This Addendum 1 document, issued by the Michigan Department of Technology, Management and Budget (DTMB) State Facilities Administration Design and Construction Division, modifies the Request for Proposal for the Monroe Welcome Center Playground Replacement project (File Number 591/25433.DPL). The project involves the complete replacement of playground equipment and safety surfacing at the Monroe Welcome Center, with work items including site preparation and grading, removal of existing play equipment, furnishing and installation of poured-in-place safety surfacing (4,513 square feet), concrete paving (112 square feet), perforated drainage pipe (275 linear feet of 4-inch and 316 linear feet of 6-inch), and restoration seeding. A mandatory site walkthrough was conducted for potential bidders, with all attendees eligible to bid on both the Monroe and New Buffalo projects. The proposal due date is August 12, 2026, at 2:00 p.m., with Project Director David Lenz overseeing the effort.

The bid schedule requires contractors to submit lump-sum pricing for mobilization, insurance, permits, bonds, site layout and staking, site preparation, equipment removal, expansion joint caulking, and play equipment installation, along with unit prices for concrete paving, poured-in-place safety surfacing, and perforated pipe installation. The project includes a mandatory $20,000 contingency allowance to be incorporated into the total bid price. This project requires prevailing wage compliance with current Michigan wage rates effective November 2025 through February 2026, covering classifications such as carpenters, cement masons, laborers, equipment operators, and various skilled trades. Schedule alternates include optional fencing (32 linear feet) and benches (2 units). Site security during construction requires snow fence, caution tape, and cones, with contractors providing their own closure signage; temporary chain-link fencing is not required, and any costs for perimeter fence removal and replacement for construction access must be covered under mobilization.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTMB-0414 RFP (Rev 2/22)

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

State Facilities Administration Design and Construction Division

CONSTRUCTION ADDENDUM NO. 01

This form identifies an Addendum to a Request for Proposal for Professional Services, and incorporates interpretations or clarifications, modifications, and other information into the Request for Proposals.

Addenda will be numbered by the Project Director and distributed through SIGMA Vendor VSS as an attachment.

TO:

ALL PROPOSERS

DATE ISSUED

07/27/26

PROJECT NAME

Monroe Welcome Center Playground Replacement

FILE NUMBER

591/25433.DPL

PROJECT DIRECTOR

David Lenz AIA

PROPOSAL DUE DATE:

8/12/26 @2:00pm

ADDENDUM ITEMS: (attach additional sheets and drawings if required)

• Revised Project Statement (removed New Buffalo information)

• New Buffalo to be bid as separate project. See Sigma for new posting

• New Buffalo will be bid w/o mandatory walk-thru to allow all bidders from Monroe walk-thru to bid on New Buffalo

• Revised Specifications

• Updated site contact

• Updated bid schedule

• Additional Addendum #1 items per project PSC (MCSA Group)

APPROVED BY:

David Lenz - PROJECT DIRECTOR DATE: 7/27/26 http://www.buy4michigan.com/

ADDENDUM #1

DTMB MDOT Welcome Center Playgrounds

MONROE, MICHIGAN

FILE # 591/24533.DPL

This addendum forms a part of the contract documents and modifies the original specification and bid proposal as noted below. Acknowledge receipt of this addendum by attaching a copy to the Bid Proposal Form. Failure to do so may subject the bidder to disqualification. This addendum consists of 49 pages.

1. See attached attendance/Sign-Sheet. Note that all bidders that attended either site walkthrough may bid on both projects.

2. Each Project shall include a $20,000 allowance for contingency. This shall be included in the total bid price. See attached updated Bid Scheduled.

3. This project requires Prevailing Wages. See attached Wage Rates.

4. Poured in Place safety surfacing color A shall be 75% light green and 25% green. Color B shall 75% light blue and 25% Blue.

5. Playground sites shall be secured during construction with snow fence, caution tap, and cones. Temporary chain link fence is not required. Contractor to provide their own signs stating “Playground is Closed, Authorized Personal Only”

6. If section of perimeter fencing is removed and replaced for construction access, the cost shall be covered in mobilization.

Bidding and Contract Document (R 4/26) Project Name: MONROE WELCOME CENTER PLAYGRPOUND File No. 591/25433.DPL

BID SCHEDULE

Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:

Base Bid Item No.

