Addendum #1 - Newberry Parking Lot - 591.26072.AGY.pdf

PDF 704 KB Posted

Attached to
591/26072. AGY; Newberry TSC Parking Lot Repaving
Solicitation number
RFQ 171 260000000339 3
Issued by
Kent County, Michigan

About this file

This is an Addendum #1 issued by the Michigan Department of Transportation (MDOT) for the Newberry TSC Parking Lot Repaving project located at 14113 M-28, Newberry, Michigan 49868. The addendum, issued on July 1, 2026, serves to inform bidders of changes, clarifications, and additions to the original bid documents and specifications for MDOT Project Number F000919CON (File Number 591/26072.AGY). Bidders are required to provide all labor, materials, equipment, services, and supervision necessary to complete the work specified in the addendum. All costs associated with the addendum work must be included in the overall bid price and are considered an integral part of the contract. All work must comply with the original bid documents and the information contained in this addendum.

The addendum contains no questions and answers section and requires bidders to acknowledge receipt of the addendum on the bid summary documentation. No specific pricing terms, set-asides, response dates, site visit requirements, or other detailed contract conditions are outlined in this addendum document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #1

Project Name: Newberry Parking Lot Repaving Issuance Date: July 1, 2026 Project Location: MDOT Newberry TSC/ 14113 M-28, Newberry, MI 49868 MDOT Project Number: F000919CON File Number: 591/26072.AGY

This addendum is issued to inform bidders of changes, clarifications, and additions to the drawings and/or specifications. Provide all labor, materials, equipment, services, and supervision as necessary to complete the work stated herein. All costs associated with the work in this addendum shall be included in the bid price and are considered part of the contract. All work shall be in accordance with the original bid documents and the information indicated below:

Q and A:

N/A

ITEM #1: Attendance Sheet

ACKNOWLEDGE RECEIPT OF ADDENDUM ON BID SUMMARY