This document is Addendum No. 1 to Invitation for Bid (IFB1 2027*45) issued by Colorado Parks and Wildlife (CPW) for the James M Robb - Colorado River State Park Island Acres Wastewater Improvements project, dated November 19, 2026. The addendum modifies the original bid documents to reflect design and specification changes for a comprehensive wastewater treatment facility upgrade including sludge removal and disposal, liner installation, cattail plantings, site restoration, and equipment installation. Key modifications include: Bid Item 8 scope expanded to include septic tank sludge removal in addition to aeration basin and wet well; Bid Item 9 topsoil quantity reduced from 3,100 cubic yards to 2,480 cubic yards; addition of new Specification Section 02940 for Wetland Plantings with specific requirements for Broadleaf Cattail installation and 75 percent survival rate warranty; revision of Specification Section 15150 for Packaged Lift Stations to align with duplex T2C3SC-B/F/WW priming pumps by Gorman-Rupp; modifications to lift station access manhole dimensions from 24-inch circular to 30-inch by 36-inch aluminum/FRP; and updates to construction drawings (Sheets 2 and 5) reflecting design operating conditions and revised elevation data. The base bid consists of 23 line items including lump sum costs for mobilization, surveying, demolition, construction access, wet well replacement, lift station installation, grinder system installation, and site restoration, plus unit-priced items for topsoil handling, cobble salvage, excavation, liner bedding material, liner installation, plantings, and time-and-equipment hourly rates for various equipment and laborers.

The addendum specifies that contractors must incorporate all changes into their bids at no additional payment above the proposed price. Payment terms include progress payments for lump sum items based on estimated completion percentages and unit-price items paid upon completion and verification by the contractor's independent surveyor. Measurement and payment provisions require load tickets for imported materials, independent surveying documentation for excavation volumes and liner installation quantities, and achievement of specified compaction densities and survival rates. Specifications require the pump station manufacturer to be ISO 9001:2008 certified with ISO 14001 environmental management registration, demonstrate solids handling capability for 1.5-inch spherical solids, provide 17-foot automatic repriming capability within five minutes, and warrant all equipment for 60 months against defects in material and workmanship. The lift station must operate at 45 gallons per minute at 30 feet total dynamic head with 3-phase, 230-volt, 60-hertz utility power. Automatic wireless alarm monitoring and telemetry functionality are excluded from the packaged lift station manufacturer's unitary responsibility, with the contractor required to independently furnish, install, and integrate a Patriot Controls & Systems PCS-5211-OS controller providing 24-hour remote monitoring capability for 10 years. No set-asides or incumbency information are identified in this addendum document.

View the file

Other files

File Type Posted
IFB1_2027_45_Bid_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1 - IFB1 2027*45

James M Robb – CO River SP – Island Acres – Wastewater Improvements

#C26CR1

November 19, 2026

BID DOCUMENT AMENDMENTS

The Bid Documents for the ‘James M Robb – CO River SP – Island Acres – Wastewater Improvements’ shall be changed as stated hereafter and the bidder shall reflect these changes in their bid. No additional payment above the proposed price will be made for these changes. The Contractor shall make these changes:

SUMMARY OF CHANGES:

1. Bid Schedule:

a. ‘Bid Item #8 – Sludge Removal and Disposal from Aeration Basin & Wet Well’ is revised to ‘Sludge Removal and Disposal from Aeration Basin, Wet Well, and Septic Tank’ as reflected in the revised bid schedule to include the removal of sludge from the septic tank.

b. The quantity for ‘Bid Item #9 – Strip, Stockpile, and Re-spread Topsoil’ is modified from 3,100 CY to 2,480 CY as reflected in the revised bid schedule.

2. Measurement and Payment:

a. ‘Bid Item 8 – Sludge Removal and Disposal from Aeration Basin, Wet Well, and Septic Tank’ is revised to include the removal of sludge from the septic tank.

b. ‘Bid Item 13 – Import and Install Liner Bedding Material’. The third sentence is deleted and replaced with: “Bedding material shall be fine-grained sand or crushed screenings (3/8-inch minus), free of sharp or angular rocks, gravel, roots, or organic material that could puncture the geomembrane liner in accordance with Section 02778, moisture treated and compacted to 95% of standard proctor density.”

c. ‘Bid Item 16 – Cattail Plantings Evaporation Lagoon’. The following sentence is added: “All wetland plant materials, installation methods, liner protection measures, and warranty requirements shall conform to Specification Section 02940 – Wetland Plantings.”

d. ‘Bid Item 17 – Site Restoration, Seeding, Mulching, and Cleanup’. The first sentence is amended as follows: “This bid item includes all material, labor, equipment, independent testing services, and incidental costs connected with restoring the site following construction to pre-project conditions and elevations, including but not limited to: ripping/decompaction and seeding/mulching all disturbed areas, removing any temporary construction access items, finish grading, and regrading and resurfacing the gravel pedestrian trail access roads with crusher fine surfacing in accordance with Specification Section 02510 – Crusher Fines Surfacing (if applicable).”

3. Technical Specifications:

a. Added new Specification 02940 – Wetland Plantings

b. Section 15150 – Packaged Lift Stations:

i. Revised performance specifications to align with duplex ‘T2C3SC- B/F/WW’ priming pumps by Gorman-Rupp or approved equal.

ii. Amended performance criteria to reflect design operation conditions.

iii. Added responsibility clarification for the Automatic Wireless Alarm Monitoring and Telemetry.

iv. Removed flow meter requirements in Section 8.IV.