Bid Quantity

Description

Unit Price

Item Bid Price

1. Lump Sum Mobilization, management, and maintaining traffic complete.

2. Lump Sum Insurance, Permits and Bonds $ $

3. Lump Sum All layout and staking of site work elements complete.

4. Lump Sum Site Preparation and Grading including Soil Erosion, Sedimentation Control, and Miscellaneous Removals Not Included Below

5. Lump Sum Remove existing play equipment and safety surfacing complete as per plans and specifications.

6. Lump Sum Contingency Allowance $20,000 $20,000

7. Lump Sum Furnish and install expansion joint caulking as per plans and specifications.

8. 112 Square Feet

Furnish and install concrete paving as per detail 1 on sheet L5 and per plans and specifications.

9. 4,513 Square Feet

Furnish and install poured in place safety surfacing as per detail 3 on sheet L5 and per plans and specifications.

10. Lump Sum Furnish and install play equipment as per plans and specifications.

11. 275 Linear Feet

Furnish and install 4” perforated pipe as per plans and specifications.

12. 316 Linear Feet

Furnish and install 6” perforated pipe, including connections to existing stormwater system, as per plans and specifications.

13. Lump Sum Furnish and install restoration seeding as per plans and specifications.

TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $

Base Bid (Sum of Item Bid Prices for all Base Bid Items):

__________________________________________________________________ Dollars $__________________________ (use words) (in figures)

Bidding and Contract Document (R 4/26) Project Name: MONROE WELCOME CENTER PLAYGRPOUND File No. 591/25433.DPL

Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate Item No.

Bid

Item Bid Price

1. 32 Linear Feet

Furnish and install fencing as per detail 5 on sheet L5 and per plans and specifications.

2. 2 Each Furnish and install benches as per detail 4 on sheet L5 and per plans and specifications.

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.

Item No. Bid

Item Bid

Prevailing Wage Rates for State Of Michigan Funded Projects Official Rate Schedule

Monroe

Classification Name Last Updated

3.1 Power Equip. Operator - Highway & Heavy 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $71.46 $94.57 $117.67 Apprentice: Level 1 0 - 6 Months $57.61 $73.79 $89.97 Apprentice: Level 2 7 -12 Months $59.93 $77.28 $94.61 Apprentice: Level 3 13 - 18 Months $62.23 $80.73 $99.21 Apprentice: Level 4 19 - 24 Months $64.54 $84.19 $103.83 Apprentice: Level 5 25 - 30 Months $66.85 $87.66 $108.45 Apprentice: Level 6 31 - 36 Months $69.15 $91.10 $113.05

Four 10-hour days allowed? - Yes Make Up Day Allowed? - Yes

November | 2025 Page 1 of 46

Monroe

Classification Name Last Updated

3.2 Power Equip. Operator - Highway & Heavy 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $70.31 $92.84 $115.37 Apprentice: Level 1 0 - 6 Months $56.81 $72.59 $88.37 Apprentice: Level 2 7 -12 Months $59.06 $75.97 $92.87 Apprentice: Level 3 13 - 18 Months $61.31 $79.35 $97.37 Apprentice: Level 4 19 - 24 Months $63.56 $82.72 $101.87 Apprentice: Level 5 25 - 30 Months $65.81 $86.09 $106.37 Apprentice: Level 6 31 - 36 Months $68.06 $89.47 $110.87

Four 10-hour days allowed? - Yes

November | 2025 Page 2 of 46

Monroe

Classification Name Last Updated

3.3 Power Equip. Operator - Highway & Heavy 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $63.58 $82.75 $101.91 Apprentice: Level 1 0 - 6 Months $52.10 $65.53 $78.95 Apprentice: Level 2 7 -12 Months $54.02 $68.41 $82.79 Apprentice: Level 3 13 - 18 Months $55.92 $71.26 $86.59 Apprentice: Level 4 19 - 24 Months $57.84 $74.14 $90.43 Apprentice: Level 5 25 - 30 Months $59.75 $77.00 $94.25 Apprentice: Level 6 31 - 36 Months $61.67 $79.89 $98.09

