This is Addendum #1 to a design/build bid issued by Royal Oak Schools for a Medium Pressure UV System at Royal Oak Middle School Pool. The project bid was originally due on Monday, April 29, 2018 at 11:00 AM local time. A pre-bid meeting was held on April 18, 2019, with an attendee sign-in sheet included as an attachment. Bidders interested in scheduling additional job site visits must contact Mark Paulus at mark.paulus@royaloakschools.org or (248) 880-6791, or Patrick Murphy at patrick.murphy@royaloakschools.org. All site visits must be scheduled in advance, and no unscheduled building visits are permitted.
The addendum clarifies a discrepancy regarding warranty duration between the front-end documents and specification section 131500. The warranty period shall be three years, superseding the conflicting 18-month duration referenced in other contract documents. All questions regarding the project should be directed to Mark Paulus using the contact information provided above.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid 19-7 Chiller Replacement at Northwood Elementary School Bid Packet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 1
Project: Design/Build Medium Pressure UV System at Royal Oak Middle School Pool
Bid Due date: Monday, April 29, 2018 at 11:00 AM Local Time (unchanged)
I. General Information
1. For questions contact Mark Paulus at mark.paulus@royaloakschools.org or (248) 880-
6791.
2. A review of the documents occurred at the pre-bid meeting.
3. If any bidders would like schedule another job site visit, contact Mark Paulus or Pat
Murphy at patrick.murphy@royaloakschools.org. Do not visit the building without a scheduled visit.
4. A schedule review occurred at the pre-bid meeting.
5. Attached is the sign in sheet for the pre-bid meeting held on April 18, 2019.
II. Questions and Answers
1Q. The warranty duration in the front end documents says 18 months and in specification section 131500 says 3 years. Please confirm duration.
1A. The warranty duration shall be 3 years.
END