4. Construction Drawings:

a. Sheet 2 – Site Map – Existing. Revised note for correct elevation of CP #1.

b. Sheet 5 – Proposed Lift Station Details. Revised to reflect design operating condition, ‘T2C3SC-B/F/WW’ configuration, and revised access manhole from 24” circular to 30” x 36” aluminum/FRP centered over grinder and rails.

REPLACE PAGES:

1. Replace the Bid Schedule with the attached, revised Bid Schedule, with changes as described above.

2. Replace the Measurement and Payment section with the revised Measurement and Payments with changes as described above.

3. Replace ‘Specification 15150 – Package Lift Stations’ with the attached, revised specification Section 15150, with changes as described above.

4. Replace Construction Drawings, Sheets 2 and 5 with the attached, revised sheets with changes as described above.

ADD PAGES:

1. Add the new Specification ‘Section 02940 – Wetland Plantings’, with associated submittal requirements.

Base Bid: Furnish and install all materials and labor for the completion of the Base Bid Improvements per the Construction Drawings and Specifications.

Base Bid Items: Quant ity Unit Unit Cost Total Item Cost

1. Mobilization 1 LS $ $

2. Construction Surveying 1 LS $ $

3. Demolition and Site Preparation 1 LS $ $

4. Construction Access Improvements 1 LS $ $

5. Remove and Replace Existing 5-ft Fiberglass Wet Well

1 LS $ $

6. Furnish & Install New Above Ground Lift Station with Bypass Piping, Complete 1 LS $ $

7. Furnish & Install New Sewage Grinder with Controller and Mounting and Retrieval Systems, Complete

1 LS $ $

8. Sludge Removal & Disposal from Aeration Basin, Wet Well, and Septic Tank 1 LS $ $

9. Strip, Stockpile, and Re-spread Topsoil 2,480 CY $ $

10. Salvage, Stockpile, and Place Cobble 112 CY $ $

11. Excavation and Placement at Proposed Berm Location 1,285 CY $ $

12. Excavation and Haul-Off of Excess Topsoil with Testing

550 CY $ $

13. Import & Install Liner Bedding Material 2,700 TON $ $

14. Install New Liner Aeration Basin 1,520 SY $ $

15. Install New Liner Evaporation Lagoon 6,200 SY $ $

16. Cattail Plantings Evaporation Lagoon 2,950 SY $ $

17. Site Restoration, Seeding, Mulching, and Cleanup 1 LS $ $

18. Excavator 80 HR $ $

19. Grader 80 HR $ $

20. Loader 80 HR $ $

21. Tandem Dump Truck 80 HR $ $

22. Skid Steer Loader 80 HR $ $

23. Laborer 160 HR $ $

MEASUREMENT AND PAYMENT

James M Robb CO River SP - Island Acres - Wastewater Improvements

The following descriptions delineate the Work, materials, and how measurements of completed Work will be made and paid for, for each bid item in the Bid Schedule. The Bidder is to read these definitions and price their proposal accordingly.

Bid Item 1 – Mobilization This bid item includes the mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any costs for required bonding of this project. This item shall also include marshalling, disassembly and security of all items indicated on the Construction Drawings or Specifications or installed as part of mobilization and demobilization from the site. Payment will be made in two installments: the first 60% will be paid on the first month’s pay estimate, and the remaining 40% after the final cleanup has been completed and approved.

Bid Item 2 – Construction Surveying This bid item includes establishing and maintaining all horizontal and vertical control, setting reference stakes, clearing limits, layout stakes, batter boards, and all other construction staking required for the project. The work shall be done under the supervision of a registered professional land surveyor (P.L.S.) registered in the State of Colorado. This bid item covers all aspects of the construction staking associated with the project, including buildings, sitework, roads, parking lots, and utilities. As-built drawings required to document construction shall be considered a requirement of this bid item. Measuring and surveying for payment quantities and the calculations and documentation required for construction quantities are also included. Progress payments will be made periodically based on an estimated completed percentage of the lump sum bid price.

Bid Item 3 – Demolition and Site Preparation This bid item includes all labor, materials, and equipment required to demolish and appropriately dispose of items identified for removal, demolition, and disposal within the limits of work. Items include but are not limited to:

Existing submersible pumps, piping, fittings, rails, and controls, including the pumping and disposal of any sewage in the wet well;

Existing (2) layers of liners at the Aeration Basin;

Existing (2) layers of liners at the Evaporation Lagoon; and Concrete flatwork, wooden fencing, and other items required in preparation for the above ground lift station concrete pad

The handling, transportation, cleaning, and disposal of sewage/sludge/biosolids shall be performed in accordance with all federal, state, and local laws, regulations, and standards.

Payment will be made at the lump sum bid price.

This bid item also includes the temporary removal of aeration basin equipment as needed to perform work, and gate/fence sections at the aeration basin and along the construction access route. The unit contract price includes all labor, material, equipment, and disposal fees for completion of the work in accordance with the Drawings and Specifications. Payment will be made at the lump sum bid price.

Bid Item 4 – Construction Access Improvements This bid item includes all labor, materials, equipment, and incidental costs connected with performing improvements to existing site conditions to accommodate temporary construction access. This bid item includes but is not limited to: furnishing, importing, and installing aggregate base course as needed for construction equipment access, furnishing and installing metal plate(s) or other temporary measures for the protection of existing infrastructure. A full description of the contractor’s proposed construction access improvements shall be detailed in the ‘Construction Control Plan’ submittal and approved by CPW prior to any work. Payment will be made at the LUMP SUM bid price.

