Addendum 1 - QandA.pdf

PDF 70 KB Posted

Attached to
Water Treatment Plant Replacement of Finished and Raw Water Pumps and Motors
Solicitation number
73092
Issued by
Scott County, Virginia

About this file

This document is an Addendum to an Invitation to Bid (ITB) for the replacement of finished and raw water pumps and motors at the Water Treatment Plant in Woodstock, Virginia. The project scope includes the removal of existing SimFlo pumps and motors and the furnishing of new complete pumps with the same horsepower and hydraulic design points as the existing equipment. An optional pre-bid meeting will be held on August 9, 2024, and bids are due by August 16, 2024 at 2:00 PM EST. The Town of Woodstock will award the contract to the bidder that best meets the stated criteria, including ability, capacity, skill, responsiveness, cost, and evaluation of previous projects. Bidders must have a valid Virginia Contractor's License of at least a Class B and submit various documentation such as a project approach, project manager contact information, references, equipment information, anticipated schedule, completed bid form, proof of insurance, and proof of authority to transact business in Virginia.

The project is not subject to Davis Bacon Prevailing Wages, Build America Buy America Act, or American Iron and Steel Act. No bid bond is required, and the Town looks to the bidders for their recommendation on field performance testing. The contract opportunity does not appear to have any set-aside designations or restrictions on the types of organizations that can respond, and the procurement documents do not indicate any incumbent vendors or current contractors, nor do they reference any existing infrastructure or technology that requires integration. The award value or budget range for this project is not provided in the available information.

View the file

Other files

File Type Posted
ITB WTP Pumps Motors 082024.pdf PDF
Addendum 2 - QandA.pdf PDF
ITB WTP Pumps Motors 082024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation To Bid (ITB)

Water Treatment Plant Replacement of Finished and raw water pumps and motors

Addendum #1: Questions and Answers

Do any of the following apply to this project; Davis Bacon Prevailing Wages, Build America Buy America Act, American Iron and Steel Act?

No – this project is not subject to Davis Bacon Prevailing Wages, Build America Buy America Act, American Iron and Steel Act

Is a Bid Bond Required for this project? If so at what percentage?

No bid bond is required

What Field Performance Testing is Required?

The Town looks to the bidders for their recommendation for carrying out field performance testing.

Field performance testing should assess that the installed equipment functions as intended, and that workmanship aligns with quality requirements.