Four 10-hour days allowed? - Yes

November | 2025 Page 3 of 46

Monroe

Classification Name Last Updated

3.4 Power Equip. Operator - Highway & Heavy 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $63.02 $81.91 $100.79 Apprentice: Level 1 0 - 6 Months $51.70 $64.93 $78.15 Apprentice: Level 2 7 -12 Months $53.59 $67.76 $81.93 Apprentice: Level 3 13 - 18 Months $55.48 $70.60 $85.71 Apprentice: Level 4 $57.36 $73.42 $89.47 Apprentice: Level 5 25 - 30 Months $59.25 $76.25 $93.25 Apprentice: Level 6 31 - 36 Months $61.13 $79.07 $97.01

Four 10-hour days allowed? - Yes

November | 2025 Page 4 of 46

Monroe

Classification Name Last Updated

3.5 Power Equip. Operator - Highway & Heavy 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $44.80 $60.98 $77.15 Apprentice: Level 1 0 - 6 Months $35.09 $46.42 $57.73 Apprentice: Level 2 7 -12 Months $36.71 $48.84 $60.97 Apprentice: Level 3 13 - 18 Months $38.33 $51.27 $64.21 Apprentice: Level 4 19 - 24 Months $39.95 $53.71 $67.45 Apprentice: Level 5 25 - 30 Months $41.57 $56.13 $70.69 Apprentice: Level 6 31 - 36 Months $43.18 $58.55 $73.91

Four 10-hour days allowed? - Yes

November | 2025 Page 5 of 46

Monroe

Classification Name Last Updated

4.1 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $73.64 $97.79 $121.93 Apprentice: Level 1 0 - 6 Months $59.15 $76.06 $92.95 Apprentice: Level 2 7 -12 Months $61.56 $79.67 $97.77 Apprentice: Level 3 13 - 18 Months $63.98 $83.30 $102.61 Apprentice: Level 4 19 - 24 Months $66.39 $86.92 $107.43 Apprentice: Level 5 25 - 30 Months $68.81 $90.55 $112.27 Apprentice: Level 6 25 - 30 Months $71.22 $94.16 $117.09

Four 10-hour days allowed? - Yes

November | 2025 Page 6 of 46

Monroe

Classification Name Last Updated

4.2 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $73.34 $97.33 $121.33 Apprentice: Level 1 0 - 6 Months $58.94 $75.74 $92.53 Apprentice: Level 2 7 -12 Months $61.34 $79.34 $97.33 Apprentice: Level 3 13 - 18 Months $63.74 $82.94 $102.13 Apprentice: Level 4 19 - 24 Months $66.14 $86.54 $106.93 Apprentice: Level 5 25 - 30 Months $68.54 $90.14 $111.73 Apprentice: Level 6 31 - 36 Months $70.94 $93.74 $116.53

Four 10-hour days allowed? - Yes

November | 2025 Page 7 of 46

Monroe

Classification Name Last Updated

4.3 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $72.52 $96.11 $119.69 Apprentice: Level 1 0 - 6 Months $58.37 $74.88 $91.39 Apprentice: Level 2 7 -12 Months $60.74 $78.44 $96.13 Apprentice: Level 3 13 - 18 Months $63.09 $81.96 $100.83 Apprentice: Level 4 19 - 24 Months $65.45 $85.51 $105.55 Apprentice: Level 5 25 - 30 Months $67.81 $89.04 $110.27 Apprentice: Level 6 31 - 36 Months $70.17 $92.59 $114.99

Four 10-hour days allowed? - Yes

November | 2025 Page 8 of 46

Monroe

Classification Name Last Updated

4.4 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $71.66 $94.82 $117.97 Apprentice: Level 1 0 - 6 Months $57.77 $73.99 $90.19 Apprentice: Level 2 7 - 12 Months $60.08 $77.45 $94.81 Apprentice: Level 3 13 - 18 Months $62.40 $80.93 $99.45 Apprentice: Level 4 19 - 24 Months $64.71 $84.39 $104.07 Apprentice: Level 5 25 - 30 Months $67.03 $87.87 $108.71 Apprentice: Level 6 31 - 36 Months $69.35 $91.35 $113.35