Bid Item 5 – Remove and Replace Existing 5-ft Fiberglass Wet Well This bid item includes all material, labor, equipment, and incidental costs connected with planning, demolition, submittals, transportation, handling, storage, excavation, hauling, disposal, and installation of new 5-ft fiberglass wet well. This bid item also includes but is not limited to: the disconnection and re-connection of piping from the existing wet well to the new wet well, backfilling, and compacting within the limits of work as noted on the plans of a 5’ diameter FRP wet well. Measurement and Payment for this bid item will be made upon completion and acceptance of the completed wet well, complete and ready to use, at the LUMP SUM bid price.

Bid Item 6 – Furnish and Install New Above Ground Lift Station with Bypass Piping, Complete This bid item includes all labor, materials, equipment, independent testing services, and incidental costs connected with furnishing and installing a pre-engineered above ground pump system, complete and ready to use, as shown on the plans and described in the specifications.

This bid item also includes all required submittals, certifications, permits, inspections, demonstrations and trainings to CPW personnel. Also included in this line item is the furnishing and installation of the concrete pad including reinforcement steel, formwork, inspections, testing, and all other costs connected with the concrete pad. This bid item also includes all required electrical services and connections to the existing electrical service panel and physical connections to the existing PVC sanitary sewer and force main pipe. Additionally, this line item shall include any and all bypass piping requirements (pumps, pipes, hoses, storage tanks if necessary) to maintain lift station functionality during Park operations if installed after April 1.

Payment will be made at the LUMP SUM bid price for the completely installed, tested, and approved lift station complete and ready to use.

Bid Item 7 – Furnish and Install New Sewage Grinder with Controller and Mounting and Retrieval Systems, Complete This bid item includes all labor, materials, submittals, equipment, and incidental costs connected with furnishing and installing a solids reduction sewage grinder system, complete and ready to use, as shown on the plans and described in the specifications. This bid item includes but is not limited to: furnishing and installing the solids reduction grinder, the controller system, and the wet well mounting and retrieval system as shown on the plans and described in the specifications. Also included are all required electrical services to connect the grinder and controller system to the existing electrical service panel and physical connections and hardware. Payment will be made at the LUMP SUM bid price for the completely installed, tested, and approved sewage grinder, controller, and mounting and retrieval system complete and ready to use.

Bid Item 8 – Sludge Removal and Disposal from Aeration Basin, Wet Well, and Septic Tank This bid item includes all material, labor, equipment, and incidental costs connected with the removal, handling, and disposal of sludge from the aeration basin, wet well, and septic tank.

The handling, transportation, cleaning, and disposal of sludge shall be performed in accordance with all federal, state, and local laws, regulations, and standards. Payment will be made at the LUMP SUM bid price.

Bid Item 9 – Strip, Stockpile, and Re-spread Topsoil This bid item includes all material, labor, equipment, and incidental costs connected with the removal, handling, transportation, and staging of topsoil from the Evaporation Lagoon.

Payment will be made at the unit price for CUBIC YARDS of topsoil stockpiled striped, stockpiled, and spread over newly installed liner as demonstrated by the Contractor’s independent surveyor.

Bid Item 10 – Salvage, Stockpile, and Place Cobble This bid item includes all material, labor, equipment, and incidental costs connected with the removal, handling, transportation, staging, and placement of cobble from the Evaporation Lagoon at locations shown on the drawings. Contractor shall take all measures necessary to ensure protection of the existing effluent PVC pipe including but not limited to: requiring only small equipment or hand placement of cobble near the pipe. A pre- and post-placement pipe inspection shall be performed by the Contractor and the CPW Project Manager. Payment will be made at the unit price for CUBIC YARDS of cobble salvaged, stockpiled, and reinstalled as demonstrated by the Contractor’s independent surveyor.

Bid Item 11 – Excavation and Placement at Proposed Berm Location This bid item includes all material, labor, equipment, and all incidental costs connected with the excavation, grading, handling, transportation, placement, and compaction of excess excavated material from the Aeration Basin and the Evaporation Lagoon as shown on the plans and approved by the CPW Project Manager. Excavations shall be made to the locations and elevations shown on the drawings. Measurement for this bid item will be based on excavated and graded volumes to the locations and elevations shown on the plans based on in-situ conditions. Payment will be made at the contract unit price for CUBIC YARDS of material. Construction survey exhibits and volume calculations are required to accompany the pay applications.

Bid Item 12 – Excavation and Haul-Off of Excess Topsoil with Testing This bid item includes all material, labor, equipment, independent testing services, and all incidental costs connected with the excavation, testing, handling, transportation, and disposal fees for excess topsoil material from the Evaporation Lagoon as shown on the plans and approved by the CPW Project Manager. Contractor shall assume excess topsoil will be considered a Class A biosolid per CDPHE Regulation 64. Contractor shall provide independent testing services if required by the disposal landfill. Measurement and payment for this bid item will be based on CUBIC YARDS of material hauled-off from the site and disposed of, with load tickets and disposal receipts required with pay application.

Bid Item 13 – Import and Install Liner Bedding Material This bid item includes all material, labor, equipment, and incidental costs connected with importing and installing liner bedding material as noted on the plans and specifications. This bid item includes subgrade preparation, grading, and placement of the imported bedding.

Bedding material shall be fine-grained sand or crushed screenings (3/8-inch minus), free of sharp or angular rocks, gravel, roots, or organic material that could puncture the geomembrane liner in accordance with Section 02778, moisture treated and compacted to

95% of standard proctor density. Measurement for this item will be based on load tickets delivered to the site, and paid based on the contract unit price in TONS. Load tickets shall be submitted by the Contractor with the pay application.

