Addendum 1 _ Meade Field Lighting.pdf
PDF 342 KB Posted
- Attached to
- Meade Field Lighting Project (Amended 3/05/2024)
- Solicitation number
- PE-65650-NONST-2024-000000004
- Issued by
- Dodge County, Georgia
About this file
This document is an Addendum to the Meade Field Lighting Replacement Project RFP issued by the City of Peachtree City, Georgia. It provides clarification and responses to questions raised by potential bidders regarding the project scope and specifications.
The bid due date has been extended to Thursday, March 7, 2024 at 3:00 pm local time. The project involves replacement of the existing lighting system at the Meade Field softball complex, with a requirement that the new lights be operational for the upcoming softball season starting March 2. The addendum addresses questions related to trenching versus boring, concrete pads, wiring configurations, panelboards, and lighting foot-candle levels. It also confirms that sign-in sheets from the prebid meeting are available upon request. The City is seeking bids that meet the 50/30 foot-candle lighting requirement, with no less than 30/20 foot-candles accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 2 _ Meade Field Lighting.pdf | ||
| Addendum 4 _ Meade Field Lighting.pdf | ||
| Addendum 3 _ Meade Field Lighting.pdf | ||
| Meade Field Lighting Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Peachtree City 151 Willowbend Road Peachtree City, GA 30269 Phone: 770-631-2515 Fax: 770-631-2507 PeachtreeCityGA.gov Purchasing Department
CITY OF PEACHTREE CITY
MEADE FIELD LIGHTING REPLACEMENT PROJECT
24-104BRS
ADDENDUM #1
REVISED BID DUE DATE: The date for submittal of bids has been extended to Thursday, March 7, 2024, at 3:00 pm local time.
CLARIFICATION: The softball season officially opens March 2. Working hours are 7 am through 4 pm Monday – Friday. Lights must be operational at all times. Staff expects the season to conclude at the end of May.
QUESTION: Sheet E051 – Detail 5-E051. Is boring an alternative to trenching?
CITY’S RESPONSE: Yes, boring is an alternative with the usual precautions of utilities and irrigation.
QUESTION: Sheet E051 – Detail 6-051. Calls for a new pad. Is this pad for the new switchboard?
CITY’S RESPONSE: Yes, this pad is to support the new switchboard.
QUESTION: Sheet E051 – Detail 1-E051. Notes on Hexagon do not match “Light Tower Feed Schedule” CITY’S RESPONSE: Please see revised sheet E051 with corrected labels.
QUESTION: Sheet E051 – Can we use the existing pole access holes in lieu of running rigid on outside of poles?
CITY’S RESPONSE: For ease of maintenance and accessibility we prefer to have rigid conduit run up the outside of the pole.
QUESTION: Sheet E051 – Detail 3-E051. Why is a 5 wire system (4#2-1#8) specified?
CITY’S RESPONSE: The Luminaires connect at 277V, therefore a neutral is required.
QUESTION: We haven’t seen any specifications on the new panelboard. Do we use aluminum buss or copper?
CITY’S RESPONSE: A copper buss should be provided.
QUESTION: Can we obtain sign-in sheets for the meeting?
CITY’S RESPONSE: Yes. Request via email.
QUESTION: Seeking clarification on the switchboard specified at 6’ x 3’?
CITY’S RESPONSE: The Design engineer confirmed the switchboard is 6’Wx3’D.
QUESTION: Specs show foot candle at 50/30. Is this correct? Is 30/20 foot candle acceptable?
CITY’S RESPONSE: 50/30 is correct; nothing less accepted.