Four 10-hour days allowed? - Yes

November | 2025 Page 9 of 46

Monroe

Classification Name Last Updated

4.5 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $70.69 $93.37 $116.03 Apprentice: Level 1 0 - 6 Months $57.09 $72.96 $88.83 Apprentice: Level 2 7 - 12 Months $59.36 $76.37 $93.37 Apprentice: Level 3 13 - 18 Months $61.62 $79.76 $97.89 Apprentice: Level 4 19 - 24 Months $63.90 $83.18 $102.45 Apprentice: Level 5 25 - 30 Months $66.16 $86.57 $106.97 Apprentice: Level 6 31 - 36 Months $68.43 $89.97 $111.51

Four 10-hour days allowed? - Yes

November | 2025 Page 10 of 46

Monroe

Classification Name Last Updated

4.6 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $68.98 $90.80 $112.61 Apprentice: Level 1 0 - 6 Months $55.89 $71.16 $86.43 Apprentice: Level 2 7 -12 Months $58.07 $74.43 $90.79 Apprentice: Level 3 13 - 18 Monhs $60.25 $77.71 $95.15 Apprentice: Level 4 19 - 24 Months $62.44 $80.99 $99.53 Apprentice: Level 5 25 - 30 Months $64.62 $84.26 $103.89 Apprentice: Level 6 31 - 36 Months $66.80 $87.53 $108.25

Four 10-hour days allowed? - Yes

November | 2025 Page 11 of 46

Monroe

Classification Name Last Updated

4.7 Power Equip. Operator - Commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $61.67 $79.83 $97.99 Apprentice: Level 1 0 - 6 Months $50.78 $63.50 $76.21 Apprentice: Level 2 7 -12 Months $52.58 $66.20 $79.81 Apprentice: Level 3 13 - 18 Months $54.40 $68.93 $83.45 Apprentice: Level 4 19 - 24 Months $56.22 $71.66 $87.09 Apprentice: Level 5 25 - 30 Months $58.03 $74.37 $90.71 Apprentice: Level 6 31 - 36 Months $59.85 $77.10 $94.35

Four 10-hour days allowed? - Yes

November | 2025 Page 12 of 46

Monroe

Classification Name Last Updated

4.8 Power Equip. Operator - commercial 11/01/2025

Wage Rates Straight Time Time and a Half Double Time Journeyman $60.64 $71.39 $86.73 Apprentice: Level 1 0 - 6 Months $50.05 $62.40 $74.75 Apprentice: Level 2 7 -12 Months $51.82 $65.06 $78.29 Apprentice: Level 3 13 - 18 Months $53.58 $67.70 $81.81 Apprentice: Level 4 19 - 24 Months $55.35 $70.36 $85.35 Apprentice: Level 5 25 - 30 Months $57.11 $72.99 $88.87 Apprentice: Level 6 31 - 36 Months $58.88 $75.65 $92.41

Four 10-hour days allowed? - Yes

November | 2025 Page 13 of 46

Monroe

Classification Name Last Updated

5.1 Truck Driver Class 01/05/2026

Wage Rates Straight Time Time and a Half Double Time Journeyman $54.10 $70.52 $86.94

Four 10-hour days allowed? - Yes Make Up Day Allowed? - No

November | 2025 Page 14 of 46

Monroe

Classification Name Last Updated

Articulated Hauler 10/28/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.02 $81.91 $100.79 Apprentice: Apprentice Level 1 $51.70 $64.93 $78.15 Apprentice: Apprentice Level 2 $53.59 $67.76 $81.93 Apprentice: Apprentice Level 3 $55.48 $70.60 $85.71 Apprentice: Apprentice Level 4 $57.36 $73.42 $89.47 Apprentice: Apprentice Level 5 $59.25 $76.25 $93.25 Apprentice: Apprentice Level 6 $61.13 $79.07 $97.01

Four 10-hour days allowed? - No

November | 2025 Page 15 of 46

Monroe

Classification Name Last Updated

Asbestos abatement worker or environmental remediation worker 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $56.20 $73.24 $90.28 Apprentice: Trainee 600 hours +1 year $43.12 $55.01 $66.90

