This document is an Addendum to an Invitation to Bid (ITB) issued by Portland Community College (PCC) for the SE Campus MDF HVAC Replacement Project. The purpose of the ITB is to remove and replace the HVAC systems serving the SE Campus MDF Room. The addendum provides key information, including the attendance record of the mandatory pre-bid conference, two substitution requests and PCC's decisions, questions and answers, and details for the public bid opening. The bid closing date remains unchanged at February 3, 2022 at 2:00 PM Pacific Time.
The substitution requests were for the outdoor and indoor HVAC units, which PCC approved with some noted conditions. PCC also provided photographs of the existing roof area and access, and answered questions related to the controls scope, existing equipment disposal, temporary HVAC, and potential COVID-19 impacts. The public bid opening will be held on February 3, 2022 at 2:05 PM Pacific Time via Zoom teleconference.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IT1056-22 - Cerium SSJ.docx | DOCX document | |
| Posting 1.6.2022 - ITB SE Campus MDF HVAC Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Planning and Capital Construction 9700 SW Capitol Hwy – Suite 260
Portland OR 97219
Date: 1/26/2022
SOLICITATION ADDENDUM NO. 1
P&CC21-014-ITB
ITB – SE CAMPUS MDF HVAC REPLACEMENT PROJECT
THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:
This Addendum modifies the Invitation to Bid (ITB) document only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the ITB document. Bidders must be responsive to any requirements of this Addendum as if the requirements were set forth in the ITB. Failure to do so may result in Bid rejection. See the ITB regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.
This addendum is to be acknowledged in the space provided on the Bidder Certification Form supplied in the solicitation document. Failure to acknowledge receipt of this addendum may be cause to reject your bid.
The closing date REMAINS UNCHANGED: February 3, 2022 at 2:00 PM Pacific Time
The purpose of this Addendum is to provide four items of information. These four items follow this Addendum Number 1 Cover Page.
1) Attendance Record at the Mandatory Pre-Bid Conference and Site Inspection
2) Two Substitution Request Forms Submitted and PCC’s Decisions on those requests
3) Questions and Answers, including the requested photographs of the roof project area
4) Public Bid Opening information and teleconference logon details
END of Addendum # 1 Cover Page James Lasseter – PCC Buyer and Contract Specialist
Solicitation No. P&CC21-014-ITB
ITB – SE CAMPUS MDF HVAC REPLACEMENT PROJECT
Attendance Record – Mandatory Pre-Bid Conference and Site Inspection Held January 18, 2022 – 10:00AM
The following 8 firms are on record of having attended the Mandatory Pre-Bid Conference and Site Inspection:
GENERAL SHEET METAL
APEX MECHANICAL
YADON MECHANICAL
TOTAL MECHANICAL
CHERRY CITY ELECTRIC
HARDER MECHANICAL
NEXUS ELECTRICAL GROUP
BUILDSKAPE
--End of Attendance Record--
DocuSign Envelope ID: 956483DE-0A53-41E0-8EF1-2CDDBE8DD167
X
Buyer/Contract Specialist 1/25/2022
SECTION V – ATTACHMENTS
SE Campus MDF HVAC Replacement
Substitution Request Form Page 1 of 2 17JUN21_ITB_PI
ATTACHMENT I - SUBSTITUTION REQUEST FORM
USE AND SUBMIT A COPY OF THIS FORM FOR EVERY SUBSTITION REQUEST
Project:SE Campus MDF HVAC REPLACEMENT Deadline to Submit this Form: Jan 24, 2022 Noon Submit this Form to: james.lasseter@pcc.edu
RFP/ITB NUMER: P&CC21-014-ITB
Substitution Request Number:_________ From:___________________________________________ Date:____________________________________________
Specification/Section Title:
Article/Paragraph: Section No.: Page:
Description:
Original Specification: QTY:
Proposed substitution: QTY:
Manufacturer:
Address: Phone:
Trade Name: Model No./Color:
Installer: Address: Phone:
History: ☐ New Product ☐ 1 — 4 years old ☐ 5 — 10 years old ☐ More than 10 years old
Differences between proposed substitution and specified product:
☐ Point-by-point comparative data attached - REQUIRED FROM BIDDER/PROPOSER SUBMITTING THIS REQUEST
Reason for not providing specified item:
Similar Installation:
Project: Owner:
Address: Date Installed:
Proposed substitution affects other parts of Work: ☐ No ☐ Yes; explain
Dave Havelick - Sustainable Mechanical Systems
01/07/2022
V. 1, June 2020, Design & Construction Standards, Division 23: Heating Ventilating and Air Conditioning
Split System Air Conditioning Unit
7.Z. Decentralized HVAC Equipment
2 each Indoor/Outdoor Units
Daikin DX11TA CU-1,2 and DAT12043 AC-1,2, M Drawing 2.01
CU-1,2 and AC-1,2 2 ea. Indoor/ Outdoor Units
Johnson Controls (Z. 7. C. 3., pg. 27)/Fraser-Johnston manufactured by Johnson Controls in Norman, OK.
