ADDENDUM #1 FOR DESIGN BUILD MEDIUM PRESSURE UV SYSTEM AT ROMS.pdf

PDF 770 KB Posted

Attached to
DESIGN/BUILD MEDIUM PRESSURE UV SYSTEM AT ROYAL OAK MIDDLE
Solicitation number
RFP-ROY-190000001872-2
Issued by
Macomb County, Michigan

About this file

This document is Addendum 1 for a Design/Build Medium Pressure UV System project for Royal Oak Schools, specifically targeting the pool at Royal Oak Middle School. The addendum, issued on April 18, 2019, provides clarification for the bid opportunity with a bid due date of Monday, April 29, 2018, at 11:00 AM local time. For questions, bidders are instructed to contact Mark Paulus or Pat Murphy, and a pre-bid meeting was held on April 18, 2019, with an attached sign-in sheet for attendees. The addendum addresses a specific warranty duration discrepancy, confirming that the warranty period for the project shall be 3 years, resolving a conflict between front-end documents and specification section 131500.

The addendum provides guidelines for potential bidders, emphasizing the importance of scheduling job site visits through designated contacts and prohibiting unscheduled building visits. No specific pricing terms, set-asides, or funding details are disclosed in this document. The focus is on procedural clarification and ensuring potential bidders have consistent information regarding the project's warranty expectations. The project appears to be a focused infrastructure improvement for the school's pool, involving the installation of a medium pressure UV system, with clear communication channels established for potential bidders to seek additional information or clarification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM 1

Project: Design/Build Medium Pressure UV System at Royal Oak Middle School Pool

Bid Due date: Monday, April 29, 2018 at 11:00 AM Local Time (unchanged)

I. General Information

1. For questions contact Mark Paulus at mark.paulus@royaloakschools.org or (248) 880-

6791.

2. A review of the documents occurred at the pre-bid meeting.

3. If any bidders would like schedule another job site visit, contact Mark Paulus or Pat

Murphy at patrick.murphy@royaloakschools.org. Do not visit the building without a scheduled visit.

4. A schedule review occurred at the pre-bid meeting.

5. Attached is the sign in sheet for the pre-bid meeting held on April 18, 2019.

II. Questions and Answers

1Q. The warranty duration in the front end documents says 18 months and in specification section 131500 says 3 years. Please confirm duration.

1A. The warranty duration shall be 3 years.

END