Four 10-hour days allowed? - Yes

November | 2025 Page 16 of 46

Monroe

Classification Name Last Updated

Boom Truck 10/28/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $70.31 $92.84 $115.37 Apprentice: Apprentice Level 1 $56.81 $72.59 $88.37 Apprentice: Apprentice Level 2 $59.06 $75.97 $92.87 Apprentice: Apprentice Level 3 $61.31 $79.35 $97.37 Apprentice: Apprentice Level 4 $63.56 $82.72 $101.87

Four 10-hour days allowed? - No

November | 2025 Page 17 of 46

Monroe

Classification Name Last Updated

Bricklayers 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $67.32 $87.09 $106.86 Apprentice: Level 1 $52.61 $65.03 $77.44 Apprentice: Level 2 $54.79 $68.30 $81.80 Apprentice: Level 3 $56.97 $71.57 $86.16 Apprentice: Level 4 $59.15 $74.84 $90.52 Apprentice: Level 5 $61.33 $78.11 $94.88 Apprentice: Level 6 $63.51 $81.38 $99.24 Apprentice: Level 7 $65.69 $84.65 $103.60

Four 10-hour days allowed? - Yes

November | 2025 Page 18 of 46

Monroe

Classification Name Last Updated

Carpenters 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $74.81 $96.28 $117.75 Apprentice: Level 1 1st year $48.91 $61.89 $74.87 Apprentice: Level 2 2nd Year $55.39 $70.50 $85.60 Apprentice: Level 3 3rd Year $61.86 $79.09 $96.31 Apprentice: Level 4 4th Year $68.34 $87.69 $107.04

Four 10-hour days allowed? - Yes

November | 2025 Page 19 of 46

Monroe

Classification Name Last Updated

Carpet layers (linoleum) 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $53.72 $70.77 $87.81 Apprentice: Level 1 $43.49 $55.42 $67.35 Apprentice: Level 2 $45.20 $57.99 $70.77 Apprentice: Level 3 $48.61 $63.10 $77.59 Apprentice: Level 4 $52.02 $68.22 $84.41

Four 10-hour days allowed? - Yes

November | 2025 Page 20 of 46

Monroe

Classification Name Last Updated

Cement Mason 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $64.27 $96.41 $128.54 Apprentice: Apprentice Level 1 $47.90 $71.25 $94.59 Apprentice: Apprentice Level 2 $50.43 $75.04 $99.65 Apprentice: Apprentice Level 3 $52.96 $78.84 $104.71 Apprentice: Apprentice Level 4 $55.49 $82.63 $109.77 Apprentice: Apprentice Level 5 $58.03 $86.44 $114.85 Apprentice: Apprentice Level 6 $60.56 $90.24 $119.91

Four 10-hour days allowed? - No

November | 2025 Page 21 of 46

Monroe

Classification Name Last Updated

Electrician 10/31/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $76.68 $115.03 $153.36 Apprentice: Apprentice Level 1 & 2 $36.86 $55.30 $73.72 Apprentice: Apprentice Level 3 $45.50 $68.26 $91.00 Apprentice: Apprentice Level 4 $51.73 $77.60 $103.46 Apprentice: Apprentice Level 5 $57.98 $86.96 $115.96 Apprentice: Apprentice Level 6 $64.19 $96.29 $128.38

Four 10-hour days allowed? - No

November | 2025 Page 22 of 46

Monroe

Classification Name Last Updated

Glaziers 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $67.95 $86.22 $107.22 Apprentice: Apprentice Level 1 $51.15 $63.75 $76.35 Apprentice: Apprentice Level 2 $53.25 $66.90 $80.55 Apprentice: Apprentice Level 3 $55.35 $70.05 $84.75 Apprentice: Apprentice Level 4 $57.45 $73.20 $88.95 Apprentice: Apprentice Level 5 $59.55 $76.35 $93.15 Apprentice: Apprentice Level 6 $61.65 $79.50 $97.35 Apprentice: Apprentice Level 7 $63.75 $82.65 $101.55 Apprentice: Apprentice Level 8 $65.85 $85.80 $105.75

Four 10-hour days allowed? - No

November | 2025 Page 23 of 46

Monroe

Classification Name Last Updated

Ground Person 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $50.85 $72.32 $93.78