Attachment: Revised sheet E051 – 2/20/2024
21 February 2024
336.9
401.2
208/120 3 PH 4W 22K REMARKS:
600 600 MCB SURFACE
BOTTOM NEMA 3R
40/3 FIELD 4 - POLES A1, B1, C1 FIELD 6 - POLES A3, B3, C5 40/3
40/3 FIELD 4 - POLES A2, B2, C2 FIELD 6 - POLES A4, B4, C6 40/3
40/3 FIELD 5 - POLES A2, B2, C3 FIELD 7 - POLES A4, B5 40/3
40/3 FIELD 5 - POLES A3, B3, C4 FIELD 7 - POLES A5, B6 40/3
30/1 PITCHING MACHINE (EXISTING CIR) SHED (EXISTING CIRCUIT) 100/3
30/1 PITCHING MACHINE (EXISTING CIR) ↓ ↓ ↓
30/1 PITCHING MACHINE (EXISTING CIR) ↓ ↓ ↓
20/1 PANEL RECEPTACLE PREPARED SPACE
20/1 EXISTING CIRCUIT PREPARED SPACE
20/1 EXISTING CIRCUIT PREPARED SPACE
20/1 SPARE PREPARED SPACE
20/1 SPARE PREPARED SPACE
20/1 SPARE PREPARED SPACE
1.00 1.00 1.00
VOLTAGE: AIC RATING:
SWITCHBOARD MDP FEEDER AMP: MAINS: MOUNTING:
LUGS: FEED: ENCLOSURE:
BKR NOTE LOAD DESCRIPTION VA CKT PHASE CKT VA LOAD DESCRIPTION NOTE BKR
3155 1 A 2 3020
3155 3 B 4 3020
3155 5 C 6 3020
3220 7 A 8 3020
3220 9 B 10 3020
3220 11 C 12 3020
3220 13 A 14 3020
3220 15 B 16 3020
3220 17 C 18 3020
3220 19 A 20 3020
3220 21 B 22 3020
3220 23 C 24 3020
2640 25 A 26 6000
2640 27 B 28 6000
2640 29 C 30 6000
360 31 A 32 0
1200 33 B 34 0
1200 35 C 36 0
0 37 A 38 0
0 39 B 40 0
0 41 C 42 0
Connected Load Per Phase PH A: 33895 PH B: 34735 PH C: 34735
Lighting HVAC Motors Recept. Refrig Kitchen Misc Total VA Amps
Connected VA 92685 0 0 0 0 0 28680 121365
Demand Factor 1.25 1.00 1.00 NEC
Demand VA 115856 0 0 0 0 0 28680 144536
LIGHT TOWER FEEDER SCHEDULE
NO. FIELD CIRCUIT FROM TO
FEEDER RATING
(KVA)
FEEDER RATING (AMPS) FEEDER LENGTH (FT) FEEDER NOTES
4A 1 MDP-1, 3, 5 LIGHTING CONTROL PANEL POLES A2, B2, C2 9.66 26.8 600 4#2, #8G, 1-1/2" PVC CONDUIT 1
4B 1 MDP-7, 9, 11 LIGHTING CONTROL PANEL POLES A1, B1, C1 9.46 26.3 550 4#2, #8G, 1-1/2" PVC CONDUIT 1
TOTAL CIRCUIT A LOAD : 19.12 53.1
5A 2 MDP-13, 15, 17 LIGHTING CONTROL PANEL POLES A2, B2, C3 9.66 26.8 600 4#2, #8G, 1-1/2" PVC CONDUIT 1
5B 2 MDP-19, 21, 23 LIGHTING CONTROL PANEL POLES A3, B3, C4 9.66 26.8 550 4#2, #8G, 1-1/2" PVC CONDUIT 1
TOTAL CIRCUIT B LOAD : 19.32 53.7
6A 3 MDP-2, 4, 6 LIGHTING CONTROL PANEL POLES A3, B3, C5 9.07 25.2 550 4#2, #8G, 1-1/2" PVC CONDUIT 1
6B 3 MDP-8, 10, 12 LIGHTING CONTROL PANEL POLES A4, B4, C6 9.07 25.2 550 4#2, #8G, 1-1/2" PVC CONDUIT 1
TOTAL CIRCUIT C LOAD : 18.1 50.4
7A 4 MDP-14, 16, 18 LIGHTING CONTROL PANEL POLES A4, B5 9.07 25.2 550 4#2, #8G, 1-1/2" PVC CONDUIT 1
7B 4 MDP-20, 22, 24 LIGHTING CONTROL PANEL POLE A5, B6 9.07 25.2 550 4#2, #8G, 1-1/2" PVC CONDUIT 1
TOTAL CIRCUIT D LOAD : 18.14 50.4
NOTES:
