual listed on the organizational chart?

ANSWER: The County requires three (3) references as a whole.

Company Name Signature of Authorized Representative

Title Date

THIS DOCUMENT MUST BE COMPLETED AND SUBMITTED AS PART OF YOUR PROPOSAL

File details come from the government source that posted it. Updated .