Norman, OK 877-874-7378
Fraser-Johnston
TBD TBD TBD
PH-10C00ATEAA5/CU-1,2 and NS-10C00CTCAA4/
AC-1,2; MINERAL BROWN
X
Negligible
Fraser Johnston has slightly different dims, performance, electrical than Daikn basis of design same as York,Tran, Carrier, etc.
X
Oregon State University
Withycombe Hall Theater
2921 SW Campus Way, Corvallis, OR
97331
NA
SECTION V – ATTACHMENTS
SE Campus MDF HVAC Replacement
Substitution Request Form Page 2 of 2 17JUN21_ITB_PI
Supporting Data Attached: ☐ Drawings ☐ Product Data ☐ Samples ☐ Tests
☐ Reports ☐ Sustainability Criteria (MA-CHPS) (LEED)
The Undersigned certifies:
• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.
• Same warranty will be furnished for proposed substitution as for specified product.
• Same maintenance service and source of replacement parts, as applicable, is available.
• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.
• Proposed substitution does not affect dimensions and functional clearances.
• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.
Submitted by:
Signed by:
Firm:
Address:
Telephone:
Email:
Attachments:
PCC INTERNAL USE (REVIEW AND ACTION)
☐ Substitution approved
☐ Substitution approved as noted
☐ Substitution rejected - Use specified materials.
☐ Substitution Request received loo late - Use specified materials.
Signed by: Date:
Additional Comments by PCC (if any):
x x
Dave Havelick
Sustainable Mechanical Systems
7412 SW Beaverton Hillsdale Hwy., Ste. 203, Portland, OR 97225
503-703-2042
Dave Havelick
Preliminary Submittal
DocuSign Envelope ID: 956483DE-0A53-41E0-8EF1-2CDDBE8DD167
Buyer/Contract Specialist
X
1/25/2022
SUBMITTAL DATA
Order #: Date: 01/06/2022 Project: PCC SE Center MDF Project #:
Submitter: David Havelick Sustainable Mechanical Systems Inc.
7412 SW Beaverton Hillsdale Hwy, Suite 203, Portland, Oregon 97225 503-703-2042 dhavelick@sustainmech.com
Information is subject to change without notice. Check local codes. Printed 01/06/2022
Notes:
1. Fraser Johnston manufactured by JCI in same Norman, OK factory and using same configuration, components, performance, etc. as already listed York.
2. Fraser Johnston split system per Specification Section 23, Z and drawings M2.01 through M2.06.
Date 01/06/2022 Project Name PCC SE Center MDF Project Number Client / Purchaser
Submittal Summary Page
Qty Tag # Model # / Material # Description 2 CU-1,2 PH-10C00ATEAA5 10 Ton, Split System R-410A Heat Pump, 2-Pipe R-410A, 2-Stage, Standard Motor, 208/230-3-60, Copper Tube/Al Fin Condenser Coil
• Smart Equipment Controller with Gateway to BACnet MS/TP (Programmable to Modbus or N2)
2 CU-1,2 2LA04702012 Low Ambient To 0° F
2 CU-1,2 1HG0429 Hail Guard
2 CU-1,2 2HG04700524 Hot Gas Bypass Kit; Includes discharge bypass valve and Copper pipe fittings for field installation. Used to modulate capacity at low load conditions.