Bid Item 14 – Install New Liner Aeration Basin This bid item includes all material, labor, equipment, independent testing services, and incidental costs connected with installing a new liner at the aeration basin as noted on the plans and specifications. Installation of liner penetrations, testing and verification of seaming, leak testing, and compaction of liner trenches are considered incidental to the work and will not be paid separately. Upon delivery and appropriate storage of the liner material on site, 20% of this bid item will be paid based solely on “Materials On Hand” at the job site.

Measurement and payment for this bid item will be based on the SQUARE YARDS of liner placed, based on quantities from the Contractor’s independent surveyor.

Bid Item 15 – Install New Liner Evaporation Lagoon This bid item includes all material, labor, equipment, independent testing services, and incidental costs connected with installing a new liner at the Evaporation Lagoon as noted on the plans and specifications. Installation of liner penetrations, testing and verification of seaming, leak testing, and compaction of liner trenches are considered incidental to the work and will not be paid separately. Upon delivery and appropriate storage of the liner material on site, 20% of this bid item will be paid based solely on “Materials On Hand” at the job site.

Measurement and payment for this bid item will be based on the SQUARE YARDS of liner placed, based on quantities from the Contractor’s independent surveyor.

Bid Item 16 – Cattail Plantings Evaporation Lagoon This bid item includes all material, labor, equipment, independent testing services, and incidental costs connected with furnishing and installing cattail plantings at the Evaporation Lagoon. All wetland plant materials, installation methods, liner protection measures, and warranty requirements shall conform to Specification Section 02940 – Wetland Plantings.

Payment will be made on the SQUARE YARDS of cattails installed based on quantities from the Contractor’s independent surveyor.

Bid Item 17 – Site Restoration, Seeding, Mulching, and Cleanup This bid item includes all material, labor, equipment, independent testing services, and incidental costs connected with restoring the site following construction to pre-project conditions and elevations, including but not limited to: ripping/decompaction and seeding/mulching all disturbed areas, removing any temporary construction access items, finish grading, and regrading and resurfacing the gravel pedestrian trail access roads with crusher fine surfacing in accordance with Specification Section 02510 – Crusher Fines Surfacing (if applicable). Payment will be made at the LUMP SUM bid price after the restoration, cleanup, and seeding/mulching has been approved by the CPW Project Manager.

Bid Items 18 - 22: Time & Equipment These bid items will only apply to additional construction requests by the Project Manager that are not included in other bid items. Payment will be made at the contract unit price for the number of HOURS operated or worked and includes operator, fuel, labor, tools and all support necessary for operation. A total of two hours for mobilization/demobilization will be paid on each piece of equipment requested not already located at the job site. The number of hours to be paid under these items will be discussed and agreed to in advance by the Contractor and the Project Manager. Bid Item pricing shall be based on the following types of equipment:

Bid Item 18: Excavator – Cat 330D series or equivalent

Bid Item 19: Grader – Cat 140M series or equivalent

Bid Item 20: Loader– Cat 950H series or equivalent

Bid Item 21: Tandem Dump Truck

Bid Item 22: Skid-Steer Loader – Cat 226B series or equivalent

Bid Item 23: Laborer

As a footnote to the bid items, the following items have NOT been included as specific pay items and ARE to be considered incidental to the construction for which they are required:

Testing State electrical permits and inspections Water, watering, and dust control Dewatering Temporary facilities and utilities Traffic control Barricades and other required safety provisions

This concludes the bid items listed in the proposal. The only payments made under this contract are for the bid items listed herein, and no additional payments will be made to the Contractor for work specified or shown in these Contract Documents. If any discrepancies exist, the Contractor shall notify the Project Manager in writing, requesting clarification.

END OF SECTION

02940-1

SECTION 02940 – WETLAND PLANTINGS

1. SCOPE OF WORK:

Furnish all labor, materials, and equipment required to complete the work of the noted Sections described herein and on the drawings.

2. WORK INCLUDED:

The work shall include, but is not necessarily limited to, furnishing, laying out, and installing emergent wetland plants (cattails) in the Evaporation Lagoon.

3. SUBMITTALS:

I. Submit certification from the nursery or vendor identifying the plant species, container/plug size, and origin of the plant material.

II. Submit a proposed planting schedule coordinated with the completion of the Lagoon Liner System (Section 02778) and topsoil placement.

4. PRODUCTS:

I. PLANT SPECIES

Plant material shall be Broadleaf Cattail (Typha latifolia). Plants shall be nursery-grown, native Colorado ecotype material.

II. PLANT SIZE/TYPE

Plants shall be supplied as deep greenhouse plugs (minimum 10 cubic inch volume) or healthy, dormant bare-root rhizomes with a minimum of two visible growth nodes. Plants shall be vigorous, free of disease, and free of noxious weed seed.

5. EXECUTION:

I. PREPARATION:

A. Do not begin planting until the 18-inch topsoil layer has been fully placed over the new liner on the flat bottom of the Evaporation Lagoon and approved by the Project Manager.

B. The soil must be thoroughly hydrated (saturated to the surface) prior to planting. The Contractor shall coordinate with CPW Project Manager to introduce fresh water or bypass effluent into the lagoon to achieve soil saturation without overtopping the planting zones.

II. PLANTING:

A. Spacing and Location: Plants shall be installed on 2-foot centers. Planting shall be prioritized at the lowest elevations of the Evaporation Lagoon

02940-2 flat bottom, extending outward until plant quantities are exhausted.

B. Installation: Dig planting holes to a depth sufficient to accommodate the entire root mass/plug vertically. Place the plant and firmly tamp the soil around the roots to eliminate air pockets.

C. Liner Protection: The Contractor shall exercise extreme caution when digging planting holes in the 18-inch topsoil layer to ensure that shovels, dibbles, or planting bars do not strike, score, or puncture the underlying geomembrane liner.

