About this file

This document is a Bidder Questions & Answers (Q&A) file for Request for Proposal (RFP) 250000003143, issued by the Michigan Department of Natural Resources (DNR) for a MiCO License Stock RFP. The RFP pertains to the production of license stock labels, with an annual production volume ranging between 2 to 5 million labels. The state is seeking a vendor to provide comprehensive services including label production, kitting, packaging, and shipping, with a preference for a 5-million-label pricing model.

The Q&A document addresses two key bidder inquiries: first, confirming the desired pricing structure for label quantities that may fluctuate between 2-5 million annually, and second, clarifying expectations around shipping and kitting costs. The Michigan DNR has explicitly stated that vendors should incorporate shipping and kitting expenses directly into their bid pricing, rather than presenting these as separate line items. The RFP appears to be structured for a 5-year contract, with pricing to be comprehensive and inclusive of all associated production and distribution costs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

BIDDER QUESTIONS & ANSWERS

Version 2021-2

RFP 250000003143

DNR - MOD - MiCO License Stock RFP

Q

Document and

Section

Page

Bidder Question Answer

Schedule A

- Section Quanties 34

You have stated that the labels produced each year are between 2 to 5 million labels. We have prepared a quote for 5 million labels. If less than 5 mil labels are ordered the price will have to be requoted. Should we state that on the quotation or are you expecting a price for 2, 3, 4 mill labels

I’d like to see a price for 5 mill labels. Please know that the quantity ordered each year may go up or down based on our customer preference.

Schedule B

- Section Item # 3 47

We do need some clarification on Item# 3, Schedule B Pricing. Can we give a lump sum cost for kitting and a lump sum cost for shipping? If the past we have always used the SOM UPS account, since they get a better rate.

The Michigan DNR does not want to pay for shipping or kitting, so please include those cost into you bid.