2 CU-1,2 S1-TEC3630-14-000 7 DAY PROGRAMMABLE THERMOSTAT, OPTIONAL MSTP OR
N2 COMMUNICATION, RTU/HEAT PUMP WITH ECON,FULL
COLOR, WHITE, JCI LOGO
2 AC-1,2 NS-10C00CTCAA4 10 Ton, Split System R-410A Air Handler, 2-pipe w/Intellispeed, 2.0 HP Motor, 208/230-3-60
• Intellispeed VFD w/Bypass
• Composite Drain Pan
• Mod Option - Stainless Steel Drain Pan
2 AC-1,2 1RG0416 Return Air Grille
NOTES:
Less Or Provide By Others:
Disconnects, wire/wiring, kW heat, condensate overflow switch (Provided by control contractor), condensate pump (Provided by contractor), economizer/mixing box, refrigerant piping or accessories, external seismic restraints or calculations, external vibration isolation, field installation of accessories (Fld), start up, Owner training and labor warranty.
Equipment start-up and commissioning by a factory trained technician is recommended.
Contact your supplying distributor or sales representative for additional information & guidance.
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Information is subject to change without notice. Check local codes. Printed 01/06/2022
Cooling Performance Total gross capacity 121.9 MBH Sensible gross capacity 99.0 MBH Total net capacity 115.8 MBH Sensible net capacity 92.9 MBH Efficiency (at ARI) 11.10 EER Integrated eff. (at ARI) 14.20 IEER Ambient DB temp. 95.0 °F Unit Leaving DB temp. 59.8 °F Unit Leaving WB temp. 57.3 °F Leaving air temp dew point 55.70 °F Power input (w/o blower) 9.08 kW Sound power 89 dB(A)
Refrigerant Refrigerant type R-410A
Heat Pump Performance Ambient DB temp. 47 °F Design Gross Capacity 107.4 MBH Power Input 7.29 kW Capacity @ 47 °F 104.00 MBH
COP @ 47 °F 3.30
Capacity @ 17 °F 63.00 MBH
COP @ 17 °F 2.30
Heating Performance Entering DB temp. 60 °F Supply air 4265 CFM
Electrical Data Power supply 208-3-60 Unit min circuit ampacity 41.6 Amps Unit max over-current protection 50 Amps
Dimensions & Weight Hgt 50 in. Len 59 in. Wth 32 in.
Weight with factory installed options 543 lbs.
Clearances Right 30 in. Front 36 in. Rear 24 in.
Top 120 in. Bottom 0 in. Left 30 in.
Note: Please refer to the tech guide for listed maximum static pressures
10 Ton
• Fraser-Johnston Split System Units are Manufactured at an ISO 9001 Registered Facility.
Unit Features
• Unit Cabinet Constructed of Powder Painted Steel, Certified At 750 Hours Salt Spray Test (ASTM B-117 Standards)
• Full Perimeter Base Rails with Built in Rigging Capabilities
• Scroll Compressors with Crankcase Heater
• Single Refrigeration Circuit (2 Pipe)
• Liquid Line Driers (Supplied for Field Installation)
• Suction Line Accumulator
• Copper Tube/Aluminum Fin Condenser Coil
• Back Seating Suction and Liquid Line Service Valves
• Inherently Protected Fan Motors
• Side or Bottom Single Point Power Connections
• Short Circuit Current: 5kA RMS Symmetrical Standard Unit Controller: Smart Equipment Control Board
• Anti-Short Cycle Protection, Lead-Lag, Low Voltage Protection, On-Board Diagnostic and Fault Code Display
• Safety Monitoring - Monitors the High and Low-Pressure Switches. The Unit Control Board will Alarm on Compressor Lockouts and Repeated Limit Switch Trips.