D. Plants shall be installed so that the root crown is level with the surrounding soil surface.

III. WATER MANAGEMENT AND ESTABLISHMENT:

Immediately following planting, the lagoon bottom shall be flooded to a depth of 1 to 3 inches of standing water to prevent the root zones from drying out. The Contractor shall ensure the soil remains continuously saturated or shallowly inundated for a minimum of 14 days post-planting. Contractor shall coordinate with CPW Project Manager on timing to ensure optimal conditions.

6. WARRANTY AND ACCEPTANCE:

The Contractor shall guarantee the survival of the wetland plantings for a period of one

(1) year following Final Acceptance of the project. A minimum survival rate of 75% across the planted area is required at the end of the warranty period. Areas failing to meet the 75% survival threshold shall be replanted at the Contractor's expense during the next appropriate planting season.

END OF SECTION

15150-1

SECTION 15150 - PACKAGED LIFT STATIONS

1. SCOPE OF WORK:

Furnish all labor, materials and equipment required to complete the work of the noted Sections of this Division described herein and on the drawings.

2. WORK INCLUDED:

Work under this section includes, but is not limited to furnishing and installing a factory built duplex pump lift station as indicated on the project drawings, herein specified, as necessary for proper and complete performance.

3. MEASUREMENTS:

The packaged above ground lift stations shall be measured for each complete, fully operational, duplex lift station system installed.

4. SUBMITTALS:

I. Product Data:

A. Prior to fabrication, pump station manufacturer shall submit 3 copies of submittal data for review and approval.

B. Submittal shall include shop drawings, electrical ladder logic drawings, and support data as follows: Catalog cuts sheets reflecting characteristics for major items of equipment, materials of construction, major dimensions, motor and v-belt drive data, pump characteristic curves showing the design duty point capacity (GPM), head (FT), net positive suction head required (NPSHr), and hydraulic brake horsepower (BHP). Electrical components used in the motor branch and liquid level control shall be fully described.

C. Shop drawings shall provide layout of mechanical equipment and anchor bolt locations for station. Pipe penetrations and station access clearances shall be dimensioned relative to the station centerline. The electrical ladder logic drawings shall illustrate motor branch and liquid level control circuits to extent necessary to validate function and integration of circuits to form a complete working system.

II. Operations and Maintenance Manuals:

A. Operation shall be in accordance with written instructions provided by the pump station manufacturer. Comprehensive instructions supplied at time of shipment shall enable personnel to properly operate and maintain all equipment supplied. Content and instructions shall assume operating personnel are familiar with pumps, motors, piping and valves, but lack experience on exact equipment supplied.

15150-2

B. Documentation shall be specific to the pump station supplied and collated in functional sections. Each section shall combine to form a complete system manual covering all aspects of equipment supplied by the station manufacturer. Support data for any equipment supplied by others, even if mounted or included in overall station design, shall be provided by those supplying the equipment. Instructions shall include the following as a minimum:

1. Functional description of each major component, complete with operating instructions.

2. Instructions for operating pumps and pump controls in all modes of operation.

3. Calibration and adjustment of equipment for initial start-up, replacement of level control components, or as required for routine maintenance.

4. Support data for commercially available components not produced by the station manufacturer, but supplied in accordance with the specifications, shall be supported by literature from the prime manufacturer and incorporated as appendices.

5. Electrical schematic diagram of the pump station circuits shall be in accordance with NFPA 70. Schematics shall illustrate, to the extent of authorized repair, pump motor branch, control and alarm system circuits including interconnections. Wire numbers and legend symbols shall be shown. Schematic diagrams for individual components, not normally repairable by the station operator, need not be included. Details for such parts shall not be substituted for an overall system schematic. Partial schematics, block diagrams, and simplified schematics shall not be provided in lieu of an overall system diagram.

6. Mechanical layout drawing of the pump station and components, prepared in accordance with good commercial practice, shall provide installation dimensions and location of all pumps, motors, valves and piping.

7. Operation and maintenance instructions which rely on vendor cut-sheets and literature which include general configurations, or require operating personnel to selectively read portions of the manual shall not be acceptable. Operation and maintenance instructions must be specific to equipment supplied in accordance with these specifications.

5. GENERAL:

I. Standards: Publications listed below form part of this specification to extent referenced in the text by basic designation only. Consult latest edition of publication unless otherwise noted.

A. American National Std. Institute (ANSI) / American Water Works Assoc.

(AWWA):

1. ANSI B16.1 Cast iron pipe flanges and flanged fittings.

2. ANSI/AWWA C115/A21.51 Cast/ductile iron pipe with

15150-3

Threaded flanges.

3. ANSI 253.1 Safety Color Code for Marking Physical Hazards.

4. AN2SI B40.1 Gages, Pressure and Vacuum.

5. AWWA C508 Single Swing Check Valves.

B. American Society for Testing and Materials (ASTM):

1. ASTM A48 Gray Iron Castings.

2. ASTM A126 Valves, Flanges, and Pipe Fittings.

3. ASTM A307 Carbon Steel Bolts and Studs.

4. ASTM A36 Structural Steel.

C. Institute of Electrical and Electronics Engineers (IEEE):

1. IEEE Std 100 Standard Dictionary of Electrical Terms.

2. IEEE Std 112 Test Procedure for Polyphase Induction Motors.

3. IEEE Std 242 Protection of Industrial and Control Power Systems.

D. National Electric Code (NEC) / National Electrical Manufacturers’ Assoc.

(NEMA):

1. NEC National Electrical Code.

2. NEMA Std MG1 Motors and Generators.

E. Miscellaneous References:

1. Ten-State Standards Recommended Standards for Sewage Works.

2. Hydraulic Institute Std for Centrifugal, Rotary and Reciprocating Pumps.

3. ISO 9001 International Organization for Standardization.

4. ISO 14001 International Organization for Standardization.

II. System Description: Design requirements consist of factory built pump station design, including materials of construction, pump features, valves and piping, and motor controls shall be in accordance with requirements listed under PRODUCTS of this section.