1 PROVIDE RIGID GALVANIZED STEEL CONDUIT WHERE EXPOSED ABOVE GRADE.
FIELD #5FIELD #6
FIELD #7 FIELD #4
POLE
C4
POLE
C3
POLE
C2
POLE
C1
POLE
B6
POLE
B1
POLE
A1
POLE A5
POLE
A3
POLE A4
POLE B4
POLE
B5
POLE
C6
POLE
C5
POLE
B3
POLE A2
POLE B2
HANDHOLE
4B
4B
7B
5A
4A
4A
5A
4A
5A
4A
5A
6A
5B
7A
6B
HANDHOLE
7A 7A
6B
HANDHOLE
4B
6B
5B
6A
6B
HANDHOLE
6A
5B
6A
5B
4B
LIGHT POLE (TYP)
POLE RELAY CABINET (TYP)
E051
6 6
HANDHOLE
PROVIDE ONE(1) 2"
CONDUIT WITH PULLSTRING
FOR FUTURE FIBER LINE
BRING 2" CONDUIT
UP AT FACE OF
BUILDING AND CAP
7B
COPPER LIGHTNING
PROTECTION AIR
TERMINAL
LIGHTING
CROSSARM/LUMINAIRE
ASSEMBLY (TYP)
EXISTING LIGHT POLE (APPROX 60'),
REPLACE EXISTING LABELS ON POLES WITH
NEW LABELS TO CORRESPOND WITH PLANS
#2 GROUND CONDUCTOR
WIRING HARNESS FURNISHED
BY LIGHTING SYSTEM
SUPPLIER IN 2" RGS CONDUIT
BY CONTRACTOR (TYP)
POLE RELAY CABINET
FURNISHED BY LIGHTING
SYSTEM SUPPLIER, INSTALLED
BY CONTRACTOR (TYP)
BOND GROUND CONDUCTOR
TO RELAY CABINET
GRADE
EXOTHERMIC WELD
5/8" x 8' CU
GROUND ROD
4#2, #8G; 1-1/2"C
(TYP) FROM FIELD LIGHTING
CONTROL AND MONITORING
PANEL. USE RGS CONDUIT FOR
ELBOW AND ABOVE GRADE
CONDUIT.
10' +/-
NEW FIELD LIGHTING CONTROL
AND MONITORING PANEL
NEW ELECTRICAL
SWITCHBOARD MDP
EXISTING PAD-MOUNTED
TRANSFORMER
EXISTING PLC CABINET
EXISTING CREDIT CARD
KIOSK
15#12, #12G; 1"C
(6' W x 3' D)
KEY NOTES:
1. PROVIDE SWITCHBOARD MDP IN EXISTING ELECTRICAL PANELBOARD
LOCATION. REFER TO 1/E000, ONE-LINE DIAGRAM AND E051, PANEL
SCHEDULE.
2. NEW FIELD LIGHTING CONTROL AND MONITORING PANEL FURNISHED BY
FIELD LIGHTING SUPPLIER FOR INSTALLATION BY CONTRACTOR.
3. EXISTING PAD-MOUNTED TRANSFORMER TO REMAIN.
4. EXISTING CREDIT CARD KIOSK TO REMAIN. REFER 1/E000, ONE-LINE
DIAGRAM AND PHOTO, E000, FOR SCOPE OF WORK REQUIRED.
5. EXISTING CREDIT CARD KIOSK CONTROLLER TO REMAIN. REFER 1/E000,
ONE-LINE DIAGRAM AND PHOTO, E000, FOR SCOPE OF WORK
REQUIRED.
6. REPLACE EXISTING LABELS ON POLES WITH NEW LABELS TO
CORRESPOND WITH PLANS.
X
A. EXISTING CIRCUIT DATA SHOWN IS TAKEN FROM EXISTING FACILITY
DOCUMENTATION AND/OR FIELD OBSERVATION. FIELD VERIFY ALL
CIRCUITS.
B. VERIFY CIRCUITS ON EXISTING PANELS. ADJUST CIRCUITING AS REQUIRED
TO MEET DESIGN INTENT OF DRAWINGS. TURN SPARE BREAKERS OFF.
C. PROVIDE NEW TYPEWRITTEN PANEL DIRECTORY TO REFLECT NEW AND ALSO
THE UNMODIFIED CONDITIONS UPON COMPLETION OF WORK DESCRIBED
IN THESE DRAWINGS. A HANDWRITTEN PANEL DIRECTORY OR CROSS-OUT
OR WHITE-OUT OF EXISTING PANEL DIRECTORY IS NOT ACCEPTABLE.
D. PROVIDE NEW CIRCUIT BREAKERS-TYPE, VOLTAGE RATING,AND AIC
RATING TO MATCH EXISTING.
E. PANEL SCHEDULES REFLECT STATUS AFTER PROPOSED WORK IS COMPLETE.
PANEL SCHEDULE NOTES:
A
13-1/2"
20-1/2"
8"
MIN.
30"
MIN.
6"
MIN.