BAS Controller
• Smart Equipment Controller with Gateway to BACnet MS/TP (Programmable to Modbus or N2)
Warranty
• One (1) Year Limited Warranty on All Other Parts
• Five (5) Year Limited Warranty on Compressors
Information is subject to change without notice. Check local codes. Printed 01/06/2022
Outdoor Split System Fraser-Johnston Split-System R-410A Outdoor
Page: 3
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5 Quantity: 2 Tag #: CU-1,2 System: PH-10C00ATEAA5,NS-10C00CTCAA4
Additional Electrical Data Power supply 208-3-60 Unit min circuit ampacity 41.6 Amps Unit max over-current protection 50 Amps Min Voltage 187 V Max Voltage 252 V Comp #1 RLA 16 Comp #1 LRA 110 Outdoor Mtr Qty 2 Outdoor Fan Voltage 208-1-60 OD Fan Mtr FLA (ea.) 2.8
Outdoor Split System Fraser-Johnston Split-System R-410A Outdoor
Page: 4
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5
Factory Installed Options
PH-10C00ATEAA5
Equipment Options Option(s) Selected
Product Category: P Split System R-410A Heat Pump Product Identifier: H 2-Pipe R-410A Nominal Cooling Capacity: -10 10 Ton Heat Type and Nominal Heat Capacity: C00 Airflow: A Standard Motor Voltage: T 208/230-3-60
Installation Options: E
Smart Equipment Controller with Gateway to BACnet MS/TP (Programmable to Modbus or N2)
Additional Options: AA Copper Tube/Aluminum Fin Condenser Coil Product Generation: 5
Field Installed Accessories 1CG0404 - Coil Guard (13.0 lbs) 1HG0429 - Hail Guard (37.0 lbs) 2HG04700524 - Hot Gas Bypass Kit; Includes discharge bypass valve and Copper pipe fittings for field installation. Used to modulate capacity at low load conditions.
(5.0 lbs)
2LA04702012 - Low Ambient To 0° F (3.2 lbs)
2PM04700124 - Phase Monitor Kit
- Includes Control and associated wiring. This accessory provides protection against phase reversal, loss or unbalance. (13.0 lbs)
S1-MP-PRTKIT-0P - MAP
(Multiple Access Portal) Gateway Kit- Replacement MAP gateway protective case, lanyard and communication cable. Use only to replace worn or damaged components. (0.3 lbs)
S1-NSB8BHN041-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, No Display, WHITE, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BHN043-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, No Display, BLACK, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BHN141-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, Warmer/Cooler Display, WHITE, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BHN143-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, Warmer/Cooler Display, BLACK, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BHN240-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, Full Display, WHITE, JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BHN241-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, Full Display, WHITE, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BHN243-0 - Wall Temperature and 3% Relative Humidity Combined Sensor, Full Display, BLACK, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BPN240-0 - Wall Temperature and 2% Relative Humidity Combined Sensor, Full Display, WHITE, JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BPN241-0 - Wall Temperature and 2% Relative Humidity Combined Sensor, Full Display, WHITE, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BPN243-0 - Wall Temperature and 2% Relative Humidity Combined Sensor, Full Display, BLACK, NO JCI LOGO, NS8000 Series (0.4 lbs)
S1-NSB8BTN041-0 - Wall Temperature Sensor, No Display, WHITE, NO JCI LOGO, NS8000
Series (0.4 lbs)
S1-NSB8BTN043-0 - Wall Temperature Sensor, No Display, BLACK, NO JCI LOGO, NS8000
Series (0.4 lbs)
Outdoor Split System Fraser-Johnston Split-System R-410A Outdoor
Page: 5
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5
S1-TEC3630-14-000 - 7 DAY
PROGRAMMABLE
THERMOSTAT, OPTIONAL MSTP
OR N2 COMMUNICATION,
RTU/HEAT PUMP WITH
ECON,FULL COLOR, WHITE, JCI
LOGO (0.8 lbs)
S1-TEC3631-14-000 - 7 DAY
PROGRAMMABLE
THERMOSTAT, OPTIONAL MSTP
OR N2 COMMUNICATION,
RTU/HEAT PUMP WITH ECON,
OCC SENSOR, FULL COLOR,
WHITE, JCI LOGO (0.8 lbs)
S1-TEC3631-16-000 - 7 DAY
PROGRAMMABLE
THERMOSTAT, OPTIONAL MSTP
OR N2 COMMUNICATION,
RTU/HEAT PUMP WITH ECON,
OCC SENSOR, FULL COLOR,
WHITE, NO LOGO (0.8 lbs)
S1-YK-MAP1810-0P - MAP
(Multiple Access Portal) Gateway- For use with SimplicitySE Control.