A. Contractor shall furnish and install factory built above ground, automatic pump stations. The station shall be complete with all equipment specified herein, factory assembled in a fiberglass reinforced polyester resin enclosure.

B. In addition to the station enclosure, principle items of equipment shall include two horizontal, self priming, centrifugal sewage pumps, V-belt drives, motors, internal piping, valves, motor control panel, automatic liquid level control system, and internal wiring.

III. Performance Criteria:

15150-4

Pumps must be designed to handle raw, unscreened, domestic sanitary sewage.

Pumps shall have 3" suction piping (with a 2” x 3” increasing suction elbows at each pump suction), and a 4" discharge manifold and station outlet connections (reducing via a 4” x 3” bend to the existing 3-inch force main). Each pump shall be selected to perform under the operating condition of 45 GPM at 30 feet TDH.

IV. Utility Power Requirements:

A. Site power furnished to pump station shall be 3 phase, 60 hertz, 230 volts, maintained within industry standards. Voltage tolerance shall be plus or minus 10 percent. Phase-to-phase unbalance shall not exceed 1% average voltage as set forth in NEMA Standard MG-1. Control voltage shall not exceed 132 volts.

6. QUALITY ASSURANCE:

I. Manufacturer’s Qualifications:

A. The pumps and pump station manufacturer must be ISO 9001:2008 revision certified, with scope of registration including design control and service after sales activities.

B. The pumps and pump station manufacturer must be registered to the ISO 14001 Environmental Management System standard and as such is committed to minimizing the impact of its activities on the environment and promoting environmental sustainability by the use of best management practices, technological advances, promoting environmental awareness and continual improvement.

C. Manufacturer must show proof of original product design and testing. Products violating intellectual property regulations shall not be allowed, as they may violate international law and expose the user or engineer to unintended liabilities.

“Reverse-engineered” products fabricated to substantially duplicate the design of original product shall not be allowed, as they may contain substantial differences in tolerances and material applications addressed in the original design, which may contribute to product failure.

D. The term “pump manufacturer” or “pump station manufacturer” shall be defined as the entity which designs, machines, assembles, hydraulically tests and warranties the final product. Any entity that does not meet this definition will not be considered a “pump manufacturer” or “pump station manufacturer” and is not an acceptable supplier. For quality control reasons and future pump and parts availability, all major castings of the pump shall be sourced and machined in North America.

II. Pump Performance Certifications:

A. Solids Handling Capability:

1. All internal passages, impeller vanes, and recirculation ports shall pass a

15150-5

1.5” spherical solid. Smaller internal passages that create a maintenance nuisance or interfere with priming and pump performance shall not be permitted. Upon request from the Project Manager, manufacturer’s certified drawings showing size and location of the recirculation port(s) shall be submitted for approval.

B. Reprime Performance:

1. Consideration shall be given to the sanitary sewage service anticipated, in which debris is expected to lodge between the suction check valve and its seat, resulting in the loss of the pump suction leg, and siphoning of liquid from the pump casing to the approximate center line of the impeller. Such occurrence shall be considered normal, and the pump must be capable of automatic, unattended operation with an air release line installed.

2. During unattended operation, the pump shall retain adequate liquid in the casing to insure automatic repriming while operating at its rated speed in a completely open system. The need for a suction check valve or external priming device shall not be required.

3. Pump must reprime 17 vertical feet at the specified speed and impeller diameter. Reprime lift is defined as the static height of the pump suction above the liquid, while operating with only one-half of the liquid remaining in the pump casing. The pump must reprime and deliver full capacity within five minutes after the pump is energized in the reprime condition. Reprime performance must be confirmed with the following test set-up:

a. A check valve to be installed downstream from the pump discharge flange. The check valve size shall be equal (or greater than) the pump discharge diameter.

b. A length of air release pipe shall be installed between pump and the discharge check valve. This line shall be open to atmosphere at all times duplicating the air displacement rate anticipated at a typical pump station fitted with an air release valve.

c. The pump suction check valve shall be removed. No restrictions in the pump or suction piping will prevent the siphon drop of the suction leg. Suction pipe configuration for reprime test shall incorporate a 2 feet minimum horizontal run, a 90 degree elbow and vertical run at the specified lift. Pipe size shall be equal to the pump suction diameter.

d. Impeller clearances shall be set as recommended in the pump service manual.

e. Repeatability of performance shall be demonstrated by testing five consecutive reprime cycles. Full pump capacity (flow) shall be achieved within five minutes during each cycle.

f. Liquid to be used for reprime test shall be water.

III. Factory System Test:

A. All internal components including the pumps, motors, valves, piping and

15150-6 controls will be tested as a complete working system at the manufacturer's facility. Tests shall be conducted in accordance with Hydraulic Institute Standards at the specified head, capacity, rated speed and horsepower.

Factory operational test shall simulate actual performance anticipated for the complete station.

B. Upon request from the project manager, the operational test may be witnessed by the project manager, and/or representatives of his choice, at the manufacturer’s facility.

IV. Manufacturer’s Start-up Services:

A. The manufacturer's technical representative shall inspect the completed installation, correct or supervise the correction of any defect or malfunction, and instruct operating personnel in the proper operation and maintenance of the equipment as described further down in this section.