Four 10-hour days allowed? - Yes

November | 2025 Page 24 of 46

Monroe

Classification Name Last Updated

Laborer, Common - Commercial 11/04/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $54.58 $71.50 $88.41 Apprentice: Apprentice Level 1 $46.12 $58.81 $71.49 Apprentice: Apprentice Level 2 $47.81 $61.34 $74.87 Apprentice: Apprentice Level 3 $49.51 $63.89 $78.27 Apprentice: Apprentice Level 4 $52.89 $68.96 $85.03

Four 10-hour days allowed? - No

November | 2025 Page 25 of 46

Monroe

Classification Name Last Updated

Laborer, Common - Highway & Heavy 11/05/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $50.32 $65.58 $80.83 Apprentice: Level 1 $42.69 $54.13 $65.57 Apprentice: Level 2 $44.22 $56.43 $68.63 Apprentice: Level 3 $45.74 $58.71 $71.67 Apprentice: Level 4 $48.79 $63.28 $77.77

Four 10-hour days allowed? - Yes

November | 2025 Page 26 of 46

Monroe

Classification Name Last Updated

Laborer, Landscaping 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $36.87 $49.23 $61.58 Apprentice: Apprentice Level 1 $30.69 $39.96 $49.22 Apprentice: Apprentice Level 2 $31.93 $41.82 $51.70 Apprentice: Apprentice Level 3 $33.16 $43.66 $54.16 Apprentice: Apprentice Level 4 $35.63 $47.37 $59.10

Four 10-hour days allowed? - No

November | 2025 Page 27 of 46

Monroe

Classification Name Last Updated

Laborer, Skilled - Commercial 11/04/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $54.58 $71.50 $88.41 Apprentice: Apprentice Level 1 $46.12 $58.81 $71.49 Apprentice: Apprentice Level 2 $47.81 $61.34 $74.87 Apprentice: Apprentice Level 3 $49.51 $63.89 $78.27 Apprentice: Apprentice Level 4 $52.89 $68.96 $85.03

Four 10-hour days allowed? - No

November | 2025 Page 28 of 46

Monroe

Classification Name Last Updated

Laborer, Skilled - Highway & Heavy 11/05/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $51.22 $66.93 $82.63 Apprentice: Level 1 $43.37 $55.15 $66.93 Apprentice: Level 2 $44.94 $57.51 $70.07 Apprentice: Level 3 $46.51 $59.86 $73.21 Apprentice: Level 4 $49.65 $64.57 $79.49

Four 10-hour days allowed? - Yes

November | 2025 Page 29 of 46

Monroe

Classification Name Last Updated

Landscaping equipment 10/28/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $39.09 $52.56 $66.02

Four 10-hour days allowed? - No

November | 2025 Page 30 of 46

Monroe

Classification Name Last Updated

Lineman 10/30/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $76.81 $111.26 $145.70 Apprentice: Level 1 0-1000 hours $49.26 $69.94 $90.60 Apprentice: Level 2 1001-2000 Hours $52.71 $75.11 $97.50 Apprentice: Level 3 2001-3000 Hours $56.15 $80.28 $104.38 Apprentice: Level 4 3001-4000 hours $59.60 $85.44 $111.28 Apprentice: Level 5 4001-5000 Hours $63.04 $90.60 $118.16 Apprentice: Level 6 5001-6000 Hours $66.48 $95.77 $125.04 Apprentice: Level 7 $69.93 $100.94 $131.94

Four 10-hour days allowed? - Yes

November | 2025 Page 31 of 46

Monroe

Classification Name Last Updated

Low Voltage Technician 01/20/2026 Wage Rates Straight Time Time and a Half Double Time Journeyman $53.28 $79.93 $106.56 Apprentice: Level 1 $25.14 $37.71 $50.28 Apprentice: Level 2 $29.17 $43.76 $58.34 Apprentice: Level 3 $44.33 $66.51 $88.66 Apprentice: Level 4 $46.11 $69.17 $92.22 Apprentice: Level 5 $47.89 $71.84 $95.78 Apprentice: Level 6 $49.67 $74.51 $99.34

