Addendum #1 - Palmer RFQ - Mailbox & Sink Removal.pdf
PDF 50 KB Posted
- Attached to
- Palmer Clerk's Office RFQ
- Solicitation number
- Not on record
- Issued by
- Matanuska-Susitna Borough, Alaska
About this file
This is Addendum #1 to a Request for Quotation issued by the Alaska Court System for demolition and renovation work at the Palmer Courthouse clerk's office located at 435 South Denali Street in Palmer, Alaska. The addendum modifies the original RFQ (Project #PAL-C-25-0019) to expand the scope of work and extend the submission deadline. The revised scope now includes demolition of the paneled wall where mailboxes are currently mounted, erection of a standard drywall wall, and patching and painting as needed, in addition to the original requirements for mailbox system and sink removal. A non-mandatory site visit was scheduled for December 5th, 2025, at 12:00 PM AKST. The RFQ submission deadline has been extended from December 15, 2025, to December 23, 2025, at 12:00 PM AKST. Contractors are responsible for all demolition work, site cleanup, and compliance with project specifications outlined in the RFQ documents.
The addendum does not contain pricing information, set-asides, incumbent vendor details, or specific funding sources. Respondents are required to possess a valid Alaska Business License, provide a Certificate of Insurance, and ensure all employees obtain a DPS Criminal History Report before commencing work. Quotations must include itemized breakdowns of materials, labor, and additional costs along with a draft project completion schedule. Submissions should be directed to Hanna Humphries, Leasing & Contracts Manager, either at the Snowden Administrative Building in Anchorage or via email. The contract does not specify term length, renewal options, or explicit budget parameters.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Palmer Courthouse RFQ – Mailbox & Sink Removal
RFQ Package
PROJECT #PAL-C-25-0019
Date: December 10, 2025
To All Plan Holders:
The following changes, additions, clarifications, and/or deletions are hereby made a part of the Contract Documents for the above noted project, fully and completely as if the same were fully contained therein. All other terms, conditions, and specifications of the original Request for Quote (RFQ) remain unchanged.
The required date and time for RFQ Submittal has changed to December 23, 2025 at 12:00 PM.
The changes/clarifications directed by this Addendum #1 are described on this 1 (one) page.
Changes/Clarifications:
Change to scope of work and RFQ submittal date:
1. Revise the scope of work to include demo of the paneled wall where the mailboxes are currently mounted and erect a standard wall with drywall. Patch and paint as needed.
2. The date and time for RFQ submittal has changed to December 23, 2025 at 12:00 PM.
END OF ADDENDUM #1