V. Manufacturer's Warranty:

A. The pump station manufacturer shall warrant all equipment to be of quality construction, free of defects in material and workmanship. A written warranty shall include specific details described below.

1. In addition to defects in material and workmanship, fiberglass reinforced polyester station enclosures are warranted for sixty (60) months to be resistant to rust, corrosion, corrosive soils, effects of airborne contamination or physical failures occurring in normal service for the period of the pump station warranty.

2. All other equipment, apparatus, and parts furnished shall be warranted for sixty (60) months, excepting only those items that are normally consumed in service, such as light bulbs, oils, grease, packing, gaskets, O-rings, etc. The pump station manufacturer shall be solely responsible for warranty of the station and all components.

B. Components failing to perform as specified by the project manager, or as represented by the manufacturer, or as proven defective in service during the warranty period, shall be replaced, repaired, or satisfactorily modified by the manufacturer.

C. It is not intended that the station manufacturer assume liability for consequential damages or contingent liabilities arising from failure of any vendor supplied product or part which fails to properly operate, however caused. Consequential damages resulting from defects in design, or delays in delivery are also beyond the manufacturer's scope of liability.

D. Equipment supplied by others and incorporated into a pump station or enclosure is not covered by this limited warranty. Any warranty applicable to equipment selected or supplied by others will be limited solely to the warranty, if any, provided by the manufacturer of the equipment.

15150-7

E. This limited warranty shall be valid only when installation is made and use and maintenance is performed in accordance with manufacturer recommendations. A start-up report competed by an authorized manufacturer’s representative must be received by manufacturer within thirty

(30) days of the initial date the unit is placed into service. The warranty shall become effective on the date of acceptance by the purchaser or the purchaser's authorized agent, or sixty (60) days after installation, or ninety

(90) days after shipment from the factory, whichever occurs first.

7. MATERIALS:

I. Unitary Responsibility: In order to unify responsibility for proper operation of the complete pumping station, it is the intent of these Specifications that all system components be furnished by a single supplier (unitary source). The pumping station must be of standard catalog design, totally warranted by the manufacturer. Under no circumstances will a system consisting of parts compiled and assembled by a manufacturer's representative or distributor be accepted.

II. Manufacturer:

A. The pump station system integrator must be ISO 9001:2000 revision certified, with scope of registration including design control and service after sales activities.

B. The specifications and project drawings depict equipment and materials manufactured by The Gorman-Rupp Company which are deemed most suitable for the service anticipated. It is not intended, however, to eliminate other products of equal quality and performance. The contractor shall prepare his bid based on the specified equipment for purposes of determining low bid. Award of a contract shall constitute an obligation to furnish the specified equipment and materials.

C. After execution of the contract, the contractor may offer substitutions to the specified equipment for consideration. The equipment proposed for substitution must be superior in construction and performance to that specified in the contract, and the higher quality must be demonstrated by a list of current users of the proposed equipment in similar installations.

D. In event the contractor obtains project manager's approval for equipment substitution, the contractor shall, at his own expense, make all resulting changes to the enclosures, buildings, piping or electrical systems as required to accommodate the proposed equipment. Revised detail drawings illustrating the substituted equipment shall be submitted to the Project Manager prior to acceptance.

E. If the cost to the contractor is less for the proposed substitution, then the contract price shall be reduced by an amount equal to the savings.

15150-8

III. Station Enclosure:

The station enclosure shall contain and protect all pumps, interior piping, valves and associated controls. Enclosure shall incorporate the following design and service features:

A. Access panels must be supplied on all sides. Location and size shall permit access for routine maintenance functions such as pump and motor inspection, drive belt adjustment, and pump clean-out. Non-hinged panels shall be secured with stainless steel tamper-proof hardware.

B. A continuous hinge and latch shall be installed on at least two access panels.

The hinged panels shall allow easy access to the electrical controls for frequent adjustments and inspections. A two-point mechanical latch assembly shall secure the panel at top and bottom. Latch handle locks shall be match keyed, requiring only one key to open all access panels.

C. A vent in one access panel shall allow free air flow for enclosure ventilation.

D. The complete station enclosure, less base, must be completely removable after disengaging reusable hardware. After disassembly, no portion of the enclosure (except electrical service entrance) shall project above the base surface to interfere with maintenance or endanger personnel.

E. Disassembly and removal of the enclosure shall require no more than two people working without assistance of lifting equipment.

F. Station enclosure shall be manufactured of molded reinforced orthophthalic polyester resins with a minimum of 30% fiberglass, and a maximum of 70% resin. Resin fillers or extenders shall not be used.

G. Chopped glass fibers of 1 1/4 inch average length shall be sprayed and rolled.

Major design consideration shall be given to structural stability, corrosion resistance, and watertight integrity. The polyester laminates shall provide a balance of mechanical, chemical, and electrical properties to insure long life.

They must be impervious to micro-organisms, mildew, mold, fungus, corrosive liquids, and gases which are expected to be present in the environment surrounding the wet well.

H. All interior surfaces of the housing shall be coated with a polyester resin-rich finish providing maintenance-free service, abrasion resistance, and protection from sewage, greases, oils, gasoline, and other common chemicals.

I. Outside surfaces of the enclosure shall be coated with gel-coat pigmented resin to insure long maintenance-free life and UV protection. Color used shall de-emphasize the presence of dirt, grease, etc.