(0.2 lbs)
S1-YK-MAP1810-0S - Stationary MAP Gateway (Includes MAP Gateway, Field Bus Adapter, Mounting Bracket and 100 to 240 VAC Power Supply). US-compatible counties. (1.9 lbs)
Page: 7
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5
Consolidated Drawing
Page: 8
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5 Quantity: 2 Tag #: CU-1,2
Piping & Connection
Page: 9
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5
Corner Weights & Center of Gravity
Page: 10
Project Name: PCC SE Center MDF Unit Model #: PH-10C00ATEAA5
Cooling Performance
Total gross capacity 121.9 MBH Sensible gross capacity 99.0 MBH Total net capacity 115.8 MBH Sensible net capacity 92.9 MBH Entering DB temp. 80.0 °F Entering WB temp. 66.0 °F Leaving DB temp. 58.5 °F Leaving WB temp. 56.8 °F
Heating Performance Entering DB temp. 60 °F Supply air 4265 CFM
Supply Air Blower Performance Supply air 4265 CFM Ext. static pressure 0.5 IWG Addl. Unit Losses (Options/Accessories) 0.03 IWG Blower speed 831 RPM Max BHP of Motor (including service factor) 2.30 HP Duct location Horizontal Motor rating 2.00 HP Actual required BHP 1.88 HP Power input 1.77 kW Elevation 0 ft.
Drive type BELT
Indoor Electrical Data Power supply 208-3-60 Unit min circuit ampacity 7.30 Amps Unit max over-current protection 15 Amps
Indoor Dimensions & Weight Hgt 65 in. Len 30 in. Wth 56 in.
Weight with factory installed options 562 lbs.
Indoor Clearances Side w/Piping 24 in.
Side Opposite Piping 24 in.
Side w/ Return Air 24 in.
Side w/ Supply Air 24 in.
Note: Please refer to the tech guide for listed maximum static pressures
10 Ton
• Fraser-Johnston split system units are manufactured at an ISO 9001 registered facility
Unit Features
• Unit Cabinet Constructed of Powder Painted Steel, Certified At 750 Hours Salt Spray Test (ASTM B-117 Standards).
• Easily converted in the field from vertical to horizontal configuration.
• Slide-out Composite Drain Pan
• Single Circuit Refrigeration
• Adjustable balanced port TXV's
• 2.0 HP Motor and Adjustable Sheave Belt Drive
• Unit ships with 2" Throwaway filters with a standard filter rack that will accept up to 4" filters.
• Short Circuit Current: 5kA RMS Symmetrical
• Intellispeed VFD w/Bypass Warranty
• One (1) Year Limited Warranty on all Other Parts
• Five (5) Year limited Warranty on Electric Heating Elements
Indoor Split System Fraser-Johnston Split-System Indoor
Page: 11
Project Name: PCC SE Center MDF Unit Model #: NS-10C00CTCAA4 Quantity: 2 Tag #: AC-1,2 System: PH-10C00ATEAA5,NS-10C00CTCAA4
Additional Electrical Data
Power supply 208-3-60 Unit min circuit ampacity 7.3 Amps Unit max over-current protection 15 Amps Min Voltage 187 V Max Voltage 252 V Indoor Mtr Voltage 208-3-60 Indoor Mtr FLA 5.8
Page: 12
Project Name: PCC SE Center MDF Unit Model #: NS-10C00CTCAA4
Factory Installed Options
NS-10C00CTCAA4
Equipment Options Option(s) Selected
Product Category: N Split System R-410A Air Handler Product Identifier: S 2-pipe w/Intellispeed Nominal Cooling Capacity: -10 10 Ton Heat Type and Nominal Heat Capacity: C00 Airflow: C 2.0 HP Motor Voltage: T 208/230-3-60 Installation Options: C Intellispeed VFD w/Bypass Additional Options: AA Composite Drain Pan
Field Installed Accessories 1BP0401 - Return Air Block Off Panel (10.7 lbs)
1BS0410 - Base Section (60.0 lbs) 1HW0410 - 2 Row Deep Hot Water Coil (When this accessory is installed, DO NOT operate above the Supply Fan Motor rated HP) (128.0 lbs)
1NF0456 - Single Row Steam Coil (When this accessory is installed, DO NOT operate above the Supply Fan Motor rated HP) (135.0 lbs)
1RG0416 - Return Air Grille (11.0 lbs)
2HJ04701025 - 10 kW 208/230-3 Electric Heat (45.0 lbs)
2HJ04701625 - 16 kW 208/230-3 Electric Heat (47.0 lbs)
2HJ04702625 - 26 kW 208/230-3 Electric Heat (47.0 lbs)
2HJ04703625 - 36 kW 208/230-3 Electric Heat (51.0 lbs)
Page: 13
Project Name: PCC SE Center MDF Unit Model #: NS-10C00CTCAA4
NS/NW Piping, Electrical, & Duct Opening Connection Sizes
Page: 14
Quantity: 2 Tag #: AC-1,2
Typical Applications
Page: 15
Dimensions 7.5 to 10 Ton P1
Page: 16
Dimensions 7.5 to 10 Ton P2
Page: 17
NS/NW 7.5 thru 20 Ton Corner Weights & Gravity
Page: 18
QUESTIONS AND PCC’S ANSWERS TO THOSE QUESTIONS
ITB – SE CAMPUS MDF HVAC REPLACEMENT
PCC has received the following 12 questions, and is providing the answers below. The last item is an informal substitution request, and PCC’s decision to that request also is provided.