Four 10-hour days allowed? - Yes

November | 2025 Page 32 of 46

Monroe

Classification Name Last Updated

Millwright 11/05/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $82.65 $126.09 $165.30 Apprentice: Level 1 $60.79 $91.21 $121.58 Apprentice: Level 2 $68.09 $102.15 $136.18 Apprentice: Level 3 $75.36 $113.05 $150.72 Apprentice: Level 4 $79.01 $118.54 $158.02

Four 10-hour days allowed? - Yes

November | 2025 Page 33 of 46

Monroe

Classification Name Last Updated

Off-Road Truck 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.02 $81.91 $100.79 Apprentice: Apprentice Level 1 $51.70 $64.93 $78.15 Apprentice: Apprentice Level 2 $53.59 $67.76 $81.93 Apprentice: Apprentice Level 3 $55.48 $70.60 $85.71 Apprentice: Apprentice Level 4 $57.36 $73.42 $89.47 Apprentice: Apprentice Level 5 $59.25 $76.25 $93.25 Apprentice: Apprentice Level 6 $61.13 $79.07 $97.01

Four 10-hour days allowed? - No

November | 2025 Page 34 of 46

Monroe

Classification Name Last Updated

Painters 02/05/2026 Wage Rates Straight Time Time and a Half Double Time Journeyman $57.02 $73.38 $90.53 Apprentice: Level 1 $43.30 $52.80 $63.09 Apprentice: Level 2 $46.73 $58.74 $70.75 Apprentice: Level 3 $50.16 $63.89 $77.61 Apprentice: Level 4 $53.59 $69.03 $84.47

Four 10-hour days allowed? - Yes

November | 2025 Page 35 of 46

Monroe

Classification Name Last Updated

Piledriver 11/01/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $74.81 $96.28 $117.75 Apprentice: Apprentice Level 1 $48.71 $61.59 $74.47 Apprentice: Apprentice Level 2 $55.39 $70.50 $85.60 Apprentice: Apprentice Level 3 $61.86 $79.09 $96.31 Apprentice: Apprentice Level 4 $68.34 $87.69 $107.04

Four 10-hour days allowed? - No

November | 2025 Page 36 of 46

Monroe

Classification Name Last Updated

Pipefitters—Steamfitters 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $72.30 $108.46 $144.60 Apprentice: Level 1 $46.55 $69.83 $93.10 Apprentice: Level 2 $51.22 $76.84 $102.44 Apprentice: Level 3 $55.89 $83.84 $111.78 Apprentice: Level 4 $60.56 $90.85 $121.12 Apprentice: Level 5 $65.23 $97.85 $130.46

Four 10-hour days allowed? - Yes

November | 2025 Page 37 of 46

Monroe

Classification Name Last Updated

Plumbers 10/29/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $72.30 $108.46 $144.60 Apprentice: Level 1 $46.55 $69.83 $93.10 Apprentice: Level 2 $51.22 $76.84 $102.44 Apprentice: Level 3 $55.89 $83.84 $111.78 Apprentice: Level 4 $60.56 $90.85 $121.12 Apprentice: Level 5 $65.23 $97.85 $130.46

Four 10-hour days allowed? - Yes

November | 2025 Page 38 of 46

Monroe

Classification Name Last Updated

Roofer/Waterproofer 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $36.79 $48.98 $61.16 Apprentice: 1st period $24.61 $30.70 $36.80 Apprentice: 2nd period $25.82 $32.52 $39.22 Apprentice: 3rd period $27.04 $34.35 $41.66 Apprentice: 4th period $28.26 $36.18 $44.10 Apprentice: 5th period $29.48 $38.01 $46.54 Apprentice: 6th period $30.70 $39.84 $48.98 Apprentice: 7th period $31.92 $41.67 $51.42 Apprentice: 8th period $33.13 $43.48 $53.84

Four 10-hour days allowed? - Yes

November | 2025 Page 39 of 46

Monroe

Classification Name Last Updated

Sheet Metal Workers 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $67.92 $91.48 $115.03 Apprentice: 1st Year $31.17 $41.07 $50.97 Apprentice: 2nd Year $44.37 $56.16 $67.93 Apprentice: 3rd Year $46.57 $59.45 $72.33 Apprentice: 4th Year $48.77 $62.75 $76.73 Apprentice: 5th Year $55.38 $72.67 $89.95