IV. Station Base: Station base shall be constructed of pre-cast, reinforced concrete encapsulated in a fiberglass mold. The design shall resist deformation of the structure

15150-9 during shipping, lifting, or handling. Base shall incorporate drainage provisions, and an opening sized to permit installation of piping and service connections to the wet well. After installation, the opening shall serve as a grout dam to be utilized by the contractor. The base shall incorporate anchor bolt recesses for securing the complete station to a concrete pad (supplied by the contractor) in accordance with the project plans.

V. Blower: A blower mounted in the station roof shall be sized to exchange station air volume at least once every two minutes. Blower motor shall energize automatically at approximately 70 degrees F, and turn off at 55 degrees F. The blower motor control circuit shall incorporate a thermal-magnetic circuit breaker providing overcurrent and overload protection. Exhaust and inlet locations shall prevent the entrance of rain, snow, or debris.

VI. Station Enclosure Height and Insulation: The station shall be equipped with a low-profile 58-inch tall molded fiberglass enclosure with hinged access doors and 1" thick spray foam insulation, which shall be applied to the roof, doors, and corner panels.

VII. Station Heater: Pump station shall be provided with a 1300/1500 watt, 115 volt electric heater with cord and grounding plug. Ungrounded heaters shall not be acceptable.

VIII. Insulation Package: The pump station shall be furnished with 1" thick spray foam insulation, which shall be applied to the roof, doors, and corner panels.

8. PUMP DESIGN:

I. Pumps shall be horizontal, self-priming centrifugal type, designed specifically for handling raw, unscreened, domestic sanitary sewage. Pump solids handling capability and performance criteria shall be in accordance with requirements listed under 5.

GENERAL of this section.

II. The pump manufacturer must be ISO 9001:2000 revision certified, with scope of registration including design control and service after sales activities.

III. Materials and Construction Features:

A. Pump casing: Casing shall be cast iron Class 30 with integral volute scroll.

Casing shall incorporate following features:

1. Mounting feet sized to prevent tipping or binding when pump is completely disassembled for maintenance.

2. Fill port coverplate, 3 1/2" diameter, shall be opened after loosening a hand nut/clamp bar assembly. In consideration for safety, hand nut threads must provide slow release of pressure, and the clamp bar shall be retained by detente lugs. A Teflon gasket shall prevent adhesion of the fill port cover to the casing.

3. Casing drain plug shall be at least 1 1/4" NPT to insure complete and rapid draining.

4. Liquid volume and recirculation port design shall be consistent with

15150-10 performance criteria listed under GENERAL of this section.

B. Coverplate: Coverplate shall be cast iron Class 30. Design must incorporate following maintenance features:

1. Retained by hand nuts for complete access to pump interior. Coverplate removal must provide ample clearance for removal of stoppages, and allow service to the impeller, seal, wearplate or check valve without removing suction or discharge piping.

2. A replaceable wearplate secured to the coverplate by weld studs and nuts shall be AISI 1015 HRS.

3. In consideration for safety, a pressure relief valve shall be supplied in the coverplate. Relief valve shall open at 75-200 PSI.

4. Two O-rings of Buna-N material shall seal coverplate to pump casing.

5. Pusher bolt capability to assist in removal of coverplate. Pusher bolt threaded holes shall be sized to accept same retaining capscrews as used in rotating assembly.

6. Easy-grip handle shall be mounted to face of coverplate.

C. Rotating Assembly: A rotating assembly, which includes impeller, shaft, mechanical shaft seal, lip seals, bearings, sealplate and bearing housing, must be removable as a single unit without disturbing the pump casing or piping.

Design shall incorporate following features:

1. Sealplate and bearing housing shall be cast iron Class 30. Separate oil filled cavities, vented to atmosphere, shall be provided for shaft seal and bearings. Cavities must be cooled by the liquid pumped. Three lip seals will prevent leakage of oil.

2. The bearing cavity shall have an oil level sight gauge and fill plug check valve. The clear sight gauge shall provide easy monitoring of the bearing cavity oil level and condition of oil without removal of the fill plug check valve. The check valve shall vent the cavity but prevent introduction of moist air to the bearings.

3. The seal cavity shall have an oil level sight gauge and fill/vent plug. The clear sight gauge shall provide easy monitoring of the seal cavity oil level and condition of oil without removal of the fill/vent plug.

4. Double lip seal shall provide an atmospheric path providing positive protection of bearings, with capability for external drainage monitoring.

5. Impeller shall be ductile iron, two-vane, semi-open, non-clog, with integral pump out vanes on the back shroud. Impeller shall thread onto the pump shaft and be secured with a lockscrew and conical washer.

6. Shaft shall be AISI 4140 alloy steel unless otherwise specified, in which case AISI 17-4 pH stainless steel shall be supplied.

7. Bearings shall be anti-friction ball type of proper size and design to withstand all radial and thrust loads expected during normal operation.

Bearings shall be oil lubricated from a dedicated reservoir. Pump designs which use the same oil to lubricate the bearings and shaft seal shall not be acceptable.

8. Shaft seal shall be oil lubricated mechanical type. The stationary and rotating seal faces shall be tungsten titanium carbide alloy. Each mating

15150-11 surface shall be lapped to within three light bands flatness (35 millionths of an inch), as measured by an optical flat under monochromatic light.

The stationary seal seat shall be double floating by virtue of a dual O-ring design; an external O-ring secures the stationary seat to the sealplate, and an internal O-ring holds the faces in alignment during periods of mechanical or hydraulic shock (loads which cause shaft deflection, vibration, and axial/radial movement). Elastomers shall be viton. Cage and spring to be stainless steel. Seal shall be oil lubricated from a dedicated reservoir. The same oil shall not lubricate both shaft seal and shaft bearings. Seal shall be warranted in accordance with requirements listed previously in this specification.

9. Pusher bolt…