Question 1: Please confirm that the controls scope- inclusive of wiring and programing will not be in the scope of the Prime contractor and will be handled by the owner separately.
PCC’s answer to Question 1: Confirmed and correct.
Question 2: Please tell us the full name of “N.C.C” responsible for the controls work.
PCC’s answer to Question 2: Northwest Control Company
Question 3: Will NCC post balance the system? We were assuming that the prime would conduct a pre-balance.
PCC’s answer to Question 3: The prime should hire certified TAB firm to include the pre and post balance as part of their scope.
Question 4: Is the expectation to salvage any of the AC unit being removed from the roof or can we dispose of it?
PCC’s answer to Question 4: Bidders shall cast their bid based on the understanding the selected contractor will remove and dispose of the AC units.
However, PCC reserves the right to discuss any salvage of the existing AC units and the duct work as a possible Change Order with the selected contractor.
Question 5: Will we be able to stage a crane to remove the AC unit from the roof?
PCC’s Answer to Question 5: Yes. The interior parking lot will be a good place to stage a crane.
Question 6: Please provide pictures of the existing roof area for reference.
PCC’s answer to Question 6: Pictures and notes of the roof area, and the roof access are provided as attached to this Addendum #1.
Question 7: May we assume that there is no drywall or painting scope within this project?
PCC’s answer to Question 7: Correct. No drywall, nor painting is part of the project scope of work.
Q&A Continued on Next Page
QUESTIONS AND PCC’S ANSWERS TO THOSE QUESTIONS
ITB – SE CAMPUS MDF HVAC REPLACEMENT
Question 8: What Is the desired extent of protection desired for the data racks?
PCC’s Answer to Question 8: Electronics are to remain active for the duration of the project. The protection required would provide safety from physical damage while allowing the equipment to be properly ventilated. Assuming all the servers will remain active during the construction, and all the electronic equipment will need to be protected would still allow the heat to be ventilated.
Question 9: What is the expectation for temporary HVAC service in this space?
PCC’s Answer to Question 9: Temporary service has already been provided by PCC with the Move and Cool Units.
Question 10: Is it assumed that should there be any long lead items that the final completion date may shift?
PCC’s Answer to Question 10: PCC would like to avoid delays but understand there are procurement and supply chain challenges. We will work with the selected contractor to resolve these challenges and may adjust our project completion date.
Question 11: Is it agreed that substitutions for material that may arrive earlier to avoid long lead items be reviewed/considered?
PCC’s Answer to Question 11: Yes, substitutions will be considered from the selected Contractor to avoid long lead times, but will need to be approved by the engineer and PCC.
Question 12: If there is a COVID-19 shutdown in the school unrelated to the prime contractor's work will they also be required to pause work?
PCC’s Answer to Question 12: A pause in work will depend on the situation and will be discussed, should the need arise, with the selected contractor and PCC.