Four 10-hour days allowed? - Yes

4 ten hour days allowed when scheduled as four consecutive days, Monday thru Friday

November | 2025 Page 40 of 46

Monroe

Classification Name Last Updated

Sprinkler Fitters 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $60.34 $78.45 $96.56 Apprentice: Class 1 $24.57 $32.72 $40.87 Apprentice: Class 10 $52.07 $68.37 $84.67 Apprentice: Class 2 $26.38 $35.43 $44.49 Apprentice: Class 3 $39.14 $49.10 $59.06 Apprentice: Class 4 $40.95 $51.82 $62.68 Apprentice: Class 5 $43.01 $54.78 $66.55 Apprentice: Class 6 $44.82 $57.49 $70.17 Apprentice: Class 7 $46.63 $60.21 $73.79 Apprentice: Class 8 $48.45 $62.94 $77.43 Apprentice: Class 9 $50.26 $65.65 $81.05

Four 10-hour days allowed? - Yes

November | 2025 Page 41 of 46

Monroe

Classification Name Last Updated

Terrazzo Workers 04/17/2026 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.39 $81.78 $100.16 Apprentice: Level 1 $42.67 $53.70 $64.73 Apprentice: Level 2 $44.51 $56.46 $68.41 Apprentice: Level 3 $46.35 $59.22 $72.09 Apprentice: Level 4 $50.03 $64.74 $79.45 Apprentice: Level 5 $51.86 $67.49 $83.11 Apprentice: Level 7 $53.70 $70.25 $86.79 Apprentice: Level 8 $55.54 $73.01 $90.47

Four 10-hour days allowed? - Yes

November | 2025 Page 42 of 46

Monroe

Classification Name Last Updated

Tile Finishers 04/17/2026 Wage Rates Straight Time Time and a Half Double Time Journeyman $56.70 $71.74 $86.78 Apprentice: Level 1 $38.39 $48.17 $57.94 Apprentice: Level 2 $39.90 $50.43 $60.96 Apprentice: Level 3 $41.40 $52.68 $63.96 Apprentice: Level 4 $42.90 $54.93 $66.96 Apprentice: Level 5 $44.41 $57.20 $69.98 Apprentice: Level 6 $45.91 $59.45 $72.98

Four 10-hour days allowed? - Yes

November | 2025 Page 43 of 46

Monroe

Classification Name Last Updated

Tile Setters 04/17/2026 Wage Rates Straight Time Time and a Half Double Time Journeyman $63.39 $81.78 $100.16 Apprentice: Level 1 $42.67 $53.70 $64.73 Apprentice: Level 2 $44.51 $56.46 $68.41 Apprentice: Level 3 $46.35 $59.22 $72.09 Apprentice: Level 4 $50.03 $64.74 $79.45 Apprentice: Level 5 $51.86 $67.49 $83.11 Apprentice: Level 7 $53.70 $70.25 $86.79 Apprentice: Level 8 $55.54 $73.01 $90.47

Four 10-hour days allowed? - Yes

November | 2025 Page 44 of 46

Monroe

Classification Name Last Updated

Tunnel Miner 11/03/2025 Wage Rates Straight Time Time and a Half Double Time Journeyman $52.82 $70.02 $87.22 Apprentice: Level 1 $44.22 $57.12 $70.02 Apprentice: Level 2 $45.94 $59.70 $73.46 Apprentice: Level 3 $47.66 $62.28 $76.90 Apprentice: Level 4 $51.10 $61.35 $75.66

Four 10-hour days allowed? - Yes

November | 2025 Page 45 of 46

Monroe

Classification Name Last Updated

Underground and Open Cut Laborer 01/06/2026 Wage Rates Straight Time Time and a Half Double Time Journeyman $50.57 $66.62 $82.67 Apprentice: Level 1 $42.54 $54.58 $66.61 Apprentice: Level 2 $44.15 $56.99 $69.83 Apprentice: Level 3 $45.76 $59.41 $73.05 Apprentice: Level 4 $48.97 $64.22 $79.47

Four 10-hour days allowed? - Yes

November | 2025 Page 46 of 46