LIGHTING
CONDUIT
GRADE
BOX AND COVER FLUSH
WITH GRADE
GASKET
CONDUIT
SKID RESISTANT, HEAVY DUTY
COVER WITH LOGO
PLAN VIEW
LOGO
1/2"x4" PULL SLOT
3/8-16 UNC STAINLESS STEEL
HEX HEAD BOLT WITH WASHER
(TYP OF 2)
SAND BED, 3" MINIMUM ABOVE
AND BELOW CONDUIT
COVER DETAIL
SECTION A-A
12"
MIN.
(2) PRECAST POLYMER CONCRETE
(STACKABLE) PULL BOXES
QUAZITE #PG1118BA12 OR EQUAL
A
12"
MIN.
6"
MIN.
CRUSHED STONE
NOTES:
UNDISTURBED EARTH
6" TOP SOIL, GRADE AND SEED
ROCK
GRAVEL / ROADWAYS
SUBGRADE
#1 CRUSHER RUN
ELECTRICAL CONDUIT
NON-TRAFFIC AREA
IF WET OR UNSTABLE CONDITIONS,
OR IF IN ROCK, BED WITH WASHED
COARSE SAND 6" MINIMUM BENEATH
CONDUIT, AS DIRECTED BY ENGINEER
2'-0" MINIMUM COVER BACKFILL:
SUITABLE EXCAVATED MATERIAL OR
BORROW ACCEPTABLE TO THE
ENGINEER
MARKER TAPE LABELED
"DANGER: BURIED ELECTRICAL LINE"
1. ALL MATERIAL PLACED IN GRAVEL/ROADWAY AREAS SHALL BE COMPACTED IN
MAXIMUM 6" LIFTS.
12"
MINIMUM
12"
MINIMUM
M
IN
NOTES:
SECTION
PLAN
(2) #4 REBAR ALL
AROUND PERIMETER
1. 3500 PSI AIR ENTRAINED CONCRETE CURED
FOR 28 DAYS BEFORE SETTING SWITCHBOARD
2. WELDED WIRE FABRIC - ASTM A-185
3. DEFORMED BARS - ASTM A-615, GRADE 40
4. TOP SURFACE SHALL BE TROWEL FINISHED
5. 3/4" CHAMFER STRIP ALL EXPOSED EDGES,
INCLUDING OPENING
APPROX. WT.
60# 38# 42#
0.83 C.Y.
2-1/2"
3-1/2"
WIRE WELDED FABRIC OR #4
BARS AT 12" EACH WAY
48"
108"
8" TYP (TYP)
#4 REBAR8" (TYP)
"A"/"V" ANCHOR
(TYP)
6"
6. PAD TO BE REINFORCED WITH ONE OF THE
REINFORCING STEEL COMBINATIONS:
A. #4 BARS @ 12" EACH WAY
B. WWF 6 X 6 X 2/2
C. WWF 4 X 4 X 4/4
7. CONCRETE VOLUME
FINISHED GRADE
615 Molly Lane Suite 100, Woodstock, GA 30189
CPL | Architecture Engineering Planning
CPLteam.com
Client Name
Project Address
PROJECT INFORMATION
Project Name
Project Number
Drawing Title
Drawn By
SHEET INFORMATION
Checked By
Drawing Number
Issued Scale
Project Status
PROFESSIONAL STAMPS
/2
/2
:4
:3
P
M
As indicated p ro je c t lo c a tio n
D
D e si g n
P ro je c t Fi le s o n
B
IM
PEACHTREE CITY GEORGIA
101 Rockaway Road
Peachtree City, GA 30269
JIM MEADE MEMORIAL FIELDS
SOFTBALL FIELDS LIGHTING
REPLACEMENT
R22.16989.07
ELECTRICAL PROPOSED PLANS,
DETAILS, & SCHEDULES
JMH TGB
12/12/2023
RELEASED FOR CONSTRUCTION
E051
1/32" = 1'-0"E051
1 MEADE FIELD ELECTRICAL PLAN
NOT TO SCALEE051
3 TYPICAL LIGHT POLE DETAIL
1/8" = 1'-0"E051
2 ENLARGED PLAN
X
NOT TO SCALEE051
4 HANDHOLE DETAIL
NOT TO SCALEE051
5 TYPICAL TRENCH DETAIL FOR CONDUIT
NOT TO SCALEE051
6 REINFORCED CONCRETE PAD DETAIL
PROJECT ISSUE & REVISION SCHEDULE
No. Date Description
1 02/20/2024 Revised feeder tags to match feeder schedule
| PTC_R22.16989.07_E051_REV_1 - Attachment.pdf |
| Sheets |
| E051 - ELECTRICAL PROPOSED PLANS, DETAILS, & SCHEDULES |
File details come from the government source that posted it. Updated .