Informal Substitution Request:
Table 2 on sheet E1.2 specifies that the conduit for these circuits will be “RMC”. I would like to propose that we substitute Electrical Metallic Tubing (EMT) for all locations where the raceway is not subject to severe physical damage.
PCC’s decision as to this request: PCC would accept EMT in the building. On the roof where the conduit is subject to weather and variable conditions, we require RMC.
Roof Access for Mt Tabor building
Stairs leading to roof & Roof Hatch
Roof has multiple tiers existing AC unit is on the top tier.
Existing AC units supporting the MDF Room. The one on the left is the Compu-air and the one on the right is the split Daikin.
Close up Daikin & disconnect
Close up Compu-air
Existing roof penetration supporting both units and additional antenna cabling located on the roof.
Backside of Compu- air & disconnect
Inside roof access dugout. Pathway to inside unit
Overall view of the exiting two units on roof.
SE CAMPUS MDF HVAC REPLACEMENT PROJECT
PCC Solicitation Number: P&CC21-014-ITB Public Bid Opening Information
The Public Bid Opening will be held Thursday, February 3, 2022 commencing at 2:05PM (Pacific) by Zoom teleconference.
The logon information to attend is presented below:
Join Zoom Meeting https://portlandcc.zoom.us/j/94847993102?pwd=LzZ4N3ZFSUZ5RUhhZjBMaktlRXdIQT09
Meeting ID: 948 4799 3102 Passcode: 346315 One tap mobile +13462487799,,94847993102#,,,,*346315# US (Houston) +16699006833,,94847993102#,,,,*346315# US (San Jose)
Dial by your location +1 346 248 7799 US (Houston) +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) +1 312 626 6799 US (Chicago) +1 646 876 9923 US (New York) +1 301 715 8592 US (Washington DC) Meeting ID: 948 4799 3102 Passcode: 346315
---- End of Public Bid Opening Information ---https://www.google.com/url?q=https%3A%2F%2Fportlandcc.zoom.us%2Fj%2F94847993102%3Fpwd%3DLzZ4N3ZFSUZ5RUhhZjBMaktlRXdIQT09&sa=D&ust=1643587729933000&usg=AOvVaw0FB3n-Pa2DeRSYgY5uWc96
| Addendum 1 - ITB SE Campus MDF HVAC Replacement Project.pdf |
| ITB Addendum 1 - SE Campus MDF HVAC Replacement.pdf |
| The purpose of this Addendum is to provide four items of information. These four items follow this Addendum Number 1 Cover Page. |
| 1) Attendance Record at the Mandatory Pre-Bid Conference and Site Inspection |
| 2) Two Substitution Request Forms Submitted and PCC’s Decisions on those requests |
| 3) Questions and Answers, including the requested photographs of the roof project area |
| 4) Public Bid Opening information and teleconference logon details |
| Attendance Record - ITB - SE Campus MDF HVAC Replacement.pdf |
| Substitution Requests - ITB SE MDF HVAC Replacement Project - Executed.pdf |
| Substitution Request - Air Reps.pdf |
| Solicitation No PCCS21-014-ITB_SE Campus MDF HVAC Replacement_CU-1,2 and AC-1,2 Prior Substitution Request 001 from Sustainable Mechanical Systems.pdf |
| CU-1,2 and AC-1,2 Prior Substitution Request 001 from Sustainable Mechanical Systems.pdf |
| MDF HVAC ITB WITH CONTRACT.pdf |
| Dec 17 Draft ITB - PAGE NUMBERS - SE Campus MDF HVAC Replacement Project.pdf |
| ATTACHMENT I - SUBSTITUTION REQUEST FORM |
| Solicitation No PCCS21-014-ITB_SE Campus MDF HVAC Replacement_CU-1,2 and AC-1,2 Prior Substitution Request 001 from Sustainable Mechanical Systems.pdf |
| FJ AC-CU-1,2 Preliminary Submittal.pdf |
| Questions, Answers, and Roof Photos - ITB SE MDF HVAC Replacement.pdf |
| QUESTIONS and ANSWERS - ITB SE MDF HVAC.pdf |
| Mt Tabor Building Roof (1).pdf |
SE CAMPUS MDF HVAC REPLACEMENT PROJECT.pdf
Mt Tabor Building Roof Photos.pdf
File details come from the government source that posted it. Updated .